About this file

This federal solicitation seeks comprehensive annual fluid geochemistry analysis and Coso Hot Springs monitoring reporting services. The contractor shall provide findings and recommendations in two separate detailed reports for each year of the contract. One report will cover fluid chemistry analysis and one will cover the Coso Hot Springs monitoring program. The contract consists of a base period and four option periods. The acquisition is set aside 100% for small businesses with a NAICS code of 541690 and size standard of $16.5M. The soliciting agency is the Department of the Navy Naval Facilities Engineering Command. Attachments to the solicitation include the contract data requirements list, quality assurance surveillance plan, request for information, and past performance questionnaire.

View the file

Other files

File Type Posted
N3943021Q2309 Solicitation Amendment 0002.pdf PDF
N3943021Q2309 Solicitation Amendment 0001.pdf PDF
N3943021Q2309 Solicitation.pdf PDF
Attachment E - Financial Questionnaire.docx DOCX document
Attachment C - RFI.docx DOCX document
Attachment D - PPQ.docx DOCX document
Attachment A - CDRL.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN FOR GEOCHEMISTRY ANALYSIS OF COSO GEOTHERMAL SYSTEM AND COSO HOT SPRINGS MONITORING REPORT This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions. It is designed to provide an effective surveillance method of monitoring contractor performance for the installation contract.

The QASP provides a systematic method to evaluate the services the contractor is required to furnish.

This QASP is based on the premise the Government desires to maintain a quality standard in installing the seismic field equipment and that a service contract to provide the service is the best means of achieving that objective.

The contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.

Performance Objective
Performance Standards
Acceptable Quality Levels
Method Used/Frequencies
Update fluid chemistry database with current geochemical analysis results
The Contractor shall submit the results to GPO in both Microsoft Access and Excel formats
The data entered appropriately according to QA/QC guidelines established.
Government Representative shall review submittal within 3 days of receipt.
Submit a half year report on the health of the field
The Contractor shall submit the report document detailing the task performance and results
QA/QC and analysis shall be thoroughly conducted and at industry standards.
Government Representative shall review the results upon completion.
Submit the annual final report on the health of the field and recommendations of any new techniques or processes
The Contractor shall submit the report document detailing the task performance and results
QA/QC and analysis shall be thoroughly conducted and at industry standards. It shall include observations from the data, conclusions and thoughtful discussion.
Government Representative shall review the results upon completion.
Review, evaluate and format annual data sets
The contractor shall submit, via email, the Draft report to GPO in Microsoft Word/pdf inclusive of graphics
The data entered appropriately according to QA/QC guidelines established.

QA/QC and analysis shall be thoroughly conducted and at industry standards and maintaining historical consistency.

Government Representative shall review submittal and return comments within 5 business days of receipt

Review edits of Draft report and make necessary revisions
The contractor shall submit, via email, the Final report to GPO in Microsoft Word/pdf inclusive of graphics
QA/QC and analysis shall be thoroughly conducted and at industry standards and maintaining historical consistency. It shall include observations from the data, conclusions and thoughtful discussion.
Government Representative shall review Final report upon completion.