Attachment B - Pricing Worksheet.xlsx

XLSX spreadsheet 43 KB Posted

Attached to
RFQ_75F40126Q00006_FDA OCI Nationwide Evidence Storage, Transportation, Disposal Management Services
Solicitation number
RFQ_75F40126Q00006_OCI_Nationwide_Evidence_Storage_Transportation_Disposal_Management_Services
Issued by

About this file

This is a Pricing Worksheet template for the FDA's nationwide evidence storage, transportation, and disposal management services contract. Offerors must complete only the yellow-highlighted cells without altering any other portions of the spreadsheet, or their proposals may be deemed non-responsive.

The pricing structure consists of four main components: (1) Management labor-hour costs for a Project Manager (700 hours estimated) and three additional key personnel positions billed at fully-loaded, firm-fixed unit rates; (2) Transportation services on a firm-fixed-price basis including tractor trailers, large box trucks (21+ feet), and small box trucks (20 feet and below), with separate pricing for four trip types based on mileage (0-50 miles, 51-100 miles, 101-200 miles, and 201-250 miles), plus per-mile charges for distances exceeding 250 miles, and hourly wait-time charges; (3) Storage on a monthly square-footage basis for general, climate-controlled, and hazmat facilities at 7,000, 14,000, and 130 square feet respectively; and (4) Other Direct Costs (ODCs) on a time-and-materials basis including property disposal (up to $65,000 base period), equipment rental, travel, and shipping. The contract includes a six-month base period ($80,500 estimated), four one-year option periods ($161,000 each), an optional 30-day transition-out period ($6,500), and an optional six-month extension under FAR 52.217-8 ($80,500), with a total potential contract value of $731,000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions: Offers are to complete only the yellow highlighted portions of the spreadsheet. No other cells shall be altered in any way, or offers may be deemed non-responsive. Details for pricing is detailed below.
Management (Labor-hour) - SOW Section 2.2.1
Offerors shall propose Firm Fixed Unit (fully burden/loaded) rates for each labor category. The Government's estimated hours have been provided, but offerors may propose alternate hours based on their understanding of the requirement.
Labor Category Description:
Project Manager - Required to have specific program management and administrative experience working with all levels of government property storage and transportation and destruction logistical services. Must be experienced as a facilitator of administrative matters associated with program and project development and proficient in directing resources to accomplish contract objectives.
Transportation and Storage (Firm Fixed Price) - SOW Sections 2.2.2 and 2.2.3
Truck Type (Tractor trailor, Box truck-large and Box truck-small) - Price for the use of the truck shall be for any specific needs for one day. This is just the cost of the truck. Small box truck is defined as 20ft and below, large box truck defined as 21ft and above.
Trip Type- Each trip shall fall into a Trip Type based on mileage. The charge shall provide for all required services detailed in the SOW to transport the evidence from the point of seizure to the storage facility, minus the price for use and rental of the truck.
Trip Type- If trip is over 250 miles, Contractor shall charge the trip with the Trip IV flat rate, plus the mileage rate for miles over 250 miles. The mileage is calculated after the property from FDA is received.
Wait Time Charges - Wait time charges are provided for the period of time that labor and equipment are deployed and on standby waiting to provide services on an operation. May be billed in .25 increments.
Square Footage Rate- Square footage rate shall be for the property to be stored in the respective storage type (general, climate-controlled, or Hazmat) to include facility, warehouseman labor, and administrative fees.
Disposal and ODCs (Time and Material) - SOW Section 2.2.4
Offerors shall propose Other Direct Costs (ODCs) to provide for disposition services as required, any special equipment rentals and materials required in order to provide the necessary transportation, storage or desctruction of the evidence, and any travel required for onsite technical assistance/seizure assistance required. The Government's annual destruction, material, equipment rental and travel estimates have been provided, but offerors may propose alternate amounts based on their understanding of the requirement.

Pricing Assumptions

Please include any pricing assumptions used in the Offeror's Business QuoteOfferor Name
Offeror UEI

Base Period Line Item 1 - BASE PERIOD (6-Months) Annual

Key Personnel (Labor-Hour)EST. QTYUNITUNIT PRICETOTAL PRICE
Project Manager700HR$ - 0
Key Personnel 2 (as needed)HR$ - 0
Key Personnel 3 (as needed)HR$ - 0
Key Personnel 4 (as needed)HR$ - 0
Labor-hour Subtotal$ - 0
Transportation (Firm-fixed unit price)EST. QTYUNITUNIT PRICETOTAL PRICE
Tractor Trailer* (*Note: The Tractor & Trailer are considered as one unit)6TRIP$ - 0
Box truck-large5TRIP$ - 0
Box truck-small10TRIP$ - 0
Trip Type I (0-50) miles12TRIP$ - 0
Trip Type II (51-100) miles8TRIP$ - 0
Trip Type III (101-200) miles1TRIP$ - 0
Trip Type IV (201-250) miles1TRIP$ - 0
Wait Time Charges (per hour)40HR$ - 0
Price per mile over 250 miles (the first 250 miles shall be billed in the Trip Type IV price)100MI$ - 0
Storage (Firm-fixed unit price)EST. QTYUNITUNIT PRICETOTAL PRICE
Storage - General7000Monthly SqFt$ - 0
Storage - Climate Control14000Monthly SqFt$ - 0
Storage - Hazmat130Monthly SqFt$ - 0
FFP Subtotal$ - 0
ODCs (Time and Material)TOTAL PRICE
Property Disposal CostsNot-to-Exceed$65,000
Materials/Equipment rentalNot-to-Exceed$5,000
TravelNot-to-Exceed$10,000
Shipping (FedEx, etc.)Not-to-Exceed$500
ODC Subtotal$80,500
ESTIMATED TOTAL PRICE FOR BASE YEAR
$ 80,500.00

Option Year 1 Line Item 2 - OPTION YEAR 1 Annual

Key Personnel (Labor-Hour)EST. QTYUNITUNIT PRICETOTAL PRICE
Project Manager700HR$ - 0
Key Personnel 2 (as needed)HR$ - 0
Key Personnel 3 (as needed)HR$ - 0
Key Personnel 4 (as needed)HR$ - 0
Labor-hour Subtotal$ - 0
Transportation (Firm-fixed unit price)EST. QTYUNITUNIT PRICETOTAL PRICE
Tractor Trailer* (*Note: The Tractor & Trailer are considered as one unit)6TRIP$ - 0
Box truck-large5TRIP$ - 0
Box truck-small10TRIP$ - 0
Trip Type I (0-50) miles12TRIP$ - 0
Trip Type II (51-100) miles8TRIP$ - 0
Trip Type III (101-200) miles1TRIP$ - 0
Trip Type IV (201-250) miles1TRIP$ - 0
Wait Time Charges (per hour)40HR$ - 0
Price per mile over 250 miles (the first 250 miles shall be billed in the Trip Type IV price)100MI$ - 0
Storage (Firm-fixed unit price)EST. QTYUNITUNIT PRICETOTAL PRICE
Storage - General7000Monthly SqFt$ - 0
Storage - Climate Control14000Monthly SqFt$ - 0
Storage - Hazmat130Monthly SqFt$ - 0
FFP Subtotal$ - 0
ODCs (Time and Material)TOTAL PRICE
Property Disposal CostsNot-to-Exceed$130,000
Materials/Equipment rentalNot-to-Exceed$10,000
TravelNot-to-Exceed$20,000
Shipping (FedEx, etc.)Not-to-Exceed$1,000
ODC Subtotal$161,000
ESTIMATED TOTAL PRICE FOR OPTION YEAR 1
$ 161,000.00

Option Year 2 Line Item 3 - OPTION YEAR 2 Annual

Key Personnel (Labor-Hour)EST. QTYUNITUNIT PRICETOTAL PRICE
Project Manager700HR$ - 0
Key Personnel 2 (as needed)HR$ - 0
Key Personnel 3 (as needed)HR$ - 0
Key Personnel 4 (as needed)HR$ - 0
Labor-hour Subtotal$ - 0
Transportation (Firm-fixed unit price)EST. QTYUNITUNIT PRICETOTAL PRICE
Tractor Trailer* (*Note: The Tractor & Trailer are considered as one unit)6TRIP$ - 0
Box truck-large5TRIP$ - 0
Box truck-small10TRIP$ - 0
Trip Type I (0-50) miles12TRIP$ - 0
Trip Type II (51-100) miles8TRIP$ - 0
Trip Type III (101-200) miles1TRIP$ - 0
Trip Type IV (201-250) miles1TRIP$ - 0
Wait Time Charges (per hour)40HR$ - 0
Price per mile over 250 miles (the first 250 miles shall be billed in the Trip Type IV price)100MI$ - 0
Storage (Firm-fixed unit price)EST. QTYUNITUNIT PRICETOTAL PRICE
Storage - General7000Monthly SqFt$ - 0
Storage - Climate Control14000Monthly SqFt$ - 0
Storage - Hazmat130Monthly SqFt$ - 0
FFP Subtotal$ - 0
ODCs (Time and Material)TOTAL PRICE
Property Disposal CostsNot-to-Exceed$130,000
Materials/Equipment rentalNot-to-Exceed$10,000
TravelNot-to-Exceed$20,000
Shipping (FedEx, etc.)Not-to-Exceed$1,000
ODC Subtotal$161,000
ESTIMATED TOTAL PRICE FOR OPTION YEAR 2
$ 161,000.00

Option Year 3 Line Item 4 - OPTION YEAR 3 Annual

Key Personnel (Labor-Hour)EST. QTYUNITUNIT PRICETOTAL PRICE
Project Manager700HR$ - 0
Key Personnel 2 (as needed)HR$ - 0
Key Personnel 3 (as needed)HR$ - 0
Key Personnel 4 (as needed)HR$ - 0
Labor-hour Subtotal$ - 0
Transportation (Firm-fixed unit price)EST. QTYUNITUNIT PRICETOTAL PRICE
Tractor Trailer* (*Note: The Tractor & Trailer are considered as one unit)6TRIP$ - 0
Box truck-large5TRIP$ - 0
Box truck-small10TRIP$ - 0
Trip Type I (0-50) miles12TRIP$ - 0
Trip Type II (51-100) miles8TRIP$ - 0
Trip Type III (101-200) miles1TRIP$ - 0
Trip Type IV (201-250) miles1TRIP$ - 0
Wait Time Charges (per hour)40HR$ - 0
Price per mile over 250 miles (the first 250 miles shall be billed in the Trip Type IV price)100MI$ - 0
Storage (Firm-fixed unit price)EST. QTYUNITUNIT PRICETOTAL PRICE
Storage - General7000Monthly SqFt$ - 0
Storage - Climate Control14000Monthly SqFt$ - 0
Storage - Hazmat130Monthly SqFt$ - 0
FFP Subtotal$ - 0
ODCs (Time and Material)TOTAL PRICE
Property Disposal CostsNot-to-Exceed$130,000
Materials/Equipment rentalNot-to-Exceed$10,000
TravelNot-to-Exceed$20,000
Shipping (FedEx, etc.)Not-to-Exceed$1,000
ODC Subtotal$161,000
ESTIMATED TOTAL PRICE FOR OPTION YEAR 3
$ 161,000.00

Option Year 4 Line Item 5 - OPTION YEAR 4 Total

Key Personnel (Labor-Hour)EST. QTYUNITUNIT PRICETOTAL PRICE
Project Manager700HR$ - 0
Key Personnel 2 (as needed)HR$ - 0
Key Personnel 3 (as needed)HR$ - 0
Key Personnel 4 (as needed)HR$ - 0
Labor-hour Subtotal$ - 0
Transportation (Firm-fixed price)EST. QTYUNITUNIT PRICETOTAL PRICE
Tractor Trailer* (*Note: The Tractor & Trailer are considered as one unit)TRIP$ - 0
Box truck-largeTRIP$ - 0
Box truck-smallTRIP$ - 0
Trip Type I (0-50) milesTRIP$ - 0
Trip Type II (51-100) milesTRIP$ - 0
Trip Type III (101-200) milesTRIP$ - 0
Trip Type IV (201-250) milesTRIP$ - 0
Wait Time Charges (per hour)HR$ - 0
Price per mile over 250 miles (the first 250 miles shall be billed in the Trip Type IV price)MI$ - 0
Storage (Firm-fixed price)EST. QTYUNITUNIT PRICETOTAL PRICE
Storage - GeneralMonthly SqFt$ - 0
Storage - Climate ControlMonthly SqFt$ - 0
Storage - HazmatMonthly SqFt$ - 0
FFP Subtotal$ - 0
ODCs (Time and Material)TOTAL PRICE
Property Disposal CostsNot-to-Exceed$130,000
Materials/Equipment rentalNot-to-Exceed$10,000
TravelNot-to-Exceed$20,000
Shipping (FedEx, etc.)Not-to-Exceed$1,000
ODC Subtotal$161,000
ESTIMATED TOTAL PRICE FOR TRANSITION IN
$ 161,000.00

Transition-out (option) Line Item 6 - TRANSITION-OUT (30 Days - OPTIONAL) Total

Key Personnel (Labor-Hour)EST. QTYUNITUNIT PRICETOTAL PRICE
Project Manager80HR$ - 0
Key Personnel 2 (as needed)HR$ - 0
Key Personnel 3 (as needed)HR$ - 0
Key Personnel 4 (as needed)HR$ - 0
Labor-hour Subtotal$ - 0
Transportation (Firm-fixed price)EST. QTYUNITUNIT PRICETOTAL PRICE
Tractor Trailer* (*Note: The Tractor & Trailer are considered as one unit)0TRIP$ - 0
Box truck-large0TRIP$ - 0
Box truck-small0TRIP$ - 0
Trip Type I (0-50) miles0TRIP$ - 0
Trip Type II (51-100) miles0TRIP$ - 0
Trip Type III (101-200) miles0TRIP$ - 0
Trip Type IV (201-250) miles0TRIP$ - 0
Wait Time Charges (per hour)0HR$ - 0
Price per mile over 250 miles (the first 250 miles shall be billed in the Trip Type IV price)0MI$ - 0
Storage (Firm-fixed price)EST. QTYUNITUNIT PRICETOTAL PRICE
Storage - GeneralMonthly SqFt$ - 0
Storage - Climate ControlMonthly SqFt$ - 0
Storage - HazmatMonthly SqFt$ - 0
FFP Subtotal$ - 0
ODCs (Time and Material)TOTAL PRICE
Property Disposal CostsNot-to-Exceed$0
Materials/Equipment rentalNot-to-Exceed$0
TravelNot-to-Exceed$6,000
Shipping (FedEx, etc.)Not-to-Exceed$500
ODC Subtotal$6,500
ESTIMATED TOTAL PRICE FOR TRANSITION IN
$ 6,500.00

52.217-8_6-Month Extension Line Item 7 - FAR 52.217-8 Six Month Extension Total

Key Personnel (Labor-Hour)EST. QTYUNITUNIT PRICETOTAL PRICE
Project Manager350HR$ - 0
Key Personnel 2 (as needed)HR$ - 0
Key Personnel 3 (as needed)HR$ - 0
Key Personnel 4 (as needed)HR$ - 0
Labor-hour Subtotal$ - 0
Transportation (Firm-fixed price)EST. QTYUNITUNIT PRICETOTAL PRICE
Tractor Trailer* (*Note: The Tractor & Trailer are considered as one unit)TRIP$ - 0
Box truck-largeTRIP$ - 0
Box truck-smallTRIP$ - 0
Trip Type I (0-50) milesTRIP$ - 0
Trip Type II (51-100) milesTRIP$ - 0
Trip Type III (101-200) milesTRIP$ - 0
Trip Type IV (201-250) milesTRIP$ - 0
Wait Time Charges (per hour)HR$ - 0
Price per mile over 250 miles (the first 250 miles shall be billed in the Trip Type IV price)MI$ - 0
Storage (Firm-fixed price)EST. QTYUNITUNIT PRICETOTAL PRICE
Storage - GeneralMonthly SqFt$ - 0
Storage - Climate ControlMonthly SqFt$ - 0
Storage - HazmatMonthly SqFt$ - 0
FFP Subtotal$ - 0
ODCs (Time and Material)TOTAL PRICE
Property Disposal CostsNot-to-Exceed$65,000
Materials/Equipment rentalNot-to-Exceed$5,000
TravelNot-to-Exceed$10,000
Shipping (FedEx, etc.)Not-to-Exceed$500
ODC Subtotal$80,500
ESTIMATED TOTAL PRICE FOR TRANSITION IN
$ 80,500.00

Summary Pricing Summary

LHFFPT&MTotal
Line Item 1Base Year$ - 0$ - 0$ 80,500.00$ 80,500.00
Line Item 2Option Year 1$ - 0$ - 0$ 161,000.00$ 161,000.00
Line Item 3Option Year 2$ - 0$ - 0$ 161,000.00$ 161,000.00
Line Item 4Option Year 3$ - 0$ - 0$ 161,000.00$ 161,000.00
Line Item 5Option Year 4$ - 0$ - 0$ 161,000.00$ 161,000.00
Line Item 6Transition-out (Optional)$ - 0$ - 0$ 6,500.00$ 6,500.00
Line Item 752.217-8 Six Month Extension (Optional)$ - 0$ - 0$ - 0$ - 0
Total$ 731,000.00

File details come from the government source that posted it. Updated .