This is a pricing schedule for dockside repair services for the USCGC STONE (WMSL-758), a U.S. Coast Guard cutter homeported in North Charleston, South Carolina. The document outlines 18 definite work items and one optional work item to be performed during FY2026 Q4, including cargo handling elevator inspection and testing, fire detection system inspection, stern boat launch and recovery maintenance, potable water tank cleaning, deck covering renewal across multiple areas (flight deck, hanger, and general deck spaces), deck preservation, polymeric deck covering repair, fan conduit box renewal, and welding services. The pricing schedule requires contractors to submit unit prices for each line item; extended prices are calculated by multiplying unit price by quantity (all quantities listed as 1 JOB). The total price of definite items, optional items, and combined definite and optional items are shown as $0.00, indicating this is a blank template awaiting quoter pricing submission.

The document includes a Composite Labor Hour Rate section for pricing contract changes, with contractors required to provide an all-inclusive mark-up and loading rate for materials and subcontractors expressed in dollars per hour. A cost estimate breakdown template is also provided, requiring contractors to detail labor hours by trade classification (engineers, technicians, machinists, electricians, shipfitters, welders, firewatch, insulators, painters, and general labor), material and subcontractor costs, and G&A and profit factors. The template includes regional labor rate guidance for 27 geographic areas with rates ranging from $45 to $67 per hour, with Baltimore, MD identified at $62/hour and the median rate at $49/hour. This is a Request for Quote (RFQ) issued under solicitation number 70Z08526QLREP0017 by the Department of Homeland Security U.S. Coast Guard for commercial ship repair services.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC STONE (WMSL-418) DOCKSIDE AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Cargo Handling Elevator, Annual Inspection and Test, PerformJOB1
D-002Fire Detection System, Inspect and TestJOB1
D-003Stern Boat Launch and Recovery, Level IIJOB1
D-004Potable Water Pneumatic Tank, Clean and InspectJOB1
D-005Dewatering Overboard Discharge Connections, InstallJOB1
D-006Tanks (MP Fuel Storage and Overflow), Clean and InspectJOB1
D-007Talon Grid (Type 18-08), Inspect and TestJOB1
D-008Deck Covering (Slip-Resistant) Flight Deck, RenewJOB1
D-009Deck Covering (Slip-Resistant) Hanger, RenewJOB1
D-010Deck Covering (Slip-Resistant) RenewJOB1
D-011Tenting, ProvideJOB1
D-012Decks, Preserve FullJOB1
D-013Deck Covering (Polymeric), RenewJOB1
D-014Deck Covering (Polymeric), Repair and SealJOB1
D-015Fan Conduit Box, RenewJOB1
O-016OPTIONAL - Welding, Provide (General)JOB1
D-017QAWTDBLD 52x66 (Mafo), ReplaceJOB1
D-018Fire Prevention, ProvideJOB1
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
CLIN 0002 – COMPOSITE LABOR HOUR RATE
The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (16) entitled “COMPOSITE LABOR HOUR RATE.”
Composite Labor Hour Rate- Provide the all inclusive mark-up/loading rate for materials and subcontractors:/HR______ hours
____ %. This rate will be incorporated into the contract and used on change requests.
*NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required.
TOTAL AMOUNT OF DEFINITE $__________________
TOTAL EVALUATED AMOUNT $__________________

(11/28/2025)_x000D_ Draft-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .