The file's text, extracted by GovTribe without its formatting.
Proposer: ______________________________
CLEVELAND METROPOLITAN SCHOOL DISTRICT
Attachment B: Pricing Form Snow and Ice Removal Services RFP, 2026 to 2027 Instructions
1. Proposers may submit pricing for one, multiple, or all regions. Complete every facility line within each region proposed. Partial pricing within a region may be considered nonresponsive for that region.
1. For any region not proposed, check "No Proposal" for that region and leave its table blank.
1. Plowing, Price per Event: one complete plowing of all roadways, driveways, and parking areas at the facility, scraped to the surface, per the Scope of Work.
1. Salt / Ice Melt, Price per Application: one complete application of salt or approved noncorrosive ice melt to the facility’s driveways and parking lots, including all material.
1. Prices must be all inclusive: labor, equipment, fuel, materials, staking, mobilization, travel, insurance, overhead, and profit. No additional charges will be accepted.
1. Prices shall remain firm for the full term of the contract. Do not modify this form; any modification, clarification, or deviation may cause the proposal to be rejected as nonresponsive.
Proposer Information Proposer Name
Primary Contact
Phone Number
Email
Regions Proposed Check one box for each region.
| Region |
| Proposing |
| No Proposal |
Region 1: North Eastside (15 facilities)
Region 2: South Eastside (15 facilities)
Region 3: East and West Central (15 facilities)
Region 4: West Side (16 facilities)
Section 1: Region 1: North Eastside No Proposal for this region
| Facility |
| Plowing, Price per Event ($) |
| Salt / Ice Melt, Price per Application ($) |
| Benjamin O. Davis (Former Lakeside Campus) |
| $ |
| $ |
| Cleveland Prep (Leased at Former Health Careers) |
| $ |
| $ |
| Cleveland School of the Arts |
| $ |
| $ |
| Kenneth Clement BLA (Former Mary Bethune) |
| $ |
| $ |
| Michael R. White Montessori (Former Stephanie Tubbs Jones) |
| $ |
| $ |
| Stephanie Tubbs Jones (Former FDR) |
| $ |
| $ |
| Region Total (sum of column) |
| $ |
| $ |
Section 2: Region 2: South Eastside
| Facility |
| Plowing, Price per Event ($) |
| Salt / Ice Melt, Price per Application ($) |
| George Washington Carver |
| $ |
| $ |
| Mary B. Martin (Former Warner GLA) |
| $ |
| $ |
| Mound School of the Arts |
| $ |
| $ |
| Woodland Data Warehouse |
| $ |
| $ |
| Region Total (sum of column) |
| $ |
| $ |
Section 3: Region 3: East and West Central
| Facility |
| Plowing, Price per Event ($) |
| Salt / Ice Melt, Price per Application ($) |
| Campus International K8 |
| $ |
| $ |
| Natividad Pagan International |
| $ |
| $ |
| Region Total (sum of column) |
| $ |
| $ |
Section 4: Region 4: West Side
| Facility |
| Plowing, Price per Event ($) |
| Salt / Ice Melt, Price per Application ($) |
| Mary Bethune (Former Douglas MacArthur) |
| $ |
| $ |
| William Rainey Harper |
| $ |
| $ |
| William Cullen Bryant |
| $ |
| $ |
| Region Total (sum of column) |
| $ |
| $ |
Section 5: Hourly Equipment Rates Hourly rates apply only to work the District directs outside the per event and per application prices above, such as snow hauling when storage areas are full, pushing back perimeter piles, and additional removals approved by the Facilities Manager. Rates include operator, fuel, and all costs. Portal to portal and minimum charges will not be accepted unless stated below.
| Equipment Type (with Operator) |
| Regular Rate per Hour ($) |
| Weekend / Holiday Rate per Hour ($) |
| Pickup Truck with Plow |
| $ |
| $ |
| Medium Duty Plow Truck |
| $ |
| $ |
| Heavy Duty Plow Truck |
| $ |
| $ |
| Dump Truck (Snow Hauling) |
| $ |
| $ |
Minimum charge per call out, if any (hours):
Minimum Hours per Call Out
Pricing Certification I certify that the prices stated on this form are firm for the term of the contract, include all costs necessary to perform the work described in the Specifications and Scope of Work, and were arrived at independently without collusion with any other proposer.
Authorized Representative
Title
Signature
Date
CMSD Snow and Ice Removal RFP | Attachment B: Pricing Form | Page 1