Attachment B - Pest Control Building Summary for Standard Services.pdf

PDF 278 KB Posted

Attached to
Pest Control services in various US Government buildings in Paris, France
Solicitation number
19FR6326R0005
Issued by

About this file

This document is an attachment providing a building summary for pest control standard services scheduled for 2026. It catalogs multiple buildings and facilities requiring pest control coverage, specifying locations, building types, and surface areas to be treated in square meters.

The summary covers fourteen primary building complexes and facilities across various locations, including the Chancery A-Buildings and B-Buildings with multiple basement levels, office spaces, and technical facilities; the CMR and CMR Gate House with basements and guard rooms; the Raphael building with parking and office spaces; the Neuilly and Boulogne Compounds with exterior trash areas and interior common spaces; and three residential properties (Leopold 2, Weber, and Deschanel/DCR) with basements, multiple floors, and garden areas. Surfaces range from 3 square meters for crawl space manholes to 8,400 square meters for the CMR garden enclosure. The document notes that all surface measurements are estimates only, indicating that final pest control service pricing and scope should account for potential variations in actual treatment areas. The comprehensive facility listing enables vendors to understand the geographic and structural scope of pest control services required across this diplomatic mission's real estate portfolio.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B - Pest Control building summary for standard services 2026

Surface in m2

Building Location Type Total *

Chancery A-Buildings

2nd Basement Technical facilities 1662

1st Basement Offices 1548

Ground floor Offices 1300

Mezzanine Offices 1200

Chancery B-Buildings

2nd Basement Technical facilities 605

1st Basement EASE store, canteen, technical facilities 1479

Ground floor Consular section 394

Chancery outsides

Front perimeter of the front yard 1375

Back Trash cans area and freight elevator 250

Consulate green square in front of the Consulate 126

CMR

Basement Technical facilities and service rooms 1215

Ground floor Service rooms 62

Garden garden enclosure 8400

CMR Gate House Basement Technical facilities 401

Ground floor Guard rooms 294

Raphael

2nd Basement Parking

1st Basement Parking and offices

Ground floor Offices

4 upper floors Offices

Attic

Ancillary Ancillary buildings exteriors Front and courtyard

Neuilly Compound

Exterior Trash can areas and enclosure walls 4225

Building 1 ground floor atrium and hallways 300

Building 2 ground floor atrium, hallways, boiler 300

Crawl space manholes 3

Boulogne Compound

Exterior Trash can areas and enclosure walls 6980

Building 1 ground floor atrium and hallways 300

Building 2 Boiler room 150

Building 3 ground floor atrium and hallways 300

Crawl space manholes 5

Leopold 2

Basement residence 650 3 upper floors

Ground floor

Weber

Basement residence 778 2 upper floors

Garden

Ancillary

Deschanel (DCR)

Basement residence 947 Ground floor

2 upper floors

Garden

* Surfaces are estimates only

File details come from the government source that posted it. Updated .