Attachment B - Pest Control Building Summary for Standard Services.pdf
PDF 278 KB Posted
- Solicitation number
- 19FR6326R0005
- Issued by
-
Department of State US Embassy Paris
About this file
This document is an attachment providing a building summary for pest control standard services scheduled for 2026. It catalogs multiple buildings and facilities requiring pest control coverage, specifying locations, building types, and surface areas to be treated in square meters.
The summary covers fourteen primary building complexes and facilities across various locations, including the Chancery A-Buildings and B-Buildings with multiple basement levels, office spaces, and technical facilities; the CMR and CMR Gate House with basements and guard rooms; the Raphael building with parking and office spaces; the Neuilly and Boulogne Compounds with exterior trash areas and interior common spaces; and three residential properties (Leopold 2, Weber, and Deschanel/DCR) with basements, multiple floors, and garden areas. Surfaces range from 3 square meters for crawl space manholes to 8,400 square meters for the CMR garden enclosure. The document notes that all surface measurements are estimates only, indicating that final pest control service pricing and scope should account for potential variations in actual treatment areas. The comprehensive facility listing enables vendors to understand the geographic and structural scope of pest control services required across this diplomatic mission's real estate portfolio.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B - Pest Control building summary for standard services 2026
Surface in m2
Building Location Type Total *
Chancery A-Buildings
2nd Basement Technical facilities 1662
1st Basement Offices 1548
Ground floor Offices 1300
Mezzanine Offices 1200
Chancery B-Buildings
2nd Basement Technical facilities 605
1st Basement EASE store, canteen, technical facilities 1479
Ground floor Consular section 394
Chancery outsides
Front perimeter of the front yard 1375
Back Trash cans area and freight elevator 250
Consulate green square in front of the Consulate 126
CMR
Basement Technical facilities and service rooms 1215
Ground floor Service rooms 62
Garden garden enclosure 8400
CMR Gate House Basement Technical facilities 401
Ground floor Guard rooms 294
Raphael
2nd Basement Parking
1st Basement Parking and offices
Ground floor Offices
4 upper floors Offices
Attic
Ancillary Ancillary buildings exteriors Front and courtyard
Neuilly Compound
Exterior Trash can areas and enclosure walls 4225
Building 1 ground floor atrium and hallways 300
Building 2 ground floor atrium, hallways, boiler 300
Crawl space manholes 3
Boulogne Compound
Exterior Trash can areas and enclosure walls 6980
Building 1 ground floor atrium and hallways 300
Building 2 Boiler room 150
Building 3 ground floor atrium and hallways 300
Crawl space manholes 5
Leopold 2
Basement residence 650 3 upper floors
Ground floor
Weber
Basement residence 778 2 upper floors
Garden
Ancillary
Deschanel (DCR)
Basement residence 947 Ground floor
2 upper floors
Garden
* Surfaces are estimates only
File details come from the government source that posted it. Updated .