Attachment B Mandatory Requirements Checklist Utah FORGE Makeup Water Pump Rental v2.docx
DOCX document 22 KB Posted
- Attached to
- Utah FORGE makeup water pump rental
- Solicitation number
- UU208321710
- Issued by
- Salt Lake County, Utah
About this file
This is a Mandatory Requirements Checklist for a makeup water pump rental solicitation by the University of Utah, specifically for the Utah FORGE (Frontier Observatory for Research in Geothermal Energy) site located in central Utah. The document outlines critical compliance requirements for potential vendors, with a preferred service start date of January 5, 2026, though vendors are asked to indicate their earliest availability. The checklist requires vendors to provide detailed equipment specifications including pump performance curves, dimensions, and weight, and to demonstrate their ability to meet all requirements specified in Section 2.0 of the Request for Proposal/Invitation for Bid.
The pricing terms include a strict markup limitation for third-party equipment, products, and services, which are capped at a maximum of 15% over the invoice amount, with taxes explicitly excluded from this markup calculation. Vendors who cannot meet the mandatory requirements will be deemed non-responsive and will not proceed to further evaluation. The document emphasizes the importance of comprehensive and accurate responses, with vendors required to indicate whether they can meet each specified criterion through a Yes/No response and provide supporting details as necessary.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A- Location of the FORGE Site_new v2.pdf | ||
| Attachment C Cost Proposal Utah FORGE Makeup Water Pump Rental.xlsx | XLSX spreadsheet | |
| IFB UU208321710 Utah FORGE Makeup Water Pump Rental.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B Mandatory Requirements Checklist UU208321710, Utah FORGE makeup water pump rental
In this checklist, indicate by a Yes/No if the criterion specified in the RFP/IFB document has been met or exceeded. Vendors that mark a NO and are not able to meet these requirements may be deemed nonresponsive. Non responsive vendors will not be evaluated further.
| Criteria |
| Meet or Exceed (Yes/No) |
| Please provide detail |
Appropriate tools and equipment based on information provided in RFP/IFB and Attachments.
Provide detailed specifications (pump performance curves, dimensions, weight, etc.) on all equipment.
All other items listed in Section §2.0 of the RFP/IFB.
· We would prefer services to begin 01/05/2026. Please indicate if you can meet that date or if not available, provide your earliest availability date _____________
· All third-party equipment, products, services that are obtained by the vendor for fulfilling the requirements for this work can only be marked-up a maximum of 15% over the invoice amount (taxes must be excluded from the amount that is marked-up) from the third-party supplier
File details come from the government source that posted it. Updated .