ATTACHMENT_B_Final_Plans_Connelly_Haynes_Road_9-23-25_-signed.pdf
PDF 9 MB Posted
- Attached to
- Connelly Haynes Road Improvements State and local contract opportunity
- Solicitation number
- 2026-48
- Issued by
- Dorchester County, South Carolina
About this file
This document comprises the final construction plans for the Connelly Haynes Road Improvements Project in Dorchester County, South Carolina, prepared by Davis & Floyd, Inc. (Certificate of Authorization No. C00538) and dated September 23, 2025. The project involves improvements to Connelly Haynes Road, a county road in the St. George area, with construction limits extending from Station 10+11.80 to Station 30+49.65, encompassing approximately 0.39 miles of roadway improvements and a 12-foot paved driveway apron. The plans include 13 total sheets detailing project layout, typical sections, right-of-way information, general construction notes, erosion control specifications, and cross-sectional details at multiple stations. The project includes placement of 82 linear feet of 18-inch reinforced concrete pipe, 24 linear feet of 18-inch RCP, 28 linear feet of 18-inch RCP, and 20 linear feet of 18-inch RCP at various locations, along with riprap placement, filter fabric installation, and sediment control measures. The proposed pavement design includes 2.5 inches of H/M asphalt concrete surface course, 3 inches of H/M asphalt concrete intermediate course, 3 inches of H/M asphalt concrete base course, and 8 inches of graded aggregate base course within the South Carolina Department of Transportation right-of-way, with design speeds of 30 miles per hour and six horizontal curves ranging from 120 to 500 feet in radius.
All construction materials and workmanship shall conform to the South Carolina Department of Transportation Standard Specifications for Highway Construction (2007 Edition) and applicable standard drawings in effect at the time of letting. The contractor must implement comprehensive erosion and sediment control measures, including silt fence installation (470 linear feet of double-row silt fence), sediment tubes, riprap placement (approximately 76 tons total), and geotextile filter fabric (approximately 108 square yards). The project requires temporary construction easements of variable widths and permanent easements ranging from 10 to 50 feet. A Pre-Construction Conference must be held on-site with the South Carolina Department of Health and Environmental Control (SCDHEC) and the Office of Coastal and Resource Management (OCRM) prior to construction commencement. Stabilization of disturbed areas must be initiated within seven days of disturbance or within 14 days of when construction activities cease, with all seeding to include fertilizer, mulch, and asphalt emulsion application per SCDOT specifications. The contractor is responsible for verifying utility locations, protecting existing structures and utilities, and coordinating with utility owners for any necessary relocations, with all associated costs included in the bid price.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Connelly_Haynes_Road_Improvements_(Addendum_#1_Revision).pdf | ||
| Connelly_Haynes_Road_Improvements.pdf | ||
| ATTACHMENT_A_Specifications_20260128_Connelly_Haynes_Road.pdf | ||
| ATTACHMENT_C_DHEC_Approval_Letter_Improvements_for_Connelly_Haynes_Road.pdf | ||
| ATTACHMENT_D_SCDOT_Permit_-252725.pdf | ||
| ATTACHMENT_C_DHEC_Approval_Letter_Improvements_for_Connelly_Haynes_Road.pdf | ||
| ATTACHMENT_D_SCDOT_Permit_-252725.pdf | ||
| ATTACHMENT_A_Specifications_20260128_Connelly_Haynes_Road.pdf | ||
| ATTACHMENT_B_Final_Plans_Connelly_Haynes_Road_9-23-25_-signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
YES / NO
RAILROAD INVOLVEMENT? DATE
ENGINEER OF RECORD
CALL 811
ALL UTILITIES MAY NOT BE A MEMBER OF SC811
WWW.SC811.COM
SOUTH CAROLINA 811 (SC811)
SOUTH CAROLINA
3 DAYS BEFORE DIGGING IN
FOR CONSTRUCTION
NPDES PERMIT INFORMATION
provided by:
Hydraulic and NPDES Design
Disturbed Area = Acre(s)
Approximate Location of Roadway is
Begin
End
Latitude
Longitude
Latitude
Longitude
CONSULTING ENGINEERING FIRM
NO. C00538
ENGINEERING
FLOYD INC.
DAVIS &
DAVIS & FLOYD, INC.
PROJECT
LOCATION MAP
N.T.S.
SHEET
NO.
TOTAL
SHEETS
Project Area = Acre(s)
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S
H E E T
T it le S h e e t.
d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
LAYOUT
(NOT TO SCALE)
BEGIN
END -N-
33°09'57" N
80°34'34" W
33°09'57" N
80°34'57" W
NET LENGTH OF BRIDGES
NET LENGTH OF PROJECT
LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
TOTAL
MILES
MILES
MILES
MILES
MILES
MILES
MILES
MILES
MILES
MILES
NET LENGTH OF ROADWAY
0.000
EXCEPT AS MAY OTHERWISE BE SPECIFIED ON THE PLANS OR IN THE SPECIAL
PROVISIONS, ALL MATERIALS AND WORKMANSHIP ON THIS PROJECT SHALL CONFORM
TO THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD
SPECIFICATIONS FOR HIGHWAY CONSTRUCTION (2007 EDITION) AND THE STANDARD
DRAWINGS FOR ROAD CONSTRUCTION IN EFFECT AT THE TIME OF LETTING.
NOTE:
1.30
4.3
AIKEN COUNTY MAP
0.000
SHEET TOTALS
TOTAL SHEETS
DESCRIPTIONSHEET #
INDEX OF SHEETS
SALES TAX AUTHORITY
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
PLAN OF PROPOSED IMPROVEMENTS FOR
X1 - X13
EC1-EC2
06-09
05A-05B
04A
02A
0.26 0.26
0.00 0.00
0.39 0.39
0.39 0.39
TO STA. 30+49.65
PAVED DRIVEWAY STA. 23+90.11
STA 10+11.80 TO STA. 23+90.11
CONNELLY HAYNES ROAD
PROJECT LIMITS FOR
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
CROSS SECTIONS
EROSION CONTROL SHEET
PLAN AND PROFILE SHEETS
REFERENCE DATA SHEETS
GENERAL CONSTRUCTION NOTES
PROPERTY STRIP MAP
RIGHT OF WAY DATA
TYPICAL SECTIONS
MOVING ITEMS
SUMMARY OF ESTIMATED QUANTITIES
TITLE SHEET
9/23/25
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
CONSTRUCTION PLANS
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S
H E E T
S u m m a r y o f
E s ti m a te d Q u a n ti ti e s .d g n
P D
F .p lt c fg
C H P la n .t b l
.8 f t i n
F
IL
E
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
REV. NO. BY DATE DESCRIPTION OF REVISION
DESIGNED BY CHECKED BYDRAWN BY
S.C.3
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
PLOT SIZE = 22" x 34"
(843) 554-8602
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
DORCHESTER
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
PRELIMINARY ROW PLANS
SUMMARY OF ESTIMATED QUANTITIES
N.T.S.
2A
MOVING ITEMS
CONSTRUCTION PLANS 28
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S h e e t
A M o v in g I te m s .d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
REV. NO. BY DATE DESCRIPTION OF REVISION
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
PLOT SIZE = 22" x 34"
(843) 554-8602
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
DORCHESTER
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
PRELIMINARY ROW PLANS
N.T.S.
H/M ASPHALT CONCRETE BASE COURSE TYPE B (600#/SY)
H/M ASPHALT CONCRETE INTERMEDIATE COURSE TYPE B (250#/SY)
H/M ASPHALT CONCRETE SURFACE COURSE TYPE B (200#/SY)
WITHIN THE SCDOT R/W USE THE FOLLOWING PAVEMENT DESIGN
2.5" H/M ASPHALT CONCRETE SURFACE COURSE TYPE C
8" GRADED AGGREGATE BASE COURSE
PRIME COAT
PAVEMENT LEGEND
TYPICAL SECTION OF IMPROVEMENT
4'
9'
12:1
3:1
50:1
10.5 10.5'
50:1 12:1
4'
9'
3:1 2:1 2:1
GRADE
POINT OF
TYPICAL SECTION
10' 10'
5' 5'
PROPOSED 50' EASEMENT
GROUND
EXISTING
GROUND
EXISTING
10+11.80 23+90.11
STA. 10+11.80 TO STA. 23+90.11
CONNELLY HAYNES ROADWAY
12:1 50:1
2:1
GRADE
POINT OF
TYPICAL SECTION
GROUND
EXISTING
GROUND
EXISTING
STA. 23+90.11 TO STA. 30+49.65
PAVED DRIVEWAY
2'4'
4:1
6' 6'
50:1 50:1 4:1
2'
PROPOSED 10' EASEMENTPROPOSED 15' EASEMENT
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S
H E E T
T y p ic a l.
d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
REV. NO. BY DATE DESCRIPTION OF REVISION
DESIGNED BY CHECKED BYDRAWN BY
TYPICAL SECTION
PLOT SIZE = 22" x 34"SCALE: NTS
MPH FROM STA. TO STA. DORCHESTER COUNTY
S.C.3
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
DORCHESTER
(843) 554-8602
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
CONNELLY HAYNES ROAD DESIGN SPEED
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A 9/23/25
CONNELLY HAYNES ROAD
RIGHT OF WAY DATA SHEET
4 28
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
S.C.3
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
PLOT SIZE = 22" x 34"SCALE 1"= 100' HOR.
DORCHESTER
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S
H E E T
R
W D
S .d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
: REV. NO. BY DATE DESCRIPTION OF REVISION
(843) 554-8602
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D
CONNELLY HAYNES ROAD
PROPERTY STRIP MAP
-N
4A 28
L-51,C-86, G-181, M-51, N-33
SURVEYED ON SITE.
LISTED BELOW AND PROPERTY CORNERS
PRESENT ROW DETERMINED WITH THE PLATS
POT 10+00.00
PC 10+42.93
PT 11+11.45
PT 29+33.66
15 20
PC 23+02.38
PT 24+79.74
PC 27+45.15
PC 32+30.19
PT 33+65.63
PC 35+32.92
PT 36+34.30
PC 37+50.11
PT 38+51.77
POT 40+18.90
PC
0+ .0
PT
.5
POT 300+00.00
300POT 301+61.79
+02.38
325' R
R
+60.00
60' R
2+02.38
45' R
+02.38
60' R
E X
IS
T
IN
G N
A T
U R
A L G
A S E
A S E
M E
N T
EASEMENT
NEW TRANS.
EASEMENT
NEW TRANS.
EASEMENT
NEW TRANS.
NEW 25' EASEMENT
NEW 25' EASEMENT NEW 25' EASEMENT
NEW 25' EASEMENT
N
EW
0' E
ASEM
EN
T
N
EW
5' E
ASEM
EN
T
PRESENT R/W
PRESENT R/W PRESENT R/W
PRESENT R/W
P R E S E
N T .5 ' R /W
P R E S E
N T .5 ' R /W
+01.57
60' R
EASEMENT
TEMPORARY CONSTRUCTION
NEW VARIABLE WIDTH
CONSTRUCTION EASEMENT
NEW 30' TEMPORARY
61.38
+23.30
90.73
+67.37
78.03
+72.95
77.61
+76.50
25.00
+61.04
25.00
+73.54
25.00
+44.82
25.00
+56.61 25.00
+89.02
219.13
+43.47 201.69
+67.88194.77
+26.07
180.18
+52.52
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
S.C.3
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
PLOT SIZE = 22" x 34"
0 100 200 300 400
SCALE 1"= 100' HOR.
DORCHESTER
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S
H E E T
A P r o p e r ty S tr ip M a p .d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
: REV. NO. BY DATE DESCRIPTION OF REVISION
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D
GENERAL CONSTRUCTION NOTES:
CONDITIONS IF NECESSARY.
THE ENGINEER RESERVES THE RIGHT TO ADJUST THE LOCATION OF ALL PROPOSED IMPROVEMENTS TO MEET FIELD
ANY COSTS ASSOCIATED WITH REMOVING EXISTING PIPE SHALL BE INCLUDED IN THE COST OF PLACING NEW PIPE.
INFORMATION SHOWN ON THE DRAWINGS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE EXACT LOCATION OF ALL UTILITIES
OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS OF THE UTILITIES
THE LOCATIONS OF EXISTING UTILITIES AND STORM DRAINAGE FACILITIES SHOWN ON THE PLANS ARE PROVIDED FOR THE CONVENIENCE
CONSTRUCTION (LATEST EDITION), SCDOT TRAFFIC SIGNAL SPECIFICATIONS, AND THE MUTCD, 2009 EDITION.
STANDARD DRAWINGS FOR ROAD CONSTRUCTION (LATEST EDITION), SCDOT STANDARD SPECIFICATIONS FOR HIGHWAY
THE CONTRACTOR MUST PERFORM ALL WORK IN ACCORDANCE WITH THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION
TO THE OWNER.
REPAIR OR COORDINATE WITH UTILITY OWNERS TO REPAIR ANY DAMAGES DUE TO CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST
THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES, STORM DRAINS, UTILITIES AND OTHER FACILITIES TO REMAIN AND SHALL
ARE CLASS B UNLESS OTHERWISE STATED.
AND DITCHES. THE CONTRACTOR SHALL ROUTINELY INSPECT AND MAINTAIN THESE DEVICES. ALL CHECK DAMS AND RIPRAP SHOWN
SOLIDS AND/OR CHEMICAL SOLUTIONS OFF-SITE, AND TO PREVENT EXCESSIVE SILTATION OF EXISTING DRAINAGE PIPES, CULVERTS, THE CONTRACTOR SHALL IMPLEMENT EROSION AND SEDIMENT CONTROL MEASURES TO PREVENT THE TRANSFER OF SUSPENDED
RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN PERMISSION TO STORE EQUIPMENT ON ADJACENT PROPERTIES.
THE CONTRACTOR SHALL NOT STORE ANY MATERIALS OR EQUIPMENT WITHIN 15 FT OF THE EDGE OF TRAVEL WAY. IT IS THE
BE MODIFIED PER DIRECTION OF THE ENGINEER TO FIT FIELD CONDITIONS.
PAVE ALL DRIVEWAYS TO R/W LINE. UNLESS THE DRIVEWAY IS LABELED, THE STANDARD DRIVEWAY RADIUS IS 10'. THIS MAY
PIPE OR STRUCTURES ACCORDINGLY.
ANY COSTS ASSOCIATED WITH ABANDONING PIPES OR STRUCTURES SHALL BE INCLUDED IN THE COST OF PLACING NEW
COOPERATE WITH THE UTILITY DURING RELOCATION OPERATIONS.
CONFIRM THAT THE PROPER COORDINATION WITH THE VARIOUS UTILITY OWNERS HAS BEEN PERFORMED. THE CONTRACTOR SHALL
BEFORE CONSTRUCTION. PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
APPLY ONLY AT THE POINTS DESIGNATED BY A TEST HOLE. INTERPOLATIONS BETWEEN THESE POINTS HAVE NOT BEEN VERIFIED.
THE LOCATION OF UTILITIES SHOWN IN THE PLANS SHOULD BE CONSIDERED APPROXIMATE ONLY. THE VERIFIED LOCATIONS/ELEVATIONS
INSTALLATIONS ARE COMPLETE.
FINAL SURFACE COURSE ON ALL ROADWAYS SHALL NOT BE PLACED UNTIL ALL DRAINAGE AND CURB AND GUTTER
PIPE SLOPE FROM CENTER OF BOX TO CENTER OF BOX. FIELD ADJUSTMENTS OF THE ACTUAL PIPE LENGTHS MAY BE NECESSARY.
PIPE LENGTHS THAT ARE SHOWN ON THE PLANS ARE ROUNDED TO THE NEAREST 4' INCREMENT AND CALCULATED ALONG THE
BE UTILIZED:
WHERE STORM PIPES AND STRUCTURES ARE IDENTIFIED TO BE ABANDONED IN PLACE, THE FOLLOWING PROCEDURES SHALL
ITEM BEING CONSTRUCTED.
UTILITIES OR TO MINIMIZE TRENCH WIDTH AS REQUIRED. PAYMENT FOR SUCH MEASURES IS INCLUDED IN THE BID PRICE FOR THE
THE CONTRACTOR SHALL PROVIDE ALL SHEETING, SHORING, AND BRACING REQUIRED TO PROTECT ADJACENT STRUCTURES AND
TEMPORARY ASPHALT IF NEEDED.
FILL STRUCTURE WITH FLOWABLE FILL TO BOTTOM OF PAVEMENT SECTION.
PLUG PIPE OPENINGS WITH BRICK AND GROUT.
STRUCTURES: REMOVE RIM/COVER AND CONE OR TOP SLAB.
PIPES: PLUG END(S) WITH BRICK AND GROUT.
UNLESS WORK IS TO RESUME IN THAT AREA IN LESS THAN 21 DAYS.
ALL DISTURBED AREAS SHALL BE SEEDED AFTER GRADING IS COMPLETE OR WITHIN 7 DAYS AFTER WORK STOPS IN AN AREA
ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED.
ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION
STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION
OBTAIN THE ENGINEER'S CLARIFICATION BEFORE COMMENCING CONSTRUCTION.
THAT MAY AFFECT CONSTRUCTION. SHOULD DISCREPANCIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER TO
THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS SHOWN ON THE PLANS AND REVIEW ALL FIELD CONDITIONS
QUANTITIES AND MAY BE ADJUSTED DURING CONSTRUCTION AS DIRECTED BY THE ENGINEER.
THE FOLLOWING QUANTITIES ARE NOT SHOWN IN DETAIL ON THE PLANS BUT ARE INCLUDED IN THE SUMMARY OF ESTIMATED
INCLUSION ITEMS
CONTRACTOR IS TO PAVE DRIVEWAY APRONS TO RIGHT-OF-WAY LIMITS. 3.
WHERE APPLICABLE.
CONTRACTOR IS TO SAW-CUT CONNECTIONS TO EXISTING ROADWAYS AND/OR DRIVEWAYS 2.
IS RESPONSIBLE FOR REPLACING THE SIGN.
IF A SIGN MARKED TO BE RELOCATED IS DAMAGED BY THE CONTRACTOR, THE CONTRACTOR1.
NOTE:
DEWATERING IS REQUIRED. ONCE APPROVED AN ADDITIONAL COPY OF THE PLAN SHOULD BE PROVIDED TO THE COUNTY.
TO THE RESIDENT CONSTRUCTION ENGINEER AND OCRM FOR APPROVAL PRIOR TO ANY WORK BEING PERFORMED WHERE
SCDHEC OR OCRM REGULATIONS OR AS APPROVED BY THE ENGINEER. A PLAN FOR DEWATERING SHALL BE SUBMITTED
OR PROPERTY. DISCHARGED WATER FROM ALL DEWATERING OPERATIONS SHALL BE FILTERED IN ACCORDANCE WITH
BE DISPOSED OF WITHOUT UNDUE INTERFERENCE WITH OTHER WORK OR DAMAGE TO PAVEMENTS AND OTHER SURFACES
ACCUMULATION OF SURFACE AND GROUND WATER IN EXCAVATED AREAS. ALL OF THE WATER PUMPED OR DRAINED SHALL
THE CONTRACTOR SHALL PROVIDE AND MAINTAIN PROPER DEWATERING PROCEDURES TO PREVENT THE FLOW AND
CONSTRUCTION
PROVIDE TEMPORARY ROAD CLOSURE SIGNAGE FOR PIPE CROSSING
ADVANCE OF THE ROAD CLOSURE TO INSTALL THE PIPE CROSSINGS.
THE CONTRACTOR SHALL NOTIFY PROPERTY OWNERS WITH SUFFICIENT
GEOTEXTILE FABRIC
COMPACTION)*
(95% MAX. DRY DENSITY
STRUCTURAL BACKFILL
AT TIME OF CONSTRUCTION. USE NO. 57 STONE IN PLACE OF SAND.
* DO NOT USE SAND FILL WITHIN 2 VERTICAL FEET OF WATER LEVEL
BEGINNING 12" BELOW PIPE
24" MINIMUM THICKNESS
PIPE BEDDING (NO. 57 STONE)
DETAILS
SEE TYPICAL SHEETS FOR
PAVEMENT DESIGN
(NOT TO SCALE)
CROSSLINE PIPE INSTALLATION TYPICAL SECTION
* SEE PLANS FOR LOCATIONS OF CROSSLINE PIPES
* GEOTEXTILE FABRIC TO BE INCLUDED IN QUANTITY FOR #57 STONE
PRACTICES ARE BEING IMPLEMENTED. INSPECT WASHOUT SUMP REGULARLY AND REMOVE LIQUIDS AND SEDIMENT AS NEEDED.
SITE. MONITORING SHALL OCCUR THROUGHOUT THE DURATION TO THE CONSTRUCTION PROJECT TO ENSURE APPROPRIATE
WASHED INTO CONCRETE PUMPER TRUCKS AND DISCHARGED INTO DESIGNATED WASHOUT AREA OR PROPERLY DISPOSED OFF
SHALL BE PUMPED BACK INTO CONCRETE MIXER TRUCK. CONCRETE WASHOUT FROM CONCRETE PUMPER BINS SHALL BE
THAN 50-FEET AWAY FROM A STORM DRAIN, OPEN DITCH, OR RECEIVING WATER. EXCESS CONCRETE IN CONCRETE PUMP BIN
AND THEN DISPOSED OF AS SOLID WASTE, OR A LOCATION WHICH IS NOT SUBJECT TO SURFACE WATER RUNOFF AND MORE
DESIGNATED AREA THAT WILL LATER BE BACK FILLED, AN AREA WHERE THE CONCRETE WASH CAN HARDEN, BE BROKEN UP, PAVEMENT THAT CARRIES STORM WATER RUNOFF. THE WASHOUT FROM A CONCRETE TRUCK SHALL BE DISPOSED OF INTO A
DO NOT DISPOSE OF TRUCK WASHOUT WATER BY DUMPING INTO A SANITARY SEWER, STORM DRAIN, OR ONTO SOIL OR
CONCRETE TRUCK WASHOUT:
GENERAL CONSTRUCTION NOTES
MANAGER FOR APPROVAL PRIOR TO COMMENCING ANY WORK ON THE PROJECT.
THE CONTRACTOR SHALL PROVIDE A DETAILED CONTRACTOR'S EROSION CONTROL PLAN TO THE RESIDENT CONSTRUCTION
DETAILS.
610-005-10, AND 610-005-20 FOR LANE CLOSURE DETAILS AND STANDARD DRAWING 610-205-00 FOR SHOULDER CLOSURE
BARRELS, CONES, AND/OR TYPE 2 BARRICADES IN ACCORDANCE WITH THE 2009 MUTCD. SEE STANDARD DRAWINGS 610-005-00, BEFORE STARTING ANY WORK ON THE PROJECT. THIS PLAN SHALL INCLUDE DETAILS CONCERNING PLACEMENT OF REFLECTORIZED
THE CONTRACTOR SHALL PROVIDE A DETAILED TRAFFIC CONTROL PLAN TO THE RESIDENT CONSTRUCTION MANAGER FOR APPROVAL
CONSTRUCTION SIGNS, SEE SCDOT STANDARD DRAWING 605-010-01.
AFFECTED BY THE PLACEMENT OF THE SIGNS. FOR ADDITIONAL INFORMATION AND REQUIREMENTS FOR PERMANENT
DISCRETION SHOULD BE USED IN PLACEMENT OF THE SIGNS, NO SIGHTLINES FROM ROADWAYS OR DRIVEWAYS SHOULD BE
CONSTRUCTION SIGN SETS SHALL BE PLACED AT BOTH BEGINNING AND END OF CONSTRUCTION ON CONNELY HAYNES RD.
PERMANENT CONSTRUCTION SIGNS:
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S h e e t G
C N .d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
REV. NO. BY DATE DESCRIPTION OF REVISION
DESIGNED BY CHECKED BYDRAWN BY PLOT SIZE = 22" x 34"SCALE: NTS
DORCHESTER COUNTY
S.C.3
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
DORCHESTER
(843) 554-8602
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D
-N
SHEET 6 SHEET 7
SHEET 8
SHEET 9
REFERENCE DATA SHEET
5A
PI Sta. 10+77.80
Dc
T = 34.87'
L = 68.52'
R = 150.00'
E = 4.00'
Ds e(max) e
= 30 MPH
= 4%
= N/A
CURVE 1
PI Sta. 10+77.80
Dc
T = 91.35'
L
R = 300.00'
E = 13.60'
Ds e(max) e
= 30 MPH
= 4%
= N/A
CURVE 2
PI Sta. 28+47.66
Dc
T
L
R = 200.00'
E = 24.74'
Ds e(max) e
= 30 MPH
= 4%
= N/A
CURVE 3
PI Sta. 33+02.92
Dc
T = 72.73'
L
R = 150.00'
E = 16.70'
Ds e(max) e
= 30 MPH
= 4%
= N/A
CURVE 4
PI Sta. 35+83.78
Dc
T = 50.86'
L
R = 500.00'
E = 2.58'
Ds e(max) e
= 30 MPH
= 4%
= N/A
CURVE 5
PI Sta. 38+04.21
Dc
T = 54.11'
L
R = 120.00'
E = 11.63'
Ds e(max) e
= 30 MPH
= 4%
= N/A
CURVE 6
= 177.36'
= 102.51'
= 189.46'
= 135.44'
= 101.38'
= 101.66'
Ending chain CH_ALT2 description
Point 21 N 485,109.2774 E 2,127,720.4785 Sta 40+18.90
Course from PT CH_ALT26 to 21 S 53° 00' 16.29" W Dist 167.1339
Chord Bear = S 28° 44' 03.30" W Ahead = S 53° 00' 16.29" W Back = S 4° 27' 50.32" W C.C. N 485,305.6925 E 2,127,781.7553 P.T. Station 38+51.77 N 485,209.8506 E 2,127,853.9655 P.C. Station 37+50.11 N 485,296.3527 E 2,127,901.3913 Mid. Ord. = 10.6060 Long Chord = 98.6499 External = 11.6343 Radius = 120.0000 Length = 101.6631 Tangent = 54.1071 Degree = 47° 44' 47.34" Delta = 48° 32' 25.97" (RT) P.I. Station 38+04.21 N 485,242.4097 E 2,127,897.1800 Curve CH_ALT26 Curve Data
Course from PT CH_ALT25 to PC CH_ALT26 S 4° 27' 50.32" W Dist 115.8065
Chord Bear = S 1° 20' 40.94" E Ahead = S 4° 27' 50.32" W Back = S 7° 09' 12.20" E C.C. N 485,450.7240 E 2,127,411.9215 P.T. Station 36+34.30 N 485,411.8079 E 2,127,910.4047 P.C. Station 35+32.92 N 485,512.9871 E 2,127,908.0297 Mid. Ord. = 2.5673 Long Chord = 101.2071 External = 2.5806 Radius = 500.0000 Length = 101.3807 Tangent = 50.8647 Degree = 11° 27' 32.96" Delta = 11° 37' 02.52" (RT) P.I. Station 35+83.78 N 485,462.5183 E 2,127,914.3637 Curve CH_ALT25 Curve Data
Course from PT CH_ALT24 to PC CH_ALT25 S 7° 09' 12.20" E Dist 167.2902
Chord Bear = S 18° 42' 51.19" W Ahead = S 7° 09' 12.20" E Back = S 44° 34' 54.59" W C.C. N 485,697.6540 E 2,128,036.0301 P.T. Station 33+65.63 N 485,678.9751 E 2,127,887.1977 P.C. Station 32+30.19 N 485,802.9431 E 2,127,929.1928 Mid. Ord. = 15.0293 Long Chord = 130.8880 External = 16.7029 Radius = 150.0000 Length = 135.4425 Tangent = 72.7313 Degree = 38° 11' 49.87" Delta = 51° 44' 06.80" (LT) P.I. Station 33+02.92 N 485,751.1403 E 2,127,878.1407 Curve CH_ALT24 Curve Data
Course from PT CH_ALT23 to PC CH_ALT24 S 44° 34' 54.59" W Dist 295.5795
Chord Bear = S 71° 43' 12.45" W Ahead = S 44° 34' 54.59" W Back = N 81° 08' 29.70" W C.C. N 485,873.0838 E 2,128,279.1179 P.T. Station 29+34.61 N 486,013.4692 E 2,128,136.6681 P.C. Station 27+45.15 N 486,070.6982 E 2,128,309.9165 Mid. Ord. = 22.0184 Long Chord = 182.4559 External = 24.7423 Radius = 200.0000 Length = 189.4610 Tangent = 102.5139 Degree = 28° 38' 52.40" Delta = 54° 16' 35.71" (LT) P.I. Station 28+47.66 N 486,086.4846 E 2,128,208.6254 Curve CH_ALT23 Curve Data
Course from PT CH_ALT22 to PC CH_ALT23 N 81° 08' 29.70" W Dist 265.4094
Chord Bear = N 64° 12' 19.14" W Ahead = N 81° 08' 29.70" W Back = N 47° 16' 08.59" W C.C. N 485,733.4053 E 2,128,525.9622 P.T. Station 24+79.74 N 486,029.8269 E 2,128,572.1602 P.C. Station 23+02.38 N 485,953.7698 E 2,128,729.5291 Mid. Ord. = 13.0112 Long Chord = 174.7846 External = 13.6011 Radius = 300.0000 Length = 177.3561 Tangent = 91.3544 Degree = 19° 05' 54.94" Delta = 33° 52' 21.11" (LT) P.I. Station 23+93.73 N 486,015.7589 E 2,128,662.4249 Curve CH_ALT22 Curve Data
Course from PT CH_ALT21 to PC CH_ALT22 N 47° 16' 08.59" W Dist 1,190.9283
Chord Bear = N 60° 21' 19.44" W Ahead = N 47° 16' 08.59" W Back = N 73° 26' 30.30" W C.C. N 485,255.8399 E 2,129,706.1068 P.T. Station 11+11.45 N 485,145.6576 E 2,129,604.3233 P.C. Station 10+42.93 N 485,112.0603 E 2,129,663.3583 Mid. Ord. = 3.8955 Long Chord = 67.9258 External = 3.9994 Radius = 150.0000 Length = 68.5200 Tangent = 34.8684 Degree = 38° 11' 49.87" Delta = 26° 10' 21.71" (RT) P.I. Station 10+77.80 N 485,121.9975 E 2,129,629.9359 Curve CH_ALT21 Curve Data
Course from 20 to PC CH_ALT21 N 73° 26' 30.30" W Dist 42.9323
Point 20 N 485,099.8250 E 2,129,704.5102 Sta 10+00.00
Beginning chain CH_ALT2 description
CP #2
CP #1
CP #3
CP #4
CP #5
CP #6
CP #7
CP #8
CP #10
CP #11
CP #12
CP #14
TBM #1
TBM #2
TBM #3
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
S.C.3
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
PLOT SIZE = 22" x 34"
0 100 200 300 400
SCALE 1"= 100' HOR.
DORCHESTER
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S h e e t
A .d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
: REV. NO. BY DATE DESCRIPTION OF REVISION
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
POT 10+00.00
PC 10+42.93
PT 11+11.45
PT 29+33.66
15 20
PC 23+02.38
PT 24+79.74
PC 27+45.15
PC 32+30.19
PT 33+65.63
PC 35+32.92
PT 36+34.30
PC 37+50.11
PT 38+51.77
POT 40+18.90
PC
0+ .0
PT
.5
POT 300+00.00
300POT 301+61.79
CURVE 1
CURVE 2
CURVE 3
CURVE 4
CURVE 6
CURVE 5
` CONNELLY HAYNES ROAD
` US-15
` PEELE ROAD (S-87)
Ending chain US15 description
Chord Bear = N 2° 25' 30.07" E Ahead = N 5° 32' 29.47" E Back = N 0° 41' 29.34" W C.C. N 484,900.3699 E 2,133,629.6359 P.T. Station 204+27.55 N 485,279.8968 E 2,129,717.8136 P.C. Station 200+00.00 N 484,852.9388 E 2,129,699.7320 Mid. Ord. = 5.8125 Long Chord = 427.3406 External = 5.8212 Radius = 3,930.1901 Length = 427.5514 Tangent = 213.9868 Degree = 1° 27' 28.21" Delta = 6° 13' 58.82" (RT) P.I. Station 202+13.99 N 485,066.9100 E 2,129,697.1496 Curve US151 Curve Data
Beginning chain US15 description
Ending chain PEELE description
Point 301 N 485,057.2254 E 2,127,781.9522 Sta 301+61.79
Course from 300 to 301 S 49° 44' 39.16" E Dist 161.7896
Point 300 N 485,161.7740 E 2,127,658.4797 Sta 300+00.00
Beginning chain PEELE description
Ending chain CH_ALT2 description
Point 21 N 485,109.2774 E 2,127,720.4785 Sta 40+18.90
Course from PT CH_ALT26 to 21 S 53° 00' 16.29" W Dist 167.1339
Chord Bear = S 28° 44' 03.30" W Ahead = S 53° 00' 16.29" W Back = S 4° 27' 50.32" W C.C. N 485,305.6925 E 2,127,781.7553 P.T. Station 38+51.77 N 485,209.8506 E 2,127,853.9655 P.C. Station 37+50.11 N 485,296.3527 E 2,127,901.3913 Mid. Ord. = 10.6060 Long Chord = 98.6499 External = 11.6343 Radius = 120.0000 Length = 101.6631 Tangent = 54.1071 Degree = 47° 44' 47.34" Delta = 48° 32' 25.97" (RT) P.I. Station 38+04.21 N 485,242.4097 E 2,127,897.1800 Curve CH_ALT26 Curve Data
Course from PT CH_ALT25 to PC CH_ALT26 S 4° 27' 50.32" W Dist 115.8065
Chord Bear = S 1° 20' 40.94" E Ahead = S 4° 27' 50.32" W Back = S 7° 09' 12.20" E C.C. N 485,450.7240 E 2,127,411.9215 P.T. Station 36+34.30 N 485,411.8079 E 2,127,910.4047 P.C. Station 35+32.92 N 485,512.9871 E 2,127,908.0297 Mid. Ord. = 2.5673 Long Chord = 101.2071 External = 2.5806 Radius = 500.0000 Length = 101.3807 Tangent = 50.8647 Degree = 11° 27' 32.96" Delta = 11° 37' 02.52" (RT) P.I. Station 35+83.78 N 485,462.5183 E 2,127,914.3637 Curve CH_ALT25 Curve Data
Course from PT CH_ALT24 to PC CH_ALT25 S 7° 09' 12.20" E Dist 167.2902
Chord Bear = S 18° 42' 51.19" W Ahead = S 7° 09' 12.20" E Back = S 44° 34' 54.59" W C.C. N 485,697.6540 E 2,128,036.0301 P.T. Station 33+65.63 N 485,678.9751 E 2,127,887.1977 P.C. Station 32+30.19 N 485,802.9431 E 2,127,929.1928 Mid. Ord. = 15.0293 Long Chord = 130.8880 External = 16.7029 Radius = 150.0000 Length = 135.4425 Tangent = 72.7313 Degree = 38° 11' 49.87" Delta = 51° 44' 06.80" (LT) P.I. Station 33+02.92 N 485,751.1403 E 2,127,878.1407 Curve CH_ALT24 Curve Data
Course from PT CH_ALT23 to PC CH_ALT24 S 44° 34' 54.59" W Dist 295.5795
Chord Bear = S 71° 43' 12.45" W Ahead = S 44° 34' 54.59" W Back = N 81° 08' 29.70" W C.C. N 485,873.0838 E 2,128,279.1179 P.T. Station 29+34.61 N 486,013.4692 E 2,128,136.6681 P.C. Station 27+45.15 N 486,070.6982 E 2,128,309.9165 Mid. Ord. = 22.0184 Long Chord = 182.4559 External = 24.7423 Radius = 200.0000 Length = 189.4610 Tangent = 102.5139 Degree = 28° 38' 52.40" Delta = 54° 16' 35.71" (LT) P.I. Station 28+47.66 N 486,086.4846 E 2,128,208.6254 Curve CH_ALT23 Curve Data
Course from PT CH_ALT22 to PC CH_ALT23 N 81° 08' 29.70" W Dist 265.4094
Chord Bear = N 64° 12' 19.14" W Ahead = N 81° 08' 29.70" W Back = N 47° 16' 08.59" W C.C. N 485,733.4053 E 2,128,525.9622 P.T. Station 24+79.74 N 486,029.8269 E 2,128,572.1602 P.C. Station 23+02.38 N 485,953.7698 E 2,128,729.5291 Mid. Ord. = 13.0112 Long Chord = 174.7846 External = 13.6011 Radius = 300.0000 Length = 177.3561 Tangent = 91.3544 Degree = 19° 05' 54.94" Delta = 33° 52' 21.11" (LT) P.I. Station 23+93.73 N 486,015.7589 E 2,128,662.4249 Curve CH_ALT22 Curve Data
Course from PT CH_ALT21 to PC CH_ALT22 N 47° 16' 08.59" W Dist 1,190.9283
Chord Bear = N 60° 21' 19.44" W Ahead = N 47° 16' 08.59" W Back = N 73° 26' 30.30" W C.C. N 485,255.8399 E 2,129,706.1068 P.T. Station 11+11.45 N 485,145.6576 E 2,129,604.3233 P.C. Station 10+42.93 N 485,112.0603 E 2,129,663.3583 Mid. Ord. = 3.8955 Long Chord = 67.9258 External = 3.9994 Radius = 150.0000 Length = 68.5200 Tangent = 34.8684 Degree = 38° 11' 49.87" Delta = 26° 10' 21.71" (RT) P.I. Station 10+77.80 N 485,121.9975 E 2,129,629.9359 Curve CH_ALT21 Curve Data
Course from 20 to PC CH_ALT21 N 73° 26' 30.30" W Dist 42.9323
Point 20 N 485,099.8250 E 2,129,704.5102 Sta 10+00.00
Beginning chain CH_ALT2 description
5B
REFERENCE DATA SHEET
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
S.C.3
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
PLOT SIZE = 22" x 34"
DORCHESTER
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S h e e t
B .d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
: REV. NO. BY DATE DESCRIPTION OF REVISION
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D
" R
C P
I.E .=7
.9
I.E .=7
.4
15" RCPI.E.= 79.68 I.E.= 79.56 I.E.= 78.87
IPF
1/2" IPF
IPF (BENT)
#477612
STA. 10+XX.XX TO 14+80.00
S E
E S
H E
E T
M A
T C
H L
IN
E S
T A .0
-N
GRADE TO DRAIN
PAVEMENT REMOVAL
NEW 25' EASEMENT
NEW 25' EASEMENT
NEW 25' EASEMENT
NEW 25' EASEMENT
PRESENT R/W
PRESENT R/W
P B . L -5
P R E S . 3
.5 ' R /W
P B . L -5
P R E S . 3
.5 ' R /W
P B . L -5
P R E S . 3
.5 ' R /W
P B . L -5
P R E S . 3
.5 ' R /W
25.00
+61.04
EASEMENT
TEMPORARY CONSTRUCTION
NEW VARIABLE WIDTH
25.00
+44.82
61.38
+23.30
90.73
+67.37
78.03
+72.95
77.61
+76.50
25.00
+73.54
CA
UP
CA
UPUP
INV. OUT = 78.25
INV. IN = 78.50
CLASS III 18" RCP
PLACE 82 LF
OF 78.15
TO EXISTING ELEVATION
GRADE DITCH TO DRAIN
AND 12 SY GEOTEXTILE FILTER FABRIC TYPE B
PLACE 10 TONS RIPRAP CLASS B
INV. OUT = 79.61
INV. IN = 79.68
CLASS III 18" RCP
PLACE 24 LF
INV. OUT = 78.91
INV. IN = 78.99
CLASS III 18" RCP
PLACE 28 LF
SEDIMENT TUBE (TYP.)
PLACE 8 LF
FILTER FABRIC TYPE B
AND 12 SY GEOTEXTILE
RIPRAP CLASS B
PLACE 10 TONS INV. OUT = 80.16
INV. IN = 80.22
CLASS III 18" RCP
PLACE 20 LF
10'
10' R
10' R
10'R 10
R
R10'
R
R
10'
R
` CONNELLY HAYNES ROAD
` US 15
P O
T
.0
P C
.9
P T
11+
11.4
12 13 14
STA. 10+11.80
` CONNELLY HAYNES ROAD
BEGIN CONSTRUCTION
STA. 202+46.97 ` US-15
STA. 10+00.00 ` CONNELLY HAYNES ROAD =
TIE EQUALITY
19' C
22' C
20' C
22' C
21' C
22' C
21' C
23' C
22' C
23' C
22' C
22' C
22' C
23' C
22' C
22' C
22' C
24" SOLID WHITE LINE
PLACE 33 LF
DOUBLE 4" SOLID YELLOW LINE
PLACE 110 LF
W14-1A-30 SIGN
PLACE NEW
AND ROAD NAME SIGN
R1-1-30 STOP SIGN
RETAIN EXISTING
10+00 11+00 12+00 13+00 14+00
.1
VPI = 10+60.00
Elev. 82.15
(-) 2.00%
(-) 0.33%
70' V.C.
.0
V
P C
E le v
.8
.0
V
P T
E le v
.0
.9
.5
.3
.1
.0
.9
.8
.8
.7
.6
.6
.5
.5
.4
.3
.3
.2
.1
.1
.0
.9
.9
.8
.7
(-) 0.33%
PROPOSED
EXISTING
STA. 10+11.80
BEGIN CONSTRUCTION
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S
H E E T
.d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
0 20 40 60 80
SCALE 1"= 20'
PLAN SHEET
REV. NO. BY DATE DESCRIPTION OF REVISION
DESIGNED BY CHECKED BYDRAWN BY PLOT SIZE = 22" x 34"
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
DORCHESTER
(843) 554-8602
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
70E X
IS
T
IN
G P
R O
P O
S E
D
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
10'
10'
10'
10'
.8
R
.7
+8 8.
U S -1 5)
' R
+9 7.
U S -1 5)
' R
.7
' R
15.80
+44.45
10.00
+73.08
76.89
+65.49
RELOCATED BY OTHERS
POWER POLE TO BE
69.91
+62.42
69.96
+71.89
62.60
+68.72
22.91
+55.84
21.17
+64.42
33"" PIN
E
19"" PIN
E
19"" O
AK
19"" O
AK
15" RCP
I.E.= 79.02
15" RCP
18" RCP
" R
C P
I.E.= 78.41 I.E.= 78.55 I.E.= 78.41 I.E.= 79.04
I.E .= 7
.9
I.E .= 7
.0
GATE
IPF
IPF
1/2" IPF
STA. 14+80.00 TO 20+20.00
S E
E S
H E
E T
M A
T C
H L
IN
E S
T A .0
S E
E S
H E
E T
M A
T C
H L
IN
E S
T A .0
-N
CAROLINA GAS TRANSMISSION
APPROX 90' NATURAL GAS EASEMENT
NEW 25' EASEMENT
NEW 25' EASEMENT NEW 25' EASEMENT
NEW 25' EASEMENT
CONSTRUCTION EASEMENT
NEW 30' TEMPORARY30
25.00
+56.61 25.00
+89.02
E E
CA
UP
UP
INV. OUT = 77.36
INV. IN = 77.48
CLASS IV 19"x30" H.E.RCP
PLACE 38 LF
AND 15 SY GEOTEXTILE FILTER FABRIC TYPE B
PLACE 11 TONS RIPRAP CLASS B
AND 15 SY GEOTEXTILE FILTER FABRIC TYPE B
PLACE 11 TONS RIPRAP CLASS B
INV. OUT = 77.46
INV. IN = 77.54
CLASS III 18" RCP
PLACE 28 LF
INV. OUT = 77.62
INV. IN = 77.70
CLASS III 18" RCP
PLACE 28 LF
SEDIMENT TUBE (TYP.)
PLACE 8 LF
TO EXISTING DITCH ELEVATION = 77.12'
GRADE DITCH TO DRAIN AT 0.1% SLOPE
` CONNELLY HAYNES ROAD
15 16 17 18 19 20 23' C
22' C
23' C
23' C
23' C
23' C
23' C
24' C
25' C
23' C
24' C
24' C
24' C
22' C
23' C
22' C
23' C
22' C
24' C
22' C
24' C
22' C
15+00 16+00 17+00 18+00 19+00 20+00
VPI = 16+65.00
Elev. 80.18
(-) 0.33% (+) 0.30%
100' V.C.
VPI = 17+80.00
Elev. 80.52
(+) 0.30% (-) 0.30%
100' V.C.
VPI = 19+20.00
Elev. 80.10
(-) 0.30% (+) 0.30%
100' V.C.
.0
V
P C
E le v
.3
.0
V
P T
E le v
.3
.0
V
P C
E le v
.3
.0
V
P T
E le v
.3
.0
V
P C
E le v
.2
.0
V
P T
E le v
.2
.7
.7
.6
.5
.5
.4
.3
.3
.2
.2
.2
.2
.3
.4
.4
.4
.4
.4
.3
.2
.2
.1
.1
.1
.2
100' V.C.
(-) 0.33%
PROPOSED
EXISTING
SPECIAL DITCH RIGHT
SPECIAL DITCH LEFT
(+) 0.30%
.3
V
P C
.2
.3
.3
100' V.C.
(-) 0.76% (+) 0.10%
.5
.5
.3
.2
.0
.9
.7
.5
.4
.3
.3
.4
.4
.4
.4
.4
.5
.5
.5
.5
.5
.6
.6
.6
.6
.6
.7
RIGHT ELEVATIONS
SPECIAL DITCH
LEFT ELEVATIONS
SPECIAL DITCH
(-) 0.68% (+) 0.14%
.5
.5
.3
.2
.1
.9
.8
.6
.5
.4
.5
.5
.5
.6
.6
.6
.6
.7
.7
.7
.8
.8
.8
.8
.9
.9
.9
(+) 0.14%
(+) 0.10%
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S
H E E T
.d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
0 20 40 60 80
SCALE 1"= 20'
PLAN SHEET
REV. NO. BY DATE DESCRIPTION OF REVISION
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
DORCHESTER
(843) 554-8602
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
70E X
IS
T
IN
G P
R O
P O
S E
D
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
10'
10'
10'
10'
S E
E S
H E
E T
M A
T C
H L
IN
E S
T A .0
S E E S
H E E T
M A T C
H L
IN
E S
T A . 2
.0
STA. 20+20.00 TO 25+20.00
-N
NEW 25' EASEMENT
NEW 25' EASEMENT
NEW 25' EASEMENT
NEW 25' EASEMENT
NEW
' E
ASEMENT
NEW
' E
ASEMENT
PRESENT R/W
PRESENT R/W
25.00
+52.38
EASEMENT
NEW TRANS.
EASEMENT
NEW TRANS.
EASEMENT
NEW TRANS.
25.00
+60.00
CA
UPUP
INV. OUT = 77.85
INV. IN = 77.93
CLASS III 18" RCP
PLACE 28 LF
SEDIMENT TUBE (TYP.)
PLACE 8 LF
R10' R
R
.0
R
` CONNELLY HAYNES ROAD
21 22
P C
.3
P T
.7
24' C
22' C
24' C
21' C
23' C
21' C
21' C
20' C
21' C
20' C
46' C
19' C
89' C
19' C
9' F
' C
9' F
' C
9' F
FOR SILT FENCE NOTE
SEE SHEET 9
CLOSED
PLACE R11-2-48 ROAD
21+00 22+00 23+00 24+00 25+00
PROPOSED
EXISTING
VPI = 20+40.00
Elev. = 80.46
(+) 0.30% (-) 0.47%
100' V.C.
(-) 0.47%
(-) 0.23%
.2
V
P T
.3
.3
.3
.2
.1
.0
.9
.8
.8
.7
.6
.5
.4
.3
.2
.1
.0
.9
.8
.7
.7
.6
.6
.5
.5
.5
.8
BEGIN 12' PAVED DRIVEWAY
STA. 23+90.11
END CONSTRUCTION
.0
.7
.7
.7
.7
.7
.8
.8
.8
.8
.8
.9
.9
.9
.9
.9
.0
.0
.0
.3
.9
.0
.0
.0
.0
.1
.1
.1
.1
.2
.2
.2
.3
LEFT ELEVATIONS
SPECIAL DITCH
RIGHT ELEVATIONS
SPECIAL DITCH
(+) 0.14% (+) 0.14%
(+) 0.10% (+) 0.10%
SPECIAL DITCH LEFT
SPECIAL DITCH RIGHT
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S
H E E T
.d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
0 20 40 60 80
SCALE 1"= 20'
PLAN SHEET
REV. NO. BY DATE DESCRIPTION OF REVISION
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
DORCHESTER
(843) 554-8602
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
70E X
IS
T
IN
G P
R O
P O
S E
D
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
10'
10'
BEGIN 12' PAVED DRIVEWAY
STA. 23+90.11
END CONSTRUCTION
R
.0
R 45.00'
35.00
+60.00
10.00
+52.38
52.67
+11.45
10.00
+60.00
RELOCATED BY OTHERS
POWER POLE TO BE
1/
" IP
F
#2
#2
S E
E S
H E
E T
M A
T C
H L
IN
E S
T A .0
STA. 25+20.00 TO 30+20.00
-N-
NEW 10' EASEMENT
NEW 15' EASEMENT
N
EW
0' E
ASEM
EN
T
N
EW
5' E
ASEM
EN
T
UP
UP
UP
AND 15 SY GEOTEXTILE FILTER FABRIC TYPE B
PLACE 11 TONS RIPRAP CLASS B
AND 15 SY GEOTEXTILE FILTER FABRIC TYPE B
PLACE 11 TONS RIPRAP CLASS B
SEDIMENT TUBE (TYP.)
PLACE 8 LF
INV. OUT = 76.29
INV. IN = 76.35
CLASS IV 12"x18" H.E.RCP
PLACE 22 LF
` CONNELLY HAYNES ROAD
P C
.1
P T
.6
DOUBLE ROW SILT FENCE
INSTALL 235 LF
15' C
10' F
15' C
10' F
15' C
10' F
15' C
10' F
15' C
10' F
14' C
11' F
15' C
9' F
15' C
8' C
' C
8' F
DOUBLE ROW SILT FENCE
INSTALL 235 LF
26+00 27+00 28+00 29+00 30+00
PROPOSED
EXISTING
VPI = 26+26.22
Elev. = 78.25
(-) 0.23% (+) 0.33%
50' V.C.
VPI = 28+78.92
Elev. = 79.09
(+) 0.33% (+) 1.
87%
62' V.C.
.3
V
P C
.3
V
P T
.9
V
P C
.6
V
P T
.5
.4
.4
.3
.3
.2
.3
.3
.4
.4
.5
.6
.6
.7
.8
.8
.9
.0
.2
.4
.8
Elev. = 81.09
(+) 1.
87%
(-) 0.50%
80' V.C.
.7
.3
V
P C
.8
V
P T
.2
.5
.8
.9
.9
.8
VPI = 29+85.73
END 12' PAVED DRIVEWAY
STA. 30+49.65
END CONSTRUCTION
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S
H E E T
.d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
0 20 40 60 80
SCALE 1"= 20'
PLAN SHEET
REV. NO. BY DATE DESCRIPTION OF REVISION
DIV.NO.
FED. ROAD
STATE COUNTY ROUTE NAME
NO.
SHEET
SHEETS
TOTAL
DORCHESTER
(843) 554-8602
NORTH CHARLESTON, SC 29418
3229 WEST MONTAGUE AVE.
DORCHESTER COUNTY
ROAD
CONNELLY HAYNES
CONNELLY HAYNES ROAD
70E X
IS
T
IN
G P
R O
P O
S E
D
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D N
A
STA. 30+49+65
12' PAVED DRIVEWAY
END CONSTRUCTION
EC1
1. If necessary, slopes which exceed eight (8) feet should be stabilized with synthetic or vegetative mats, in addition to hydroseeding. It may be necessary to install temporary slope drains during construction. Temporary berms may be needed until the slope is brought to grade.
2. Stabilization measures shall be initiated as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than fourteen (14) days after work has ceased, except as stated below:
*Where stabilization by the 14th day is precluded by snow cover or frozen ground conditions stabilization measures must be initiated as soon as practicable.
*Where construction activity on a portion of the site is temporarily ceased, and earth disturbing activities will be resumed within 14 days, temporary stabilization measures do not have to be initiated on that portion of the site.
4. Provide silt fence and or other control devices, as may be required, to control soil erosion during utility construction. All disturbed areas shall be cleaned, graded, and stabilized immediately after the utility installation. Fill, cover, and temporary seeding at the end of each day are recommended. If water is encountered while trenching, the water should be filtered to remove any sediments before being pumped back into any waters of the state.
5. All erosion control devices shall be properly maintained during all phases of construction until the completion of all construction activities and all disturbed areas have been stabilized. Additional control devices may be required during construction in order to control erosion and or offsite sedimentation. All temporary control devices shall be removed once construction is complete and the site is stabilized.
6. The contractor must take necessary action to minimize the tracking of mud onto paved roadway(s) from the construction area and the generation of dust.
The contractor shall daily remove mud/soil from pavement, as may be required.
7. Residential subdivisions require erosion control features for infrastructure as well as for individual lot construction. Individual property owners shall follow these plans during construction or obtain approval of an individual plan in accordance with S.C. REG. 72-300 ET SEQ. and SCR100000.
8. Temporary diversion berms and or ditches will be provided as needed during construction to protect work areas from upslope runoff and or to divert sediment laden water to appropriate traps or stable outlets.
9. All waters of the state (WOS), including wetlands, are to be flagged or otherwise clearly marked in the field. A double row of silt fence is to be installed in all areas where a 50-foot buffer can't be maintained between the disturbed area and all WOS. A 10-foot buffer should be maintained between the last row of silt fence and all WOS..
potential for impact (such as stockpiles of freshly treated lumber) and construction chemicals that could be exposed to storm water must be prevented from being a pollutant source in storm water discharges.
modification required to correct the BMP within 48 hours of identification.
or incorrectly installed, the Permittee must address the necessary replacement or
If periodic inspection or other information indicates that a BMP has been inappropriately
3. All sediment and erosion control devices shall be inspected once every calendar week.
10. Litter, construction debris, oils, fuels, and building products with significant
13. Minimize soil compaction and, unless infeasible, preserve topsoil.
the date that final stabilization is reached.
business hours, from the date of commencement of construction activities to at the construction site or a nearby location easily accessible during normal
11. A copy of the SWPPP, inspections records, and rainfall data must be retained not resume for a period of 7 calendar days.
where land-disturbing activities have permanently or temporarily ceased, and will
12. Initiate stabilization measures on any exposed steep slope (3H:1V or greater) basin or alternative control that provides equivalent or better treatment prior to discharge.
wash water, and other wash waters. Wash waters must be treated in a sediment
14. Minimize the discharge of pollutants from equipment and vehicle washing, wheel
*Soaps or solvents used in vehicle and equipment washing.
*Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and and other construction materials;
*Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds
*Wastewater from washout of concrete, unless managed by an appropriate control;
16. The following discharges from sites are prohibited:
areas of the construction site.
once every calendar week and must be conducted until final stabilization is reached on all
17. After construction activities begin, inspections must be conducted at a minimum of at least alternative BMPs must be implemented as soon as reasonably possible.
the next storm event is impracticable, the situation must be documented in the SWPPP and be completed before the next storm event whenever practicable. If implementation before the requirements of this permit and/or SC's Water Quality Standards, implementation must
18. If existing BMPs need to be modified or if additional BMPs are necessary to comply with has approved otherwise.
that disturb 10 acres or more this conference must be held on-site unless the Department
On-Site SWPPP prior to the implementation of construction activities. For non-linear projects
19. A Pre-Construction Conference must be held for each construction site with an approved
OCRM STANDARD NOTES
SEEDING INSTALLATION
SEQUENCE OF CONSTRUCTION
D. A recommended sequence of construction follows:
9. Remove sediment controls 30 days after all disturbed areas have stabilized.
seven (7) days.
8. Clean out temporary sediment control as needed; check controls every
7. Stabilize all remaining areas.
particular erosion control device has been stabilized.
6. Erosion controls may be removed after the area contributing flow to that driveways as long as possible.
progress to limit disruption to traffic. Schedule work to maintain access to all
5. Proceed with construction. Limit disturbed areas to areas with work in possible (within 7 calendar days).
4. Install protection around inlets and stabilize disturbed areas as soon as controls.
3. Construct new drainage appurtenances within the areas protected by perimeter
2. Construct perimeter controls.
control silt fence, hay bales, and temporary sediment traps.
1. Clear and grub only areas necessary for perimeter erosion and sediment install BMP's per the SCDOT Standard Drawings for Erosion Control.
4. Adhere by all of the OCRM Standard Notes listed on the right of this sheet and directed by the Engineer.
3. A temporary rock filter dam or sediment tube shall be used as ditch checks as shall be washed down as necessary to prevent tracking of silt offsite.
where construction vehicles access public non-construction areas. Vehicles
2. Stabilized Graveled Construction Entrances shall be used at locations construction.
1. Silt Fences shall be used to prevent silt from leaving the limits of
C. Install sediment erosion controls as follows:
(843)238-4528 prior to commencing construction activities.
B. Contact the office of Ocean and Coastal Resource Management (OCRM) at
A. Obtain all permits.
These discharges are to be routed through appropriate BMPs (sediment basin, filter bag, etc.).
15. Minimize the discharge of pollutants from dewatering of trenches and excavated areas.
DRAWING NO.
washout which occurs shall be regraded and reseeded until good sod is established.
G. Slopes shall be protected against washouts by an approved method. Any over the entire area seeded.
shall be done if and when necessary until a good, healthy, uniform growth is established
F. All seeded areas shall be watered and maintained in good condition. Reseeding considered on a case-by-case basis as approved by the Engineer.
tack the mulch, unless otherwise shown on the plans. Mechanical tacking will be per acre. Asphalt emulsion shall be applied uniformly at a rate of 300 GAL per acre to
All seeded areas shall be mulched with clean small-grain straw at a rate of 1•to 2 tons
SCDOT Standard Specifications for Highway Construction (Edition 2007).
applied, depending on the period of year, at the rates indicated in Section 810 of the raked into the surface. Lightly roll the surface and water with fine spray. Seed shall be
E. Immediately following this preparation the seed shall be uniformly applied and lightly
D. Fertilizer shall be uniformly spread and disked or roto-tilled to a depth of at least 4 IN.
stones larger than 2 IN shall be removed.
C. The subgrade of all areas to be seeded shall be raked and all rubbish, sticks, roots, and too wet to rake easily, when it is in a frozen condition, or too dry.
B. No seeding should be undertaken in windy or unfavorable weather, when the ground is
A. Seed all disturbed areas of construction (excluding riprap lined ditches).
FOR EROSION CONTROL DETAILS
SEE DETAIL SHEETS AND SCDOT STANDARD DRAWINGS
815-205-00
815-605-00
SEDIMENT TUBES
SILT FENCE
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S
H E E T E
C E r o s io n C o n tr o l
N o te s .d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
(803) 256-4121
COLUMBIA, SC 29210
SUITE 305
240 STONERIDGE DRIVE,
SHEETS
TOTAL
NO.
SHEET
NO.
ROUTE
ROAD NAMECOUNTYSTATE
DIV.NO.
FED. ROAD
3 S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION
TRANSPORTATION AUTHORITY
DORCHESTER COUNTY
NTS
EROSION CONTROL DATA SHEET
DORCHESTER
CONNELLY HAYNES ROAD
ROAD
CONNELLY HAYNES
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D
EC2 28
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n f_ d g n C o n s t p lp r C o n n e ll y H a y n e s R o a d S
H E E T E
C E
C D
S .d g n
P D
F .p lt c fg
C H P la n .t b l
.0 f t i n
F
IL
E
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
(803) 256-4121
COLUMBIA, SC 29210
SUITE 305
240 STONERIDGE DRIVE,
SHEETS
TOTAL
NO.
SHEET
NO.
ROUTE
ROAD NAMECOUNTYSTATE
DIV.NO.
FED. ROAD
3 S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION
TRANSPORTATION AUTHORITY
DORCHESTER COUNTY
NTS
EROSION CONTROL DATA SHEET
DORCHESTER
CONNELLY HAYNES ROAD
ROAD
CONNELLY HAYNES
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DES
N
E
CI
L
E
R
YMS WER
D
O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n
X S C C o n n e ll y H a y n e s C
M X
S C S h e e ts .d g n
G
R e s o u r c e S ta n d a r d s B e n tl e y T r a n s p o r ta ti o n
D F S
T A
N D
A R
D S
M S fi le s p lo tt in g P
D F .p lt c fg
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n P r in t
O r g a n iz e r P e n T a b le s C
H X S e c ti o n s .t b l
.0 f t i n
F
IL
E
DESCRIPTION OF REVISION
DATE
DATE
DATECHK.
R/W
DGN.
REV. NO. BY DATE
SCALE: 1"=5' HOR. 1"=5' VERT.
70 102030405060 706050403020100
102030405060 302010070
STATE
S.C.
COUNTY ROAD NAME
NO.
SHEET
SHEETS
TOTAL
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
PROJECT ID NO.
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n
X S C C o n n e ll y H a y n e s C
M X
S C S h e e ts .d g n
G
R e s o u r c e S ta n d a r d s B e n tl e y T r a n s p o r ta ti o n
D F S
T A
N D
A R
D S
M S fi le s p lo tt in g P
D F .p lt c fg
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n P r in t
O r g a n iz e r P e n T a b le s C
H X S e c ti o n s .t b l
.0 f t i n
F
IL
E
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DE
S
N E
CI
L
E
R
YMS WER
D N
A
3:1 3:12:1 2:1
2.0%12:1 2.0% 13:18 .6
.3
.9
.2
.4
.2
.9
.3
.9
3:1 3:1 2:1
2:1 2.0%12:1 2.0% 12:1
.8
.9
.5
.8
.0
.8
.5
.9
.9
70 70
75 75
80 80
85 85
65 65
10+50.00
80 80
85 85
75 75 11+00.00
DORCHESTER X1
STA. 10+50.00
STA. 11+00.00
TO
CONNELLY HAYNES
STA. 10+11.80
BEGIN CONSTRUCTION
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n
X S C C o n n e ll y H a y n e s C
M X
S C S h e e ts .d g n
G
R e s o u r c e S ta n d a r d s B e n tl e y T r a n s p o r ta ti o n
D F S
T A
N D
A R
D S
M S fi le s p lo tt in g P
D F .p lt c fg
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n P r in t
O r g a n iz e r P e n T a b le s C
H X S e c ti o n s .t b l
.0 f t i n
F
IL
E
DESCRIPTION OF REVISION
DATE
DATE
DATECHK.
R/W
DGN.
REV. NO. BY DATE
SCALE: 1"=5' HOR. 1"=5' VERT.
70 102030405060 706050403020100
102030405060 302010070
STATE
S.C.
COUNTY ROAD NAME
NO.
SHEET
SHEETS
TOTAL
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
PROJECT ID NO.
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n
X S C C o n n e ll y H a y n e s C
M X
S C S h e e ts .d g n
G
R e s o u r c e S ta n d a r d s B e n tl e y T r a n s p o r ta ti o n
D F S
T A
N D
A R
D S
M S fi le s p lo tt in g P
D F .p lt c fg
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n P r in t
O r g a n iz e r P e n T a b le s C
H X S e c ti o n s .t b l
.0 f t i n
F
IL
E
No. 35794
A
NI
L
ORAC H
T U
O S
R E
E
NI
GN
E
LANOISSEFORP DE
S
N E
CI
L
E
R
YMS WER
D N
A
3:1 3:1 2:1
2:1 2.0%12:1 2.0% 13:1
.9
.7
.4
.6
.8
.6
.4
.7
.1
3:1 3:1 2:1 2:1
2.0%12:1 2.0% 12:1
.7
.6
.2
.5
.7
.5
.2
.6
.1
3:1 3:1 2:1 2:1
2.0%13:1 2.0% 12:1
.8
.4
.1
.3
.5
.3
.1
.4
.3
80 80
85 85
75 75
11+50.00
80 80
85 85
75 75
12+00.00
80 80
85 85
75 75
12+50.00
DORCHESTER X2
STA. 11+50.00
STA. 12+50.00
TO
CONNELLY HAYNES
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
P L
O T D
R
IV
E R
P E
N T
A B L E
S C
A L E
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n
X S C C o n n e ll y H a y n e s C
M X
S C S h e e ts .d g n
G
R e s o u r c e S ta n d a r d s B e n tl e y T r a n s p o r ta ti o n
D F S
T A
N D
A R
D S
M S fi le s p lo tt in g P
D F .p lt c fg
G Jo b s E v e n C o n n e ll y H a y n e s R o a d P r o d u c ti o n T r a n s p o r ta ti o n P r in t
O r g a n iz e r P e n T a b le s C
H X S e c ti o n s .t b l
.0 f t i n
F
IL
E
DESCRIPTION OF REVISION
DATE
DATE
DATECHK.
R/W
DGN.
REV. NO. BY DATE
SCALE: 1"=5' HOR. 1"=5' VERT.
70 102030405060 706050403020100
102030405060 302010070
STATE
S.C.
COUNTY ROAD NAME
NO.
SHEET
SHEETS
TOTAL
S O
U
TH CARO
L
IN
A
C E
R T
IF
IC
ATE OF AUTHO
R
IZ
A T
IO
N
FLOYD, INC.
DAVIS &
No. C00538
PROJECT ID NO.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .