This package includes construction drawings and specifications for a federal contract opportunity to repair an electrical substation and switchgear aboard Marine Corps Base Quantico in Virginia. The scope of work involves replacing the existing 15kV and 35kV switchgears with new pad-mounted gas insulated switchgear, installing new concrete pads, and reconnecting 120V circuits. Outages will be required to transition electrical feeds. The contractor must coordinate all utility outages with Dominion Virginia Power and base personnel. Sequencing of construction activities and outage procedures are delineated. Civil plans show the layout of new pads and details. Electrical drawings provide single line diagrams, grounding details, and layouts. The Naval Facilities Engineering Command is the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
SCALE: NOT TO SCALE
N
ISSUE DATE:
ISSUE :
N40080-17-D-0018
N40008018F5256AE CONTRACT TASK ORDER:
AE CONTRACT NO.:
10 APRIL 2020
QU1810M PWB#2017137
FOR OFFICIAL USE ONLY
FINAL DESIGN SUBMITTAL
MARINE CORPS BASE - QUANTICO
REPAIR TBS ELECTRICAL SYSTEM - SUBSTATION
LOCATION MAP
SCALE: NOT TO SCALE
N
SITE LOCATION PLAN
SCALE: NOT TO SCALE
PROJECT VICINITY
QUANTICO
MCB
INTERSTATE 95
I-95
PROJECT SITE
MCB 3
PROJECT SITE
R E
P A
IR
T
B S
E
LE
C
TR
IC
A
L S
Y S
TE
M
S
U B
S
TA
TI
O
N
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
MCB 2
TITLE SIGNATURE DATE
PWO
DPWO
FEAD HEAD
ASSET MANAGEMENT HEAD
ENGINEERING HEAD
FACILITIES MAINTENACE
BASE SAFETY
BASE FIRE
NREA BRANCH
G-6: COMMUNICATIONS
TBS
FBI
N
04/10/2020
G-002
R E
P A
IR
T
B S
E
LE
C
TR
IC
A
L S
Y S
TE
M
S
U B
S
TA
TI
O
N
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
SHEET INDEX
SHEET TITLE
NAVFAC DRAWING
NUMBER
GENERAL
G-001 COVER, LOCATION AND VICINITY MAPS, SITE LOCATION PLAN 3193066
G-002 SHEET INDEX, SYMBOLS AND ABBREVIATIONS 3193067
G-003 SEQUENCE OF CONSTRUCTION 3193068
CIVIL
C-100 CIVIL PLAN AND DETAILS 3193069
ELECTRICAL
E-100 SINGLE LINE DIAGRAM, NOTES, LEGEND 3193070
E-101 ELECTRICAL DETAILS 3193071
E-102 GROUNDING DETAILS 3193072
E-103 ELECTRICAL LAYOUT 3193073
E-104 ELECTRICAL LAYOUT - TEMPORARY EQUIPMENT 3193074
ABBREVIATIONS
A AMPERES
AF AMP FRAME
AWG AMERICAN WIRE GAUGE
C CONDUIT
CLR CLEARANCE
CONC. CONCRETE
CPT CONTROL POWER TRANSFORMER
CT CURRENT TRANSFORMER
CU COPPER
DMM DIGITAL MULTIMETER
DVP DOMINION VIRGINIA POWER
ELEC. ELECTRICAL
FPR FEEDER PROTECTIVE RELAY
G GROUND
GFCI GROUND FAULT CIRCUIT INTERRUPTER
IPS INTEGRATED POWER SYSTEM
KCMIL THOUSAND CIRCULAR MILS
KV KILOVOLT
KVA KILOVOLT AMPERES
MIN MINIMUM
MR MULTI RATIO
MV MEDIUM VOLTAGE
MVS MEDIUM VOLTAGE SWITCHGEAR
NTS NOT TO SCALE
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
PT POTENTIAL TRANSFORMER
SCADA SUPERVISORY CONTROL AND DATA ACQUISITION
S.D. SOFT DRAWN
SF SILT FENCE
SWGR SWITCHGEAR
V VOLT
UG UNDERGROUND
GENERAL ELECTRICAL DEMOLITION NOTES:
1. REMOVE EXISTING ELECTRICAL SYSTEMS WHERE
INDICATED. ELECTRICAL CONTRACTOR TO FIELD
VERIFY EXACT REQUIREMENTS AT THE PRE-BID
WALK THROUGH AS SPECIFIED.
2. DO NOT ABANDON WIRE, OR ANY ELECTRICAL
EQUIPMENT/DEVICE IN PLACE. REMOVE ALL
CONDUIT, BOXES, DEVICES, WIRING, PANELS,
CABINET, ETC, COMPLETE FROM PREMISES. LEAVE
CONDUIT UNDERGROUND INTACT, PROVIDE PULL
WIRE, AND CAP END 4" ABOVE GROUND.
3. MATERIALS AND EQUIPMENT TO BE SALVAGED,
WILL BE TAGGED BY THE OWNER PRIOR TO THE
PRE-BID WALK THROUGH. REMOVE AND DELIVER
MATERIALS AND EQUIPMENT TO BE SALVAGED TO
A STORAGE LOCATION ON BASE DESIGNATED BY
THE OWNER.
4. ASBESTOS / HAZMAT MATERIALS: EXISTING
MATERIAL(S) ARE NOT SUSPECT TO CONTAIN
ASBESTOS OR OTHER HAZMAT MATERIAL(S). IF
DURING CONSTRUCTION, HAZMAT MATERIAL(S) IS
ENCOUNTERED, AND MUST BE DISTURBED, DO NOT
TOUCH THE MATERIAL. NOTIFY THE CONTRACTING
OFFICER IN WRITING. IF ENCOUNTERED SUSPECT
MATERIAL IS NOT A DANGER, THE CONTRACTING
OFFICER WILL DIRECT THE CONTRACTOR TO
PROCEED WITHOUT CHANGE. IF THE MATERIAL IS
ASBESTOS OR OTHER HAZMAT MATERIAL(S),
WHICH MUST BE HANDLED AND IS A DANGER, THE
CONTRACTING OFFICER WILL DIRECT A CHANGE
PURSUANT TO FAR 52.243-4, CHANGES AND "FAR
52.236-2, DIFFERING SITE CONDITIONS.
5. MATERIALS AND EQUIPMENT INDICATED TO BE
REMOVED AND NOT SALVAGED SHALL BECOME
THE PROPERTY OF THE CONTRACTOR. THE
CONTRACTOR SHALL REMOVE, TRANSPORT, AND
LEGALLY DISPOSE OF THE DEMOLISHED MATERIAL,
EQUIPMENT DEBRIS, AND RUBBISH OFF THE SITE.
6. THE CONTRACTOR SHALL NOTIFY THE OWNER'S
REPRESENTATIVE A MINIMUM OF (72) HOURS IN
ADVANCE OF INTERRUPTING ANY UTILITIES OR
BUILDING SERVICES, AND BEFORE SHUTTING
DOWN ANY SYSTEMS OR EQUIPMENT.
7. THE CONTRACTOR SHALL PROVIDE CONDUIT AND
WIRE AS REQUIRED MAINTAINING ALL EXISTING
BRANCH CIRCUITS AND DISTRIBUTION FEEDERS
THAT REQUIRE RELOCATION DUE TO WALL, FLOOR,
OR CEILING DEMOLITION. THE CONTRACTOR SHALL
REROUTE FEEDERS WHERE REQUIRED TO BYPASS
ANY SUCH DEMOLITION. FIELD VERIFY EXACT
REQUIREMENTS WITH ELECTRICAL DEMOLITION
DRAWINGS PRIOR TO CONSTRUCTION.
8. PRIOR TO COMMENCING WITH ANY OF THE
OUTAGES, THE CONTRACTOR WILL COORDINATE
WITH THE DVP OPS CENTER (PHONE NUMBER:
804-755-5642) AND THE BASE ENERGY MANAGER
9. THE CONTRACTOR WILL NEED TO COORDINATE
WITH BASE FIRE MARSHALL FOR THE RESET OF
THE LIFE SAFETY SYSTEMS.
GENERAL ELECTRICAL NOTES:
1. THE WORK INCLUDES PROVIDING NEW MATERIALS,
FIXTURES, DEVICES AND ACCESSORIES
NECESSARY FOR A COMPLETE FUNCTIONING
ELECTRICAL SYSTEM. ALL WORK SHALL BE IN
ACCORDANCE WITH LOCAL CODES OR
ORDINANCES AND SUBJECT TO INSPECTION.
2. COMPLY WITH ALL LAWS APPLYING TO ELECTRICAL
INSTALLATIONS IN EFFECT, AND WITH THE MOST
RECENT EDITION OF THE NATIONAL ELECTRICAL
CODE, ADA, APPLICABLE SECTIONS OF OTHER
NFPA, OSHA, LIFE SAFETY CODES AND
RECOMMENDATIONS, AND THE INTERIM
AMENDMENTS IN EFFECT AT THE TIME OF THE
PROPOSAL. ALL MATERIALS USED SHALL BE NEW
AND SHALL CONFORM TO THE STANDARDS
ESTABLISHED BY THE UNDERWRITERS
LABORATORIES INCORPORATED.
3. THE INTENT OF THE DRAWINGS IS TO INDICATE THE
GENERAL EXTENT OF WORK REQUIRED FOR THE
PROJECT. THE DRAWINGS FOR ELECTRICAL WORK
ARE DIAGRAMMATIC, SHOWING THE LOCATION,
TYPE, DEVICES AND EQUIPMENT REQUIRED. THE
DRAWINGS SHALL NOT BE SCALED FOR EXACT
MEASUREMENTS. PROVIDE ALL FIXTURES,
DEVICES, ACCESSORIES, OFFSETS, AND
MATERIALS NECESSARY TO FACILITATE THE
SYSTEM'S FUNCTIONING AS INDICATED BY THE
DESIGN AND THE EQUIPMENT FURNISHED BY
OTHERS.
4, EXISTING CONDITIONS ARE BASED ON "AS-BUILT"
DRAWINGS PROVIDED BY THE OWNER AND LIMITED
FIELD VERIFICATION. CONTRACTOR SHALL ADJUST
TO ACTUAL FIELD CONDITIONS AT NO ADDITIONAL
EXPENSE TO THE OWNER. CONTRACTOR IS TO
FIELD VERIFY EXISTING CONDITIONS PRIOR TO
BIDDING.
5. ELECTRICAL CONTRACTOR TO FIELD VERIFY ALL
EXISTING UNDERGROUND UTILITIES. ANY ITEM
DAMAGED BY THIS CONTRACTOR SHALL BE
REPAIRED IMMEDIATELY AND AT NO COST TO THE
OWNER.
6. CONTRACTOR TO VERIFY PLACEMENT OF ALL
DEVICES SHOWN ON THE ELECTRICAL
CONSTRUCTION DOCUMENTS.
7. CONTRACTOR SHALL COORDINATE NOTICE TO
DOMINION VIRGINIA POWER (DVP) TO FACILITATE A
SMOOTH WORK-FLOW.
8. CONTRACTOR'S FEE SHALL INCLUDE ANY
CHARGES BY DVP. THESE CHARGES MAY INCLUDE
BUT NOT LIMITED TO SERVICES OR FIELD WORK
PERFORMED BY DVP PERSONNEL FOR THE
CONTRACTOR TO COMPLETE THIS CONTRACT. DVP
MAY REQUIRE ONLY DVP PERSONNEL TO PERFORM
WORK INVOLVING DVP EQUIPMENT. DVP MAY
REQUIRE DVP PERSONNEL TO MONITOR UTILITY
SYSTEM PERFORMANCE REMOTELY WHILE THE
CONTRACTOR IS WORKING ON THE SYSTEM
DURING OUTAGES OR UTILITY DISCONNECTS OR
RECONNECTS. THE CONTRACTOR IS RESPONSIBLE
FOR CONTACTING DVP TO DETERMINE WHAT
THESE CHARGES MIGHT BE AND INCLUDING THEM
IN THEIR PROPOSALS.
AutoCAD SHX Text
SHEET INDEX, SYMBOLS AND ABBREVIATIONS
AutoCAD SHX Text 3193067
AutoCAD SHX Text
AutoCAD SHX Text
PJM
AutoCAD SHX Text
PJM
AutoCAD SHX Text
DT
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
MARINE CORPS BASE - QUANTICO
AutoCAD SHX Text
QUANTICO, VA
AutoCAD SHX Text
AutoCAD SHX Text
<<PM/DM>>
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 10 MARCH 2009
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
ARLINGTON, VIRGINIA 22201
AutoCAD SHX Text
TEL (571) 218-1000
AutoCAD SHX Text
FAX (571) 218-1600
AutoCAD SHX Text
1100 NORTH GLEBE ROAD SUITE 500
AutoCAD SHX Text
APRIL 10, 2020
AutoCAD SHX Text
QU1810M PWB#2017137
TironaD Text Box 04/10/2020
TironaD Stamp
R E
P A
IR
T
B S
E
LE
C
TR
IC
A
L S
Y S
TE
M
S
U B
S
TA
TI
O
N
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
G-003
MV SWITCHGEAR OUTAGE SEQUENCE OF OPERATION
CONTRACTOR'S FEE SHALL INCLUDE ANY CHARGES BY DVP. THE CHARGES MAY INCLUDE BUT ARE NOT LIMITED TO SERVICES OR FIELD WORK PERFORMED BY DVP PERSONNEL FOR THE CONTRACTOR TO COMPLETE THIS CONTRACT. DVP MAY REQUIRE ONLT DVP PERSONNEL TO PERFORM WORK INVOLVING DVP EQUIPMENT. DVP MAY REQUIRE DVP PERSONNEL TO MONITOR UTILITY SYSTEM PERFORMANCE REMOTELY WHILE THE CONTRACTOR IS WORKING ON THE SYSTEM DURING OUTAGES OR UTILITY DISCONNECTS OR RECONNECTS. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING DVP TO DETERMINE WHAT THESE
CHARGES MIGHT BE AND INCLUDING THEM IN THEIR PROPOSALS.
13.2 KV WORK
PRE-OUTAGE
1. RUN A TEMPORARY, ABOVE-GROUND, 500 KCMIL, 3-PHASE CIRCUIT FROM A TEMPORARY PAD MOUNTED SWITCHGEAR TO BE PLACED NEAR THE FIRST 13.2 KV MANHOLE TO THE DOMINION-VIRGINIA POWER (DVP) DELIVERY STRUCTURE. REFER
TO SHEET E-104 DETAIL A2.
a. CONNECTION TO THE DVP DELIVERY STRUCTURE WILL BE MADE DURING THE OUTAGE.
b. THE TEMPORARY SWITCHGEAR IS TO BE FURNISHED AND INSTALLED BY THE CONTRACTOR ON A TEMPORARY, ELEVATED PAD AND SHALL BE RATED 1200A WITH (3) TWO 600A FUSED SWITCHES. FUSES SHALL BE SIZED TO PROTECT
THE CABLES.
2. PROTECT THE TEMPORARY CONDUCTORS AND THE SWITCH FOR THE DURATION OF CONSTRUCTION.
OUTAGE #1
1. DVP TO OPEN THEIR 13.2 KV SERVICE DISCONNECT.
2. DISCONNECT THE EXISTING TBS SERVICE CONDUCTORS FROM THE DELIVERY STRUCTURE AND REMOVE. LEAVE CONDUIT.
3. DISCONNECT THE TBS FEEDER CONDUCTORS FROM THE EXISTING SWITCHGEAR.
4. REMOVE TBS FEEDER CONDUCTORS BACK TO THE FIRST MANHOLE, SPLICE NEW CONDUCTORS, AS NEEDED, TO THE
EXISTING CIRCUIT IN THE MANHOLE, AND CONNECT TO THE TEMPORARY SWITCHGEAR.
a. PROTECT THE CONDUCTORS FOR THE DURATION OF CONSTRUCTION.
b. PROTECT THE SWITCH FOR THE DURATION OF CONSTRUCTION.
c. PROTECT THE OPEN MANHOLE FOR THE DURATION OF CONSTRUCTION.
5. CONNECT THE TEMPORARY DVP SERVICE AT THE DELIVERY STRUCTURE AND AT THE TEMPORARY SWITCH.
6. DVP TO CLOSE SERVICE DISCONNECT.
7. CLOSE FEEDERS AT TEMPORARY SWITCHGEAR.
POST-OUTAGE #1
1. CONTRACTOR'S NICET 3 STAFF SHALL COORDINATE WITH THE BASE FIRE DEPARTMENT'S DISPATCH OFFICE TO RESET LIFE SAFETY SYSTEMS (SEE TABLE BELOW). THE CONTRACTOR'S NICET 3 STAFF SHALL BE FIELD RESETTING THE SYSTEM
WHILE IN COMMUNICATION WITH DISPATCH OFFICE PERSONNEL.
2. REMOVE THE EXISTING 13.2 KV SWITCHGEAR.
3. REMOVE THE EXISTING 13.2 KV SWITCHGEAR PAD.
4. REWORK THE EXISTING CONDUITS TO SUIT THE NEW PAD MOUNTED SWITCHGEAR.
5. RUN A 5" PVC CONDUIT FROM THE 13.2KV SWITCHGEAR TO THE NEW PAD MOUNTED STATION SERVICE TRANSFORMER.
6. RUN 2” UNDERGROUND PVC CONDUITS FROM THE PAD MOUNTED TRANSFORMER LOW VOLTAGE CONNECTION AND THE
AUXILIARY PANEL TO THE SCADA CABINET.
7. POUR NEW PADS FOR THE PAD MOUNTED SWITCHGEAR AND THE PAD MOUNTED TRANSFORMER.
8. SET THE PAD MOUNTED SWITCHGEAR AND PAD MOUNTED TRANSFORMER.
9. TERMINATE 13.2 KV SERVICE CONDUCTORS USING NEW DEAD-BREAK ELBOWS.
10. INSTALL NEW CONDUCTORS FROM THE PAD MOUNTED SWITCHGEAR TO THE DVP DELIVERY STRUCTURE.
OUTAGE #2
1. DVP TO OPEN SERVICE DISCONNECT.
2. CONNECT THE NEW DVP SERVICE CONDUCTORS AT THE DVP DELIVERY.
3. DISCONNECT THE TBS FEEDERS FROM THE TEMPORARY SWITCH AND REMOVE CONDUCTORS TO PADMOUNTED
SWITCHGEAR AT MANHOLE #2.
4. REPLACE 3# 500KCMIL TBS1 CIRCUIT FROM NEW SWITCHGEAR IN SUBSTATION TO EXISTING SWITCHGEAR AT MANHOLE #2.
INSTALL DEADBREAK ELBOWS ON EACH END. SPLICE TBS2 AT MH-1.
5. TEST.
6. DVP TO CLOSE SERVICE DISCONNECT.
7. CLOSE FEEDERS AT PAD MOUNTED SWITCHGEARS.
POST-OUTAGE #2
1. CONTRACTOR'S NICET 3 STAFF SHALL COORDINATE WITH THE BASE FIRE DEPARTMENT'S DISPATCH OFFICE TO RESET LIFE SAFETY SYSTEMS (SEE TABLE BELOW). THE CONTRACTOR'S NICET 3 STAFF SHALL BE FIELD RESETTING THE SYSTEM
WHILE IN COMMUNICATION WITH DISPATCH OFFICE PERSONNEL.
34.5 KV WORK
PRE-OUTAGE
1. RUN A TEMPORARY, ABOVE-GROUND, 500 KCMIL, 3-PHASE CIRCUIT FROM A TEMPORARY PAD MOUNTED SWITCHGEAR TO BE PLACED NEAR THE FIRST 34.5 KV MANHOLE TO THE DOMINION-VIRGINIA POWER (DVP) DELIVERY STRUCTURE. REFER
TO SHEET E-104 DETAIL A2.
a. CONNECTION TO THE DVP DELIVERY STRUCTURE WILL BE MADE DURING THE OUTAGE.
b. THE TEMPORARY SWITCHGEAR IS TO BE FURNISHED AND INSTALLED BY THE CONTRACTOR ON A TEMPORARY, ELEVATED PAD AND RATED 1200A WITH 3-600A FUSED SWITCHES. FUSES SHALL BE SIZED TO PROTECT THE CABLES.
2. PROTECT THE TEMPORARY CONDUCTORS AND THE SWITCH FOR THE DURATION OF CONSTRUCTION.
3. COORDINATE WITH FBI PERSONNEL TO ALERT THEM OF UPCOMING OUTAGES
OUTAGE #1
1. DVP TO OPEN THEIR 34.5 KV SERVICE DISCONNECT.
2. DISCONNECT THE EXISTING FBI SERVICE CONDUCTORS FROM THE DELIVERY STRUCTURE AND REMOVE. LEAVE CONDUIT.
3. DISCONNECT THE FBI FEEDER CONDUCTORS FROM THE EXISTING SWITCHGEAR.
4. PULL FBI FEEDER CONDUCTORS BACK TO THE FIRST MANHOLE. SPLICE NEW CONDUCTORS, AS NEEDED, TO THE EXISTING
CIRCUIT AND CONNECT TO THE TEMPORARY SWITCHGEAR.
a. PROTECT THE CONDUCTORS FOR THE DURATION OF CONSTRUCTION.
b. PROTECT THE SWITCH FOR THE DURATION OF CONSTRUCTION.
c. PROTECT THE OPEN MANHOLE FOR THE DURATION OF CONSTRUCTION.
d. REPLACE CABLE TERMINATIONS TO SUIT THE TEMPORARY SWITCHGEAR.
5. CONNECT THE TEMPORARY DVP SERVICE AT THE DELIVERY STRUCTURE.
6. DVP TO CLOSE SERVICE DISCONNECT.
7. CLOSE FEEDERS AT TEMPORARY SWITCHGEAR.
POST-OUTAGE #1
1. CONTRACTORS NICET 3 STAFF SHALL COORDINATE WITH FBI PERSONNEL AND THE BASE FIRE DEPARTMENT'S DISPATCH OFFICE TO RESET LIFE SAFETY SYSTEMS IN BUILDINGS ON THE FBI CAMPUS. FBI PERSONNEL SHALL BE FIELD RESETTING THE SYSTEMS WHILE IN COMMUNICATION WITH THE CONTRACTOR'S NICET 3 STAFF AND DISPATCH OFFICE PERSONNEL.
2. REMOVE THE EXISTING 34.5 KV SWITCHGEAR.
3. REMOVE THE EXISTING 34.5 KV SWITCHGEAR PAD.
4. REWORK THE EXISTING CONDUITS TO SUIT THE NEW PADMOUNTED SWITCHGEAR AND ITS LOCATION.
5. RUN A 2” UNDERGROUND PVC CONDUIT STUB-UP FROM THE LOW VOLTAGE CONNECTION TO THE SCADA CABINET.
6. POUR A NEW PAD FOR THE PAD MOUNTED SWITCHGEAR.
7. SET THE PAD MOUNTED SWITCHGEAR.
8. TERMINATE 34.5 KV SERVICE CONDUCTORS USING NEW DEAD-BREAK ELBOWS.
OUTAGE #2
1. DVP TO OPEN SERVICE DISCONNECT.
2. INSTALL THE NEW DVP SERVICE CONDUCTORS FROM THE DVP DELIVERY TO THE NEW 34.5KV SWITCHGEAR.
3. DISCONNECT THE FBI FEEDERS FROM THE TEMPORARY SWITCH.
4. REPLACE FBI FEEDERS FROM THE MANHOLE TO THE NEW PAD MOUNTED SWITCHGEAR BY SPLICING IN THE MANHOLE
(MH-1).
5. INSTALL NEW DEAD-BREAK ELBOWS TO SUIT THE NEW PAD MOUNTED SWITCHGEAR.
6. TEST.
7. DVP TO CLOSE SERVICE DISCONNECT.
8. CLOSE FEEDERS AT PAD MOUNTED SWITCHGEAR.
POST-OUTAGE #2
1. CONTRACTORS NICET 3 STAFF SHALL COORDINATE WITH FBI PERSONNEL AND THE BASE FIRE DEPARTMENT'S DISPATCH OFFICE TO RESET LIFE SAFETY SYSTEMS IN BUILDINGS ON THE FBI CAMPUS. FBI PERSONNEL SHALL BE FIELD RESETTING THE SYSTEMS WHILE IN COMMUNICATION WITH THE CONTRACTOR'S NICET 3 STAFF AND DISPATCH OFFICE PERSONNEL.
AutoCAD SHX Text
MARINE CORPS BASE - QUANTICO
AutoCAD SHX Text
QUANTICO, VA
AutoCAD SHX Text
AutoCAD SHX Text
<<PM/DM>>
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 10 MARCH 2009
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
ARLINGTON, VIRGINIA 22201
AutoCAD SHX Text
TEL (571) 218-1000
AutoCAD SHX Text
FAX (571) 218-1600
AutoCAD SHX Text
1100 NORTH GLEBE ROAD SUITE 500
AutoCAD SHX Text
APRIL 10, 2020
AutoCAD SHX Text
QU1810M PWB#2017137
AutoCAD SHX Text
SEQUENCE OF CONSTRUCTION
AutoCAD SHX Text 3193068
AutoCAD SHX Text
AutoCAD SHX Text
FSK
AutoCAD SHX Text
FSK
AutoCAD SHX Text
HW
AutoCAD SHX Text
AS NOTED
TironaD Text Box 04/10/2020
ELE
C.
VAULT
CONCRETE
SHED
SWITCH
SWITCH
GRAVEL
COMMUNIC
ATIO
NS
PANEL
GRAVEL
SF
SF
SF
SF
SF
SF
SF
SF
SF
ELE
C.
VAULT
CONCRETE
SHED
SWITCH
SWITCH
GRAVEL
COMMUNIC
ATIO
NS
PANEL
GRAVEL
9.5'
10.1'
.8
.6
SF
SF
SF
SF
SF
SF
SF
SF
SF
4.
0'
0.75'
1.0'
1.33'
1.0'
# 4 @ 1.0' O.C. EACH
WAY
1" CHAMFER
AGGREGATE BASE
0.75'
3" MIN. CLR.
SEE NOTE 1
3" MIN. CLR.
0.5'
SUBGRADE COMPACTED
TO 95% DRY DENSITY
(ASTM D698)
C-100
C-100
A1 EXISTING CONDITION AND DEMO PLAN
1" : 10'
LEGEND
CONCRETE PAD
SILT FENCE
KEY NOTES
DEMOLISH CONCRETE PAD.
2 DEMOLISH SHED AND CONCRETE PAD
3 DEMOLISH SWITCH GEAR; SEE ELEC
EXISTING CHAIN LINK GATE AND FENCE TO
REMAIN5
NOTES
1. CONCRETE PAD DIMENSIONS SHALL BE CONFIRMED
WITH MANUFACTOR OF ELECTRICAL SWITCH GEAR.
2. ELECTRICAL SWITCH LAYOUT SHOWN ON
ELECTRICAL SHEETS.
3. CONCRETE ANCHORS, CONDUIT LOCATION, AND
FINAL DIMENSIONS SHALL BE COORDINATED WITH
THE EQUIPMENT MANUFACTURES PLANS AND
EQUIPMENT ORIENTATION.
4. CONTRACTOR SHALL DISPOSE OF ALL DEBRIS AND
CONSTRUCTION MATERIAL IN AN APPROVED
OFF-SITE WASTE DISPOSAL FACILITY.
5. DISTRURBED AREA SHALL NOT EXCEED 5,000 SF,
WITHIN THE PROJECT LIMITS. CONTRACTOR SHALL
NOTIFY COR IF DISTURBANCE THRESHOLD WILL BE
INCREASED PRIOR TO THE START OF ANY
EXCAVATION.
6. ALL AREAS WITHIN THE YARD SHALL BE COVERED
WITH GRAVEL AND NO SOIL SHALL BE LEFT
EXPOSED. NEW GRAVEL SHALL MATCH EXISTING
GRAVEL ON SITE.
R E
P A
IR
T
B S
E
LE
C
TR
IC
A
L S
Y S
TE
M
S
U B
S
TA
TI
O
N
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
C-100
A2 PROPOSED PLAN
1" : 10'
COMMUNICATION PANEL TO REMAIN
7 PROPOSED CONCRETE PAD (6'-3" X 10'-9")
PAD ELEVATION = 227.8
8 PROPOSED CONCRETE PAD (6'-3" X 10'-9")
PAD ELEVATION = 227.1
FEET
1:10
20100 5
SF
C-100
A4 CONCRETE PAD
NTS
C-100
C4 SILT FENCE DETAIL
NTS
9 DOMINION POWER SUBSTATION
10 PROPOSED CONCRETE PAD (2'-9" X 3'-1")
PAD ELEVATION = 227.1
6" OF GRAVEL SHALL BE PLACED WHERE
DEMOLITION OCCURRED OF EXISTING PADS,
CARE SHALL BE TAKEN THAT SPOILS FROM
EXCAVATION FOR NEW PADS DOES NOT COVER
GRAVEL IN YARD. GRAVEL IS TO MATCH
EXISTING GRAVEL ON SITE. GRADE TO DRAIN.
GRAVEL
4 NOT USED
FEET
1:10
20100 5
AutoCAD SHX Text
CIVIL PLAN AND DETAILS
AutoCAD SHX Text 3193069
AutoCAD SHX Text
AutoCAD SHX Text
PJM
AutoCAD SHX Text
PJM
AutoCAD SHX Text
RT
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
MARINE CORPS BASE - QUANTICO
AutoCAD SHX Text
QUANTICO, VA
AutoCAD SHX Text
AutoCAD SHX Text
<<PM/DM>>
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 10 MARCH 2009
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
ARLINGTON, VIRGINIA 22201
AutoCAD SHX Text
TEL (571) 218-1000
AutoCAD SHX Text
FAX (571) 218-1600
AutoCAD SHX Text
1100 NORTH GLEBE ROAD SUITE 500
AutoCAD SHX Text
APRIL 10, 2020
AutoCAD SHX Text
QU1810M PWB#2017137
TironaD Text Box 04/10/2020
BrasweR Image
| F5Y67384_G-SHEETS |
| Sheets and Views |
| G-001 |
| Sheets and Views |
| G-002 |
| Sheets and Views |
| G-003 |
| F5Y67384_C-100 |
| Sheets and Views |
| C-100 |
F5Y67384_ELECTRICAL-SHEETS