Attachment_B_Drawings.pdf

PDF 6 MB Posted

Attached to
Building and Waterline Construction, Ozette Area Federal contract opportunity
Solicitation number
140P8323R0003
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document package includes construction drawings and specifications for a federal contract opportunity to replace water distribution lines at Olympic National Park in Washington state. The scope of work involves installing approximately 2,000 linear feet of 2-inch HDPE waterlines, abandoning existing water infrastructure in place where possible, constructing two new buildings, and replacing associated valves, hydrants, and service connections. Work will require archaeological monitoring, coordination with tribal authorities, and adherence to NPS standards and Washington state regulations for public water systems. Bidders should note requirements for experienced personnel, safety compliance, erosion control, waste disposal, and environmental protection measures.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET SUB SHEET TITLE OF SHEET

1 G0 COVER SHEET & VICINITY MAP

2 G1 GENERAL NOTES

3 G2 EXISTING CONDITIONS

4 G3 UTILITY SUPPORT RACK - PHOTOS

5 G4 COAL CREEK BRIDGE DRAWINGS

6 C1 CONSTRUCTION SITE PLAN

7 C2 TRENCH DETAILS

UNITED STATES

DEPARTMENT OF THE INTERIOR

TITLE OF PROJECT

REPLACE WATER DISTRIBUTION LINES

DRAWING NO.

_149_

XXX,XXX

NATIONAL PARK SERVICE

OLYMPIC NATIONAL PARK

LOCATION WITHIN PARK

OZETTE LAKE

PMIS/PKG NO.

237330

REGION COUNTY STATE

PACIFIC WEST CLALLAM WASHINGTON

SHEET

_1_ OF _7_

GENERAL NOTES

1. ALL CONSTRUCTION SHALL BE IN CONFORMANCE WITH NPS STANDARDS AND

THE REQUIREMENTS OF CHAPTER 246-290 WASHINGTON ADMINISTRATIVE

CODE (GROUP A PUBLIC WATER SUPPLIES), IN ADDITION TO OTHER STATE

AND LOCAL STANDARDS.

2. CONTRACTOR SHALL CONTACT DIG ALERT AND FIELD VERIFY ALL UTILITIES

PRIOR TO EXCAVATION. DIAL 811 BEFORE YOU DIG. CONDUCT PRIVATE

LOCATES AS REQUIRED.

3. DIMENSIONS SHOWN ON PLANS ARE TO BE USED BY CONTRACTOR TO

DETERMINE APPROXIMATE FIELD CONDITIONS. PRIOR TO CONSTRUCTION,

CONTRACTOR SHALL FIELD VERIFY EXISTING LOCATIONS, ELEVATIONS,

MATERIAL TYPES, DIAMETER OF PIPES, ETC. OF ALL UTILITIES AND FEATURES

WHERE PROPOSED IMPROVEMENTS CONNECT. NOTIFY CONTRACTING

OFFICER OF ANY DISCREPANCIES IN WRITING.

4. EXISTING FACILITIES, INCLUDING BUT NOT LIMITED TO ROADS, SIDEWALKS,

STRUCTURES AND UTILITIES, DAMAGED BY CONTRACTOR’S OPERATIONS

SHALL BE RESTORED TO MATCH ORIGINAL PRE-CONSTRUCTION CONDITION

AND TO THE SATISFACTION OF THE CONTRACTING OFFICER WITHOUT

ADDITIONAL COST TO THE GOVERNMENT.

5. ALL DISTURBED ASPHALT, GRASS, DRAINAGE PATTERNS, ROADSIDE DITCHES,

TRAILS AND GRADE SHALL BE RESTORED TO ITS ORIGINAL CONDITION OR AS

CALLED FOR IN THE CONTRACT DOCUMENTS, WHICHEVER IS MORE

STRINGENT.

6. CONTRACTOR SHALL FURNISH AND INSTALL EVERYTHING REQUIRED TO

PROVIDE COMPLETE AND OPERABLE FACILITIES AS SHOWN HEREIN. IF THERE

IS AN OMISSION ON THE CONSTRUCTION DOCUMENTS, SUCH OMISSION

SHALL NOT BE CONSTRUED TO MEAN THAT THE CONTRACTOR IS NOT

REQUIRED TO FURNISH OR PROVIDE EVERYTHING THAT IS NECESSARY TO

PROVIDE COMPLETE AND OPERABLE FACILITIES.

7. ALL CONTRACTORS WORKING WITH THE PROJECT BOUNDARIES ARE

RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE SAFETY LAWS.

CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL EMPLOYEES AND/OR

SUBCONTRACTORS WITH PERSONAL PROTECTIVE EQUIPMENT AND

FOLLOWING ALL SAFETY PROTOCOLS.

8. CONTRACTOR SHALL PROVIDE TRACER WIRE AND LOCATOR TAPE FOR ALL

BURIED PIPE AND CONDUITS.

9. ALL COSTS INCURRED IN CORRECTION OF DEFICIENT WORK SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

10. CONSTRUCTION FENCING OR BARRIERS SHALL BE PROVIDED WHERE

NECESSARY, INCLUDING AROUND OPEN EXCAVATIONS WHEN WORK IS NOT

ACTIVELY IN PROGRESS, TO PREVENT THE PUBLIC FROM ENTERING WORK

AREAS.

11. UNLESS OTHERWISE INDICATED, DEMOLISHED MATERIALS BECOME THE

PROPERTY OF THE CONTRACTOR. COMPLY WITH EPA REGULATIONS AND

DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION.

12. MINIMIZE CONSTRUCTION IMPACTS TO SOILS, WATER, PLANTS, AND

ANIMALS, AND OTHER NATURAL RESOURCES DURING CONSTRUCTION.

CONFINE CONSTRUCTION OPERATIONS TO MINIMUM PRACTICAL AREA. IN NO

CASE SHALL CONSTRUCTION OPERATIONS EXTEND BEYOND LIMITS OF

CONSTRUCTION INDICATED WITHOUT PRIOR APPROVAL BY THE

CONTRACTING OFFICER.

13. CONDUCT ALL OPERATIONS IN ACCORDANCE WITH APPROVED, CONTRACTOR-

PREPARED UNDER-AN-ACRE POLLUTION PREVENTION PLAN (UPPP).

DESIGNED:

K. COOK

SUB SHEET NO. TITLE OF SHEET

GENERAL NOTES

DRAWING NO.

_149_

XXX,XXX

TECH REVIEW:

L. TURECEK G1 REPLACE WATER DISTRIBUTION LINES

PMIS/PKG NO.

237330

DATE:

4/2023

OZETTE LAKE

OLYMPIC NATIONAL PARK

SHEET

_2_ OF _7_

DESIGNED:

K. COOK

SUB SHEET NO. TITLE OF SHEET

GENERAL NOTES

DRAWING NO.

_149_

XXX,XXX

TECH REVIEW:

L. TURECEK G2 REPLACE WATER DISTRIBUTION LINES

PMIS/PKG NO.

237330

DATE:

4/2023

OZETTE LAKE

OLYMPIC NATIONAL PARK

SHEET

_3_ OF _7_

A SERVICE LINES INSIDE SOUTHEAST CORNER

OF WATER TREATMENT BUILDINGG2

D CAMPGROUND YARD HYDRANT, POST

& DRAIN PADG2

B RANGER STATION VALVE BOX & YARD

HYDRANTG2

C COMFORT STATION ABOVE-GROUND

EXPOSED VALVEG2

NPS HOUSING LINE –

RUNS NORTH

CAMPGROUND LINE –

RUNS SOUTH

SUB SHEET NO. TITLE OF SHEET

UTILITY SUPPORT RACK - PHOTOS

DRAWING NO.

_149_

XXX,XXX

TECH REVIEW:

L. TURECEK G3 REPLACE WATER DISTRIBUTION LINES

PMIS/PKG NO.

237330

DATE:

4/2023

OZETTE LAKE

OLYMPIC NATIONAL PARK

SHEET

_4_ OF _7_

A VIEW: LOOKING FROM SOUTH TO NORTH

G3

B VIEW: LOOKING FROM NORTH TO SOUTH

G3

EXISTING INSULATED &

SLEEVED WATER LINE

EXISTING INSULATED &

SLEEVED WATER LINE

SUB SHEET NO. TITLE OF SHEET

COAL CREEK BRIDGE DRAWINGS

DRAWING NO.

_149_

XXX,XXX

TECH REVIEW:

L. TURECEK G4 REPLACE WATER DISTRIBUTION LINES

PMIS/PKG NO.

237330

DATE:

4/2023

OZETTE LAKE

OLYMPIC NATIONAL PARK

SHEET

_5_ OF _7_

A COAL CREEK BRIDGE – END SECTION VIEW

G4

B COAL CREEK BRIDGE – UTILITY SUPPORT SYSTEM

G4

CONNECT TO EXISTING

CAMPGROUND SERVICE

LINE AT EXISTING

TREATMENT BUILDING

MAINTAIN > 10’

HORIZONTAL

SEPARATION FROM

CXT TOILET VAULT

MAINTAIN 10’ HORIZONTAL

SEPARATION FROM SEWAGE FORCE

MAIN OR CONSULT DESIGN ENGINEER

FOR GUIDANCE ON SLEEVING

INSULATE, SLEEVE

AND SECURE WATER

LINE TO BRIDGE

(SIMILAR TO EXISTING)

PROVIDE NEW SERVICE LINE

UP TO AND REPLACE RANGER

STATION SHUT-OFF VALVE;

INSTALL YARD HYDRANT

WITH MOUNTING POST &

DRAIN PAD, PER SPECS

PROVIDE NEW SERVICE LINE UP

TO AND REPLACE COMFORT

STATION SHUT-OFF VALVE

WITH NEW IN-GROUND VALVE

W/ DRAIN & VALVE BOX

PROVIDE NEW SERVICE LINE TO

CAMPGROUND; INSTALL YARD

HYDRANT WITH MOUNTING

POST & DRAIN PAD, PER SPECS

PROVIDE NEW SERVICE LINE TO

CAMP HOST SITE; INSTALL

LOCKABLE YARD HYDRANT

WITH MOUNTING POST &

DRAIN PAD, PER SPECS

INSTALL LOW POINT DRAIN

WITH DRAIN PAD BEHIND

CAMPGROUND YARD HYDRANT

INSTALL NEW VALVE W/ DRAIN &

VALVE BOX IN MAIN LINE,

BEYOND COMFORT STATION

SERVICE LINE

DESIGNED:

K. COOK

SUB SHEET NO. TITLE OF SHEET

CONSTRUCTION SITE PLAN

DRAWING NO.

_149_

XXX,XXX

TECH REVIEW:

L. TURECEK C1 REPLACE WATER DISTRIBUTION LINES

PMIS/PKG NO.

237330

DATE:

4/2023

OZETTE LAKE

OLYMPIC NATIONAL PARK

SHEET

_6_ OF _7_

KEY NOTES:

1. DEMOLISH AND REMOVE ALL ABOVE-GROUND

INFRASTRUCTURE FROM EXISTING WATER

DISTRIBUTION SYSTEM; COORDINATE WITH

COR

2. ALL NEW WATER SYSTEM COMPONENTS MUST

HAVE NSF 61 CERTIFICATION

3. NEW WATER LINE SHALL BE 2” HDPE SDR 11

FUSED PIPE

4. EXISTING PIPE AND BELOW-GROUND

APPURTENANCES OF EXISTING WATER SYSTEM

SHALL BE ABANDONED IN PLACE UNLESS

REMOVAL IS NECESSARY FOR INSTALLATION

OF NEW WATER LINE

5. MAKE CONNECTIONS TO EXISTING BUILDING

SERVICE LINES AS REQUIRED DOWNSTREAM

OF NEW VALVES

6. ARCHAEOLOGICAL MONITORING AND TRIBAL

NOTIFICATION IS REQUIRED A MINIMUM OF

FOUR WEEKS PRIOR TO GROUND

DISTURBANCE; COORDINATE WITH COR

DEMOLISH ABOVE-GROUND

COMPONENTS OF EXISTING

WATER SYSTEM NOT RE-USED;

HERE AND SIMILAR

SUB SHEET NO. TITLE OF SHEET

TRENCH DETAILS

DRAWING NO.

_149_

XXX,XXX

TECH REVIEW:

L. TURECEK C2 REPLACE WATER DISTRIBUTION LINES

PMIS/PKG NO.

237330

DATE:

4/2023

OZETTE LAKE

OLYMPIC NATIONAL PARK

SHEET

_7_ OF _7_

2’ MIN

Relocate SAR Cache and Maintenance Buildings Drawings
Ozette Water Line Drawings