Attachment_F_Drawings_(Revised)_0001.pdf
PDF 6 MB Posted
- Attached to
- Building and Waterline Construction, Ozette Area Federal contract opportunity
- Solicitation number
- 140P8323R0003
About this file
This document package includes construction drawings and specifications for replacing water distribution lines at Olympic National Park. The drawings depict the existing water system infrastructure and proposed work, including replacing above-ground components, installing approximately 400 linear feet of 2-inch HDPE water main with fused joints, individual 1-inch HDPE service laterals, new valves and valve boxes, yard hydrants, connections to existing buildings, and abandoning existing below-ground pipes and appurtenances in place. Notable project requirements include NSF 61 certification for all new water system components, archaeological monitoring and tribal notification prior to ground disturbance, and following existing alignments to limit new ground impacts. The related federal contract opportunity is to construct two new 24-foot by 24-foot slab on grade buildings and HDPE waterlines in the Ozette area of Olympic National Park. The soliciting agency is the National Park Service Pacific West Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_E_Site_Visit_Discussion_Notes_0001.pdf | ||
| Attachment_H_Olympic_National_Park_Cultural_Resource_Inadvertent_Discovery_Plan_-_Makah__0001.pdf | ||
| Attachment_G_Hazards_Materials_Survey-Ozette_Ranger_Station_Report_0001.pdf | ||
| Sol_140P8323R0003_Amd_0001.pdf | ||
| Attachment_C_DOL_Wage_Determination.pdf | ||
| Attachment_D_Forms_to_Return_with_Proposal.docx | DOCX document | |
| Attachment_A_Specifications.pdf | ||
| Attachment_B_Drawings.pdf | ||
| Sol_140P8323R0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET SUB SHEET TITLE OF SHEET
1 G0 COVER SHEET & VICINITY MAP
2 G1 GENERAL NOTES
3 G2 EXISTING CONDITIONS
4 G3 UTILITY SUPPORT RACK - PHOTOS
5 G4 COAL CREEK BRIDGE DRAWINGS
6 C1 CONSTRUCTION SITE PLAN
7 C2 TRENCH DETAILS
UNITED STATES
DEPARTMENT OF THE INTERIOR
TITLE OF PROJECT
REPLACE WATER DISTRIBUTION LINES
DRAWING NO.
_149_
188,361
NATIONAL PARK SERVICE
OLYMPIC NATIONAL PARK
LOCATION WITHIN PARK
OZETTE LAKE
PMIS/PKG NO.
237330
REGION COUNTY STATE
PACIFIC WEST CLALLAM WASHINGTON
SHEET
_1_ OF _7_
GENERAL NOTES
1. ALL CONSTRUCTION SHALL BE IN CONFORMANCE WITH NPS STANDARDS AND
THE REQUIREMENTS OF CHAPTER 246-290 WASHINGTON ADMINISTRATIVE
CODE (GROUP A PUBLIC WATER SUPPLIES), IN ADDITION TO OTHER STATE
AND LOCAL STANDARDS.
2. CONTRACTOR SHALL CONTACT DIG ALERT AND FIELD VERIFY ALL UTILITIES
PRIOR TO EXCAVATION. DIAL 811 BEFORE YOU DIG. CONDUCT PRIVATE
LOCATES AS REQUIRED. EXISTING WATER AND SEWER LINES MAY BE NON-
CONDUCTING MATERIAL WITH NO TRACER WIRE.
3. DIMENSIONS SHOWN ON PLANS ARE TO BE USED BY CONTRACTOR TO
DETERMINE APPROXIMATE FIELD CONDITIONS. PRIOR TO CONSTRUCTION,
CONTRACTOR SHALL FIELD VERIFY EXISTING LOCATIONS, ELEVATIONS,
MATERIAL TYPES, DIAMETER OF PIPES, ETC. OF ALL UTILITIES AND FEATURES
WHERE PROPOSED IMPROVEMENTS CONNECT. NOTIFY CONTRACTING
OFFICER OF ANY DISCREPANCIES IN WRITING.
4. EXISTING FACILITIES, INCLUDING BUT NOT LIMITED TO ROADS, SIDEWALKS,
STRUCTURES AND UTILITIES, DAMAGED BY CONTRACTOR’S OPERATIONS
SHALL BE RESTORED TO MATCH ORIGINAL PRE-CONSTRUCTION CONDITION
AND TO THE SATISFACTION OF THE CONTRACTING OFFICER WITHOUT
ADDITIONAL COST TO THE GOVERNMENT.
5. ALL DISTURBED ASPHALT, GRASS, DRAINAGE PATTERNS, ROADSIDE DITCHES,
TRAILS AND GRADE SHALL BE RESTORED TO ITS ORIGINAL CONDITION OR AS
CALLED FOR IN THE CONTRACT DOCUMENTS, WHICHEVER IS MORE
STRINGENT.
6. CONTRACTOR SHALL FURNISH AND INSTALL EVERYTHING REQUIRED TO
PROVIDE COMPLETE AND OPERABLE FACILITIES AS SHOWN HEREIN. IF THERE
IS AN OMISSION ON THE CONSTRUCTION DOCUMENTS, SUCH OMISSION
SHALL NOT BE CONSTRUED TO MEAN THAT THE CONTRACTOR IS NOT
REQUIRED TO FURNISH OR PROVIDE EVERYTHING THAT IS NECESSARY TO
PROVIDE COMPLETE AND OPERABLE FACILITIES.
7. ALL CONTRACTORS WORKING WITH THE PROJECT BOUNDARIES ARE
RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE SAFETY LAWS.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL EMPLOYEES AND/OR
SUBCONTRACTORS WITH PERSONAL PROTECTIVE EQUIPMENT AND
FOLLOWING ALL SAFETY PROTOCOLS.
8. CONTRACTOR SHALL PROVIDE TRACER WIRE AND LOCATOR TAPE FOR ALL
BURIED PIPE AND CONDUITS.
9. ALL COSTS INCURRED IN CORRECTION OF DEFICIENT WORK SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
10. CONSTRUCTION FENCING OR BARRIERS SHALL BE PROVIDED WHERE
NECESSARY, INCLUDING AROUND OPEN EXCAVATIONS WHEN WORK IS NOT
ACTIVELY IN PROGRESS, TO PREVENT THE PUBLIC FROM ENTERING WORK
AREAS.
11. UNLESS OTHERWISE INDICATED, DEMOLISHED MATERIALS BECOME THE
PROPERTY OF THE CONTRACTOR. COMPLY WITH EPA REGULATIONS AND
DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
12. MINIMIZE CONSTRUCTION IMPACTS TO SOILS, WATER, PLANTS, AND
ANIMALS, AND OTHER NATURAL RESOURCES DURING CONSTRUCTION.
CONFINE CONSTRUCTION OPERATIONS TO MINIMUM PRACTICAL AREA. IN NO
CASE SHALL CONSTRUCTION OPERATIONS EXTEND BEYOND LIMITS OF
CONSTRUCTION INDICATED WITHOUT PRIOR APPROVAL BY THE
CONTRACTING OFFICER.
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
GENERAL NOTES
DRAWING NO.
_149_
188,361
TECH REVIEW:
L. TURECEK G1 REPLACE WATER DISTRIBUTION LINES
PMIS/PKG NO.
237330
DATE:
4/2023
OZETTE LAKE
OLYMPIC NATIONAL PARK
SHEET
_2_ OF _7_
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
EXISTING CONDITIONS
DRAWING NO.
_149_
188,361
TECH REVIEW:
L. TURECEK G2 REPLACE WATER DISTRIBUTION LINES
PMIS/PKG NO.
237330
DATE:
4/2023
OZETTE LAKE
OLYMPIC NATIONAL PARK
SHEET
_3_ OF _7_
A SERVICE LINES INSIDE SOUTHEAST CORNER
OF WATER TREATMENT BUILDINGG2
D CAMPGROUND YARD HYDRANT, POST
& DRAIN PADG2
B RANGER STATION VALVE BOX & YARD
HYDRANTG2
C COMFORT STATION ABOVE-GROUND
EXPOSED VALVEG2
NPS HOUSING LINE –
RUNS NORTH
CAMPGROUND LINE –
RUNS SOUTH
SUB SHEET NO. TITLE OF SHEET
UTILITY SUPPORT RACK - PHOTOS
DRAWING NO.
_149_
188,361
TECH REVIEW:
L. TURECEK G3 REPLACE WATER DISTRIBUTION LINES
PMIS/PKG NO.
237330
DATE:
4/2023
OZETTE LAKE
OLYMPIC NATIONAL PARK
SHEET
_4_ OF _7_
A VIEW: LOOKING FROM SOUTH TO NORTH
G3
B VIEW: LOOKING FROM NORTH TO SOUTH
G3
EXISTING INSULATED &
SLEEVED WATER LINE
EXISTING INSULATED &
SLEEVED WATER LINE
SUB SHEET NO. TITLE OF SHEET
COAL CREEK BRIDGE DRAWINGS
DRAWING NO.
_149_
188,361
TECH REVIEW:
L. TURECEK G4 REPLACE WATER DISTRIBUTION LINES
PMIS/PKG NO.
237330
DATE:
4/2023
OZETTE LAKE
OLYMPIC NATIONAL PARK
SHEET
_5_ OF _7_
A COAL CREEK BRIDGE – END SECTION VIEW
G4
B COAL CREEK BRIDGE – UTILITY SUPPORT SYSTEM
G4
CONNECT TO EXISTING
CAMPGROUND SERVICE
LINE AT EXISTING
TREATMENT BUILDING
MAINTAIN > 10’
HORIZONTAL
SEPARATION FROM
CXT TOILET VAULT
SLEEVE OR ENCASE NEW WATER LINE
IN PRESSURE-RATED PIPE WHERE
HORIZONTAL DISTANCE FROM SEWAGE
FORCE MAIN IS < 10’ (ASSUMED TO BE
APPROXIMATELY 400 L.F.) & SEAL
CASING ENDS
INSULATE, SLEEVE
AND SECURE WATER
LINE TO BRIDGE
(SIMILAR TO EXISTING)
PROVIDE NEW SERVICE LINE
UP TO AND REPLACE RANGER
STATION SHUT-OFF VALVE;
INSTALL YARD HYDRANT
WITH MOUNTING POST &
DRAIN PAD, PER SPECS
PROVIDE NEW SERVICE LINE UP
TO AND REPLACE COMFORT
STATION SHUT-OFF VALVE
WITH NEW IN-GROUND VALVE
W/ DRAIN & VALVE BOX
PROVIDE NEW SERVICE LINE TO
CAMPGROUND; INSTALL YARD
HYDRANT WITH MOUNTING
POST & DRAIN PAD, PER SPECS
PROVIDE NEW SERVICE LINE TO
CAMP HOST SITE; INSTALL
LOCKABLE YARD HYDRANT
WITH MOUNTING POST &
DRAIN PAD, PER SPECS
INSTALL LOW POINT DRAIN
WITH DRAIN PAD BEHIND
CAMPGROUND YARD HYDRANT
INSTALL NEW 2” VALVE W/ DRAIN
& VALVE BOX IN MAIN LINE,
BEYOND RANGER STATION /
COMFORT STATION SERVICE LINE
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
CONSTRUCTION SITE PLAN
DRAWING NO.
_149_
188,361
TECH REVIEW:
L. TURECEK C1 REPLACE WATER DISTRIBUTION LINES
PMIS/PKG NO.
237330
DATE:
4/2023
OZETTE LAKE
OLYMPIC NATIONAL PARK
SHEET
_6_ OF _7_
KEY NOTES:
1. NEW WATER LINE ALIGNMENT SHALL FOLLOW
EXISTING WATER LINE ALIGNMENT TO LIMIT
NEW GROUND DISTURBANCE IN
ARCHAEOLOGICALLY SENSITIVE AREAS.
2. DEMOLISH AND REMOVE ALL ABOVE-GROUND
INFRASTRUCTURE FROM EXISTING WATER
DISTRIBUTION SYSTEM; COORDINATE WITH
COR
3. ALL NEW WATER SYSTEM COMPONENTS MUST
HAVE NSF 61 CERTIFICATION
4. NEW WATER MAIN SHALL BE 2” HDPE SDR 11
FUSED PIPE; INDIVIDUAL SERVICE LATERALS
SHALL BE 1” HDPE
5. EXISTING PIPE AND BELOW-GROUND
APPURTENANCES OF EXISTING WATER SYSTEM
SHALL BE ABANDONED IN PLACE UNLESS
REMOVAL IS NECESSARY FOR INSTALLATION
OF NEW WATER LINE
6. MAKE CONNECTIONS TO EXISTING BUILDING
SERVICE LINES AS REQUIRED DOWNSTREAM
OF NEW VALVES
7. ARCHAEOLOGICAL MONITORING AND TRIBAL
NOTIFICATION IS REQUIRED A MINIMUM OF
FOUR WEEKS PRIOR TO GROUND
DISTURBANCE; COORDINATE WITH COR
DEMOLISH ABOVE-GROUND
COMPONENTS OF EXISTING
WATER SYSTEM NOT RE-USED;
HERE AND SIMILAR
REDUCE FROM 2” MAIN TO 1”
SERVICE LINES; INSTALL NEW 1”
VALVES ON EACH SERVICE LINE
W/ DRAIN & VALVE BOX
SUB SHEET NO. TITLE OF SHEET
TRENCH DETAILS
DRAWING NO.
_149_
188,361
TECH REVIEW:
L. TURECEK C2 REPLACE WATER DISTRIBUTION LINES
PMIS/PKG NO.
237330
DATE:
4/2023
OZETTE LAKE
OLYMPIC NATIONAL PARK
SHEET
_7_ OF _7_
2’ MIN
| Amended Ozette Water Line Drawings.pdf |
| Slide Number 1 |
| GENERAL NOTES |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
File details come from the government source that posted it. Updated .