Attachment B_DRAWINGS_5.19.26_127EAX26Q0086.pdf

PDF 3 MB Posted

Attached to
Solicitation is Restricted to the Current Region 3, Zone 5 FERM BPA Holders - USDA Forest Service
Solicitation number
127EAX26Q0086
Issued by

About this file

This document is a design/construction drawing set for the Barillas Peak Roads Reconstruction project located in the Santa Fe National Forest, Pecos/Las Vegas Ranger District in San Miguel County, New Mexico. The project consists of nine sheets of detailed engineering specifications and construction details dated 5/16/2026, prepared by the U.S. Department of Agriculture Forest Service, R3 Southwestern Region.

The project encompasses road reconstruction work on multiple forest service roads (NFSR 66, 66F, 66J, 83, 83Y, 83Z, 832, 200L, 203, and 203H) with total project lengths ranging from 0.03 miles to 10.45 miles depending on the road segment. Key construction elements include typical road section details for both native-surfaced and aggregate-surfaced roads with specified slope requirements, drain dip and grade dip installations with minimum 4% flowline grades, culvert reset and apron/riprap installations using Class 5 riprap and non-woven geotextile, gate and locking post installations with specific dimensions and materials, roadside clearing with 10-foot clearing height limits, and reinforced traveled way with turnout widening specifications. The contractor is responsible for all labor, equipment, supervision, transportation, and supplies necessary for project completion. Construction activity is limited to 30 minutes after dawn to 30 minutes before dusk Monday through Friday unless otherwise approved in writing. Road reconditioning must be approved by the Contracting Officer prior to material placement, and all changes to project activities require advance written approval from the Contracting Officer.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION MAP

PROJECT LOCATION MAP

TRAVEL DIRECTIONS TO NFSR 83 FROM PECOS RANGER DISTRICT OFFICE:

Head North on S Main St. Turn right onto NM-223. Drive approximately 2.1 miles to NFSR 83 on your right.

SHEET OF

United States Department of Agriculture Forest Service

BARILLAS PEAK ROADS RECONSTRUCTION

RECOMMENDED BY:

APPROVED:

ENGINEERING STAFF OFFICER

DISTRICT RANGER DATE

DATE

DIRECTOR OF ENGINEERING DATE

FOREST SUPERVISOR DATE

5/1 9/2

6 1 9:

A

RM

AN

DO

DE

LA

CR

UZ

C

:\U

SE

RS

\A

RM

AN

DO

DE

LA

CR

UZ

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

NC

3IL

E8

HU

0K

SQ

L4

XT

KH

1+

G=

BA

RI

LL

AS

_P

EA

K_

RO

AD

S_

RE

CO

NS

T_

5_

_2 6_

DR

AF

T.

DW

G;

NEW MEXICO

SAN MIGUEL COUNTY

R3 SOUTHWESTERN REGION

SANTA FE NATIONAL FOREST

PECOS/LAS VEGAS RANGER DISTRICT

INDEX OF SHEETS

SHEET TITLE

01 COVER SHEET

G-02 VICINITY MAP

G-03 GENERAL NOTES

C-01 TYPICAL SECTION DETAIL

C-02 DRAIN DIP DETAIL

C-03 CULVERT RESET AND APRON/RIPRAP

INSTALLATION DETAIL

C-04 GATE AND LOCKING POSTS DETAIL

C-05 CLEARING DETAIL

C-06 REINFORCED TRAVELED WAY AND TURNOUT

DETAIL

5/16/2026

AutoCAD SHX Text

PROJECT AREA

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 9/2

6 1 9:

A

RM

AN

DO

DE

LA

CR

UZ

C

:\U

SE

RS

\A

RM

AN

DO

DE

LA

CR

UZ

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

NC

3IL

E8

HU

0K

SQ

L4

XT

KH

1+

G=

BA

RI

LL

AS

_P

EA

K_

RO

AD

S_

RE

CO

NS

T_

5_

_2 6_

DR

AF

T.

DW

G;

R3

SOUTHWESTERN REGION

BARILLAS PEAK

ROADS

RECONSTRUCTION

SANTA FE NATIONAL

FOREST

PECOS/LAS VEGAS RANGER

DISTRICT

VICINITY MAP

5/16/2026

M. DE LA CRUZ

M. DE LA CRUZ

V. JENSEN

G-02 02 09

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 9/2

6 1 9:

A

RM

AN

DO

DE

LA

CR

UZ

C

:\U

SE

RS

\A

RM

AN

DO

DE

LA

CR

UZ

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

NC

3IL

E8

HU

0K

SQ

L4

XT

KH

1+

G=

BA

RI

LL

AS

_P

EA

K_

RO

AD

S_

RE

CO

NS

T_

5_

_2 6_

DR

AF

T.

DW

G;

R3

SOUTHWESTERN REGION

BARILLAS PEAK

ROADS

RECONSTRUCTION

SANTA FE NATIONAL

FOREST

PECOS/LAS VEGAS RANGER

DISTRICT

GENERAL NOTES

5/16/2026

M. DE LA CRUZ

M. DE LA CRUZ

V. JENSEN

G-03 03 09

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text G-01. THE CONTRACTING OFFICER (CO) AS REFERENCED HEREIN REFERS TO THE GOVERNMENT CO OVERSEEING THE CONTRACT. THE CONTRACTING OFFICER (CO) AS REFERENCED HEREIN REFERS TO THE GOVERNMENT CO OVERSEEING THE CONTRACT. G-02. THE CONTRACTOR AS REFERENCED HEREIN REFERS TO THE COMPANY OR PERSON PERFORMING ALL PROJECT ACTIVITIES. THE CONTRACTOR AS REFERENCED HEREIN REFERS TO THE COMPANY OR PERSON PERFORMING ALL PROJECT ACTIVITIES. G-03. STANDARD DETAILS SHALL APPLY TO ALL PROJECT ACTIVITIES. STANDARD DETAILS SHALL APPLY TO ALL PROJECT ACTIVITIES. G-04. CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, SUPERVISION, SIGNING, TRANSPORTATION, AND SUPPLIES NECESSARY CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, SUPERVISION, SIGNING, TRANSPORTATION, AND SUPPLIES NECESSARY TO PERFORM ALL PROJECT ACTIVITIES. G-05. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES BEFORE DIGGING. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES BEFORE DIGGING. G-06. CONTRACTOR SHALL CONFORM TO THE PROVIDED SANTA FE NATIONAL FOREST FIRE PLAN AT ALL TIMES. CONTRACTOR SHALL CONFORM TO THE PROVIDED SANTA FE NATIONAL FOREST FIRE PLAN AT ALL TIMES. G-07. IN THE EVENT OF INADVERTENT DISCOVERY OF POSSIBLE ARCHAEOLOGICAL RESOURCES, CONTRACTOR SHALL STOP WORK IN THE EVENT OF INADVERTENT DISCOVERY OF POSSIBLE ARCHAEOLOGICAL RESOURCES, CONTRACTOR SHALL STOP WORK IN THE IMMEDIATE VICINITY AND CONTACT THE CONTRACTING OFFICER'S REPRESENTATIVE. G-08. CONTRACTOR SHALL NOT PERFORM WORK IN OR DISCARD MATERIAL INTO WATER BODIES. CONTRACTOR SHALL NOT PERFORM WORK IN OR DISCARD MATERIAL INTO WATER BODIES. G-09. BERMS OF MATERIAL OF ANY KIND SHALL BE REMOVED PRIOR TO THE END OF EACH WORKING DAY. BERMS OF MATERIAL OF ANY KIND SHALL BE REMOVED PRIOR TO THE END OF EACH WORKING DAY. G-10. ALL VEHICLES AND EQUIPMENT SHALL BE CLEAN AND FREE OF WEEDS AND SUBJECT TO INSPECTION PRIOR TO ALL VEHICLES AND EQUIPMENT SHALL BE CLEAN AND FREE OF WEEDS AND SUBJECT TO INSPECTION PRIOR TO MOBILIZING ONTO FOREST LANDS. G-11. CONSTRUCTION ACTIVITY SHALL BE LIMITED TO THE HOURS OF THIRTY (30) MINUTES AFTER DAWN TO THIRTY (30) CONSTRUCTION ACTIVITY SHALL BE LIMITED TO THE HOURS OF THIRTY (30) MINUTES AFTER DAWN TO THIRTY (30) MINUTES BEFORE DUSK, MONDAY THROUGH FRIDAY, UNLESS OTHER HOURS ARE APPROVED IN WRITING BY THE CO. G-12. CONSTRUCTION ACTIVITY SHALL NOT OCCUR ON FEDERAL HOLIDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE CONSTRUCTION ACTIVITY SHALL NOT OCCUR ON FEDERAL HOLIDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE CO. G-13. ALL CHANGES TO PROJECT ACTIVITIES SHALL BE REVIEWED AND APPROVED BEFOREHAND BY THE CO. ALL CHANGES TO PROJECT ACTIVITIES SHALL BE REVIEWED AND APPROVED BEFOREHAND BY THE CO. G-14. PRIOR TO CLOSING A ROAD LONGER THAN 45 MINUTES, IT SHALL BE APPROVED, IN WRITING, BY THE CO. PRIOR TO CLOSING A ROAD LONGER THAN 45 MINUTES, IT SHALL BE APPROVED, IN WRITING, BY THE CO. G-15. ROAD RECONDITIONING SHALL BE APPROVED BY COR, PRIOR TO PLACING AGGREGATE/MATERIAL. ROAD RECONDITIONING SHALL BE APPROVED BY COR, PRIOR TO PLACING AGGREGATE/MATERIAL. G-16. COR/FOREST SERVICE REPRESENTATIVE SHALL BE PRESENT DURING PLACEMENT AND COMPACTION OF CULVERT.COR/FOREST SERVICE REPRESENTATIVE SHALL BE PRESENT DURING PLACEMENT AND COMPACTION OF CULVERT.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

ROAD BMP EMP LENGTH (MI) NOTES

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 9/2

6 1 9:

A

RM

AN

DO

DE

LA

CR

UZ

C

:\U

SE

RS

\A

RM

AN

DO

DE

LA

CR

UZ

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

NC

3IL

E8

HU

0K

SQ

L4

XT

KH

1+

G=

BA

RI

LL

AS

_P

EA

K_

RO

AD

S_

RE

CO

NS

T_

5_

_2 6_

DR

AF

T.

DW

G;

R3

SOUTHWESTERN REGION

BARILLAS PEAK

ROADS

RECONSTRUCTION

SANTA FE NATIONAL

FOREST

PECOS/LAS VEGAS RANGER

DISTRICT

TYPICAL SECTION

DETAIL

5/16/2026

M. DE LA CRUZ

M. DE LA CRUZ

V. JENSEN

C-01 04 09

AutoCAD SHX Text

NFSR 66

AutoCAD SHX Text 4.75

AutoCAD SHX Text 5.52

AutoCAD SHX Text 0.77

AutoCAD SHX Text

FROM ISECT NFSR 66F TO NFSR 66J

AutoCAD SHX Text

NFSR 66F

AutoCAD SHX Text 2.79

AutoCAD SHX Text 3.94

AutoCAD SHX Text 1.15

AutoCAD SHX Text

TO FIRST WASHOUT COMING IN FROM NFSR 83

AutoCAD SHX Text

NFSR 66J

AutoCAD SHX Text 0.00

AutoCAD SHX Text 0.87

AutoCAD SHX Text 0.87

AutoCAD SHX Text

FROM NFSR 66 TO NFSR 200L

AutoCAD SHX Text

NFSR 83

AutoCAD SHX Text 0.02

AutoCAD SHX Text 10.47

AutoCAD SHX Text 10.45

AutoCAD SHX Text

FROM END OF PAVEMENT TO ML2 SECTION

AutoCAD SHX Text

NFSR 83

AutoCAD SHX Text 10.47

AutoCAD SHX Text 19.39

AutoCAD SHX Text 8.92

AutoCAD SHX Text

TO ISECT NFSR 66F

AutoCAD SHX Text

NFSR 83Y

AutoCAD SHX Text 0.00

AutoCAD SHX Text 2.18

AutoCAD SHX Text 2.18

AutoCAD SHX Text

BOTH ENDS INTERSECT NFSR 83

AutoCAD SHX Text

NFSR 83Z

AutoCAD SHX Text 0.00

AutoCAD SHX Text 1.02

AutoCAD SHX Text 1.0200

AutoCAD SHX Text

FROM NFSR 83 TO LOOKOUT TOWER

AutoCAD SHX Text

NFSR 200L

AutoCAD SHX Text 0.00

AutoCAD SHX Text 2.88

AutoCAD SHX Text 2.8800

AutoCAD SHX Text

FROM NFSR 83 TO ISECT NFSR 66J

AutoCAD SHX Text

NFSR 203

AutoCAD SHX Text 0.00

AutoCAD SHX Text 6.07

AutoCAD SHX Text 6.0700

AutoCAD SHX Text

TO ISECT NFSR 203JA

AutoCAD SHX Text

NFSR 203H

AutoCAD SHX Text 0.29

AutoCAD SHX Text 0.32

AutoCAD SHX Text 0.0300

AutoCAD SHX Text

FROM MP 0.29 TO ISECT NFSR 203

AutoCAD SHX Text ROAD RECONDITIONING CONSTRUCTION NOTES 1. THE ROADWAY SURFACE SHALL BE CROWNED UNLESS IT IS THE ROADWAY SURFACE SHALL BE CROWNED UNLESS IT IS INSLOPED OR OUTSLOPED. NO FLAT BLADING SHALL BE PERMITTED.

AutoCAD SHX Text

TABLE 1. ROAD RECONDITIONING SUMMARY

AutoCAD SHX Text

OUTSLOPED:

AutoCAD SHX Text

TYPICAL SECTIONS FOR NATIVE-SURFACED ROADS

AutoCAD SHX Text

FILL SLOPE

AutoCAD SHX Text

CUT SLOPE

AutoCAD SHX Text

NATURAL GROUND

AutoCAD SHX Text

CROWNED:

AutoCAD SHX Text

FILL SLOPE

AutoCAD SHX Text

CUT SLOPE

AutoCAD SHX Text

NATURAL GROUND

AutoCAD SHX Text

OUTSLOPED:

AutoCAD SHX Text

FILL SLOPE

AutoCAD SHX Text

CUT SLOPE

AutoCAD SHX Text

NATURAL GROUND

AutoCAD SHX Text

CROWNED:

AutoCAD SHX Text

FILL SLOPE

AutoCAD SHX Text

CUT SLOPE

AutoCAD SHX Text

NATURAL GROUND

AutoCAD SHX Text

INSLOPED:

AutoCAD SHX Text

FILL SLOPE

AutoCAD SHX Text

CUT SLOPE

AutoCAD SHX Text

NATURAL GROUND

AutoCAD SHX Text

TYPICAL SECTIONS FOR AGGREGATE-SURFACED ROADS

AutoCAD SHX Text AGGREGATE AND OTHER SURFACING CONSTRUCTION NOTES 2. ROAD RECONDITIONING IS REQUIRED PRIOR TO MATERIAL PLACEMENT. 3. SURFACING SHALL COVER 14 FEET MINIMUM OF ROAD WIDTH AND BE COMPACTED TO 4". 4. COMPACT ACCORDING TO SPECIFICATIONS FOR EACH MATERIAL TYPE AS DESCRIBED IN THE SCHEDULE OF ITEMS AND ATTACHMENT C.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

ORIGINAL GRADEFLOWLINE

CL

ROLLING DIP LOCATIONS

SHOWN ON ROAD LOGS

L L

T L T

GA G GA

GGD

0.5ft.

1 FT. DITCH (IF IN

DITCHED STANDARD

ROADWAY).

DITCH GRADE

GD-ADVERSE GRADE

GA-APPROACH GRADE

G -ORIGINAL ROAD GRADE

L -LENGTH OF VERTICAL

CURVE

T -LENGTH OF APPROACH

GRADE

1. GRADE ALONG THE FLOWLINE WILL BE A MINIMUM OF 4%.

3. WHERE FURROW DITCHES ARE SPECIFIED IN THE DESCRIPTION OF

WORK THE FURROW DITCH GRADE WILL BE A MINIMUM OF (G)

WHICH IS DESCRIBED IN THE PROFILE DRAWING ABOVE.

4. TOLERANCE CRITERIA:

FREEBOARD: +0.2 FT.

"L" : +5 FT.

"T" : +10 FT.

GRADE

G GA

L T 2% 4% 14' 42' 4% 6% 16' 55' 6% 8% 18' 71'

UPHILL

UPHILL

GRADE DIP LOCATIONS

SHOWN ON ROAD LOGS

ORIGINAL GRADE LINE

FLOWLINE

GRADE DIP ___________

15' 15'

30 30 30 30

PLAN VIEW_________

FLOWLINE

0 0

0 0

PROFILE VIEW____________

POINTS OF FULL OUTSLOPE

GRADE OF 4%

3. WHERE FURROW DITCHES ARE SPECIFIED IN THE DESCRIPTION

OF WORK THE FURROW DITCH GRADE WILL BE A MINIMUM OF

THE STEEPER GRADE (G1 OR G2) DRAINING INTO THE DIP.

DOWNGRADE

GRADE LINE (G 2)

GRADE LINE (G 1)

ROLLING DIP (0.5' FREEBOARD)

1. GRADE ALONG FLOWLINE WILL BE A MINIMUM OF 4%.

2. ARMORED GRADE DIPS SHALL BE SCARIFIED 6" MIN. PRIOR TO

PLACING CLASS 0 RIPRAP AND COMPACTED ACCORDING TO

FSSS 204 COMPACTION METHOD (e).

2. ROLLING/GRADE DIPS ON ML-3 ROADS SHALL BE

COMPACTED ACCORDING TO FSSS 204 COMPACTION

METHOD (d), AND ON ML-2 ROADS ACCORDING TO FSSS 204 COMPACTION METHOD (e).

4. CLASS 0 RIPRAP TO BE SPREAD EVENLY FROM TROUGH OF

GRADE DIPS. (e.g.10' ON BOTH SIDES OF TROUGH.) DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 9/2

6 1 9:

A

RM

AN

DO

DE

LA

CR

UZ

C

:\U

SE

RS

\A

RM

AN

DO

DE

LA

CR

UZ

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

NC

3IL

E8

HU

0K

SQ

L4

XT

KH

1+

G=

BA

RI

LL

AS

_P

EA

K_

RO

AD

S_

RE

CO

NS

T_

5_

_2 6_

DR

AF

T.

DW

G;

R3

SOUTHWESTERN REGION

BARILLAS PEAK

ROADS

RECONSTRUCTION

SANTA FE NATIONAL

FOREST

PECOS/LAS VEGAS RANGER

DISTRICT

DRAIN DIP DETAIL

5/16/2026

M. DE LA CRUZ

M. DE LA CRUZ

V. JENSEN

C-02 05 09

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 9/2

6 1 9:

A

RM

AN

DO

DE

LA

CR

UZ

C

:\U

SE

RS

\A

RM

AN

DO

DE

LA

CR

UZ

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

NC

3IL

E8

HU

0K

SQ

L4

XT

KH

1+

G=

BA

RI

LL

AS

_P

EA

K_

RO

AD

S_

RE

CO

NS

T_

5_

_2 6_

DR

AF

T.

DW

G;

R3

SOUTHWESTERN REGION

BARILLAS PEAK

ROADS

RECONSTRUCTION

SANTA FE NATIONAL

FOREST

PECOS/LAS VEGAS RANGER

DISTRICT

CULVERT RESET AND

APRON/RIPRAP

INSTALLATION DETAIL

5/16/2026

M. DE LA CRUZ

M. DE LA CRUZ

V. JENSEN

C-03 06 09

AutoCAD SHX Text CULVERT INSTALLATION CONSTRUCTION NOTES: : 1. BEDDING MATERIAL SHALL ADHERE TO FP-24 BEDDING MATERIAL SHALL ADHERE TO FP-24 714.01(c). 2. 4" BEDDING MATERIAL SHALL NOT BE COMPACTED. 4" BEDDING MATERIAL SHALL NOT BE COMPACTED. 3. BACKFILL SHALL BE COMPACTED ACCORDING BACKFILL SHALL BE COMPACTED ACCORDING TO FSSS 204 COMPACTION METHOD (d). 4. WHEN COMPACTING WITH ROLLERS IS NOT WHEN COMPACTING WITH ROLLERS IS NOT PRACTICAL, USE APPROVED MECHANICAL TAMPERS FOR A MIN. OF THREE PASSES. 5. EXCAVATION AND THE CULVERT FOUNDATION EXCAVATION AND THE CULVERT FOUNDATION SHALL BE APPROVED IN WRITING BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) BEFORE THE PIPE IS PLACED AND BACKFILL IS CONDUCTED. 6. NEW APRONS AND COUPLINGS SHALL MATCH EXISTING CULVERT MATERIAL AND SIZE. CULVERT MATERIAL AND SIZE. 7. EXISTING CULVERT IS A 95" X 67" X 40' SQUASH EXISTING CULVERT IS A 95" X 67" X 40' SQUASH PIPE. 8. INSTALLATION TO PROVIDE POSITIVE DRAINAGE.INSTALLATION TO PROVIDE POSITIVE DRAINAGE.

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text

INVERT

AutoCAD SHX Text

%%UTYPICAL INSTALLATION IN FILL SECTION

AutoCAD SHX Text

DISCHARGE ONTO

AutoCAD SHX Text

NATURAL GROUND

AutoCAD SHX Text

1' MIN.

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

TOE OF FILL

AutoCAD SHX Text

SLOPE

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

SHOULDER

AutoCAD SHX Text

INSTALL CLASS 5 RIPRAP AND NON-WOVEN GEOTEXTILE

AutoCAD SHX Text

INSTALL NEW APRONS ON BOTH ENDS

AutoCAD SHX Text

TOE PLATE

AutoCAD SHX Text

VARIABLE SLOPE

AutoCAD SHX Text

%%UEND SECTION

AutoCAD SHX Text

FINISH EARTH

AutoCAD SHX Text

SLOPE AS

AutoCAD SHX Text

REQUIRED

AutoCAD SHX Text

STANDARD

AutoCAD SHX Text

COUPLING

AutoCAD SHX Text

BAND

AutoCAD SHX Text

%%UTYPICAL METAL

AutoCAD SHX Text

6" (LOOSE DEPTH) COMPACTED LAYERS

AutoCAD SHX Text D

AutoCAD SHX Text

BEDDING MATERIAL

AutoCAD SHX Text

12" MIN.

AutoCAD SHX Text D

AutoCAD SHX Text

%%UTYPICAL BACKFILL DETAIL

AutoCAD SHX Text

%%UPLAN VIEW

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 9/2

6 1 9:

A

RM

AN

DO

DE

LA

CR

UZ

C

:\U

SE

RS

\A

RM

AN

DO

DE

LA

CR

UZ

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

NC

3IL

E8

HU

0K

SQ

L4

XT

KH

1+

G=

BA

RI

LL

AS

_P

EA

K_

RO

AD

S_

RE

CO

NS

T_

5_

_2 6_

DR

AF

T.

DW

G;

R3

SOUTHWESTERN REGION

BARILLAS PEAK

ROADS

RECONSTRUCTION

SANTA FE NATIONAL

FOREST

PECOS/LAS VEGAS RANGER

DISTRICT

GATE AND LOCKING

POSTS DETAIL

5/16/2026

M. DE LA CRUZ

M. DE LA CRUZ

V. JENSEN

C-04 07 09

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text

GATE EXTENSION TOP VIEW

AutoCAD SHX Text P 1/4" x 5" x 10"

AutoCAD SHX Text L

AutoCAD SHX Text 1/8" (Each side only)

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 3'-3"

AutoCAD SHX Text

ROAD BED

AutoCAD SHX Text

DIA.

AutoCAD SHX Text

%%ULOCKING OPEN POST

AutoCAD SHX Text L

AutoCAD SHX Text P 1/4" x 3" x 3" Stiffner

AutoCAD SHX Text 5"

AutoCAD SHX Text 3'-6 1/4"

AutoCAD SHX Text 3'-0 1/4"

AutoCAD SHX Text 9"

AutoCAD SHX Text 8"

AutoCAD SHX Text

3/16" ALL

AutoCAD SHX Text

AROUND

AutoCAD SHX Text 1/8" (One side only)

AutoCAD SHX Text 1/8" (Top & bottom only)

AutoCAD SHX Text 1/8" (Each side only)

AutoCAD SHX Text L

AutoCAD SHX Text P 1/4" x 5" x 10"

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text

%%UDETAIL A

AutoCAD SHX Text

WELDED TO EXTENSION

AutoCAD SHX Text 3" x 6" x 1/4" PLATE

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text

GATE EXTENSION SIDE VIEW

AutoCAD SHX Text 1/8"

AutoCAD SHX Text 2 1/4"

AutoCAD SHX Text 3/8" x 1 3/4" SLOT

AutoCAD SHX Text

SEE DETAIL A

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text 5"

AutoCAD SHX Text

VARIABLE

AutoCAD SHX Text 16'-20'

AutoCAD SHX Text

%%UPLAN VIEW

AutoCAD SHX Text

%%UGATE PLAN & ELEVATION DETAILS

AutoCAD SHX Text

ELEVATION VIEW

AutoCAD SHX Text 8"

AutoCAD SHX Text 10"

AutoCAD SHX Text 3'-6 1/4"

AutoCAD SHX Text

3' MIN.

AutoCAD SHX Text L

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text 5"

AutoCAD SHX Text 14'-0"

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 7"

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 2'

AutoCAD SHX Text

SET TOP OF PIPE 3'-9"

AutoCAD SHX Text

ABOVE C OF ROAD.

AutoCAD SHX Text

TACK WELD CAP OR JAM

AutoCAD SHX Text

THREADS WITH PUNCH

AutoCAD SHX Text

AFTER INSTALLATION.

AutoCAD SHX Text

3' MIN.

AutoCAD SHX Text

LOCKING OPEN POST

AutoCAD SHX Text

HINGE POST

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text

LOCKING CLOSED

AutoCAD SHX Text

POST

AutoCAD SHX Text B

AutoCAD SHX Text

HINGE POST

AutoCAD SHX Text A

AutoCAD SHX Text

PIPE, NOMINAL

AutoCAD SHX Text 3"(STD) x 8'-0" x0.216", AutoCAD SHX Text

ASTM A53

AutoCAD SHX Text

DIA.

AutoCAD SHX Text 2'

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

LOCKING CLOSED POST

AutoCAD SHX Text B

AutoCAD SHX Text

SET TOP OF LOCKING POST B

AutoCAD SHX Text

LEVEL WITH LOCKING POST C

AutoCAD SHX Text

OR BOTTOM OF GALE.

AutoCAD SHX Text (Ea. side only)

AutoCAD SHX Text 1/8"

AutoCAD SHX Text

ALL MEMBERS OF THE GATE ASSEMBLY SHALL BE FABRICATED FROM STANDARD

AutoCAD SHX Text

STEEL SECTIONS, AND APPROVED BY CO PRIOR TO INSTALLATION.

AutoCAD SHX Text

THE CLOSURE GATE PAY ITEM INCLUDES ALL REQUIRED RETROREFLECTIVE TAPE PLACEMENT.

AutoCAD SHX Text CONCRETE SHALL BE 4000 PSI AND IN ACCORDANCE WITH SECTION 601, OR METHOD APPROVED BY THE CO.

AutoCAD SHX Text

RETROREFLECTIVE TAPE PLACEMENT TO BE COORDINATED WITH COR.

AutoCAD SHX Text 1.

AutoCAD SHX Text 2.

AutoCAD SHX Text 3.

AutoCAD SHX Text 4.

AutoCAD SHX Text

%%UNOTES:

AutoCAD SHX Text

%%UHINGE DETAIL

AutoCAD SHX Text 3 3/4"

AutoCAD SHX Text

DIA. HOLE

AutoCAD SHX Text P 3/8" x 5" x 5"

AutoCAD SHX Text L

AutoCAD SHX Text

STEEL TUBING,

AutoCAD SHX Text

12 GA.

AutoCAD SHX Text 2 1/2" x 2 1/2"

AutoCAD SHX Text

GATE EXTENSION

AutoCAD SHX Text

STEEL TUBING, 12" GA.

AutoCAD SHX Text 2" x 2" x 7"

AutoCAD SHX Text C

AutoCAD SHX Text

1' DIA.

AutoCAD SHX Text 1"

AutoCAD SHX Text

SET TOP OF LOCKING POST C

AutoCAD SHX Text

LEVEL WITH LOCKING POST B

AutoCAD SHX Text

OR BOTTOM OF GATE.

AutoCAD SHX Text

PIPE

AutoCAD SHX Text NOMINAL 3"(STD) x 5' x 0.216"

AutoCAD SHX Text

ASTM A53

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text Place 3" Yellow Retroreflective tape on both sides of post.

AutoCAD SHX Text Place 3" yellow retroreflective tape on both sides of post.

AutoCAD SHX Text Place 3" Yellow Retroreflective tape on both sides of post.

AutoCAD SHX Text Place 3" Red/White Retroreflective tape on both sides of top rail.

AutoCAD SHX Text Red/White Stripes Width Varies.

AutoCAD SHX Text 3" Yellow Retro Tape

AutoCAD SHX Text

INCLUDE LOCKING PIN.

AutoCAD SHX Text

INCLUDE LOCKING PIN.

AutoCAD SHX Text

5. TWO (2) LOCKING OPEN POSTS TO BE INSTALLED ON NFSR 83Y SHALL MATCH EXISTING GATE MATERIAL.

AutoCAD SHX Text

6. TWO (2) LOCKING PINS SHALL BE PROVIDED WITH LOCKING OPEN POSTS.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 9/2

6 1 9:

A

RM

AN

DO

DE

LA

CR

UZ

C

:\U

SE

RS

\A

RM

AN

DO

DE

LA

CR

UZ

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

NC

3IL

E8

HU

0K

SQ

L4

XT

KH

1+

G=

BA

RI

LL

AS

_P

EA

K_

RO

AD

S_

RE

CO

NS

T_

5_

_2 6_

DR

AF

T.

DW

G;

R3

SOUTHWESTERN REGION

BARILLAS PEAK

ROADS

RECONSTRUCTION

SANTA FE NATIONAL

FOREST

PECOS/LAS VEGAS RANGER

DISTRICT

CLEARING DETAIL

5/16/2026

M. DE LA CRUZ

M. DE LA CRUZ

V. JENSEN

C-05 08 09

AutoCAD SHX Text

%%UCLEARING DETAILS

AutoCAD SHX Text

%%UCLEARING LIMITS

AutoCAD SHX Text

%%UTYPICAL

AutoCAD SHX Text

%%USIGHT DISTANCE

AutoCAD SHX Text

%%UTYPICAL

AutoCAD SHX Text

%%UNOTES

AutoCAD SHX Text

CLEARING

AutoCAD SHX Text

HEIGHT

AutoCAD SHX Text (10 ft.)

AutoCAD SHX Text

ROADBED

AutoCAD SHX Text

SHOULDERS

AutoCAD SHX Text

FILL SLOPE

AutoCAD SHX Text

BACKSLOPE

AutoCAD SHX Text

SIGHT DISTANCE

AutoCAD SHX Text

SEE NOTE 2 & 3

AutoCAD SHX Text

ROADSIDE CLEARING

AutoCAD SHX Text

SEE NOTE 1

AutoCAD SHX Text

ROADSIDE CLEARING

AutoCAD SHX Text

SEE NOTE 2 & 3

AutoCAD SHX Text

SIGHT DISTANCE

AutoCAD SHX Text 60%

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text 1.

AutoCAD SHX Text 2.

AutoCAD SHX Text All conifers, hardwoods and brush within 5 feet of the

AutoCAD SHX Text shoulders of the road or the bottom of the ditch shall

AutoCAD SHX Text be removed.

AutoCAD SHX Text The area of sight distance clearing will be from the

AutoCAD SHX Text roadside clearing limit, to a line of sight between the

AutoCAD SHX Text beginning and ending points marked on the road logs.

AutoCAD SHX Text 3.

AutoCAD SHX Text Branches on remaining conifers shall be trimmed from

AutoCAD SHX Text ground level to a clearing height limit 10 feet above

AutoCAD SHX Text the roadbed or to a limit of 60% of the tree's height, AutoCAD SHX Text whichever is less. Limbs of vegetation shall be cut

AutoCAD SHX Text so as to not protrude within the clearing limits.

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text 10'

AutoCAD SHX Text 4.

AutoCAD SHX Text FSSS 203 Disposal Method (b), Scattering shall be used.

AutoCAD SHX Text Remove all debris from ditches and drainage feature outlets, unless otherwise agreed.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

5/1 9/2

6 1 9:

A

RM

AN

DO

DE

LA

CR

UZ

C

:\U

SE

RS

\A

RM

AN

DO

DE

LA

CR

UZ

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

NC

3IL

E8

HU

0K

SQ

L4

XT

KH

1+

G=

BA

RI

LL

AS

_P

EA

K_

RO

AD

S_

RE

CO

NS

T_

5_

_2 6_

DR

AF

T.

DW

G;

R3

SOUTHWESTERN REGION

BARILLAS PEAK

ROADS

RECONSTRUCTION

SANTA FE NATIONAL

FOREST

PECOS/LAS VEGAS RANGER

DISTRICT

REINFORCED TRAVELED

WAY AND TURNOUT

DETAIL

5/16/2026

M. DE LA CRUZ

M. DE LA CRUZ

V. JENSEN

C-06 09 09

AutoCAD SHX Text

ORIGINAL GROUND

AutoCAD SHX Text

ORIGINAL GROUND

AutoCAD SHX Text

60 CY

AutoCAD SHX Text

TRAVELED WAY

AutoCAD SHX Text

AS APPROVED BY THE ENGINEER.

AutoCAD SHX Text

DISPOSE OF UNSUITABLE EXCAVATED MATERIAL

AutoCAD SHX Text

TRANSITION

AutoCAD SHX Text

20 FT.

AutoCAD SHX Text

FINAL ROAD GRADE

AutoCAD SHX Text

GEOGRID ON TOP OF WOVEN GEOTEXTILE

AutoCAD SHX Text

14 FT.

AutoCAD SHX Text

EXCAVATED WIDTH

AutoCAD SHX Text

0.5 FT. EXCAVATED DEPTH

AutoCAD SHX Text

TRAVELED WAY

AutoCAD SHX Text

WIDTH 14 FT.

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

60 CY

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXCAVATED

AutoCAD SHX Text

WIDTH 18 FT.

AutoCAD SHX Text

RIPRAP CLASS 0 QTY:

AutoCAD SHX Text

SUBBASE QTY:

AutoCAD SHX Text

LOCATION:

AutoCAD SHX Text

%%UCROSS SECTION VIEW

AutoCAD SHX Text

ROAD NO.

AutoCAD SHX Text

OBJ ID

AutoCAD SHX Text

18 FT.

AutoCAD SHX Text

%%UPROFILE VIEW

AutoCAD SHX Text

%%UPLAN VIEW

AutoCAD SHX Text

TRANSITION

AutoCAD SHX Text

20 FT.

AutoCAD SHX Text 140'

AutoCAD SHX Text

GEOGRID ON TOP OF WOVEN GEOTEXTILE

AutoCAD SHX Text

PLACE 60 CY OF CLASS 0 RIPRAP WITHIN 180'

AutoCAD SHX Text

PLACE 60 CY OF SUBBASE WITHIN 180'

AutoCAD SHX Text

1960 SF

AutoCAD SHX Text

WOVEN GEOTEXTILE QTY:

AutoCAD SHX Text

1960 SF

AutoCAD SHX Text

GEOGRID QTY:

AutoCAD SHX Text

REINFORCED TRAVELED WAY

AutoCAD SHX Text

%%UPLAN VIEW

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text

50 FT. MIN.

AutoCAD SHX Text

10 FT.

AutoCAD SHX Text

TURNOUT WIDENING

AutoCAD SHX Text

25 FT.

AutoCAD SHX Text

25 FT.

AutoCAD SHX Text 83Z

AutoCAD SHX Text

AutoCAD SHX Text

LOCATION:

AutoCAD SHX Text

ROAD NO.

AutoCAD SHX Text

OBJ ID

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
Barillas_Peak_Roads_Reconst_5_19_26_draft-1_CoverSheet
Barillas_Peak_Roads_Reconst_5_19_26_draft-2_VicinityMap
Barillas_Peak_Roads_Reconst_5_19_26_draft-3_GeneralNotes
Barillas_Peak_Roads_Reconst_5_19_26_draft-4_TypicalSection
Barillas_Peak_Roads_Reconst_5_19_26_draft-5_DrainDip
Barillas_Peak_Roads_Reconst_5_19_26_draft-6_Culvert
Barillas_Peak_Roads_Reconst_5_19_26_draft-7_Gate
Barillas_Peak_Roads_Reconst_5_19_26_draft-8_Clearing
Barillas_Peak_Roads_Reconst_5_19_26_draft-9_ReinforcedTraveledWay

File details come from the government source that posted it. Updated .