Attachment A_SOI_5.17.2026_127EAX26Q0086.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Solicitation is Restricted to the Current Region 3, Zone 5 FERM BPA Holders - USDA Forest Service
Solicitation number
127EAX26Q0086
Issued by

About this file

This file is a Schedule of Items (SOI) for Request for Quotation (RFQ) 127EAX26Q0086 for the Barillas Peak Roads Reconstruction project on the Santa Fe National Forest. The solicitation is restricted to New Mexico Forest Engineering and Roads Maintenance Blanket Purchase Agreement (NM FERM BPA) Zone 5 contractors and is set aside for small business concerns under the $45M size standard. The work encompasses comprehensive road reconstruction services including mobilization, roadside brushing and clearing, removal of structures and obstructions, excavation and embankment work with multiple dip and turnout constructions, geosynthetic material installation, riprap placement, untreated aggregate course application, road reconditioning on ML3 and ML2 roads, culvert installation, gate installation, and soil material supply.

The base scope includes 32 line items with quantities ranging from single units to thousands of tons or linear feet. Key quantities include: 1,110 linear feet of brushing, 110 square feet of clearing and grubbing, 18 armored dips with class 0 material, 53 tons of class 5 riprap, 344 tons of class 0 riprap, 1,793 tons of untreated aggregate, 10.45 miles of ML3 road reconditioning, and 23.89 miles of ML2 road reconditioning. The solicitation includes three optional items: Option A for 500 tons of stockpiled class 0 riprap, Option B for 20 miles of additional ML2 road reconditioning, and Option C for 20 additional armored dips and 200 tons of riprap. Quotations must include unit costs and amounts for all line items, with the total contract value calculated from base and optional selections.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Schedule of Items
RFQ# 127EAX26Q0086
Company:Project Title:Barillas Peak Roads Reconstruction
Date:Representative:
BASE Items
Item No.DescriptionUnitQuantityUnit CostAmount
151(01)MobilizationLSALL
201(01)Roadside Brushing, FSSS 203 Disposal Method (b) ScatteringLF1110
201(02)Clearing and Grubbing, FSSS 203 Disposal Method (b) ScatteringSF110
203(01)Removal of Structures and Obstructions, Remove/Dispose of ~15 TiresLSALL
203(02)Removal of Structures and Obstructions, Type I GateEA1
204(01)Excavation and Embankment, Construct Grade Dip, FSSS 204 Compaction Method (d) w/ RollerEA1
204(02)Excavation and Embankment, Construct Grade Dip, FSSS Compaction Method (e) w/ Equipment (3 passes)EA2
204(03)Excavation and Embankment, Construct Rolling Dip, FSSS 204 Compaction Method (d) w/ RollerEA3
204(04)Excavation and Embankment, Construct Rolling Dip, FSSS 204 Compaction Method (e) w/ Equipment (3 passes)EA3
204(05)Excavation and Embankment, Construct Armored Dip w/ Class 0, FSSS 204 Compaction Method (e) w/ Equipment (3 passes)EA18
204(06)Excavation and Embankment, Construct Lead Out Ditch, ~10 LF eachEA5
204(07)Excavation and Embankment, Construct Turn Out, FSSS 204 Compaction Method (e) w/ Equipment (3 passes)EA2
204(08)Excavation and Embankment, Reinforce Traveled Way w/ Class 0/Geogrid/Geotextile, FSSS 301 Compaction C, ~160 ft. (Material paid under 207 & 251)LSALL
204(09)Excavation and Embankment, Place Select Borrow, FSSS 204 Compaction Method (g) w/ BucketTON28
204(10)Excavation and Embankment, Place Borrow/Fill, FSSS 204 Compaction Method (g) w/ Bucket, or (f) w/ Equipment (one pass)CY172
207(01)Earthwork Geosynthetics, Non-woven Geotextile, Class I, Material ONLYSF900
207(02)Earthwork Geosynthetics, Reinforcement (Woven) Geotextile, Type 6 & Class I, Material ONLYSF1960
207(03)Earthwork Geosynthetics, Reinforcement Geogrid, Type 6, Material ONLYSF1960
251(01)Riprap, Class 5, Install w/ Non-woven Geotextile (Fabric paid under 204)TON53
251(02)Riprap, Install Class 0, FSSS 301 Compaction BTON20
251(03)Riprap, Install Class 0, FSSS 301 Compaction ATON344
251(04)Riprap, Install Class 0 for Road Edge or Embankment Armoring, FSSS 204 Compaction Method (g)TON80
301(01)Untreated Agg. Courses, Spot Gravel, R3-G FS Surface Course, FSSS 301 Compaction C, includes wateringTON1793
301(02)Untreated Agg. Courses, Spot surfacing, Subbase Grading B, FSSS 301 Compaction C, includes wateringTON28
301(03)Untreated Agg. Courses, Spot surfacing, Subbase Grading B, FSSS 301 Compaction ATON1953
303(01)Road Reconditioning, ML3 road, < 25 CMPs, FSSS 204 Compaction Method (d), includes wateringMILE10.45
303(02)Road Reconditioning, ML2 road, FSSS 204 Compaction Method (e), includes wateringMILE23.89
602(01)Culverts,Reset 95" x 67" x 40' Squash Pipe and install Aprons (include bedding, coupling bands, and gaskets ), FSSS 204 Compaction Method (d)LSALL
619(01)Gates, Install Contractor Furnished Type I Gate, includes 3" yellow & red/white retroreflective tape installationEA2
619(02)Gates, Install Contractor Furnished Type I Gate LOCKING POSTS AND PINS ONLY, includes 3" yellow retroreflective tape installationEA2
619(02)Cattleguard, Repair or Replace Angle Iron, 15' x 2" x 2"EA1
633(01)Permanent Traffic Control, Install 3" Retroreflective tape on Gates and Posts ONLYEA2
704(01)Soil, Borrow/Fill, Material Only, placement covered under 204(10)TON35
704(02)Soil, Select Borrow, Material Only, placement covered under 204(09)TON28
BASE Subtotal
BASE TOTAL
Option Item A
Item No.DescriptionUnitQuantityUnit CostAmount
251(01)AStockpiled Aggregates, Class 0 Riprap, within project boundaryTON500
Option A Subtotal
Option A TOTAL

Total w/ BASE & Option A

Option Item B
Item No.DescriptionUnitQuantityUnit CostAmount
303(01)BRoad Reconditioning, ML2 road, FSSS 204 Compaction Method (e), includes wateringMILE20
Option B Subtotal
Option B TOTAL

Total w/ BASE & Option B

Option Item C
Item No.DescriptionUnitQuantityUnit CostAmount
204(05)CExcavation and Embankment, Construct Armored Dip w/ Class 0, FSSS 204 Compaction Method (f)EA20
251(04)CRiprap, Class 0TON200
Option B Subtotal
Option C TOTAL

Total w/ BASE & Options B & C

Total w/ BASE & ALL Options