Attachment A_127EAX26Q0086-Amendment 001_SOI_9.22.26.pdf
PDF 67 KB Posted
- Attached to
- Solicitation is Restricted to the Current Region 3, Zone 5 FERM BPA Holders - USDA Forest Service
- Solicitation number
- 127EAX26Q0086
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Schedule of Items pricing template for the Barillas Peak Roads Reconstruction project. The schedule includes base items and three optional line items with quantities and unit costs to be completed by bidders.
The base scope encompasses comprehensive road reconstruction and maintenance work including mobilization, roadside brushing and clearing, removal of structures and obstructions (approximately 60 tires and 3 trees), excavation and embankment work (grade dips, rolling dips, armored dips, turnarounds, lead out ditches, and turn outs), geosynthetic materials (geotextile and geogrid reinforcement), riprap installation in multiple classes and compaction methods, untreated aggregate courses and spot surfacing, road reconditioning on ML3 and ML2 roads totaling approximately 34.34 miles, culvert reset and apron installation, gate installation (2 Type I gates with locking posts and pins), cattleguard repair, permanent traffic control with retroreflective tape, temporary stream diversion, and borrow/fill soil materials. Option Item A adds 500 tons of stockpiled Class 0 riprap within the project boundary. Option Item B adds 20 miles of ML2 road reconditioning with FSSS 204 Compaction Method (e). Option Item C includes 20 additional armored dips and 200 tons of Class 0 riprap with a 25% profit and overhead markup. New Mexico Gross Receipts Tax (NMGRT) is applied at 7.425% to the base and optional items. All work items are to be paid by contract quantity, with estimates derived from market research and previous contract awards.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Company: Project Title:
Date: Representative:
Item No. Description Unit Quantity Unit Cost Amount 151(01) Mobilization LS ALL
201(01) Roadside Brushing, FSSS 203 Disposal Method (b) Scattering LF 1110
201(02) Clearing and Grubbing, FSSS 203 Disposal Method (b) Scattering SF 110
203(01)
Removal of Structures and Obstructions, Remove/Dispose of ~60 Tires and 3 trees (~16" dbh x 30' long), FSSS 203 Disposal Method (b) Scattering for trees LS ALL
203(02) Removal of Structures and Obstructions, Type I Gate EA 1
204(01) Excavation and Embankment, Construct Grade Dip, FSSS 204 Compaction Method (d) w/ Roller EA 1
204(02)
Excavation and Embankment, Construct Grade Dip, FSSS Compaction Method (e) w/ Equipment (3 passes) EA 2
204(03) Excavation and Embankment, Construct Rolling Dip, FSSS 204 Compaction Method (d) w/ Roller EA 3
204(04)
Excavation and Embankment, Construct Rolling Dip, FSSS 204 Compaction Method (e) w/ Equipment (3 passes) EA 3
204(05)
Excavation and Embankment, Construct Armored Dip w/ Class 0, FSSS 204 Compaction Method (e) w/ Equipment (3 passes) EA 18
204(06) Excavation and Embankment, Construct Lead Out Ditch, ~10 LF each EA 5
204(07)
Excavation and Embankment, Construct Turn Out, FSSS 204 Compaction Method (e) w/ Equipment (3 passes) EA 2
204(08)
Excavation and Embankment, Reinforce Traveled Way w/ Class 0/Geogrid/Geotextile, FSSS 301 Compaction C, ~160 ft. (Material paid under 207
& 251) LS ALL
204(09)
Excavation and Embankment, Place Select Borrow, FSSS 204 Compaction Method (g) w/ Bucket TON 28
204(10)
FSSS 204 Compaction Method (g) w/ Bucket, or (f) w/ Equipment (one pass) CY 172
Schedule of Items Barillas Peak Roads Reconstruction
BASE Items
204(11)
Excavation and Embankment, Construct J-Hook Turnaround, FSSS 204 Compaction Method (e) w/ Equipment (3 passes) EA 6
207(01)
Earthwork Geosynthetics, Reinforcement (Non-woven) Geotextile, Type 6, Material ONLY, Mirafi or approved equal SF 2860
207(02)
Earthwork Geosynthetics, Reinforcement Geogrid, Type 6, Material ONLY, Mirafi or approved equal SF 1960
251(01) Riprap, Class 5, Install w/ Non-woven Geotextile (Fabric paid under 204) TON 53
251(02) Riprap, Install Class 0, FSSS 301 Compaction B TON 20
251(03) Riprap, Install Class 0, FSSS 301 Compaction A TON 344
251(04)
Riprap, Install Class 0 for Road Edge or Embankment Armoring, FSSS 204 Compaction Method (g) TON 80
301(01)
Untreated Agg. Courses, Spot Gravel, R3-G FS Surface Course, FSSS 301 Compaction C, includes watering TON 1793
301(02)
Untreated Agg. Courses, Spot surfacing, Subbase Grading B, FSSS 301 Compaction C, includes watering TON 28
301(03) Untreated Agg. Courses, Spot surfacing, Subbase Grading B, FSSS 301 Compaction A TON 1953
303(01) Road Reconditioning, ML3 road, < 25 CMPs, FSSS 204 Compaction Method (d), includes watering MILE 10.45
303(02) Road Reconditioning, ML2 road, FSSS 204 Compaction Method (e), includes watering MILE 23.89
602(01)
Culverts,Reset 95" x 67" x 40' Squash Pipe and install Aprons (include bedding, coupling bands, and gaskets ), FSSS 204 Compaction Method (d) LS ALL
619(01)
Gates, Install Contractor Furnished Type I Gate, includes 3" yellow & red/white retroreflective tape installation EA 2
619(02)
Gates, Install Contractor Furnished Type I Gate LOCKING POSTS AND PINS ONLY, includes 3" yellow retroreflective tape installation EA 2
619(02) Cattleguard, Repair or Replace Angle Iron, 15' x 2" x 2" EA 1
628(01) Temporary Stream Diversion LS ALL
633(01) Permanent Traffic Control, Install 3" Retroreflective tape on Gates and Posts ONLY EA 2
704(01) Soil, Borrow/Fill, Material Only, placement covered under 204(10) TON 35
704(02) Soil, Select Borrow, Material Only, placement covered under 204(09) TON 28
NMGRT @7.425%
Item No. Description Unit Quantity Unit Cost Amount
251(01)A Stockpiled Aggregates, Class 0 Riprap, within project boundary TON 500
NMGRT @ 7.425%
Item No. Description Unit Quantity Unit Cost Amount
303(01)B Road Reconditioning, ML2 road, FSSS 204 Compaction Method (e), includes watering MILE 20
NMGRT @ 7.425%
Item No. Description Unit Quantity Unit Cost Amount
204(05)C Excavation and Embankment, Construct Armored Dip w/ Class 0, FSSS 204 Compaction Method (f) EA 20
251(04)C Riprap, Class 0 TON 200
Profit & Overhead @ 25%
NMGRT @ 7.425%
BASE Subtotal
Notes: Estimates derived from market research and previous contract awards. All work items to be paid by Contract Quantity.
BASE TOTAL
Option B Subtotal
Option B TOTAL
Total w/ BASE & Option B
Option Item C
Option B Subtotal
Option Item A
Option A Subtotal
Option A TOTAL
Total w/ BASE & Option A
Option Item B
Option C TOTAL
Total w/ BASE & Options B & C
Total w/ BASE & ALL Options
Sheet1