This document is a Schedule of Items pricing template for the Barillas Peak Roads Reconstruction project. The schedule includes base items and three optional line items with quantities and unit costs to be completed by bidders.

The base scope encompasses comprehensive road reconstruction and maintenance work including mobilization, roadside brushing and clearing, removal of structures and obstructions (approximately 60 tires and 3 trees), excavation and embankment work (grade dips, rolling dips, armored dips, turnarounds, lead out ditches, and turn outs), geosynthetic materials (geotextile and geogrid reinforcement), riprap installation in multiple classes and compaction methods, untreated aggregate courses and spot surfacing, road reconditioning on ML3 and ML2 roads totaling approximately 34.34 miles, culvert reset and apron installation, gate installation (2 Type I gates with locking posts and pins), cattleguard repair, permanent traffic control with retroreflective tape, temporary stream diversion, and borrow/fill soil materials. Option Item A adds 500 tons of stockpiled Class 0 riprap within the project boundary. Option Item B adds 20 miles of ML2 road reconditioning with FSSS 204 Compaction Method (e). Option Item C includes 20 additional armored dips and 200 tons of Class 0 riprap with a 25% profit and overhead markup. New Mexico Gross Receipts Tax (NMGRT) is applied at 7.425% to the base and optional items. All work items are to be paid by contract quantity, with estimates derived from market research and previous contract awards.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Company: Project Title:

Date: Representative:

Item No. Description Unit Quantity Unit Cost Amount 151(01) Mobilization LS ALL

201(01) Roadside Brushing, FSSS 203 Disposal Method (b) Scattering LF 1110

201(02) Clearing and Grubbing, FSSS 203 Disposal Method (b) Scattering SF 110

203(01)

Removal of Structures and Obstructions, Remove/Dispose of ~60 Tires and 3 trees (~16" dbh x 30' long), FSSS 203 Disposal Method (b) Scattering for trees LS ALL

203(02) Removal of Structures and Obstructions, Type I Gate EA 1

204(01) Excavation and Embankment, Construct Grade Dip, FSSS 204 Compaction Method (d) w/ Roller EA 1

204(02)

Excavation and Embankment, Construct Grade Dip, FSSS Compaction Method (e) w/ Equipment (3 passes) EA 2

204(03) Excavation and Embankment, Construct Rolling Dip, FSSS 204 Compaction Method (d) w/ Roller EA 3

204(04)

Excavation and Embankment, Construct Rolling Dip, FSSS 204 Compaction Method (e) w/ Equipment (3 passes) EA 3

204(05)

Excavation and Embankment, Construct Armored Dip w/ Class 0, FSSS 204 Compaction Method (e) w/ Equipment (3 passes) EA 18

204(06) Excavation and Embankment, Construct Lead Out Ditch, ~10 LF each EA 5

204(07)

Excavation and Embankment, Construct Turn Out, FSSS 204 Compaction Method (e) w/ Equipment (3 passes) EA 2

204(08)

Excavation and Embankment, Reinforce Traveled Way w/ Class 0/Geogrid/Geotextile, FSSS 301 Compaction C, ~160 ft. (Material paid under 207

& 251) LS ALL

204(09)

Excavation and Embankment, Place Select Borrow, FSSS 204 Compaction Method (g) w/ Bucket TON 28

204(10)

FSSS 204 Compaction Method (g) w/ Bucket, or (f) w/ Equipment (one pass) CY 172

Schedule of Items Barillas Peak Roads Reconstruction

BASE Items

204(11)

Excavation and Embankment, Construct J-Hook Turnaround, FSSS 204 Compaction Method (e) w/ Equipment (3 passes) EA 6

207(01)

Earthwork Geosynthetics, Reinforcement (Non-woven) Geotextile, Type 6, Material ONLY, Mirafi or approved equal SF 2860

207(02)

Earthwork Geosynthetics, Reinforcement Geogrid, Type 6, Material ONLY, Mirafi or approved equal SF 1960

251(01) Riprap, Class 5, Install w/ Non-woven Geotextile (Fabric paid under 204) TON 53

251(02) Riprap, Install Class 0, FSSS 301 Compaction B TON 20

251(03) Riprap, Install Class 0, FSSS 301 Compaction A TON 344

251(04)

Riprap, Install Class 0 for Road Edge or Embankment Armoring, FSSS 204 Compaction Method (g) TON 80

301(01)

Untreated Agg. Courses, Spot Gravel, R3-G FS Surface Course, FSSS 301 Compaction C, includes watering TON 1793

301(02)

Untreated Agg. Courses, Spot surfacing, Subbase Grading B, FSSS 301 Compaction C, includes watering TON 28

301(03) Untreated Agg. Courses, Spot surfacing, Subbase Grading B, FSSS 301 Compaction A TON 1953

303(01) Road Reconditioning, ML3 road, < 25 CMPs, FSSS 204 Compaction Method (d), includes watering MILE 10.45

303(02) Road Reconditioning, ML2 road, FSSS 204 Compaction Method (e), includes watering MILE 23.89

602(01)

Culverts,Reset 95" x 67" x 40' Squash Pipe and install Aprons (include bedding, coupling bands, and gaskets ), FSSS 204 Compaction Method (d) LS ALL

619(01)

Gates, Install Contractor Furnished Type I Gate, includes 3" yellow & red/white retroreflective tape installation EA 2

619(02)

Gates, Install Contractor Furnished Type I Gate LOCKING POSTS AND PINS ONLY, includes 3" yellow retroreflective tape installation EA 2

619(02) Cattleguard, Repair or Replace Angle Iron, 15' x 2" x 2" EA 1

628(01) Temporary Stream Diversion LS ALL

633(01) Permanent Traffic Control, Install 3" Retroreflective tape on Gates and Posts ONLY EA 2

704(01) Soil, Borrow/Fill, Material Only, placement covered under 204(10) TON 35

704(02) Soil, Select Borrow, Material Only, placement covered under 204(09) TON 28

NMGRT @7.425%

Item No. Description Unit Quantity Unit Cost Amount

251(01)A Stockpiled Aggregates, Class 0 Riprap, within project boundary TON 500

NMGRT @ 7.425%

Item No. Description Unit Quantity Unit Cost Amount

303(01)B Road Reconditioning, ML2 road, FSSS 204 Compaction Method (e), includes watering MILE 20

NMGRT @ 7.425%

Item No. Description Unit Quantity Unit Cost Amount

204(05)C Excavation and Embankment, Construct Armored Dip w/ Class 0, FSSS 204 Compaction Method (f) EA 20

251(04)C Riprap, Class 0 TON 200

Profit & Overhead @ 25%

NMGRT @ 7.425%

BASE Subtotal

Notes: Estimates derived from market research and previous contract awards. All work items to be paid by Contract Quantity.

BASE TOTAL

Option B Subtotal

Option B TOTAL

Total w/ BASE & Option B

Option Item C

Option B Subtotal

Option Item A

Option A Subtotal

Option A TOTAL

Total w/ BASE & Option A

Option Item B

Option C TOTAL

Total w/ BASE & Options B & C

Total w/ BASE & ALL Options