Attachment B_598-23-107 Drawings.pdf
PDF 19 MB Posted
- Solicitation number
- 36C25626R0006
About this file
This is a set of construction documents for medical gas deficiency improvements at the Eugene J. Towbin VA Healthcare Center in North Little Rock, Arkansas. The project involves replacing and upgrading medical gas systems, master alarm panels, and associated cabling across multiple buildings, including Building 1 and Building 170. Key scope includes:
Specific work involves replacing oxygen main shutoff valves, check valves, and auxiliary valve connections, installing new lockable shutoff valves, and upgrading medical gas cabling and master alarm systems. The project covers ground through sixth floors, with work involving medical gases such as oxygen, medical air, vacuum, and nitrogen. The documents are fully sprinklered bid documents dated August 15, 2025, with the VA project number 598-23-107 and a project number of 23-134, prepared by Apogee Consulting Group for the VA Office of Construction and Facilities Management.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
JOHN L. MCCLELLAN MEMORIAL VETERANS HOSPITAL SITE MAP JOHN L. MCCLELLAN MEMORIAL VETERANS HOSPITAL LOCATION MAP
EUGENE J. TOWBIN VA HOSPITAL SITE MAP EUGENE J. TOWBIN VA HOSPITAL LOCATION MAP
4300 W. SEVENTH ST. LITTLE ROCK, AR 72205
2200 FORT ROOTS DR. NORTH LITTLE ROCK, AR 72114
4300 W. SEVENTH ST. LITTLE ROCK, AR 72205
2200 FORT ROOTS DR. NORTH LITTLE ROCK, AR 72114
/1
/2
:5
:4
P
M C
U s e rs
\a ri c h a rd s \D o c u m e n ts
\A
-1
-Q
-V A
N L it tl e R o c k -M e d G a s D e f-
A R a ri c h a rd s P
K P
J .r v t
G-001
COVER
1 2CET
MED GAS DEFICIENCIES
VA CENTRAL ARKANSAS HEALTH
CARE
AUGUST 15, 2025
BID DOCUMENTS
598-23-10723-134
1,69,170
MED GAS DEFICIENCIES
VA CENTRAL ARKANSAS HEALTH CARE
VA PROJECT #: 598-23-107
ADR
DRAWING LIST
GENERAL
G-001 COVER 1 2
G-005 ICRA INFORMATION AND DETAILS 2 2
CIVIL
CU100 JLM CAMPUS SITE, PAVING, AND UTILITY PLAN 1 3
CU101 NORTH CAMPUS SITE, PAVING, UTILITY PLAN 2 3
CU-501 STANDARD DETAILS 3 3
ARCHITECTURAL
A-302 WALL TYPE DETAILS 1 1
PLUMBING
P-001 PLUMBING GENERAL INFORMATION, SCHEDULES, AND DETAILS 1 3
001.P-400 GROUND FLOOR MEDICAL GAS ENLARGED PLAN 2 3
170.P-400 FIRST FLOOR MEDICAL GAS PLAN AND ENLARGED PLAN 3 3
TECHNOLOGY
001.T-100 GROUND FLOOR MEDICAL GAS CABLING OVERALL AND ENLARGED PLANS 1 12
001.T-110 FIRST FLOOR MEDICAL GAS CABLING OVERALL AND ENLARGED PLAN 2 12
001.T-120 SECOND FLOOR MEDICAL GAS CABLING OVERALL AND ENLARGED PLAN 3 12
001.T-150 FIFTH FLOOR MEDICAL GAS CABLING OVERALL AND ENLARGED PLAN 4 12
001.T-160 SIXTH FLOOR MEDICAL GAS CABLING OVERALL AND ENLARGED PLAN 5 12
TS101 TECHNOLOGY SITE PLAN 6 12
069.T-110 FIRST FLOOR MEDICAL GAS CABLING PLAN 7 12
170.T-100 GROUND FLOOR MEDICAL GAS CABLING OVERALL AND ENLARGED PLAN 8 12
170.T-110 FIRST FLOOR MEDICAL GAS CABLING OVERALL AND ENLARGED PLANS 9 12
170.T-120 SECOND FLOOR MEDICAL GAS CABLING OVERALL AND ENLARGED PLAN 10 12
T-501 TECHNOLOGY DETAILS 11 12
T-601 TECHNOLOGY RISERS 12 12
AREA OF WORK
AREA OF WORK
AREA OF WORK
AREA OF WORK
SEAL
057626
P
ROFESSIONAL
A N
D
RE W D. RICHA
R D
S
N O
RT H C A R OLIN
A
E N G IN E E R
Docusign Envelope ID: FC3B8347-6482-4AE6-A61E-D7CBC70598FF
8/13/20258/13/2025
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
A
TEMPORARY PREFABRICATED
ICRA WALL SYSTEM. BASIS OF
DESIGN: STARC WALL SYSTEM OR
EDGEGUARD SYSTEM OR EQUAL.
EXISTING CEILING
SYSTEM TO HAVE
INTEGRATED CEILING
SEAL.
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY MATS
(CHANGED END OF
SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
ISOLATE AND COVER ALL
SUPPLY DIFFUSERS NOT
IN OPERATION DURING
PROJECT - COORDINATE
W/ COR
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL STATION
WITH AUDIO /
VISUAL
EXISTING WALL
BARRIER
NOTE:
A. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL VERIFY
LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM
EXHAUST. VERIFY LOCAL JURISDICTION CODE AND VA REQUIREMENTS
FOR DISTANCE PRIOR TO STARTING WORK.
EXHAUST LOCATION
- SEE NOTE A
G-005
_____4
G-005
G-005
FLEX DUCT
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
MED GAS DEFICIANCES
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS
PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL
ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON
THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK
AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE
A STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES -
CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA
AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL
BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON
COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED
CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
[AFTER EACH PHASE, PERFORM TASKS STATED IN CONTAMINATION OF PATIENT ROOMS,
SUPPLIES, EQUIPMENT AND RELATED AREAS NOTE 2.
3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE SPACES
(CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT
THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS
PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING
SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER
THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT
OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED
BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF
ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE
USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN
NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF
THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-
CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY
ADJACENT EXCAVATION DEBRIS.
6. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL BE COVERED AND
PROTECTED PRIOR STARTING EACH CONSTRUCTION PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE
ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR
MUST FLOW FROM CLEAN TO DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE
WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF
ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE
TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-
CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST
TO PREVENT CONTAMINATION OF THE DUCTS.
3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-FLANGE
HANGER HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM OF 7'-2" A.F.F.
4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY
AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL
AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT
WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE
USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR
CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT,
TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE
MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL
CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL
CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE
CLEANING.
ICRA NOTES
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
A
.F .F
A P
P R
O X
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
HEPA NEGATIVE
AIR UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
E X
IS
T
IN
G
W A
L L
FLOOR SLAB ABOVE
CEILING
PLASTIC
WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H
IG
H T
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING
CEILING
FLEX DUCT
STICKY MATS
VALVE REPLACEMENT AT NURSE
STATION
PLASTIC SHEET ICRA BARRIER
ZIPPER DOOR
VALVE BOX/ ALARM
STICKY MAT
INDIVIDUAL RECEPTACLE
CORRIDOR
PLASTIC SHEET ICRA
BARRIER
ZIPPER DOOR
ABOVE CEILING WORK IN CORRIDOR
WORK ABOVE CEILING
OR ALONG WALL
STICKY MATS
PLASTIC SHEET ICRA
BARRIER
ZIPPER DOOR
EXISTING WALL
NURSE STATION OR
OPEN WORK AREA
VALVE BOX/ ALARM
EXISTING WALL
EXISTING CASEWORK
20'-0" MAX
C L E
A R
M
IN
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:5
:4
P
M C
U s e rs
\a ri c h a rd s \D o c u m e n ts
\A
-1
-Q
-V A
N L it tl e R o c k -M e d G a s D e f-
A R a ri c h a rd s P
K P
J .r v t
G-005
ICRA INFORMATION AND DETAILS
2 2CET
MED GAS DEFICIENCIES
VA CENTRAL ARKANSAS HEALTH
CARE
AUGUST 15, 2025
BID DOCUMENTS
598-23-10723-134
1,69,170
ADR
Scale: No Scale
ICRA BARRIER WALL TYPE
Scale: No Scale
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: No Scale
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: No Scale
ICRA ROOM ELEVATION
Scale: No Scale
CROSS SECTION "A"
Scale: No Scale
ICRA MOBILE CONTAINMENT CART
Scale: No Scale
TYPICAL ICRA CONDITIONS
SEAL
057626
P
ROFESSIONAL
A N
D
RE W D. RICHA
R D
S
N O
RT H C A R OLIN
A
E N G IN E E R
8/13/20258/13/2025
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
SS SS SS SS
POW POW POW POW POW POW POW POW POW POW POW POW
TANK AREA
UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
W W
W
W W
W W
W W
SS SS SS SS SS SS SS SS SS
SS SS SS SS
SS
SS
SS
W
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E UG/E
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E UG/E
CHILLER UNITS THIS AREA
CONCRETE
VAULT FH WV
LP
VA HOSPITAL
SS
SS
SS
SS
SS
SS
SS
SS
FIN. FLOOR=373.94'
UNKNOWN UTILITY
MARKINGS
CONSTRUCTION
FENCE
MONITORING
WELL
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UNKNOWN UTILITY
SS
SS
SS
SS
SS
SS
CURB AND GUTTER IN THIS
AREA, NOT ACCESSIBLE AT
THE TIME OF SURVEY.
UNKNOW UTILITY
MARKINGS 3'-4'±
DEPTH
1'-2'±
ACCESS MANHOLES
(UNKNOWN-BOLTED)
GAS LINE
DEPTH 3'-4'±
CURB AND GUTTER IN THIS
AREA, NOT ACCESSIBLE AT
THE TIME OF SURVEY.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
U.S. Department of Veterans Affairs o | f | w |
FULLY SPRINKLERED
BID DOCUMENTS
JOHN L. MCCLELLAN MEMORIAL OF
CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205
Engineers Architects
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date
CONSULTANTS:
8/
/2
4:
:4
PM
CU100
ZLRNSY
JLM CAMPUS SITE, PAVING, AND
UTILITY PLAN
1 3AUGUST 15, 2025
MED GAS DEFICIENCIES 598-23-107
23-134
KEY PLAN
CONTRACTOR TO CONTACT UTILITIES PROTECTION
CENTER PRIOR TO ANY EXCAVATION
UTILITY NOTES:
1) ALL ON-SITE PVC PIPE SHALL HAVE CLASS B BEDDING.
2) ALL CONDUIT, PIPE, AND CHASE PIPE SHALL BE WRAPPED WITH
THE APPROPRIATE LOCATION WIRE AND TAPE.
3) ALL DISTURBED AREAS ARE TO BE STABILIZED AS SOON AS
PRACTICABLE.
4) ALL DISTURBED VEGETATED AREAS ARE TO BE RESTORED TO
THEIR ORIGINAL CONDITION.
LEGEND
EXISTING FENCE LINE
PROPERTY LINE
EXISTING UNKNOWN UTILITY LINE
EXISTING OVERHEAD POWER LINE
EXISTING UNDERGROUND POWER LINE
EXISTING SANITARY SEWER LINE
EXISTING WATER LINE
EXISTING STORM LINE
EXISTING WALL
PROPOSED UNDERGROUND COMMUNICATIONS LINE
LIMITS OF CONSTRUCTION
OHP OHP OHP
UG/E UG/E
UG/C UG/C
SS SS SS
W W W
KEY PLAN
1" = 10'
SCALE IN FEET
10 5 10 20 before you dig belowKnow what's
Call
R
LOC LOC LOC
KEY NOTES:
1) EXISTING CONCRETE PAVEMENT TO BE REMOVED AND REPLACED
(TYP.)
2) EXISTING ASPHALT PAVEMENT TO BE REMOVED AND REPLACED
(TYP.)
3) PROPOSED UNDERGROUND COMMUNICATION DUCT BANK. SEE
COMMUNICATION PLANS FOR DETAILS.
4) PROPOSED BUILDING CONNECTION FOR UNDERGROUND
COMMUNICATION DUCT BANK. SEE COMMUNICATION PLANS FOR
DETAILS.
5) EXISTING UNDERGROUND ELECTRICAL LINE TO BE REMOVED IN
ITS ENTIRETY (TYP.)
6) EXISTING SANITARY SEWER LINE TO REMAIN
7) EXISTING UNDERGROUND ELECTRICAL LINE TO REMAIN (TYP)
8) PROPOSED OXYGEN TANK CONNECTION FOR UNDERGROUND
COMMUNICATION DUCT BANK (2-2" CONDUITS). SEE
COMMUNICATION PLANS FOR DETAILS.
9) EXISTING UNKNOWN UTILITY TO REMAIN.
10) PROVIDE NEW 12"X17" HANDHOLE/PULLBOX.
AutoCAD SHX Text
SS LINE DEPTH 2'-3'±
AutoCAD SHX Text Foresite Group, LLC 2128 Moores Mill Rd. Suite C Auburn, AL 36830
AutoCAD SHX Text
334.887.6064 334.887.6024 www.foresitegroup.net
AutoCAD SHX Text
UTILITY SERVICE PROVIDERS
AutoCAD SHX Text
WATER
AutoCAD SHX Text
CENTRAL ARKANSAS WATER (501) 377-1245 CONTACT: JASON LOWDER
AutoCAD SHX Text
SEWER & STORM
AutoCAD SHX Text UAMS UTILITIES (501) 218-6242 CONTACT: Troy "Al" Graham
AutoCAD SHX Text
GAS
AutoCAD SHX Text
SUMMIT UTILITIES (501) 772-2134 CONTACT: JONI BATES
AutoCAD SHX Text
POWER
AutoCAD SHX Text
ENTERGY ARKANSAS (501) 773-6115 CONTACT: BRAD VANCE
AutoCAD SHX Text X
BLDG. 89
BLDG. 69
BLDG. 170
ASPHALT
ASPHALT
AREA UNDER CONSTRUCTION
UG/C
UG/C
UG/C
UG/C
SS
SS SS
SS
SS
SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
PO
W
POW
PO
W
POW
W
W
WV
FH
TRANSFORMER
LP
LP
STEAM LINE
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
ELECTRIC MH
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
VAULT
CONCRETE
STEAM LINE
TEMP.
POLE
ELECTRIC MH
ELECTRIC MH
(AP&L 3 EACH)
LIQUID
OXYGEN
TANKS
CONSTRUCTION
FENCE
COMM.
MH
METAL
VAULT
METAL
VAULT
METAL
VAULT
COMM.
MH
COMM.
MH
ELEC.
BOX
METAL
VAULT
STEAM LINE MH
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/EUG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/EUG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/EUG/EUG/EUG/EUG/EUG/EUG/EUG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W
W
W
W
W
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GASGAS
GAS
GAS
GAS
GAS
GAS
GAS
GASGAS
GAS
GAS
GAS
GAS
GAS
GAS
GASGA
S
GAS
GAS
GA
S
GA
S
GA
S
GAS
GAS
GAS
GAS
GAS
GA
S
W
UG/C UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG
/C
UG
/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG
/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG
/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
C O
M M
. D U
C T
BA
N
K (Q
L- B)
C O
M M
. D U
C T
BA
N
K (Q
L- B)
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
COMMUNICATION MANHOLE
ID# CMH-2
4" HDPE EMPTY FIBER
OPTIC CONDUITS (QL-B)
COMMUNICATION DUCT
BANK (QL-B)
COMMUNICATION DUCT BANK (QL-C)
COMMUNICATION
MANHOLE
ID# CMH-1
4" HDPE EMPTY FIBER
OPTIC CONDUITS (QL-B)
COMMUNICATION DUCT BANK (QL-D)
COMM. DUCT BANK (QL-B)
COMM. DUCT BANK (QL-D)
COM
M
. D
UCT
BA
NK
(Q L-
B)
COMM. DUCT BANK (QL-B)
COMMUNICATION MANHOLE (QL-D)
ID# CMH-2
(FILLED WITH DEBRIS, POSSIBLY
OUT OF SERVICE)
COMMUNICATION
MANHOLE
ID#CMH-3
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
U.S. Department of Veterans Affairs o | f | w |
FULLY SPRINKLERED
BID DOCUMENTS
JOHN L. MCCLELLAN MEMORIAL OF
CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205
Engineers Architects
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date
CONSULTANTS:
8/
/2
4:
:2
PM
CU101
NORTH CAMPUS SITE, PAVING,
UTILITY PLAN
2 3AUGUST 15, 2025
KEY PLAN
CONTRACTOR TO CONTACT UTILITIES PROTECTION
CENTER PRIOR TO ANY EXCAVATION
LEGEND
EXISTING FENCE LINE
PROPERTY LINE
EXISTING UNDERGROUND POWER LINE
EXISTING UNDERGROUND TELEPHONE LINE
EXISTING STEAM LINE
EXISTING STORM LINE
PROPOSED UNDERGROUND COMMUNICATIONS LINE
LIMITS OF CONSTRUCTION
PROPOSED ASPHALT
PROPOSED CONCRETE
UG/E UG/E
UG/T UG/T
UG/C UG/C
ST ST
KEY PLAN
1" = 10'
SCALE IN FEET
10 5 10 20 before you dig belowKnow what's
Call
R
LOC LOC LOC
UTILITY NOTES:
1) ALL ON-SITE PVC PIPE SHALL HAVE CLASS B BEDDING.
2) ALL CONDUIT, PIPE, AND CHASE PIPE SHALL BE WRAPPED WITH
THE APPROPRIATE LOCATION WIRE AND TAPE.
3) ALL DISTURBED AREAS ARE TO BE STABILIZED AS SOON AS
PRACTICABLE.
4) ALL DISTURBED VEGETATED AREAS ARE TO BE RESTORED TO
THEIR ORIGINAL CONDITION.
5) REFERENCE THE UTILITY EXHIBIT AND BUTTERFLY DIAGRAMS
OF COMMUNICATION MANHOLES FROM MCCARTHY MAPPING AS
WELL AS REPORT FROM ELITE SCANNING GROUP DATED FEBRUARY
26, 2024.
KEY NOTES:
1) EXISTING CONCRETE PAVEMENT TO BE SAWCUT, REMOVED, AND
REPLACED (TYP.)
2) PROPOSED 24" X 30" PULL BOX TO ALLOW FOR REPAIR AND
CONNECTION OF BROKEN CONDUIT AND WIRING AS WELL AS
PROPOSED TELECOMMUNICATION WIRING. SEE TELECOM SHEETS
FOR DETAILS OF PULL BOXES AND WIRING.
3) EXISTING UNDERGROUND ELECTRICAL MANHOLE TO REMAIN (TYP.)
4) EXISTING UNDERGROUND COMMUNICATION DUCT BANK TO REMAIN
5) EXISTING OXYGEN TANKS, FENCE, AND CONCRETE PAD TO REMAIN
6) EXISTING STORM PIPE TO REMAIN
7) APPROXIMATE LOCATION OF EXISTING STEAM PIPE. EXISTING
STEAM PIPE TO REMAIN
8) APPROXIMATE LOCATION OF EXISTING UNDERGROUND
ELECTRICAL LINE PER RECORD DRAWINGS. EXISTING ELECTRICAL
LINE TO REMAIN
9) APPROXIMATE LOCATION OF EXISTING UNDERGROUND
ELECTRICAL DUCT BANK TO REMAIN
10) EXISTING CONSTRUCTION FENCE
AutoCAD SHX Text Foresite Group, LLC 2128 Moores Mill Rd. Suite C Auburn, AL 36830
AutoCAD SHX Text
334.887.6064 334.887.6024 www.foresitegroup.net
AutoCAD SHX Text
UTILITY SERVICE PROVIDERS
AutoCAD SHX Text
WATER
AutoCAD SHX Text
CENTRAL ARKANSAS WATER (501) 377-1245 CONTACT: JASON LOWDER
AutoCAD SHX Text
SEWER & STORM
AutoCAD SHX Text UAMS UTILITIES (501) 218-6242 CONTACT: Troy "Al" Graham
AutoCAD SHX Text
GAS
AutoCAD SHX Text
SUMMIT UTILITIES (501) 772-2134 CONTACT: JONI BATES
AutoCAD SHX Text
POWER
AutoCAD SHX Text
ENTERGY ARKANSAS (501) 773-6115 CONTACT: BRAD VANCE
X
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Location
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
U.S. Department of Veterans Affairs o | f | w |
FULLY SPRINKLERED
BID DOCUMENTS
JOHN L. MCCLELLAN MEMORIAL OF
CENTRAL ARKANSAS VHCS
4300 W. 7TH STREET
LITTLE ROCK, ARKANSAS 72205
Engineers Architects
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date
CONSULTANTS:
8/
/2
:5 8:
A
M
CU-501
STANDARD DETAILS
3 3AUGUST 15, 2025
TYPE 1 UTILITY TRENCH PATCH
NOT TO SCALE
CU-501
1. MATERIAL AND COMPACTION REQUIREMENTS FOR PIPE BEDDING/SHADING SHALL BE IN ACCORDANCE WITH THE
SPECIFICATIONS FOR THE APPLICABLE UTILITY PIPE.
2. TRENCH BACKFILL SHALL COMMENCE 1 FOOT [305mm] ABOVE THE TOP OF PIPE AND SHALL BE PER SECTION 31 20 00.
3. BACKFILL COMPACTION REQUIREMENTS SHALL BE PER SECTION 31 20 00.
4. THE 1 FOOT [305mm] TRENCH "SHOULDER" AREAS SHALL BE DELETED FOR TYPE 2 TRENCHES.
5. ABC SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16.
6. PORTLAND CEMENT CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 05 23.
7. ASPHALTIC TACK MATERIAL SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16.
8. ASPHALTIC CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16 FOR THE TYPE
SPECIFIED.
9. LOAD TRANSFER DOWELS FOR JOINTS TRANSVERSE TO THE ROADWAY CENTERLINE SHALL BE SMOOTH STEEL DOWELS IN ACCORDANCE WITH THE REQUIREMENTS OF SECTIO N32 05 23. DOWELS SHALL BE SIZED AND SPACED AS
FOLLOWS:
PCCP THICKNESS DOWEL SIZE DOWEL LENGTH DOWEL SPACING
6" [150mm] #5 [No. 16] 12" [305mm] 18" [455mm] 7" [180mm] #6 [No. 19] 15" [380mm] 15" [380mm] 8" [180mm] #8 [No. 19] 15" [380mm] 12" [305mm] 10" [180mm] #10 [No. 19] 15" [380mm] 12" [305mm]
10. DEFORMED TIE BARS SHALL BE USED IN TRENCH PATCHES LONGITUDINAL TO THE ROADWAY CENTERLINE WHEN THE TRENCH LENGTH IS GREATER THAN 50 FEET [15240mm]. TIE BARS SHALL BE 24 INCHES [610mm] LONG. DEFORMED #4 [No. 13] BARS FOR PCCP LESS THAN 8 INCHES [205mm] THICK AND #5 [No. 16] BARS IF 8 INCHES [205mm] THICK OR MORE. TIE BARS SHALL BE PLACED 30 INCHES [760mm] CENTER-TO-CENTER.
11. HOLES SHALL BE DRILLED 1 FOOT [305mm] INTO THE EXISTING SLAB FOR TIE BARS AND 7 INCHES [180mm] FOR DOWELS. HOLES SHALL BE OF A DIAMETER SUFFICIENT TO ACCOMMODATE THE TIE BAR ANCHORAGE OR DOWEL CAP.
TIE BARS SHALL BE ANCHORED WITH AN APPROVED HIGH VISCOSITY EPOXY.
12. IF THE CONCRETE SLAB REMAINING NEXT TO A LONGITUDINAL OR TRANSVERSE JOINT IS LESS THAN 6 FEET [1829mm]
AT ITS NARROWEST WIDTH, REMOVE AND REPLACE THE EXISTING CONCRETE TO THE JOINT.
FOR TRENCH WIDTHS EXCEEDING 4' [1219mm] REFER TO VA STANDARD DETAIL 32 12 16-02
"TYPE 2 UTILITY TRENCH PATCH".
FOR TRENCH WHERE PORTLAND CEMENT CONCRETE (PCC) PAVEMENT EXISTS, REFER TO
32 12 16-03 "TYPE 3 UTILITY TRENCH PATCH".
2" [50mm] MINIMUM OR THICKNESS OF EXISTING PAVEMENT WHICHEVER IS GREATER.
BITUMINOUS SURFACE TREATMENT (CHIPSEAL) REQUIRED ONLY FOR LONGITUDINAL
TRENCHES WITH WIDTHS GREATER THAN 6' [1829mm].
4" [100mm] MINIMUM ABC OR THICKNESS OF EXISTING GRANULAR BASE COURSE
MATERIALS (E.G. ABC & SELECT MATERIAL) WHICHEVER IS GREATER.
REFER TO VA STANDARD DETAIL 32 12 16-04 "UTILITY TRENCH PAVEMENT PATCH NOTES"
FOR ADDITIONAL INFORMATION.
4'-0" MAX.
[1219mm]
1'-0" MAX.
[305mm]
1'-0" MAX.
[305mm]
TRENCH
BACKFILL
ABC 100% MIN.
COMPACTION
ASPHALTIC CONCRETE
SAW CUT EXISTING.
ASPHALT FULL DEPTH
BOTH SIDESTACK COAT (TYP.)
EXISTING PAVEMENT
INSTALL 45° BEND
(TYP.)
PRESSURIZED OR
NON-GRAVITY UTILITY
INSTALL 45° BEND
(TYP.)
INSTALL 45° BEND
(TYP.)
INSTALL 45° BEND
(TYP.)
GRAVITY UTILITY
NOTES:
1. MAINTAIN A MINIMUM VERTICAL CLEARANCE OF AT LEAST 1'-0" BETWEEN ALL UTILITIES AT CROSSINGS UNLESS
OTHERWISE SPECIFIED BELOW.
2. AT CROSSING OF POTABLE WATER MAINS AND SANITARY SEWERS, STORM SEWERS, FORCE MAINS, RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS, WHERE THE POTABLE WATER MAIN CROSSES ABOVE THE OTHER UTILITY, THE MINIMUM VERTICAL SEPARATION SHALL BE 18", OR AS REQUIRED BY THE STATE HEALTH DEPARTMENT, DEPARTMENT OF ENVIRONMENTAL QUALITY, OR AGENCY GOVERNING THE FACILITY OF
POTABLE WATER, WHICHEVER IS GREATER.
3. WHERE 18" CANNOT BE MAINTAINED OR WHERE POTABLE WATER LINES CROSS UNDER GRAVITY SEWERS, RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS, ADDITIONAL PROTECTION SHALL BE PROVIDED AS REQUIRED BY THE AGENCY GOVERNING THE FACILITY OF POTABLE WATER. ADDITIONAL PROTECTION SHALL CONSIST OF CONSTRUCTION BOTH PIPING SYSTEMS WITH DUCTILE IRON PIPE WITH RESTRAINED MECHANICAL JOINTS OR USE OF CONCRETE ENCASEMENT. THE ADDITIONAL PROTECTION SHALL EXTEND A MINIMUM
DISTANCE OF 10'-0" OUTSIDE THE LIMITS OF THE CROSSING.
4. SANITARY SEWER FORCE MAINS SHALL ONLY CROSS UNDER POTABLE WATER MAINS WITH A MINIMUM VERTICAL CLEARANCE OF 18". WHEN THE VERTICAL CLEARANCE BETWEEN THE POTABLE WATER MAIN AND THE FORCE MAIN IS LESS THAN 18", BOTH THE WATER MAIN AND THE FORCE MAIN SHALL BE CONSTRUCTED WITH RESTRAINED MECHANICAL JOINT DUCTILE IRON PIPE AS INDICATED ABOVE FOR ADDITIONAL
PROTECTION.
5. THE PREFERRED VERTICAL CLEARANCE BETWEEN DUCT BANKS AND PIPED UTILITIES HALL BE 2'-0" AND THE
MINIMUM VERTICAL CLEARANCE SHALL BE 18".
6. THE MINIMUM VERTICAL CLEARANCE TO ALL STEAM, PUMPED CONDENSATE, AND HOT WATER, AND OTHER UTILITIES SHALL BE AT LEAST 18". WHEN THE VERTICAL CLEARANCE CANNOT BE MAINTAINED, THE INSULATION
THICKNESS OF THE STEAM, CONDENSATE, OR HOT WATER MAIN SHALL BE INCREASED BY 50%.
UTILITY CONFLICT CROSSING
NOT TO SCALE
GRADE
24" MIN.24" MIN.
" M
IN
CU-501
AutoCAD SHX Text Foresite Group, LLC 2128 Moores Mill Rd. Suite C Auburn, AL 36830
AutoCAD SHX Text
334.887.6064 334.887.6024 www.foresitegroup.net
AutoCAD SHX Text
SCALE :
AutoCAD SHX Text
CAD DETAIL NO.:
AutoCAD SHX Text
DATE ISSUED:
AutoCAD SHX Text
DETAIL TITLE /
AutoCAD SHX Text
UTILITY TRENCH PATCH NOTES
AutoCAD SHX Text
SD321216-04.DWG
AutoCAD SHX Text
DECEMBER 2008
AutoCAD SHX Text
NONE
AutoCAD SHX Text %%uGENERAL NOTES
AutoCAD SHX Text
SCALE :
AutoCAD SHX Text
CAD DETAIL NO.:
AutoCAD SHX Text
DATE ISSUED:
AutoCAD SHX Text
DETAIL TITLE /
AutoCAD SHX Text
TYPE 1 UTILITY TRENCH PATCH
AutoCAD SHX Text
SD321216-01.DWG
AutoCAD SHX Text
DECEMBER 2008
NONE
ELEVATION
PLAN
PLAN
ELEVATION
Engineers Architects
# NEW KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:5
:4
P
M C
U s e rs
\a ri c h a rd s \D o c u m e n ts
\A
-1
-Q
-V A
N L it tl e R o c k -M e d G a s D e f-
A R a ri c h a rd s P
K P
J .r v t
A-302
WALL TYPE DETAILS
1 1CET
MED GAS DEFICIENCIES
VA CENTRAL ARKANSAS HEALTH
CARE
AUGUST 15, 2025
BID DOCUMENTS
598-23-10723-134
1,69,170
ADR
Scale: 1" = 1'-0"
GYP PARTITION
1 NEW OR EXISTING EQUIPMENT
2 INSTALL JOINT SEALANT AROUND DEVICE/
OPENING AS REQUIRED
3 PATCH, REPAIR AND PAINT WALL SURFACE
AROUND EQUIPMENT TO MATCH COLOR AND
FINISH OF EXISTING
4 BLOCKING FOR NEW EQUIPMENT
Scale: 1" = 1'-0"
CMU PARTITION
A. SEE SHEET G-005 FOR ICRA MEASURES IN
REQUIRED WORK AREAS
B. SEE ELECTRICAL DRAWING FOR DETAILS
OF WORK BEING DONE
SEAL
057626
P
ROFESSIONAL
A N
D
RE W D. RICHA
R D
S
N O
RT H C A R OLIN
A
E N G IN E E R
8/13/2025 8/13/2025
S SS
DCWR
DHW
PIPING SYSTEM
NG NATURAL GAS
ST STORM
PD PUMP DISCHARGE
OFD OVERFLOW STORM DRAIN
GW GREASE WASTE
OW OIL WASTE
SAN SANITARY WASTE
CD CONDENSATE DRAIN
CA COMPRESSED AIR
AW ACID WASTE
N2 NITROGEN
N2O NITROUS OXIDE
MA MEDICAL AIR
O2 OXYGEN
WAGD WASTE ANESTHETIC GAS DISPOSAL
VAC VACUUM
V SANITARY VENT
OV OIL VENT
AV ACID VENT
NPCW NONPOTABLE COLD WATER
DI DE-IONIZED WATER
DSCW DOMESTIC SOFT COLD WATER
DCW DOMESTIC COLD WATER
RO REVERSE OSMOSIS WATER
DOMESTIC CW RECIRCULATION
DOMESTIC HOT WATER
CO2 CARBON DIOXIDE
DHW 140 DOMESTIC HOT WATER (OTHER TEMP)
PG PROPANE GAS
DHWR DOMESTIC HW RECIRCULATION
NG
ST
PD
OFD
GW
OW
SAN
CD
CA
AW
N2
N2O
MA
O2
WAGD
VAC
CO2
PG
V
OV
AV
HW 140
DSCW
NPCW
DI
RO
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
NEW PLUMBING EQUIPMENT MARK
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
P-###
EXISTING PLUMBING EQUIPMENT MARKP-###
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CONTROL VALVE
GATE VALVE
GLOBE VALVE
SAFETY RELIEF VALVE
TWO POSITION CONTROL VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
HOSE BIBB / SILLCOCK
PLUG VALVE
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER WITH DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
CO
PIPE SLOPE ARROW
AV
F
P
T
M
CIRCUIT SETTER
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .