This file is a utility mapping exhibit and subsurface utility engineering report for the Eugene J. Towbin VA Healthcare Center located at 2200 Fort Roots Drive, North Little Rock, Arkansas. The document contains detailed vault butterfly diagrams documenting underground utility infrastructure, including communication ducts, electrical lines, water lines, gas lines, sanitary and storm sewer lines, and fiber optic cables. The mapping was completed on February 26, 2024, by Elite Professional Ethan King using Proceq GS8000 Pro Subsurface Mapping System and Vivax Metrotech VLoc3-Pro Utility Locator equipment across a 57,000 square foot scan area around buildings 69, 89, and 170. The report identifies multiple communication vaults (CMH-1, CMH-2, CMH-3) with specific measurements, orientations, and conduit configurations documented using ASCE 38-22 Quality Level standards.
The existing composite utility plan (QL-B standard) and proposed composite utility plan indicate all utilities were traced and surveyed using geophysical instruments and marked with paint, with recommended clearance of 1-2 feet from all markings. McCarthy Mapping, the professional surveying firm, documented significant findings including a communication ductbank that may be collapsed or damaged near the boiler plant area requiring further exploration. The report notes limitations in locating all storm and sanitary lines due to depth, inability to detect oxygen lines within locked gated tanks, and disregarded water hydrant markings that could not be confirmed by ground penetrating radar. All utility records were requested from stakeholders including North Little Rock Electric Department, CenterPoint Energy, AT&T, Comcast Xfinity, Central Arkansas Water, and the City of North Little Rock Street Department. This mapping exhibit directly supports the Medical Gas Deficiencies project #598-23-107 requiring underground civil work and duct bank installation at the VA Healthcare Center.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vault Butterfly Diagram Project____________________
Vault Name____________ Date Inventoried____________
OVERALL DEPTH________
NORTH/SOUTH DIMENSION________________
EAST/WEST DIMENSION___________________
COLLAR HEIGHT__________________________
LID ORIENTATION_________________________
TOP
BOTTOM
T O
P
B O
T T
O
MT
O P
B O
T T
O M
TOP
BOTTOM
VAULT ORIENTATION
VAULT SHAPE_________________
VAULT MATERIAL______________
LOCATION/COMMENTS_____________________________________________________________
N
N
Prepared By:
AKarsten
360 PICTURE
AKarsten Butterfly Diagram Note For complete information and picture, download diagram and view in Bluebeam
FArellano Text Box 360 Picture opens facing NORTH
NJNolte VAULT ORIENTATION -Communication
NJNolte SINGLE CONDUIT - Communication Conduit Material: HDPE Conduit Size:4" Cable type: Fiber Empty:0 Destination: North to Boiler Plant
NJNolte SINGLE CONDUIT - Communication Conduit Material:HDPE Conduit Size:6" Cable type:Fiber Empty:0 Destination: South To CMH2
NJNolte 1X2 DUCT BANK - Communication Conduit Material:HDPE Conduit Count & Size: (2) 4" Cable type: Copper Empty Count:1 Destination: Unknown
NJNolte Note Team was not concerned with the copper cable due to it being out of service.
Vault Name____________ Date Inventoried____________
OVERALL DEPTH________
NORTH/SOUTH DIMENSION________________
EAST/WEST DIMENSION___________________
COLLAR HEIGHT__________________________
LID ORIENTATION_________________________
TOP
BOTTOM
T O
P
B O
T T
O
MT
O P
B O
T T
O M
TOP
BOTTOM
VAULT ORIENTATION
VAULT SHAPE_________________
VAULT MATERIAL______________
LOCATION/COMMENTS_____________________________________________________________
N
AKarsten Butterfly Diagram Note For complete information and picture, download diagram and view in Bluebeam
FArellano Text Box 360 Picture opens facing NORTH
JThomas SINGLE CONDUIT - Communication Conduit Material:HDPE Conduit Size:(1) 4" Cable type: Empty Empty:1 Destination: Unknown
JThomas SINGLE CONDUIT - Communication Conduit Material:
Conduit Size:
Cable type:
Empty:
Destination:
JThomas SINGLE CONDUIT - Communication Conduit Material:
Conduit Size:
Cable type:
Empty:
Destination:
JThomas SINGLE CONDUIT - Communication Conduit Material:HDPE Conduit Size:(4) 4" Cable type: Fiber Empty:1 Destination: To Boiler Plant And CMH-1
JThomas SINGLE CONDUIT - Communication Conduit Material:
Conduit Size:
Cable type:
Empty:
Destination:
JThomas SINGLE CONDUIT - Communication Conduit Material:
Conduit Size:
Cable type:
Empty:
Destination:
JThomas SINGLE CONDUIT - Communication Conduit Material:HDPE Conduit Size:(2) 4" Cable type: Fiber Empty:
Destination:CMH-3
JThomas Square Duct - Communication Conduit Material:
Conduit Size:
Cable type:
Empty:
Destination:
Vault Name____________ Date Inventoried____________
OVERALL DEPTH________
NORTH/SOUTH DIMENSION________________
EAST/WEST DIMENSION___________________
COLLAR HEIGHT__________________________
LID ORIENTATION_________________________
TOP
BOTTOM
T O
P
B O
T T
O
MT
O P
B O
T T
O M
TOP
BOTTOM
VAULT ORIENTATION
VAULT SHAPE_________________
VAULT MATERIAL______________
LOCATION/COMMENTS_____________________________________________________________
N
AKarsten Butterfly Diagram Note For complete information and picture, download diagram and view in Bluebeam
FArellano Text Box 360 Picture opens facing Northeast
NJNolte VAULT ORIENTATION -Communication
NJNolte SINGLE CONDUIT - Communication Conduit Material: HDPE Conduit Size: 4" Cable type: Copper Empty:
Destination: South To Building 170
NJNolte SINGLE CONDUIT - Communication Conduit Material:HDPE Conduit Size: 4" Cable type:Fiber Empty:0 Destination: South To Building 170
NJNolte SINGLE CONDUIT - Communication Conduit Material:HDPE Conduit Size: 4:
Cable type: Fiber Empty:
Destination: East To CHM-2
NJNolte SINGLE CONDUIT - Communication Conduit Material: HDPE Conduit Size: (2) 4" Cable type: Fiber Empty:0 Destination: East To CMH-2
NJNolte SINGLE CONDUIT - Communication Conduit Material: HDPE Conduit Size: 4" Cable type: Copper Empty:0 Destination: South East To Building 89
NJNolte SINGLE CONDUIT - Communication Conduit Material:HDPE Conduit Size: 4" Cable type: Fiber Empty:
Destination: Southeast To Building 89
Vault Name____________ Date Inventoried____________
OVERALL DEPTH________
NORTH/SOUTH DIMENSION________________
EAST/WEST DIMENSION___________________
COLLAR HEIGHT__________________________
LID ORIENTATION_________________________
TOP
BOTTOM
T O
P
B O
T T
O
MT
O P
B O
T T
O M
TOP
BOTTOM
VAULT ORIENTATION
VAULT SHAPE_________________
VAULT MATERIAL______________
LOCATION/COMMENTS_____________________________________________________________
N
N
Prepared By:
CMH1
5'
4'
6'
1'
Centered
Rectangle
Concrete
Northern most manhole, south side of boiler plant
7-15-25
Eugene Townbin
For complete information and picture, download diagram and view in Bluebeam
360 Picture opens facing
NORTH
N
NJNolte Note Team was not concerned with the copper cable due to it being out of service.
Vault Name____________ Date Inventoried____________
OVERALL DEPTH________
NORTH/SOUTH DIMENSION________________
EAST/WEST DIMENSION___________________
COLLAR HEIGHT__________________________
LID ORIENTATION_________________________
TOP
BOTTOM
T O
P
B O
T T
O
MT
O P
B O
T T
O M
TOP
BOTTOM
VAULT ORIENTATION
VAULT SHAPE_________________
VAULT MATERIAL______________
LOCATION/COMMENTS_____________________________________________________________
N
N
Prepared By:
CMH-3
7'
6'
8'
2'
Centered
Rectangle
Concrete
West of CMH-1 & CMH-2
7-16-25
Eugene Townbin
For complete information and picture, download diagram and view in Bluebeam
360 Picture opens facing
Northeast
1 | P a g e
Customer Job Number: 24-013 VA Hospital Topographic Surveys
Date Inspection Completed: February 26, 2024
Customer: Smith and Goodson, PLLC Elite Professional: Ethan King
Job Site Address: 2200 Fort Roots Dr Little Rock, AR
Elite Project Number: SMIT24001
Job Summary Report
Equipment Used
• Proceq GS8000 Pro Subsurface Mapping System
• Vivax Metrotech VLoc3-Pro Utility Locator Set Transmitter
• MA8000 GPS
Application / Type of Work Performed
Utility Locating Scan Area (sq ft) 57,000 Max Effective Range (feet) 2-3 Client Scope of Work Scan and detect utilities around buildings 69, 89 and 170. Due to construction and open excavations, we are not able to scan the west area of the scan boundary.
Results & Findings Marking Medium Marking Paint Findings Walkthrough with Client No contact on site while work was being performed.
Additional Notes We set up our equipment and scanned the boring location in a
NSEW grid pattern. We were not able to locate all storm/sanitary lines due to the depths of the lines. Disregard markings running to/from the water hydrants located to the west of building 89 and northeast of the transformer located near building 170. The locations of these lines were not able to be confirmed with GPR.
Throughout the scan area we were able to detect multiple electrical lines running to the transformers, buildings, site lighting and pull boxes. Water lines were detected running from building 170 to the east of building 89. Gas was detected running from building 170 running to the west of building 89. Sanitary and storm lines were detected running throughout the scan area. Two unknown lines were detected running east from the construction area. The oxygen line located inside the gated tanks was not detected with GPR. We were not able to directly connect to this line due to the gate being
2 | P a g e locked. All markings were made clearly on the surface using marking paint. Please note: stay off all markings at least 1’-2’.
Client Contact Information Name Sean Goodson Phone Number 501-749-2850 Email Sean.goodson@smithandgoodson.com
By: Sean Goodson x (Signature)
3 | P a g e
Pictures
4 | P a g e
Map
CHECKED BY
DRAWN BY
SHEET
SHEET TITLE
MSD BASE MAP
ZIP CODE
UM 1.00
PARCEL NO.
MAPPING NO.
PROJECT NO.
C McCarthy Building Companies, Inc. 2025
JMF
CLM
PSG25CEN.000
72114
PREPARED FOR:
PREPARED BY:
THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TO WHICH
THEY ARE AFFIXED. THE SIGNER OF THIS DOCUMENT EXPRESSLY
DISCLAIMS ANY AND ALL RESPONSIBILITY FOR DOCUMENTS THAT DO
NOT BEAR HIS SEAL AND SIGNATURE INCLUDING, BUT NOT NECESSARILY
LIMITED TO, DRAWINGS, SPECIFICATIONS, ESTIMATES, REPORTS AND
OTHER SIMILAR INSTRUMENTS OF SERVICES INTENDED TO BE USED FOR
THIS PROJECT.
DRAWING ISSUE
DATE
DATE
SIGNATURE
NO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
N. LITTLE ROCK, AZ
PULASKI CO.
FORT ROOTS DR.
LOCATOR MAP
NOT TO SCALE
SITE
DRAWING INDEX
EUGENE J. TOWBIN VA HEALTHCARE CENTER
2200 FORT ROOTS DR, NORTH LITTLE ROCK, AR. 72114
EXISTING SUBSURFACE UTILITY EXHIBIT
MAPPING NUMBER:
PSG25CEN.000
PROJECT DIRECTORY
GENERAL NOTES: SHEET # SHEET NAME
UM 1.00
UM 1.01
UM 1.02
COVER SHEET
EXISTING COMPOSITE UTILITY PLAN - QL-B
PROPOSED COMPOSITE UTILITY PLAN - QL-B
ELECTRIC
NORTH LITTLE ROCK ELECTRIC DEPARTMENT
120 MAIN ST.
NORTH LITTLE ROCK, AR 72115
CUSTOMER SERVICE
(501)975-8888
GAS
CENTERPOINT ENERGY
CUSTOMER SERVICE
1-(800)-992-7552
TELEPHONE
AT&T TELELPHONE CO.
CUSTOMER SERVICE LINE
800-288-2020
CABLE TV
COMCAST XFINITY
CUSTOMER SERVICE
1-(800)-934-6489
FIBER OPTIC
AT&T TELELPHONE CO.
CUSTOMER SERVICE LINE
800-288-2020
WATER
CENTRAL ARKANSAS WATER
221 EAST CAPITOL AVENUE
LITTLE ROCK, AR. 72203
CUSTOMER SERVICE
(501)371-8340
STORM & SANITARY SEWER
CENTRAL ARKANSAS WATER
221 EAST CAPITOL AVENUE
LITTLE ROCK, AR. 72203
CUSTOMER SERVICE
(501)371-8340
CITY OF NORTH ARKANSAS STREET DEPARTMENT
701 W MARKHAM ST,
LITTLE ROCK AR, 72201
(501)371-4475
UTILITY COMPANY STAKEHOLDERS:
Know what'sbelow.
before you dig.CallR COVER
SHEET
McCARTHY MAPPING 20401 SW Birch St.
Newport Beach, California 92660 p: 949-851-8383 http://www.mccarthy.com
We have contacted the listed utility stakeholders and have requested and and all available utility records. The provided records have be depicted hereon at the appropriate quality level.
1. This plan was prepared in conformance with ASCE standard CI/ASCE 38-22 “American Society of Civil Engineers Standard Guideline for Investigating and Documenting Existing Utilities”.
2. WE will only warrant the three dimensional location of utility lines based on quality level A information. QL “A” information is only valid within the visible limits of the test hole.
3. WE will advance a vacuum test hole until a condition of practical refusal for vacuum excavation is reached.
Practical refusal is defined as any of the following conditions occurring: bedrock, water table or reaching a depth of 12'.
4. Below ground structures, unless dimensioned, are symbolic only.
5. Prior to excavation utility owners shall review and approve this drawing.
6. This drawing is prepared in color. Reproduction may alter the information contained herein. WE do not warrant the information contained herein in the event of reproduction.
7. Base mapping/survey control is shown for information only and is not warranted.
8. WE recommend that all existing utilities critical to proposed construction activities be located by vacuum excavation (quality level A) prior to any excavation (if not already located by vacuum excavation).
9. Utility Lines shown on the plans labeled as Quality Level B have been traced and surveyed using various geophysical instruments. Unless noted as Quality Level B it should be assumed that lines are shown as approximate only.
10. Utility Lines depicted on the plan as ASCE Quality Level D are from various plans and records from public or private stakeholders. WE requested that all available plans and records be provided from all of the known stakeholders.
11. WE obtained numerous One Call design tickets for this project and the locations of all markouts have been surveyed and documented.
12. Electrical lines shown on the plans were traced using hand held locators by indirect induction methods. The lines traced are depicted as ASCE 38-22 Quality Level B.
13. Telephone and communication lines shown on the plans were traced using direct and indirect connections through building basements, vaults, and hand holes. The lines traced are depicted as ASCE 38-22 Quality Level B.
14. Water lines were traced using direct and indirect induction methods. The lines traced are depicted as ASCE 38-22 Quality Level B.
15. Underground structural elements such as tie backs, sheeting, shoring, framing, piles or pile caps have not been plotted within this set. The respective public and private plans should be reviewed prior to demolition and construction in order to identify underground structural elements.
16. Utilities located within fenced in electrical sub-stations are not accessible by field personnel, therefore can not be field located.
17. Utility vault structures are shown using best available information collected at the time of the survey/investigation. However, data may be limited by accessibility and measurement accuracies. All below grade utility vaults structures shown hereon should be considered approximate and are depicted as ASCE 38-22 Quality Level C.
18. Any and all depth of utilities depicted at a QL-B standard of care hereon shall be considered approximate as of the date of the investigation and shall not be used as a basis of design, constructability analysis, or construction methodology without further investigation to expose the utility in question and obtain a hard measurement. It is the responsibility of the contractor to utilize soft digging best practices to expose all utilities having a potential for conflict within the area of excavation prior to any hard digging excavation. McCarthy shall not be held liable for any decisions of incidents that result from the reliance upon any of the QL-B provided depth information.
19. All easement lines depicted hereon are shown per provided record documents and approximately plotted per available GIS parcel information or survey by others. These lines are approximate and should be considered for reference only. The purpose of this depiction is to show the possibility of the existence of utilities that may or may not exist within said easements and should not be relied upon for any other purpose. A title report has not been procured as a part of this scope and therefore additional easements may exist beyond what has been depicted.
PROJECT MANAGER CONTACT
McCARTHY MAPPING James Parks
PHONE: (314)656-0259
WEBSITE: http://www.mapping.mccarthy.com Email: jparks@mccarthy.com
UM 1.00
TYPICAL UTILITY CALLOUT:
UTILITY TYPE
UTILITY MATERIAL TYPE
UTILITY SIZE
QUALITY LEVEL
TYPICAL SHEET CALLOUT:
SHEET ORDER
SHEET TYPE
DISCIPLINE
LEGEND: FORESIGHT GROUP, LLC
3740 DAVINCI COURT, SUITE 100
PEACHTREE CORNERS, GA 30092
1ST ST.
PROJECT LIM
ITS
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
PR
O
JE
CT L
IM
ITS
PR
O
JE
C
T L
IM
ITS
PROJECT LIMITS
EXISTING COMPOSITE UTILITY PLAN - QL-B
NOTE: ANY AND ALL DEPTH OF UTILITY'S DEPICTED AT A QL-B STANDARD OF CARE HEREON SHALL BE CONSIDERED APPROXIMATE AS OF THE DATE OF THE INVESTIGATION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE SOFT DIGGING BEST PRACTICES TO EXPOSE ALL UTILITIES HAVING A POTENTIAL
FOR CONFLICT WITHIN THE AREA OF EXCAVATION PRIOR TO ANY HARD DIGGING EXCAVATION.
CHECKED BY
DRAWN BY
SHEET
SHEET TITLE
MSD BASE MAP
ZIP CODE
EXISTING COMPOSITE
UTILITY PLAN - QL-B
UM 1.01
PARCEL NO.
MAPPING NO.
PROJECT NO.
C McCarthy Building Companies, Inc. 2025
JMF
CLM
PSG25.CEN.000
72114
PREPARED FOR:
PREPARED BY:
THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TO WHICH
THEY ARE AFFIXED. THE SIGNER OF THIS DOCUMENT EXPRESSLY
DISCLAIMS ANY AND ALL RESPONSIBILITY FOR DOCUMENTS THAT DO
NOT BEAR HIS SEAL AND SIGNATURE INCLUDING, BUT NOT NECESSARILY
LIMITED TO, DRAWINGS, SPECIFICATIONS, ESTIMATES, REPORTS AND
OTHER SIMILAR INSTRUMENTS OF SERVICES INTENDED TO BE USED FOR
THIS PROJECT.
DRAWING ISSUE
DATE
DATE
SIGNATURE
NO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
McCARTHY MAPPING 20401 SW Birch St.
Newport Beach, California 92660 p: 949-851-8383 http://www.mccarthy.com
N. LITTLE ROCK, AZ
PULASKI CO.
FORT ROOTS DR.
McCARTHY BUILDING COMPANIES, INC 12851 Manchester Rd.
St. Louis, MO 63131
JParks Snapshot Lost tone in this area. Unable to push rod in this area. Communication ductbank possibly collapsed or damaged. Further exploration is needed.
JParks Text Box
1ST ST.
PROJECT LIM
ITS
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
PR
O
JE
CT L
IM
ITS
PR
O
JE
C
T L
IM
ITS
PROJECT LIMITS
UG/C
UG
/C
UG/C
UG
/C
SS
SS SS
SS
SS
SS
SS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
PO
W
POW
PO
W
POW
W
W
UG/C
UG
/C
UG/C
UG
/C
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG
/CUG/C
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
UG
/C
UG
/C
UG
/C
UG
/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG
/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/C
UG/
CUG/
CUG/
CUG/
CUG/
C
UG/C
UG/C
UG/C
LOC LOC LOC LOC LOC
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOCLOCLOCLOCLOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/EUG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E UG/E UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W
W
W
W
W
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GASGAS
GAS
GAS
GAS
GAS
GAS
GAS
GASGA
S
GAS
GAS
GA
S
GA
S
GA
S
GAS
GAS
GAS
GAS
GAS
GA
S
W
1 8
PROPOSED COMPOSITE UTILITY PLAN - QL-B
NOTE: ANY AND ALL DEPTH OF UTILITY'S DEPICTED AT A QL-B STANDARD OF CARE HEREON SHALL BE CONSIDERED APPROXIMATE AS OF THE DATE OF THE INVESTIGATION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE SOFT DIGGING BEST PRACTICES TO EXPOSE ALL UTILITIES HAVING A POTENTIAL
FOR CONFLICT WITHIN THE AREA OF EXCAVATION PRIOR TO ANY HARD DIGGING EXCAVATION.
CHECKED BY
DRAWN BY
SHEET
SHEET TITLE
MSD BASE MAP
ZIP CODE
PROPOSED COMPOSITE
UTILITY PLAN - QL-B
UM 1.02
PARCEL NO.
MAPPING NO.
PROJECT NO.
C McCarthy Building Companies, Inc. 2025
JMF
CLM
PSG25.CEN.000
72114
PREPARED FOR:
PREPARED BY:
THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TO WHICH
THEY ARE AFFIXED. THE SIGNER OF THIS DOCUMENT EXPRESSLY
DISCLAIMS ANY AND ALL RESPONSIBILITY FOR DOCUMENTS THAT DO
NOT BEAR HIS SEAL AND SIGNATURE INCLUDING, BUT NOT NECESSARILY
LIMITED TO, DRAWINGS, SPECIFICATIONS, ESTIMATES, REPORTS AND
OTHER SIMILAR INSTRUMENTS OF SERVICES INTENDED TO BE USED FOR
THIS PROJECT.
DRAWING ISSUE
DATE
DATE
SIGNATURE
NO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
DATENO.
McCARTHY MAPPING 20401 SW Birch St.
Newport Beach, California 92660 p: 949-851-8383 http://www.mccarthy.com
N. LITTLE ROCK, AZ
PULASKI CO.
FORT ROOTS DR.
McCARTHY BUILDING COMPANIES, INC 12851 Manchester Rd.
St. Louis, MO 63131
CONFLICT ANALYSIS REPORT - _Markup Summary
Subject: COMMUNICATION DISCREPANCY Creation Date: 7/25/2025 1:25:40 PM Sequence: 1
Lost tone in this area. Unable to push rod in this area. Communication ductbank possibly collapsed or damaged. Further exploration is needed.
COMMUNICATION DISCREPANCY (1)
| Attachment G - Mapping Exhibits |
| CMH_1_Butteryfly Diagram |
| CMH_2_Butteryfly Diagram |
| CMH_3_Butteryfly Diagram |
| docget_862378_CMH-1-_Eugene_Townbin_-_McCarthy_Mapping_-_Vault_Butterfly_Diagram |
| docget_862378_CMH-3_-_Eugene_Townbin_-_McCarthy_Mapping_-_Vault_Butterfly_Diagram |
| Elite Scanning Group - Job Summary Report (SMIT24001) |
02 - UTILITY EXHIBIT - TOWBIN DB - 2025 07-25
| Text2: CMH1 |
| Text3: 5' |
| Text4: 4' |
| Text5: 6' |
| Text6: 1' |
| Text7: Centered |
| Text8: Rectangle |
| Text9: Concrete |
| Text10: Northern most manhole, south side of boiler plant |
| Text11: 7-15-25 |
| Text12: Eugene Townbin |