Attachment B-230711_OYA_REGIONAL GENERATOR REPLACEMENT_CONSTRUCTION DOCUMENTS_COMBINED DRAWINGS_REDUCED.pdf
PDF 9 MB Posted
- Attached to
- OYA Regional Generator Replacement
- Solicitation number
- S-DASOBO-00008606
- Issued by
- Harney County, Jackson County, Lake County, Gladstone City, Amity City, Oregon
About this file
This is an Invitation to Bid (ITB) for the OYA Regional Generator Replacement project, issued by the Oregon Youth Authority (OYA). The purpose of this ITB is to solicit bids for the removal and replacement of generators at three OYA youth correctional facilities: the Rogue Valley Youth Correctional Facility in Grants Pass, the Eastern Oregon Youth Correctional Facility in Burns, and the Oak Creek Youth Correctional Facility in Albany. The project covers all work associated with this generator replacement, including the installation of new generators, muffler assemblies, and operable wall louvers. The ITB provides details on the project scope, site locations, and construction documents. No specific quantities or response deadlines are provided, but the contract term and any renewal options are not stated.
The ITB does not include pricing terms, set-asides, incumbent information, funding sources, or other financial details. It focuses on the technical requirements of the generator replacement work and the necessary steps for contractors to access and secure the work areas during construction while maintaining the facilities' security protocols. The document also outlines the demolition and construction general notes that the selected contractor must follow.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OYA REGIONAL GENERATOR REPLACEMENT
OREGON YOUTH CORRECTIONAL FACILITIES
ALTERNATE NO. 1
OAK CREEK YOUTH CORRECTIONAL FACILITY (OCYCF) (OC)
4400 LOCHNER ROAD SE
ALBANY, OR 97322
CONSTRUCTION DOCUMENTS
INDEX OF DRAWINGS
JULY 11, 2023
BASE BID
ROGUE VALLEY YOUTH CORRECTIONAL FACILITY (RVYCF) (RV)
2001 NE F STREET
GRANTS PASS, OR 97526-4813
BASE BID
EASTERN OREGON YOUTH CORRECTIONAL FACILITY (EOYCF) (EO)
1800 WEST MONROE
BURNS, OR 97720
OWNER'S REPRESENTATIVE
OREGON YOUTH AUTHORITY
530 CENTER STREET
SALEM, OR 97301-3777
(503) 354-4058
STACY DAVIS
STACY.M.DAVIS@OYA.OREGON.GOV
OWNER'S FIELD REPRESENTATIVE
OREGON YOUTH AUTHORITY
530 CENTER STREET
SALEM, OR 97301-3777
(503) 986-6740
MEL JOHNSTON (OC & EO)
MEL.JOHNSTON@OYA.OREGON.GOV
HARA MILLER (RV)
HARA.MILLER@OYA.OREGON.GOV
ARCHITECTURE
DLR GROUP
110 SW YAMHILL STREET
PORTLAND, OR 87204
(503)-200-3303
KENT LARSON
KLARSON@DLRGROUP.COM
STRUCTURAL
DLR GROUP
110 SW YAMHILL STREET
PORTLAND, OR 87204
(503) 274-2675
JUSTIN LYONS
JLYONS@DLRGROUP.COM
MECHANICAL
DLR GROUP
110 SW YAMHILL STREET
PORTLAND, OR 87204
(503) 575-3441
KEITH MILLER
KMILLER@DLRGROUP.COM
ELECTRICAL
DLR GROUP
110 SW YAMHILL STREET
PORTLAND, OR 87204
(541)-510-6019
EVAN STEWART
ESTEWART@DLRGROUP.COM
EASTERN OREGON YOUTH CORRECTIONAL FACILITY
PR
IV
ATE
R
D
.0
E-W AXIS E-W AXIS
OAK CREEK YOUTH CORRECTIONAL FACILITY
PRIVATE ROAD
LO
C
H N
E R
R O
A D
S E
GRIFFIN BROS, INC.
OZONE WINDOW FILMS
41ST AVE SE
NE F. STREET
ROGUE VALLEY YOUTH CORRECTIONAL FACILITY
JOSEPHINE COUNTY SHERRIF'S OFFICE
D
L R
G ro u p
REVISIONS
A B C D E F
/1
/2
:3
:1
P
M
A u to d e s k D o c s /7
-2
-0
O
Y A
R e g io n a l G e n e ra to r
R e p la c e m e n t/
-2
-0
O Y
A G e n e ra to r_ A
R
.r v t
#74-23108-00
JULY 11, 2023
CONSTRUCTION
DOCUMENTS
COVER SHEET
G0.1
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y C
E N
T E
R S
T R
E E
T S
A L E
M O
R
-3
O Y
A R
E G
IO
N
A L
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
O A
K C
R E
E K
R
O G
U E
V A
L L
E Y
E
A S
T E
R N
O R
E G
O N
Y O
U T
H C
O R
R E
C T
IO
N
A L
F A
C
IL
IT
IE
S
.ARCHITECTURAL.
A0.1RV ROGUE VALLEY - ORIENTATION & CODE PLANS
A1.1RV ROGUE VALLEY - FLOOR PLANS & ELEVATIONS
A1.4RV ROGUE VALLEY - SECTION & EXTERIOR DETAILS
A2.1RV ROGUE VALLEY - REFLECTED CEILING PLANS
A3.1RV ROGUE VALLEY - ROOF PLANS
A0.1OC OAK CREEK - ORIENTATION & CODE PLANS
A1.1OC OAK CREEK - FLOOR PLANS & ELEVATIONS
A1.4OC OAK CREEK - SECTION & EXTERIOR DETAILS
A2.1OC OAK CREEK - REFLECTED CEILING PLANS
A3.1OC OAK CREEK - ROOF PLANS
A0.1EO EASTERN OREGON - ORIENTATION & CODE PLANS
A1.1EO EASTERN OREGON - FLOOR PANS & ELEVATIONS
A1.4EO EASTERN OREGON - SECTION & EXTERIOR DETAILS
A2.1EO EASTERN OREGON - REFELCTED CEILING PLANS
A3.1EO EASTERN OREGON - ROOF PLANS
A9.1 SHARED DETAILS
.GENERAL.
G0.1 COVER SHEET
G1.1 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
.MECHANICAL.
M0.1 MECHANICAL SYMBOLS, ABBREVIATIONS & NOTES
M1.1EO MECHANICAL PLAN - EASTERN OREGON
M1.1OC MECHANICAL PLAN - OAK CREEK
M1.1RV MECHANICAL PLAN - ROGUE VALLEY
M7.1 MECHANICAL DETAILS
.ELECTRICAL.
E0.1 ELECTRICAL SYMBOLS, ABBREVIATIONS & NOTES
E0.2 BASIS OF DESIGN
E4.1 POWER PLAN - GENERATOR ROOM - OAK CREEK
E4.2 POWER PLAN - GENERATOR ROOM - EASTERN OREGON
E4.3 POWER PLAN - GENERATOR ROOM - ROGUE VALLEY
E4.4 LIGHTING PLAN - GENERATOR ROOM - OAK CREEK
E4.5 LIGHTING PLAN - GENERATOR ROOM - EASTERN OREGON
E4.6 LIGHTING PLAN - GENERATOR ROOM - ROGUE VALLEY
E5.1 ELECTRICAL DIAGRAMS - OAK CREEK
E5.2 ELECTRICAL DIAGRAMS - EASTERN OREGON
E5.3 ELECTRICAL DIAGRAMS - ROGUE VALLEY
E6.1 ELECTRICAL DETAILS
VICINITY MAPVICINITY MAP VICINITY MAP
DEFERRED SUBMITTALS:
• SPECIFICATION SECTION 055000 - COLD-FORMED METAL FRAMING
• SPECIFICATION SECTION 078413 - PENETRATION FIRESTOPPING
• SPECIFICATION SECTION 089116 - OPERABLE WALL LOUVERS
• SPECIFICATION SECTION 260548 - VIBRATION AND SEISMIC CONTROLS
FOR ELECTRICAL SYSTEMS
REVISIONS
07/11/2023
CD OWNER
REVIEW
CONSTRUCTION
DOCUMENTS
O Y
A R
E G
IO
N
A L
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
R E
G
IO
N A
L Y
O U
T H
C O
R R
E C
T
IO
N A
L F
A C
IL
IT
IE
S
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y A
D D
R E
S S
V A
R
IE
S F
R O
M S
IT
E
T O
S
IT
E
GENERAL SYMBOLS
SIM
ROOM NAME
XXX-XX
DETAIL NUMBER
SHEET NUMBER
CROSS REFERENCE
WALL SECTION
SIMILAR OR TYPICAL
REFERENCE
DETAIL REFERENCE
BUILDING SECTION
SHEET NOTE
COLUMN GRID LINE
ROOM NUMBER/NAME
REVISION NUMBER
EARTH
GRAVEL
SAND
CONCRETE
PRECAST CONCRETE
STEEL
STONE
CONCRETE MASONRY UNIT
BRICK VENEER
LEVEL XX
XXX'-XX"
LEVEL ELEVATION
GYM FLOOR
WOOD
(CONTINUOUS BLOCKING)
WOOD
(NON-CONTINUOUS BLOCKING)
WOOD (TRIM/FINISH)
GLASS
SHINGLES
PLYWOOD (LARGE SCALE)
GYPSUM WALL BOARD
BLANKET INSULATION
RIGID INSULATION
SPRAY FOAM INSULATION
MINERAL WOOL INSULATION
PROTECTION BOARD
CARPET (LARGE SCALE)
ACOUSTIC TILE (LARGE SCALE)
TILE (LARGE SCALE)
REFERENCE KEYNOTE
XX A4.XX BUILDING ELEVATION
A12.X
XX
XX XX
XX
INTERIOR ELEVATION
100'-0"
TYP FF EL=
100'-0"
FINISH FLOOR
ELEVATION
SPOT ELEVATION
XARCHITECTURAL SYMBOLS
XX/ A11.X
XX. X. XX
CASEWORK ELEVATION
DOOR NUMBER
EXTERIOR WINDOW /
CURTAIN WALL NUMBER
WALL TYPE
A110
A124
XX/ A11.X XXXX
XX
XX
APC-1
9' - 0"
CEILING TYPE
CEILING HEIGHT
CEILING TYPE
INTERIOR WINDOW
NUMBER
GENERAL ARCHITECTURAL NOTES
1. FURNISH AND INSTALL FIRE-TREATED WOOD BLOCKING OR
METAL BACKING PLATE IN METAL STUD PARTITIONS FOR THE
PROPER ANCHORAGE OF ALL WALL ATTACHED ITEMS; I.E.
TOILET ACCESSORIES, CASEWORK, MILLWORK, WALL-
MOUNTED FIXTURES, MARKER BOARDS, TACK BOARDS, DOOR
STOPS, AUDIO VISUAL BRACKETS, AND OTHER WALL ATTACHED
ITEMS.
2. SCRIBE GYPSUM WALL BOARD OF WALLS AND PARTITIONS TO
IRREGULARITIES OF DECK ABOVE. SEAL TIGHTLY AROUND ALL
PENETRATIONS.
DEMOLITION GENERAL NOTES
THE CONTRACTOR SHALL:
A. COORDINATE ALL DEMOLITION AND PHASING EFFORTS WITH THE
OWNER’S REPRESENTATIVE. EVERY EFFORT SHALL BE MADE TO
MINIMIZE DISRUPTION OF OWNER’S OPERATIONS. EXCESSIVE
NOISE OR VIBRATION SHALL BE PRE-APPROVED AND
COORDINATED WITH THE OWNER’S REPRESENTATIVE. IN ALL
CASES, PROVISIONS SHALL BE MADE FOR USER’S SAFETY.
B. COORDINATE ANY DISRUPTION OF UTILITY SERVICES WITH THE
OWNER AND AS SPECIFIED.
C. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS WITHIN
THE EXISTING BUILDING WHICH OFFER A ONE-HOUR ENCLOSURE
TO ISOLATE ANY DEMOLITION/CONSTRUCTION WORK FROM THE
GENERAL PUBLIC AND AS DEEMED NECESSARY BY THE OWNER
AND CODE OFFICIAL HAVING JURISDICTION. COORDINATE
LOCATIONS WITH THE OWNER AND MAINTAIN MEANS OF EGRESS
THROUGHOUT THE WORK.
D. MAINTAIN A SECURE, WEATHER-TIGHT ENCLOSURE AT ALL
TIMES.
E. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND
ELEVATIONS AND NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES.
F. REMOVE IN THEIR ENTIRETY ALL ITEMS, AS REQUIRED TO
EXECUTE THE DEMOLITION/CONSTRUCTION WORK DESCRIBED
BY THE DRAWINGS.
G. THE OWNER SHALL RESERVE THE RIGHT TO SALVAGE ANY
MATERIALS.
H. PROVIDE PROTECTION FOR ALL EXISTING BUILDING MATERIALS
AND EQUIPMENT FROM DAMAGE DUE TO ANY DEMOLITION OR
CONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THIS
CONTRACT.
I. REPAIR OR REPLACE ITEMS THAT ARE DAMAGED AS A RESULT
OF DEMOLITION OR CONSTRUCTION TO MATCH EXISTING FINISH
AND/OR CONDITION.
J. EXISTING MATERIALS SHALL NOT BE REUSED UNLESS NOTED
OTHERWISE OR AS AUTHORIZED BY ARCHITECT.
K. VERIFY AND MAINTAIN THE LOCATION OF EXISTING POWER,
COMMUNICATION AND DATA CABLES TO PREVENT
INTERRUPTION OF THEIR SERVICE.
L. PATCH FLOOR, WALL AND CEILING PENETRATIONS RESULTING
FROM REMOVAL OR RE-ROUTING OF NEW OR EXISTING PIPING,
DUCTWORK, CONDUIT, AND OTHER ITEMS, AS REQUIRED TO
MAINTAIN FIRE-RESISTANCE-RATED SEPARATIONS. FINISH AS
REQUIRED FOR NEW OR EXISTING ADJACENT SURFACES.
M. CAP ALL DISCONNECTED MECHANICAL PIPING LINES WITHIN THE
WALL OR FLOOR. PATCH AND FINISH AS REQUIRED TO MATCH
NEW OR EXISTING ADJACENT SURFACES.
N. SEE MECHANICAL AND ELECTRICAL DRAWINGS AND NOTES FOR
FURTHER SEQUENCING AND SCOPE OF WORK.
O. WHERE PLASTER/STUD WALLS ARE INDICATED TO BE REMOVED,
PREPARE ADJACENT WALLS TO RECEIVE NEW PATCH/FINISH BY
SAWCUTTING ADJACENT PLASTER FINISH A MINIMUM OF 1'-0"
BEYOND DEMOLITION.
DEMOLITION NOTES APPLY TO ALL DEMOLITION SHEETS.
SECURITY & FIRE WALL LEGEND
SW2: SECONDARY SECURITY WALLS
(Restraint/Staff Protection)
SW1: PRIMARY SECURITY WALLS
(Glass / Mech / Hardware / Movement Doors)
FB2: 2-HOUR OCCUPANCY
FIRE SEPARATION WALL
FB1: 1-HOUR OCCUPANCY
FIRE SEPARATION WALL
SW3: TERTIARY SECURITY WALLS
D
L R
G ro u p
REVISIONS
A B C D E F
O Y
A R
E G
IO
N
A L
G E
N E
R A
T O
R R
E P
L A
C E
M E
N T
R E
G
IO
N A
L Y
O U
T H
C O
R R
E C
T
IO
N A
L F
A C
IL
IT
IE
S
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y A
D D
R E
S S
V A
R
IE
S F
R O
M S
IT
E
T O
S
IT
E
/1
/2
:3
:2
P
M
A u to d e s k D o c s /7
-2
-0
O
Y A
R e g io n a l G e n e ra to r
R e p la c e m e n t/
-2
-0
O Y
A G e n e ra to r_ A
R
.r v t
#74-23108-00
JULY 11, 2023
CONSTRUCTION
DOCUMENTS
GENERAL NOTES,
SYMBOLS AND
ABBREVIATIONS
G1.1
GENERAL ABBREVIATIONS
# NUMBER
& AND
@ AT
ADA AMERICANS WITH DISABILITY ACT
ADDN ADDITION OR ADDITIONAL
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BLDG BUILDING
BSMT BASEMENT
CL CENTER LINE
CLG CEILING
CM CENTIMETER
CONC CONCRETE
CONN(S) CONNECTION(S)
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACT(OR)
CTR CENTER
D DEPTH
DEG DEGREE
DEMO DEMOLISH OR DEMOLITION
DIA DIAMETER
DIM DIMENSION
DIV SPECIFICATION DIVISION
DN DOWN
DTL DETAIL
DWG(S) DRAWING(S)
E EAST
EA EACH
EC ELECTRICAL CONTRACTOR
EL ELEVATION
ELEC ELECTRICAL
ENG ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
EXST EXISTING
EXT EXTERIOR
FIN FINISHED
FL FLOOR
FT FEET
FUT FUTURE
GC GENERAL CONTRACTOR
GOVT GOVERNMENT
H HEIGHT
HORIZ HORIZONTAL
HT HEIGHT
i.e. THAT IS
IBC INTERNATIONAL BUILDING CODE
IN INCH
INT INTERIOR
LB(S) POUND(S)
M METER
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MM MILLIMETER
N NORTH
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OPP OPPOSITE
OVHD OVERHEAD
PAR PARALLEL
PENT PENTHOUSE
PLYWD PLYWOOD
QTY QUANTITY
REQ(D) REQUIRE(D)
REV REVISION(S)
RM ROOM
RND ROUND
S SOUTH
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION(S)
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SYM SYMETRICAL
TEMP TEMPORARY
TYP TYPICAL
UNEX UNEXCAVATED
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
W WEST
W/ WITH
W/O WITHOUT
A/E ARCHITECT/ENGINEER
AB AIR BARRIER
ABS ASBESTOS
ACC ADA ACCESSIBLE
ACR ACRYLIC
ACT ACOUSTIC CEILING TILE
AD ACCESS DOOR
ADJ ADJUSTABLE
ADJT ADJACENT
ADMIN ADMINISTRATION
AEC AUTOMATED EXTERNAL DEFIBRILLATORS
AL ALUMINUM
ALUM ALUMINUM
AP ACCESS PANEL
APC ACOUSTIC PANEL CEILING
ASPH ASPHALT
AUTO AUTOMATIC
AVG AVERAGE
AWP ACOUSTIC WALL PANEL
B.O. BOTTOM OF
BCS BABY CHANGING STATION
BD BOARD
BLK BLOCK
BLKG BLOCKING
BLKHD BULKHEAD
BM(S) BEAM(S)
BOT BOTTOM
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BT BATHTUB
BTWN BETWEEN
CAB CABINET
CBD CHALKBOARD
CER CERAMIC
CF CUBIC FEET
CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CFMF COLD-FORMED METAL FRAMING
CG CLEAR FLOAT GLASS
CGD CORNER GUARD
CI CAST IRON
CIG CLEAR INSULATING GLASS
CIP CAST IN PLACE
CJ CONTROL JOINT
CJA CONTROL JOINT ABOVE
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COM COMMON
COMB COMBINATION
COMM COMMUNICATIONS
COMPR COMPRESSIBLE
CONF CONFERENCE
CONFIG CONFIGURATION
CORR CORRIDOR
CP COVER PLATE
CPT CARPET
CR CHAIR RAIL
CS COUNTERSINK
CSTJ CONSTRUCTION JOINT
CSWK CASEWORK
CT CERAMIC TILE
CTG CLEAR TEMPERED FLOAT GLASS
CTIG CLEAR TEMPERED INSULATING GLASS
CU COPPER
CU COMBINATION UNIT
CV CONDOM VENDOR
CY CUBIC YARD
CYL CYLINDER
DB DECIBEL
DBL DOUBLE
DC DUST COLLECTOR
DEPR DEPRESS(ION)(ED)
DEPT DEPARTMENT
DET DETENTION
DF DRINKING FOUNTAIN
DG DOOR GRILLE
DIAG DIAGONAL
DPFG DAMPROOFING
DR DOOR
DSN DOWNSPOUT NOZZLE
DW DISHWASHER
DWL(S) DOWEL(S)
DWR DRAWER
EB EXPANSION BOLT
EE EACH END
EEW EMERGENCY EYE WASH
EEWS EMERGENCY EYE WASH SHOWER
EFF EFFICIENCY
EJ EXPANSION JOINT
ELAS ELASTOMERIC
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENTR ENTRANCE
ERF EPOXY RESIN FLOORING
EUI ENERGY USE INTENSITY
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXP EXPANSION
EXP EXPOSED
F FABRIC
F.O. FACE OF
FAB FABRICATE(D)
FB FACE BRICK
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIX FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FLG FLOORING
FLM FULL LENGTH MIRROR
FLUOR FLUORESCENT
FO FINISH OPENING
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FP FIREPROOFING
FR FIRE RESISTANT
FRP FIBERGLASS REINFORCED PANEL
FRT FIRE RESISTANCE TREATED
FS FLOOR SINK
FSS FOLDING SHOWER SEAT
FTG FOOTING
FVC FIRE VALVE CABINET
FWC FABRIC WALL COVERING
G GROUT
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GD GARBAGE DISPOSAL
GEN GENERAL
ARCHITECTURAL ABBREVIATIONS
GFA GROSS FLOOR AREA
GL GLUE LAMINATED
GL GLASS
GMP GUARANTEED MAXIMUM PRICE
GR GUARD RAIL
GR GRADE
GRS GALVANIZED RIGID STEEL
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HOLLOW CORE
HD HAND DRYER
HDF HIGH DENSITY FIBERBOARD
HDR HEADER
HDWD HARDWOOD
HDWR HARDWARE
HM HOLLOW METAL
HR HOUR
HR HANDRAIL
HS HARDWARE SET
HSS HOLLOW STRUCTURAL SHAPE
HVAC HEATING VENTILATING AND AIR CONDITIONING
IAW IN ACCORDANCE WITH
ID INSIDE DIAMETER
IF INSIDE FACE
IIP INSULATED INFILL PANEL GLASS
IJ ISOLATION JOINT
IJS IN JOIST SPACE
INC INCLUDE(ING)
INSUL INSULATION
JAN JANITOR
JBE JOIST BEARING ELEVATION
JBX JUNCTION BOX
JCT JUNCTION
JFB JOINT FILLER BOARD
JST JOIST
JT JOINT
KCJ KEYED CONSTRUCTION JOINT
KD KNOCKDOWN
KH KITCHEN HOOD
KIT KITCHEN
L ANGLE
LAB LABORATORY
LAM LAMINATED
LAV LAVATORY
LBR LUMBER
LDG LOADING
LF LINEAR FOOT
LG LENGTH (LONG)
LG LAMINATED GLASS
LIN LINEAR
LINO LINOLEUM
LKR LOCKER
LOC LOCATION
LONG LONGITUDINAL
LSC LIFE SAFETY CODE
LTG LIGHTING
LV LOUVER
LVT LUXURY VINYL TILE
MAG MAGNETIC
MAINT MAINTENANCE
MAN MANUAL
MAS MASONRY
MATL MATERIAL
MB MOP BASIN
MBD MARKER BOARD
MBH MOP/BROOM HOLDER
MC MEDICINE CABINET
MEMB MEMBRANE
MH MANHOLE
MR/S MIRROR WITH SHELF
MTD MOUNTED
MTG MOUNTING
MUL MULLION
NC NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NOM NOMINAL
O to O OUT TO OUT
OA OVERALL
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED OWNER INSTALLED
OH OPPOSITE HAND
OPG(S) OPENING(S)
OSHA OPERATIONAL SAFETY AND HEALTH ADMINISTRATION
OTB OPEN TO BELOW
OVFL OVERFLOW
P PAINT
PAN B PANIC BOLT
PB PARTICLE BOARD
PC PRECAST CONCRETE
PCD PAPER CUP DISPENSER
PCT PORCELAIN CERAMIC TILE
PD PANIC DEVICE
PERF PERFORATED
PERP PERPENDICULAR
PG PATTERN GLASS
PIC PORTABLE INSTRUMENT CONNECTION
PIG PATTERN INSULATING GLASS
PL PLATE
PL PROPERTY LINE
PL PLASTIC LAMINATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PR PAIR
PREFAB PREFABRICATED
PROJ PROJECT(OR) (ION)
PS PROJECTION SCREEN
PT POINT
PT POINT OF TANGENCY
PTD PAPER TOWEL DISPENSER
PTD/R COMBINATION TOWEL DISPENSER/RECEPTACLE
PTN PARTITION
PVC POLYVINYL CHLORIDE
PWL SOUND POWER LEVEL
QGV QUAD GAS VALVE
QT QUARRY TILE
QTR RND QUARTER ROUND
R RISER
RAD RADIUS
RB RUBBER BASE
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFERENCE
REFL REFLECTED
REM REMOVABLE
RESIL RESILIENT
RF RESILIENT FLOORING
RF RUBBER FLOOR
RFM RECESSED FLOOR MAT
RH ROBE HOOK
RI&C ROUGH IN AND CONNECT
S SINK
SAT SPRAYED ACOUSTIC TREATMENT
SAW SOUND ABSORBING WALL UNITS
SB SPLASH BLOCK
SC SOLID CORE
SC SHOWER CURTAIN
SCD SEAT COVER DISPENSER
SCH SHOWER CURTAIN HOOK
SCR SHOWER CURTAIN ROD
SCT STRUCTURAL CLAY TILE
SD SOAP DISPENSER
SECY SECRETARY
SF SQUARE FEET
SG SPANDREL GLASS
SG SPECIALTY GLASS
SGL SINGLE
SGV SINGLE GAS VALVE
SH SHOWER
SHM SECURITY HOLLOW METAL
SLNT SEALANT
SM SHEET METAL
SND SANITARY NAPKIN DISPOSAL
SNV SANITARY NAPKIN VENDOR
SO SENSOR OPERATED
SPL SOUND PRESSURE LEVEL
SQ SQUARE
SR SURFACE MOUNTED ELECTRICAL RACEWAY
SS SOLID SURFACE
SSA STORM SHELTER AREA
SSM SOLID SURFACE
SSS STAINLESS STEEL SHELF
SST STAINLESS STEEL
ST STONE
ST STAIR
STAG'D STAGGERED
STC SOUND TRANSMISSION CLASS
STGR STRINGER
SUBFL SUBFLOOR
SUL SULPHUR
SURF SURFACE
SUSP SUSPENDED
SVF SHEET VINYL FLOORING
SVF SERVICE FIXTURE
SVG SERVICE FIXTURE GROUP
T TREAD
T&G TONGUE AND GROOVE
T.O. TOP OF
TAN TANGENT
TB TOWEL BAR
TBD TACK BOARD
TCP TOILET COMPARTMENT PARTITION
TERR TERRAZZO
TFG TINTED FLOAT GLASS
TG TEMPERED GLASS
TH THRESHOLD
THK THICK(NESS)
TI TENANT IMPROVEMENT
TIG TINTED INSULATING GLASS
TMR TILT MIRROR UNIT
TOIL TOILET
TOP TOP OF PAVING
TRANS TRANSVERSE
TT TERRAZZO TILE
TTD TOILET TISSUE DISPENSER
TTG TINTED TEMPERED FLOAT GLASS
TTIG TINTED TEMPERED INSULATING GLASS
TW TACK WALL
UL UNDERWRITERS LABORATORIES
UR URINAL
US UTILITY SHELF
UTIL UTILITY
VB VAPOR BARRIER
VB VINYL BASE
VCB VENTED COVE BASE
VF VINYL FLOOR
VOC VOLITILE ORGANIC COMPOUND
VOL VOLUME
VP VENEER PLASTER
VT VINYL TILE
VWC VINYL WALL COVERING
W WIDE
WB WALL BASE
WC WATER CLOSET
WC WALL COVERING
WCL WATER CLOSET/LAVATORY COMBINATION
WD WOOD
WDF WOOD FLOORING
WDW WINDOW
WG POLISHED WIRE GLASS
WI WROUGHT IRON
WOM WALK OFF MAT
WR WASTE RECEPTACLE
WRB WEATHER RESISTANT BARRIER
WW WARM WHITE
WWF WELDED WIRE FABRIC
YD YARD
REVISIONS
07/11/2023
CD OWNER
REVIEW
CONSTRUCTION
DOCUMENTS
2.RV
2.RV
RV.CRV.C
3.RV
3.RV
1.RV
1.RV
RV.DRV.D
RV.BRV.B
RV.A
RV.A
(EXST)
MECHANICAL
ROOM
A236
(EXST) LIFE
SAFETY
A231
(EXST)
ELECTRICAL
ROOM
A230
(EXST)
STORAGE
A232
(EXST)
GENERATOR
ROOM
A235 (EXST) OFFICE
A234
(EXST) LOW
VOLTAGE
A233
(EXST)
CORRIDOR
(EXST)
PERSONNEL
SALLYPORT
3B
INTERIOR COURTYARD SIDEEXTERIOR FIRE LANE SIDE
(EXST)
DUMPSTER
PAD
STAFF ENTRANCE FROM FIRE LANE
AREA OF WORK
AREA OF WORK
2 2
3A
(EXST) OFFICE
(EXST) WORK
AREA
(EXST)
RECEPTION
(EXST) LOBBY
(EXST)
CONFERENCE /
VISIT ROOM
(EXST)
CONTROL
(EXST)
CONFERENCE
(EXST)
ADMITTING
(EXST)
SALLYPORT
(EXST)
VOCATIONAL
EDUCATION
CLASSROOM
(EXST) TOILET
(EXST) OFFICE
(EXST)
SHOWER
(EXST)
STORAGE
A229
EXTERIOR FIRE LANE SIDE INTERIOR COURTYARD SIDE
GENERATOR ROOM
TEMPORARY SECURITY DIAGRAM
A1.1RV
4D
FB1
F B
FB2
FB2
FB2
FB2
F B
MAINTAIN EXISTING
1-HR OCCUPANCY
SEPARATION WALL
2 HOUR OCCUPANCY
SEPARATION WALL
MAINTAIN EXISTING
2-HR RATED WALL
FB1: 1-HOUR OCCUPANCY FIRE SEPARATION WALL
FB2: 2-HOUR OCCUPANCY FIRE SEPARATION WALL
FIRE BARRIER LEGEND
F B
F B
(EXST) LOW VOLTAGE ROOM
(EXST) OFFICE
(EXST) GENERATOR ROOM
(EXST) STORAGE
(EXST) STORAGE(EXST) MECHANICAL ROOM
(EXST) ELECTRICAL ROOM
(EXST) LIFE SAFETY
A1.1RV
5A
(EXST) LOW VOLTAGE ROOM
(EXST) OFFICE
(EXST) GENERATOR ROOM
(EXST) STORAGE
(EXST) STORAGE(EXST) MECHANICAL ROOM
(EXST) ELECTRICAL ROOM
(EXST) LIFE SAFETY
EXTERIOR FIRE LANE SIDE INTERIOR COURTYARD SIDE
SW2 SECONDARY SECURITY WALLS
(Restraint / Staff Protection)
SW3 TERTIARY SECURITY WALLS
SW1 PRIMARY SECURITY WALLS
(Glass / Mech / Hardware / Movement Doors
SECURITY WALL LEGEND
SW2
S W
S W
SW1
SW1
S W
SW2
S W
SW1
S W
SW1
SW1
S W
S W
S
W
S W
S W
SW1
S W
SW1
S W
SW1 S
W
S W
S W
S W
S W
SW1
SW1
SW1
SW1
SW1
S W
S
W
SW1
SW1
SW1
S W
SW1
S W
S W
S W
S W
S W
S W
S W
S W
S W
SW2
SW2
SW2 SW2
S W
S W
S W
S W
S W
S W
S W
SW2
SW2
SW2
SW2
SW2
SW2
S W
S W
S W
SW2
SW2
S W
SW2
SW2
SW2
SW3
SW3
SW3
SW3
SW3
SW3
S W
S W
S W
S W
S W
S W
S W
S W
SW3
SW3
SW3
SW1
SW1
S W
SW1
S W
S W
S W
2 SW2
SW2
SW2
S W
SW2
SW2
S W
S W
S W
A1.1RV
5B
SECURITY & FIRE WALL LEGEND
SW2: SECONDARY SECURITY WALLS
(Restraint/Staff Protection)
SW1: PRIMARY SECURITY WALLS
(Glass / Mech / Hardware / Movement Doors)
FB2: 2-HOUR OCCUPANCY
FIRE SEPARATION WALL
FB1: 1-HOUR OCCUPANCY
FIRE SEPARATION WALL
SW3: TERTIARY SECURITY WALLS
TEMPORARY SECURITY NOTES
TO MAINTAIN 2-LOCKABLE-DOOR SECURITY SEPARATION
BETWEEN YOUTH CORRECTIONAL FACILITY AND EXTERIOR AT
ALL TIMES, THE CONTRACTOR SHALL FOLLOW THE NECESSARY
STEPS TO ACCESS AND SECURE THE AREA OF WORK DURING
CONSTRUCTION:
1. INITIALLY, CONTRACTOR TO GO THROUGH STAFF ENTRANCE
AND PERSONNEL SALLYPORT (MUST BE BUZZED IN BY
OREGON YOUTH AUTHORITY SECURITY CONTROL, WITH
PERMISSION FROM AUTHORIZED FIELD REPRESENTATIVE).
2. OREGON YOUTH AUTHORITY SECURITY CONTROL CAN OPEN
BOTH DOORS OF THE PERSONNEL SALLYPORT IF/WHEN THE
INTERIOR COURTYARD IS CLEARED, TO ALLOW
CONTRACTOR TO TRANSPORT CONTRUCTION TOOLS AND
MATERIALS.
3. ONCE INSIDE THE DESIGNATED AREA OF WORK,
CONTRACTOR TO ERECT A LOCKOUT DOOR, IN PLACE OF
REMOVED LOUVER, SO THAT THE LOCKABLE DOOR CANNOT
BE OPENED FROM THE GENERATOR ROOM SIDE. LOCKOUT
DOOR MUST BE UNLOCKED FROM THE EXTERIOR SIDE (FIRE
LANE SIDE OF THE DOOR) ONLY. CONTRACTOR TO ALSO
ERECT TEMPORARY WALL AND LOCKABLE DOOR IN EXISTING
STORAGE ROOM.
A. INTERIOR SECURITY WALL 3A TO HAVE 5/8" PLYWOOD
SHEATHING ON BOTH SIDES OF STUD, SET AT 12"
CENTERS. TEMPORARY SECURITY DOOR TO BE
SECURED WITH A PAD-LOCK AND SECURITY
FASTENERS.
B. CONSTRUCT TEMPORARY WALL 3B AFTER
TEMPORARY GENERATOR IS INSTALLED AND
ACCEPTED FOR USE. TEMPORARY WALL 3B TO HAVE
5/8" PLYWOOD SHEATHING ON BOTH SIDES OF STUD,
SET AT 12" CENTERS. TEMPORARY SECURITY DOOR
TO BE SECURED WITH PAD-LOCK AND SECURITY
FASTENERS.
4. ONCE LOCKOUT DOORS/TEMPORARY WALLS ARE
ESTABLISHED, CONTRACTOR CAN USE THEIR OWN KEYS TO
UNLOCK THE TEMPORARY LOCKABLE DOORS AND ACCESS
THE GENERATOR ROOM FROM THE EXTERIOR SIDE (FIRE
LANE SIDE). CONTRACTOR TO CARRY OUT WORK IN
HATCHED AREA, AS NEEDED.
5. DOOR BETWEEN ROOM A230 AND ROOM A229 IS TO REMAIN
LOCKED AT ALL TIMES, EXCEPT AS APPROVED BY OWNER.
6. ALL OTHER SPACES ACCESSED BY OWNER ESCORT, ONLY.
7. AFTER NEW GENERATOR AND EXTERIOR OPERABLE WALL
LOUVER IS INSTALLED, USE ROUTE NUMBER 1 FOR THE
REMAINDER OF THE PROJECT.
8. CONTRACTOR TO ENSURE ROOF OPENING IS SECURED WITH
PLYWOOD AT THE THE END OF EACH DAY.
9. FOR EACH LOCATION, CONTRACTOR SHALL WORK WITH
OWNER TO DETERMINE THE BEST LOCATION AND MEANS OF
INSTALLING/SECURING TEMPORARY WALLS AND CEILINGS.
D
L R
G ro u p
REVISIONS
KEY PLAN
A B C D E F
O Y
A R
E G
IO
N
A L G
E N
E R
A T
O R
R E
P L A
C E
M E
N T
R O
G U
E V
A L L
E Y
Y O
U T
H C
O R
R E
C T
IO
N
A L F
A C
IL
IT
Y
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y N
E F
S T
G
R A
N T
S P
A S
S O
R
NORTH
/1
/2
:3
:4
P
M
A u to d e s k D o c s /7
-2
-0
O
Y A
R e g io n a l G e n e ra to r
R e p la c e m e n t/
-2
-0
O Y
A G e n e ra to r_ A
R
.r v t
#74-23108-00
JULY 11, 2023
CONSTRUCTION
DOCUMENTS
ROGUE VALLEY -
ORIENTATION &
CODE PLANS
A0.1RV
N
SCALE: 1/16" = 1'-0"A0.1RV
3D ROGUE VALLEY - TEMPORARY SECURITY DIAGRAM
SCALE: 1/32" = 1'-0"A0.1RV
5D ROGUE VALLEY - ORIENTATION PLAN
NN
N
SCALE: 1/32" = 1'-0"A0.1RV
3B ROGUE VALLEY - FIRE SEPARATION DIAGRAM
SCALE: 1/32" = 1'-0"A0.1RV
5B ROGUE VALLEY - TEMPORARY SECURITY DIAGRAM
REVISIONS
07/11/2023
CD OWNER
REVIEW
GENERAL ARCHITECTURAL NOTES
1. FURNISH AND INSTALL FIRE-TREATED WOOD BLOCKING OR
METAL BACKING PLATE IN METAL STUD PARTITIONS FOR THE
PROPER ANCHORAGE OF ALL WALL ATTACHED ITEMS; I.E.
TOILET ACCESSORIES, CASEWORK, MILLWORK, WALL-
MOUNTED FIXTURES, MARKER BOARDS, TACK BOARDS, DOOR
STOPS, AUDIO VISUAL BRACKETS, AND OTHER WALL ATTACHED
ITEMS.
2. SCRIBE GYPSUM WALL BOARD OF WALLS AND PARTITIONS TO
IRREGULARITIES OF DECK ABOVE. SEAL TIGHTLY AROUND ALL
PENETRATIONS.
DEMOLITION GENERAL NOTES
THE CONTRACTOR SHALL:
A. COORDINATE ALL DEMOLITION AND PHASING EFFORTS WITH THE
OWNER’S REPRESENTATIVE. EVERY EFFORT SHALL BE MADE TO
MINIMIZE DISRUPTION OF OWNER’S OPERATIONS. EXCESSIVE
NOISE OR VIBRATION SHALL BE PRE-APPROVED AND
COORDINATED WITH THE OWNER’S REPRESENTATIVE. IN ALL
CASES, PROVISIONS SHALL BE MADE FOR USER’S SAFETY.
B. COORDINATE ANY DISRUPTION OF UTILITY SERVICES WITH THE
OWNER AND AS SPECIFIED.
C. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS WITHIN
THE EXISTING BUILDING WHICH OFFER A ONE-HOUR ENCLOSURE
TO ISOLATE ANY DEMOLITION/CONSTRUCTION WORK FROM THE
GENERAL PUBLIC AND AS DEEMED NECESSARY BY THE OWNER
AND CODE OFFICIAL HAVING JURISDICTION. COORDINATE
LOCATIONS WITH THE OWNER AND MAINTAIN MEANS OF EGRESS
THROUGHOUT THE WORK.
D. MAINTAIN A SECURE, WEATHER-TIGHT ENCLOSURE AT ALL
TIMES.
E. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND
ELEVATIONS AND NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES.
F. REMOVE IN THEIR ENTIRETY ALL ITEMS, AS REQUIRED TO
EXECUTE THE DEMOLITION/CONSTRUCTION WORK DESCRIBED
BY THE DRAWINGS.
G. THE OWNER SHALL RESERVE THE RIGHT TO SALVAGE ANY
MATERIALS.
H. PROVIDE PROTECTION FOR ALL EXISTING BUILDING MATERIALS
AND EQUIPMENT FROM DAMAGE DUE TO ANY DEMOLITION OR
CONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THIS
CONTRACT.
I. REPAIR OR REPLACE ITEMS THAT ARE DAMAGED AS A RESULT
OF DEMOLITION OR CONSTRUCTION TO MATCH EXISTING FINISH
AND/OR CONDITION.
J. EXISTING MATERIALS SHALL NOT BE REUSED UNLESS NOTED
OTHERWISE OR AS AUTHORIZED BY ARCHITECT.
K. VERIFY AND MAINTAIN THE LOCATION OF EXISTING POWER,
COMMUNICATION AND DATA CABLES TO PREVENT
INTERRUPTION OF THEIR SERVICE.
L. PATCH FLOOR, WALL AND CEILING PENETRATIONS RESULTING
FROM REMOVAL OR RE-ROUTING OF NEW OR EXISTING PIPING,
DUCTWORK, CONDUIT, AND OTHER ITEMS, AS REQUIRED TO
MAINTAIN FIRE-RESISTANCE-RATED SEPARATIONS. FINISH AS
REQUIRED FOR NEW OR EXISTING ADJACENT SURFACES.
M. CAP ALL DISCONNECTED MECHANICAL PIPING LINES WITHIN THE
WALL OR FLOOR. PATCH AND FINISH AS REQUIRED TO MATCH
NEW OR EXISTING ADJACENT SURFACES.
N. SEE MECHANICAL AND ELECTRICAL DRAWINGS AND NOTES FOR
FURTHER SEQUENCING AND SCOPE OF WORK.
O. WHERE PLASTER/STUD WALLS ARE INDICATED TO BE REMOVED,
PREPARE ADJACENT WALLS TO RECEIVE NEW PATCH/FINISH BY
SAWCUTTING ADJACENT PLASTER FINISH A MINIMUM OF 1'-0"
BEYOND DEMOLITION.
DEMOLITION NOTES APPLY TO ALL DEMOLITION SHEETS.
SECURITY & FIRE WALL LEGEND
SW2: SECONDARY SECURITY WALLS
(Restraint/Staff Protection)
SW1: PRIMARY SECURITY WALLS
(Glass / Mech / Hardware / Movement Doors)
FB2: 2-HOUR OCCUPANCY
FIRE SEPARATION WALL
FB1: 1-HOUR OCCUPANCY
FIRE SEPARATION WALL
SW3: TERTIARY SECURITY WALLS
2.OC
2.OC
(EXST)
MECHANICAL
ROOM
A236
(EXST) LIFE
SAFETY
A231
(EXST)
ELECTRICAL
ROOM
A230
(EXST)
STORAGE
A232
(EXST)
GENERATOR
ROOM
A235
(EXST) OFFICE
A234
(EXST) LOW
VOLTAGE
A233
MATCHLINE A MATCHLINE A
MATCHLINE B MATCHLINE B
2.RV
2.RV
RV.CRV.C
3.RV
3.RV
1.RV
1.RV
RV.D
RV.D
RV.BRV.B
RV.A
RV.A
MAINTAIN EXISTING
1-HR OCCUPANCY
SEPARATION WALL
2 HOUR OCCUPANCY
SEPARATION WALL
MAINTAIN EXISTING
2-HR RATED WALL
FB1
F B
FB2
F B
(EXST)
STORAGE
A229
FB2
FB2
FB2
EQ EQ
MUFFLER TAIL TO EDGE OF VENTILATOR
10' - 0" MIN. HORIZONTAL DISTANCE
12' - 11 3/4" (+/-) VIF
NEW
GENERATOR
ASSEMBLY
MUFFLER
ASSEMBLY
GRAVITY VENTILATOR BEYOND
VIF
1' - 8"
VIF
3' - 8 5/8" (+/-)
' 1
/4
V
IF
/2
V
IF
M A
T C
H
LI
N E
A
EQ EQ
5A
A1.4RV RV.BRV.A
NOTE: INSTALL NEW CONC.
EQUIPMENT PAD TO MATCH NEW
GENERATOR PAD REQUIREMENTS
SEE SPEC
0' - 6" MIN.
SEE SPEC
0' - 6" MIN.
A9.1
2E
M A
X
M
IN
T .O
S
T U
D
/2
OPERABLE WALL
LOUVER
INFILL WALL
V
IF
/2
1' - 8 1/4" VIF 10' - 2" VIF
DOCKING STATION -
SEE ELEC.
FUEL FILL PANEL -
SEE ELEC.
EXISTING DOWNSPOUT
TO REMAIN
A1.4RV
5E
A1.4RV
2E
A9.1
2C
A9.1
3A
A9.1
3A
A1.4RV
4E
A1.4RV
3E
5A
A1.4RV
RV.BRV.A
A9.1
2C
7' - 0" VIF
5C
A1.1RV
A1.1RV 5D
(EXST)
MECHANICAL
ROOM
A236
(EXST) LIFE
SAFETY
A231
(EXST)
ELECTRICAL
ROOM
A230
(EXST)
STORAGE
A232
(EXST)
GENERATOR
ROOM
A235
(EXST) OFFICE
A234
(EXST) LOW
VOLTAGE
A233 6
/4
17' - 11 1/2" VIF
V
IF
/4
/4
V
IF
(EXST) OFFICE (EXST) WAITING(EXST) EXAM(EXST) EXAM
MATCHLINE A
MATCHLINE A
MATCHLINE B MATCHLINE B
INSTALL
OPERABLE
WALL LOUVER
(EXST) OVERHEAD JOIST
NEW GRAVITY
VENTILATOR ROUGH
OPENING ABOVE
NEW
GENERATOR
ASSEMBLY
CENTER GENERATOR
AND LOUVER AT
ROOM CENTERLINE
5A
A1.4RV
/2
1' - 10"
EXST MUFFLER
PENETRATION ABOVE
TO REMAIN
(EXST) OVERHEAD JOIST
(EXST) OVERHEAD JOIST
(EXST) OVERHEAD JOIST
(EXST) OVERHEAD JOIST
(EXST) OVERHEAD JOIST
(EXST) BRACED FRAME
2.RV
2.RV
RV.CRV.C
3.RV
3.RV
1.RV
1.RV
RV.D
RV.D
RV.BRV.B
RV.A
RV.A
18' - 7" 17' - 11"
2' - 0" VIF 12' - 11 1/2" 3' - 0" MIN.
NEW DUCTWORK
ASSEMBLY - SEE MECH.
A9.1
2B
A9.1
3A
A9.1
3A
A9.1
2B
E Q
E Q
(EXST)
STORAGE
A229
5C
A1.1RV
A1.1RV 5D
(EXST)
MECHANICAL
ROOM
A236
(EXST) LIFE
SAFETY
A231
(EXST)
ELECTRICAL
ROOM
A230
(EXST)
STORAGE
A232
(EXST)
GENERATOR
ROOM
A235
(EXST) OFFICE
A234
(EXST) LOW
VOLTAGE
A233
/4
V
IF
V
IF
1' - 8" VIF
9' - 0" VIF 7' - 2" VIF
/4
V
IF
V
IF
/4
(EXST) OFFICE
(EXST) WAITING(EXST) EXAM(EXST) EXAM
MATCHLINE A MATCHLINE A
MATCHLINE B MATCHLINE B
EXST MUFFLER PENETRATION
ABOVE TO REMAIN - SEE RCP
EXST OVERHEAD JOIST
REMOVE (EXST)
GENERATOR, DUCTWORK,
MUFFLER, AND ASSOCIATED
CONC. EQUIP. PAD
EXST BRACED FRAME
EXST OVERHEAD JOIST
REMOVE EXISTING LOUVER
A9.1
2B
5A
A1.4RV
EXST OVERHEAD JOIST
EXST OVERHEAD JOIST
EXST OVERHEAD JOIST
EXST OVERHEAD JOIST
EXST OVERHEAD JOIST
EXST OVERHEAD JOIST
EXST OVERHEAD JOIST
EXST OVERHEAD JOIST
EXST OVERHEAD JOIST
A9.1
2B
EXST FIRE
EXTINGUISHER CABINET
(EXST)
STORAGE
A229
2.RV
2.RV
RV.CRV.C
3.RV
3.RV
1.RV
1.RV
RV.DRV.D
RV.BRV.B
RV.A
RV.A
18' - 7" 17' - 11"
17' - 11 1/2" VIF
V
IF
V
IF
2.OC
2.OC
2.RV
2.RV
RV.CRV.C
3.RV
3.RV
1.RV
1.RV
RV.D
RV.D
RV.BRV.B
RV.A
RV.A
(EXST)
MECHANICAL
ROOM
A236
(EXST) LIFE
SAFETY
A231
(EXST)
ELECTRICAL
ROOM
A230
(EXST)
STORAGE
A232
(EXST)
GENERATOR
ROOM
A235
(EXST) OFFICE
A234
(EXST) LOW
VOLTAGE
A233
(EXST)
STORAGE
A229
MATCHLINE A MATCHLINE A
MATCHLINE B MATCHLINE B
S E
C O
N D
A R
Y S
E C
U R
IT
Y
W A
LL
S E
C O
N D
A R
Y S
E C
U R
IT
Y
W A
LL
P R
IM
A
R Y
S E
C U
R
IT
Y W
A
LL
S W
SW2
S W
SW1
SW2
S W
SW2
S W
D
L R
G ro u p
REVISIONS
KEY PLAN
A B C D E F
O Y
A R
E G
IO
N
A L G
E N
E R
A T
O R
R E
P L A
C E
M E
N T
R O
G U
E V
A L L
E Y
Y O
U T
H C
O R
R E
C T
IO
N
A L F
A C
IL
IT
Y
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y N
E F
S T
G
R A
N T
S P
A S
S O
R
NORTH
/1
/2
:3
:0
P
M
A u to d e s k D o c s /7
-2
-0
O
Y A
R e g io n a l G e n e ra to r
R e p la c e m e n t/
-2
-0
O Y
A G e n e ra to r_ A
R
.r v t
#74-23108-00
JULY 11, 2023
CONSTRUCTION
DOCUMENTS
ROGUE VALLEY -
FLOOR PLANS &
ELEVATIONS
A1.1RVSCALE: 1/8" = 1'-0"A1.1RV
5A ROGUE VALLEY - FIRE SEPARATION DIAGRAM
SCALE: 1/4" = 1'-0"A1.1RV
5C ROGUE VALLEY SECTION DIAGRAM - N-S
SCALE: 1/4" = 1'-0"A1.1RV
5D ROGUE VALLEY - WEST ELEVATION
SCALE: 1/4" = 1'-0"A1.1RV
4D ROGUE VALLEY - FLOOR PLAN
SCALE: 1/4" = 1'-0"A1.1RV
4A ROGUE VALLEY - DEMO PLAN
N N
N N
(EXST) FIRE
EXTINGUISHER
SCALE: 1/8" = 1'-0"A1.1RV
5B ROGUE VALLEY - SECURITY SEPARATION DIAGRAM
REVISIONS
07/11/2023
CD OWNER
REVIEW
5C
A1.1RV
1/8" / 1'-0"
GENERATOR ROOM - VIF
17' - 11 1/2"
/8
V
IF
A1.4RV
5E
A1.4RV
4E
A1.4RV
3E
A1.4RV
2E
A9.1
4A
A9.1
4A
2.RV
2.RV
1.RV
1.RV
M A
X
M
IN
C U
R B
H T
M
IN
C U
R B
H T
M
IN
GENERATOR ASSEMBLY - SEE ELECTRICAL AND SPEC. MECHANICAL DUCTWORK - SEE MECHANICAL
O P
E R
A B
L E
W A
L L
L O
U V
E R
T A
L L
X
W
ID
E
V
IF
OPERABLE WALL LOUVER ASSEMBLY
(EXST) CEMENTIOUS PLASTER
SHIM & SEALANT AS REQUIRED
FLASHING W/ DRIP EDGE - SEE DETAIL 2A/A9.1
(EXST) BUILDING PAPER TUCKED UNDER SELF-ADHERED
WATERPROOFING MEMBRANE
5/8" GYP SHEATHING
FIBER CEMENT PANEL SIDING
6" BLANKET INSULATION
3/4" FIRE-TREATED PLYWOOD SHEATHING
ADHERED WATERPROOFING LAPPED OVER FLASHING
REMOVE/REPLACE CEMENTITIOUS PLASTER TO
INSTALL FLASHING AND WATERPROOFING
6" RUNNER CHANNEL AT INFILL HEAD OF INFILL WALL
(EXST) BUILDING PAPER
(EXST) PLYWOOD SHEATHING
6" RUNNER CHANNEL
(EXST) PLYWOOD SHEATHING
FLASH OVER NEW INFILL WALL
WEATHER BARRIER
5/8" GYP SHEATHING
FIBER CEMENT PANEL SIDING
OPERABLE WALL LOUVER ASSEMBLY
WEATHER BARRIER
BLANKET INSULATION
1/2" BACKER ROD + SEALANT
6" COLD FORMED METAL FRAMING
FLASHING WITH WEEP
3/4" FIRE TREATED PLYWOOD SHEATHING
1/4" STEEL PLATE
MOUNTING ANGLE BY LOUVER SUPPLIER
SECURITY BAR ASSEMBLY
BIRD SCREEN ASSEMBLY
6" STUD, TYP.
0' - 6"
BLANKET INSULATION
6" COLD-FORMED METAL FRAMING
5/8" GYP SHEATHING
FIBER CEMENT PANEL SIDING
1/4" STEEL PLATE OPERABLE WALL LOUVER ASSEMBLY
0' - 0 1/2"
WEATHER BARRIER
3/4" FIRE TREATED PLYWOOD SHEATHING
6" STUD, TYP.
SECURITY GRILL ASSEMBLY
MOUNTING ANGLE - BY LOUVER SUPPLIER
SHIM & SEALANTEXTENDED SILL W/ END DAMS
BY LOUVER SUPPLIER
1/4" BACKER ROD & SEALANT
BIRD SCREEN ASSEMBLY
3/4" PLYWOOD SHEATHING
TYP.
0' - 6"
3/4" PLYWOOD SHEATHING
6" SOUND ATTENUATION BLANKET INSULATION
5/8" GYP SHEATHING
WEATHER BARRIER
SHEET METAL FLASHING - SEE DETAILS 4E/A9.1 & 4F/A9.1
SHIM INFILL WALL AS REQUIRED
6" RUNNER CHANNEL
ADD FLASHING
1/8" PER FOOT (MIN.) SLOPEE
X
S T
S L
A B
M
IN
FIBER CEMENT PANEL SIDING
D
L R
G ro u p
REVISIONS
A B C D E F
O Y
A R
E G
IO
N
A L G
E N
E R
A T
O R
R E
P L A
C E
M E
N T
R O
G U
E V
A L L
E Y
Y O
U T
H C
O R
R E
C T
IO
N
A L F
A C
IL
IT
Y
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y N
E F
S T
G
R A
N T
S P
A S
S O
R
/1
/2
:3
:0
P
M
A u to d e s k D o c s /7
-2
-0
O
Y A
R e g io n a l G e n e ra to r
R e p la c e m e n t/
-2
-0
O Y
A G e n e ra to r_ A
R
.r v t
#74-23108-00
JULY 11, 2023
CONSTRUCTION
DOCUMENTS
ROGUE VALLEY -
SECTION &
EXTERIOR
DETAILS
A1.4RV
(EXST) RIGID INSULATION AT PARAPET EXTENSION
(EXST) OVERLAPPING EPMD ROOFING MEMBRANE
(EXST) ROOF SYSTEM
(EXST) METAL DECKING
(EXST) K-SERIES BAR JOIST ANGLE WEB
(EXST) W-SHAPE STEEL
(EXST) PREFIN. METAL WALL CAP
(EXST) 2X4 NOMINAL BLOCKING
(EXST) 1/2" PLYWOOD SHEATHING
CUT BACK (EXST) 3/4" CEMENTITIOUS
PLASTER TO ALLOW FOR FLASHING
(EXST) 6" BATT INSULATION - EXTENDED 6" ABOVE ROOF
(EXST) CONCRETE SLAB
(EXST) 6" BATT INSULATION IN STUD CAVITY - EXTEND 6” PAST ROOFLINE
(EXST) AISC ANGLE STEEL L5X5X3/8
(EXST) 3/4” PLYWOOD SHEATHING
(EXST) 3/4” PLYWOOD SHEATHING
(EXST) BUILDING PAPER
REMOVE & REPLACE MUFFLER/EXHAUST ASSEMBLY ON EXISTING ROUGH
OPENING - SEE MUFFLER AND EXHAUST CURB SUPPORT DETAIL 5E/A9.1
(EXST) 2x6 BLOCKING ANCHORED TO DECK @ 2' - 0" O.C.
NO SCALEA1.4RV
5A ROGUE VALLEY E-W SECTION
SCALE: 3" = 1'-0"A1.4RV
2E INFILL WALL - HEAD DETAIL
SCALE: 3" = 1'-0"A1.4RV
3E OPERABLE WALL LOUVER - HEAD DETAIL
SCALE: 3" = 1'-0"A1.4RV
4E OPERABLE WALL LOUVER - EXTENDED SILL DETAIL
SCALE: 3" = 1'-0"A1.4RV
5E INFILL WALL - SILL DETAIL
GRAVITY VENTILATOR - SEE MECH.
REVISIONS
07/11/2023
CD OWNER
REVIEW
CONSTRUCTION
DOCUMENTS
5C
A1.1RV
1/8" / 1'-0"
GENERATOR ROOM - VIF
17' - 11 1/2"
13' - 0 (+/-)
/8
V
IF
A1.4RV
5E
A1.4RV
4E
A1.4RV
3E
A1.4RV
2E
A9.1
4A
A9.1
4A
2.RV
2.RV
1.RV
1.RV
MIN.
0' - 6"
MIN.
0' - 6"
M A
X
M
IN
C U
R B
H T
M
IN
C U
R B
H T
M
IN
GENERATOR ASSEMBLY - SEE ELECTRICAL AND SPEC. MECHANICAL DUCTWORK - SEE MECHANICAL
O P
E R
A B
L E
W A
L L
L O
U V
E R
T A
L L
X
W
ID
E
V
IF
OPERABLE WALL LOUVER ASSEMBLY
(EXST) RIGID INSULATION AT PARAPET EXTENSION
(EXST) OVERLAPPING EPMD ROOFING MEMBRANE
(EXST) ROOF SYSTEM
(EXST) METAL DECKING
(EXST) K-SERIES BAR JOIST ANGLE WEB
(EXST) W-SHAPE STEEL
(EXST) PREFIN. METAL WALL CAP
(EXST) 2X4 NOMINAL BLOCKING
(EXST) 1/2" PLYWOOD SHEATHING
CUT BACK (EXST) 3/4" CEMENTITIOUS
PLASTER TO ALLOW FOR FLASHING
(EXST) 6" BATT INSULATION - EXTENDED 6" ABOVE ROOF
(EXST) CONCRETE SLAB
(EXST) 6" BATT INSULATION IN STUD CAVITY - EXTEND 6” PAST ROOFLINE
(EXST) AISC ANGLE STEEL L5X5X3/8
(EXST) 3/4” PLYWOOD SHEATHING
(EXST) 3/4” PLYWOOD SHEATHING
(EXST) BUILDING PAPER
REMOVE & REPLACE MUFFLER/EXHAUST ASSEMBLY ON EXISTING ROUGH
OPENING - SEE MUFFLER AND EXHAUST CURB SUPPORT DETAIL 5E/A9.1
(EXST) 2x6 BLOCKING ANCHORED TO DECK @ 2' - 0" O.C.
GRAVITY VENTILATOR - SEE MECH.
METAL BACKING PLATE IN METAL STUD PARTITIONS FOR THE
PROPER ANCHORAGE OF ALL WALL ATTACHED ITEMS; I.E.
TOILET ACCESSORIES, CASEWORK, MILLWORK, WALL-
MOUNTED FIXTURES, MARKER BOARDS, TACK BOARDS, DOOR
STOPS, AUDIO VISUAL BRACKETS, AND OTHER WALL ATTACHED
ITEMS.
2. SCRIBE GYPSUM WALL BOARD OF WALLS AND PARTITIONS TO
IRREGULARITIES OF DECK ABOVE. SEAL TIGHTLY AROUND ALL
PENETRATIONS.
DEMOLITION GENERAL NOTES
THE CONTRACTOR SHALL:
A. COORDINATE ALL DEMOLITION AND PHASING EFFORTS WITH THE
OWNER’S REPRESENTATIVE. EVERY EFFORT SHALL BE MADE TO
MINIMIZE DISRUPTION OF OWNER’S OPERATIONS. EXCESSIVE
NOISE OR VIBRATION SHALL BE PRE-APPROVED AND
COORDINATED WITH THE OWNER’S REPRESENTATIVE. IN ALL
CASES, PROVISIONS SHALL BE MADE FOR USER’S SAFETY.
B. COORDINATE ANY DISRUPTION OF UTILITY SERVICES WITH THE
OWNER AND AS SPECIFIED.
C. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS WITHIN
THE EXISTING BUILDING WHICH OFFER A ONE-HOUR ENCLOSURE
TO ISOLATE ANY DEMOLITION/CONSTRUCTION WORK FROM THE
GENERAL PUBLIC AND AS DEEMED NECESSARY BY THE OWNER
AND CODE OFFICIAL HAVING JURISDICTION. COORDINATE
LOCATIONS WITH THE OWNER AND MAINTAIN MEANS OF EGRESS
THROUGHOUT THE WORK.
D. MAINTAIN A SECURE, WEATHER-TIGHT ENCLOSURE AT ALL
TIMES.
E. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND
ELEVATIONS AND NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES.
F. REMOVE IN THEIR ENTIRETY ALL ITEMS, AS REQUIRED TO
EXECUTE THE DEMOLITION/CONSTRUCTION WORK DESCRIBED
BY THE DRAWINGS.
G. THE OWNER SHALL RESERVE THE RIGHT TO SALVAGE ANY
MATERIALS.
H. PROVIDE PROTECTION FOR ALL EXISTING BUILDING MATERIALS
AND EQUIPMENT FROM DAMAGE DUE TO ANY DEMOLITION OR
CONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THIS
CONTRACT.
I. REPAIR OR REPLACE ITEMS THAT ARE DAMAGED AS A RESULT
OF DEMOLITION OR CONSTRUCTION TO MATCH EXISTING FINISH
AND/OR CONDITION.
J. EXISTING MATERIALS SHALL NOT BE REUSED UNLESS NOTED
OTHERWISE OR AS AUTHORIZED BY ARCHITECT.
K. VERIFY AND MAINTAIN THE LOCATION OF EXISTING POWER,
COMMUNICATION AND DATA CABLES TO PREVENT
INTERRUPTION OF THEIR SERVICE.
L. PATCH FLOOR, WALL AND CEILING PENETRATIONS RESULTING
FROM REMOVAL OR RE-ROUTING OF NEW OR EXISTING PIPING,
DUCTWORK, CONDUIT, AND OTHER ITEMS, AS REQUIRED TO
MAINTAIN FIRE-RESISTANCE-RATED SEPARATIONS. FINISH AS
REQUIRED FOR NEW OR EXISTING ADJACENT SURFACES.
M. CAP ALL DISCONNECTED MECHANICAL PIPING LINES WITHIN THE
WALL OR FLOOR. PATCH AND FINISH AS REQUIRED TO MATCH
NEW OR EXISTING ADJACENT SURFACES.
N. SEE MECHANICAL AND ELECTRICAL DRAWINGS AND NOTES FOR
FURTHER SEQUENCING AND SCOPE OF WORK.
O. WHERE PLASTER/STUD WALLS ARE INDICATED TO BE REMOVED,
PREPARE ADJACENT WALLS TO RECEIVE NEW PATCH/FINISH BY
SAWCUTTING ADJACENT PLASTER FINISH A MINIMUM OF 1'-0"
BEYOND DEMOLITION.
DEMOLITION NOTES APPLY TO ALL DEMOLITION SHEETS.
5C
A1.1RV
A1.1RV 5D
5A
A1.4RV
E Q
E Q
E Q
E Q
E Q
EXISTING JOIST
EXISTING BRACED FRAME
EXISTING JOIST EXISTING JOIST
EXISTING JOISTEXISTING JOIST
EXISTING JOIST
EXISTING JOIST
EXISTING JOIST
EXISTING JOIST
EXISTING JOIST
EXISTING JOIST
/4
V
IF
(EXST) MUFFLER
PENETRATION TO REMAIN
(EXST) LIFE
SAFETY
A231
(EXST)
ELECTRICAL
ROOM
A230
(EXST)
MECHANICAL
ROOM
A236
(EXST)
STORAGE
A232
(EXST) LOW
VOLTAGE
A233
(EXST) OFFICE
A234
(EXST)
GENERATOR
ROOM
A235
/4
V
IF
V
IF
V
IF
V
IF
V
IF
/4
VIF
1' - 8" 10' - 3 1/2" (+/-) VIF
REMOVE MUFFLER ABOVE ROOF - SEE ROOF PLANS
8' - 2" VIF 5' - 0 1/2" VIF
RELOCATE (EXST)
STRIP LIGHTS
REMOVE ATTACHED SHROUD
2.RV
2.RV
RV.CRV.C
3.RV
3.RV
1.RV
1.RV
RV.D
RV.D
RV.BRV.B
RV.ARV.A
REMOVE (EXST) DUCTWORK
AND ASSOCIATED EQUIPMENT
V
IF
V
IF
/8
(EXST)
STORAGE
A229
5C
A1.1RV
5A
A1.4RV
MECH R.O. LENGTH
6' - 0"
V
IF
/2 " M
E C
H R
.O
W
ID
T H
EXISTING JOIST
EXISTING BRACED FRAME
1' - 10" FROM BACK WALL
E Q
E Q
EXISTING MUFFLER
PENETRATION
E Q
E Q
E Q
GENERATOR
ASSEMBLY
(EXST) OFFICE
A234
(EXST) LIFE
SAFETY
A231
(EXST)
ELECTRICAL
ROOM
A230
(EXST)
MECHANICAL
ROOM
A236
(EXST)
STORAGE
A232
(EXST) LOW
VOLTAGE
A233
(EXST) OFFICE
A234
(EXST)
GENERATOR
ROOM
A235
EXISTING JOIST
EXISTING JOIST
EXISTING JOIST
EXISTING JOIST
EXISTING JOIST
V
IF
/4
2.RV
2.RV
RV.CRV.C
3.RV
3.RV
1.RV
1.RV
RV.D
RV.D
RV.BRV.B
RV.ARV.A
V
IF
V
IF
S U
S P
. L
IG
H T
V
IF
S U
S P
. L
IG
H T
4' - 9" 4' - 4"
6' - 0" VIF
VIF
1' - 8" 10' - 3 1/2" VIF
GRAVITY VENTILATOR ROUGH OPENING -
SEE ROOF PLANS & 5A/A9.1
RELOCATED STRIP
LIGHTS - ALIGN WITH
EXISTING FIXTURES
GENERATOR
DUCTWORK -
SEE MECH.
(EXST)
STORAGE
A229
D
L R
G ro u p
REVISIONS
KEY PLAN
A B C D E F
O Y
A R
E G
IO
N
A L G
E N
E R
A T
O R
R E
P L A
C E
M E
N T
R O
G U
E V
A L L
E Y
Y O
U T
H C
O R
R E
C T
IO
N
A L F
A C
IL
IT
Y
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y N
E F
S T
G
R A
N T
S P
A S
S O
R
NORTH
/1
/2
:3
:1
P
M
A u to d e s k D o c s /7
-2
-0
O
Y A
R e g io n a l G e n e ra to r
R e p la c e m e n t/
-2
-0
O Y
A G e n e ra to r_ A
R
.r v t
#74-23108-00
JULY 11, 2023
CONSTRUCTION
DOCUMENTS
ROGUE VALLEY -
REFLECTED
CEILING PLANS
A2.1RV
SCALE: 1/4" = 1'-0"A2.1RV
4A ROGUE VALLEY - DEMO REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"A2.1RV
4D ROGUE VALLEY - REFLECTED CEILING PLAN
N N
REVISIONS
07/11/2023
CD OWNER
REVIEW
CONSTRUCTION
DOCUMENTS
tgovreau Line tgovreau Line tgovreau Line tgovreau Line
Z.OC Z.OC
5C
A1.1RV
5A
A1.4RV
REMOVE EXISTING MUFFLER
AND SUPPORT CURB FOR
EXHAUST PIPE TO REMAIN
JOIST BELOW DECK
JOIST BELOW DECK
JOIST BELOW DECK
JOIST BELOW DECK
JOIST BELOW DECK
JOIST BELOW DECK
JOIST BELOW DECK
VIF
5' - 10" (+/-)
MATCHLINE AMATCHLINE A
35' - 7 5/8"
/8
V
IF
MATCHLINE B MATCHLINE B
EXISTING ROOF WALKWAY
DEMO + REROUTE EXISTING
ROOF WALKWAY
REMOVE EXISTING ROOF
DECK FOR NEW ROUGH
OPENING
2.RV
2.RV
RV.CRV.C
3.RV
3.RV
1.RV
1.RV
RV.D
RV.D
RV.BRV.B
RV.A
RV.A
RV.Z RV.Z
REMOVE AND REPLACE
ROOFING FOR MUFFLER
SUPPORT CURBS
JOIST BELOW DECK
JOIST BELOW DECK
Z.OC
Z.OC
5C
A1.1RV
5A
A1.4RV
M U
F F
LE
R
T A
IL
T
O E
D G
E O
F R
T U
M
IN
JOIST BELOW DECK
JOIST BELOW DECK
JOIST BELOW DECK
JOIST BELOW DECK
JOIST BELOW DECK
JOIST BELOW DECK
JOIST BELOW DECK
MATCHLINE AMATCHLINE A
MATCHLINE B MATCHLINE B
EXISTING ROOF WALKWAY
NEW OPENING FOR GRAVITY
VENTILATOR HOOD - SEE
MECH.
TYPICAL JOIST
REINFORCEMENTS - SEE
DETAIL 5A/A9.1
6' - 0"
REROUTED WALKWAY
ADD 2-INCHES ADDITIONAL
INSULATION AND TAPERED
INSULATION TO PROVIDE MIN.
2-INCHES COVER ABOE NEW
STEEL SUPPORT ANGLES
2.RV
2.RV
RV.CRV.C
3.RV
3.RV
1.RV
1.RV
RV.DRV.D
RV.BRV.B
RV.ARV.A
RV.Z
RV.Z
DECK SUPPORT ANGLES
ABOVE DECK IN PLANE OF
ROOF ASSEMBLY - SEE 5A/A9.1
ENSURE NEW MUFFLER ASSEMBLY EXHAUST
POINT IS AT LEAST 10' - 0" AWAY (HORIZONTALLY)
FROM GRAVITY VENTILATOR
MUFFLER AND EXHAUST SUPPORT
CURBS - QTY DETERMINED BY
MUFFLER PROVIDER
JOIST BELOW DECK
JOIST BELOW DECK
D
L R
G ro u p
REVISIONS
KEY PLAN
A B C D E F
O Y
A R
E G
IO
N
A L G
E N
E R
A T
O R
R E
P L A
C E
M E
N T
R O
G U
E V
A L L
E Y
Y O
U T
H C
O R
R E
C T
IO
N
A L F
A C
IL
IT
Y
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y N
E F
S T
G
R A
N T
S P
A S
S O
R
NORTH
/1
/2
:3
:1
P
M
A u to d e s k D o c s /7
-2
-0
O
Y A
R e g io n a l G e n e ra to r
R e p la c e m e n t/
-2
-0
O Y
A G e n e ra to r_ A
R
.r v t
#74-23108-00
JULY 11, 2023
CONSTRUCTION
DOCUMENTS
ROGUE VALLEY -
ROOF PLANS
A3.1RV
SCALE: 1/4" = 1'-0"A3.1RV
4A ROGUE VALLEY - DEMO ROOF PLAN
SCALE: 1/4" = 1'-0"A3.1RV
4C ROGUE VALLEY - ROOF PLAN
N N
REVISIONS
07/11/2023
CD OWNER
REVIEW
CONSTRUCTION
DOCUMENTS
tgovreau Polygon tgovreau Snapshot tgovreau Snapshot tgovreau Snapshot tgovreau Snapshot tgovreau Polygon tgovreau Snapshot tgovreau Snapshot tgovreau Snapshot tgovreau Snapshot tgovreau Polygon tgovreau Snapshot tgovreau Polygon tgovreau Snapshot tgovreau Line
2.OC
C.OCC.OC
3.OC
3.OC
1.OC
1.OC
D.OC
D.OC
B.OCB.OC
A.OCA.OC
3C
INTERIOR COURTYARD SIDEEXTERIOR FIRE LANE SIDE
STAFF ENTRANCE FROM FIRE LANE
AREA OF WORK
AREA OF WORK
2 2
(EXST)
CLASSROOM
A229
(EXST)
MECHANICAL
ROOM
A236
(EXST) LIFE
SAFETY
A231
(EXST)
ELECTRICAL
ROOM
A230
(EXST)
STORAGE
A232
(EXST)
GENERATOR
ROOM
A235
(EXST) OFFICE
A234
(EXST) LOW
VOLTAGE
A233
(EXST)
CORRIDOR
(EXST)
PERSONNEL
SALLYPORT
(EXST)
DUMPSTER
PAD
(EXST) OFFICE
(EXST) WORK
AREA
(EXST)
RECEPTION
(EXST) LOBBY
(EXST)
CONFERENCE /
VISIT ROOM
(EXST)
CONTROL
(EXST)
CONFERENCE
(EXST)
ADMITTING
(EXST)
SALLYPORT
3A
(EXST)
HOLDING
(EXST)
HOLDING
(EXST)
CORRIDOR (EXST)
STORAGE
(EXST)
STORAGE
(EXST) VISIT /
WAIT
(EXST)
HOLDING
(EXST)
HOLDING
(EXST) TOILET
(EXST) OFFICE
(EXST)
SECURE FILES
(EXST) OFFICE
(EXST)
CORRIDOR
(EXST) OFFICE (EXST)
STORAGE
(EXST)
WAITING(EXST) OFFICE
(EXST)
SHOWER
(EXST) TOILET
(EXST) TOILET
3B
EXTERIOR FIRE LANE SIDE INTERIOR COURTYARD SIDE
GENERATOR ROOM
T E
M P
O R
A R
Y S
E C
U R
IT
Y
D
IA
G R
A M
T E
M P
O R
A R
Y S
E C
U R
IT
Y
D
IA
G R
A M
(EXST)
MECHANICAL
ROOM
(EXST)
ELECTRICAL
ROOM
(EXST) LIFE
SAFETY
(EXST)
STORAGE
(EXST)
GENERATOR
ROOM
(EXST) OFFICE
(EXST) LOW
VOLTAGE
FB1
F B
FB2
FB2
FB2
FB2
F B
MAINTAIN EXISTING
1-HR OCCUPANCY
SEPARATION WALL
2 HOUR OCCUPANCY
SEPARATION WALL
MAINTAIN EXISTING
2-HR RATED WALL
F B
F B
FB1
FB1: 1-HOUR OCCUPANCY FIRE SEPARATION WALL
FB2: 2-HOUR OCCUPANCY FIRE SEPARATION WALL
FIRE BARRIER LEGEND
(EXST) CLASSROOM
A1.1OC
5A
SW2
S W
S W
SW1
SW1
S W
S W
SW2
S W
SW1
S W
SW1
SW1
S W
S W
S
W
S W
S W
S W
SW1
S W
SW1
S W
SW1
SW1
S W
S W
S W
S W
S W
SW1
SW1
SW1
SW1
SW1
S W
S
W
SW1
SW1
SW1
S W
SW1
SW1
S W
S W
S W
S W
S W
S W
S W
S W
S W
S W
S W
SW2
SW2
SW2 SW2
S W
S W
S W
S W
S W
S W
S W
SW2
SW2
SW2
SW2
SW2
SW2
S W
S W
S W
S W
SW2
SW2
SW2
S W
SW2
SW2
SW2
SW3
SW3
SW3
SW3
SW3
SW3
S W
S W
S W
S W
S W
S W
S W
S W
SW3
SW3
SW3
EXTERIOR FIRE LANE SIDE INTERIOR COURTYARD SIDE
(EXST) GENERATOR
ROOM
(EXST) MECHANICAL ROOM
(EXST) ELECTRICAL ROOM
(EXST) LIFE SAFETY
(EXST) LOW VOLTAGE ROOM
(EXST) STORAGE
(EXST) CLASSROOM
(EXST) OFFICE
SW2 SECONDARY SECURITY WALLS
(Restraint / Staff Protection)
SW3 TERTIARY SECURITY WALLS
SW1 PRIMARY SECURITY WALLS
(Glass / Mech / Hardware / Movement Doors
SECURITY WALL LEGEND
A1.1OC
5B
TEMPORARY SECURITY NOTES
TO MAINTAIN 2-LOCKABLE-DOOR SECURITY SEPARATION
BETWEEN YOUTH CORRECTIONAL FACILITY AND EXTERIOR AT
ALL TIMES, THE CONTRACTOR SHALL FOLLOW THE NECESSARY
STEPS TO ACCESS AND SECURE THE AREA OF WORK DURING
CONSTRUCTION:
1. INITIALLY, CONTRACTOR TO GO THROUGH STAFF ENTRANCE
AND PERSONNEL SALLYPORT (MUST BE BUZZED IN BY
OREGON YOUTH AUTHORITY SECURITY CONTROL, WITH
PERMISSION FROM AUTHORIZED FIELD REPRESENTATIVE).
2. OREGON YOUTH AUTHORITY SECURITY CONTROL CAN OPEN
BOTH DOORS OF THE PERSONNEL SALLYPORT IF/WHEN THE
INTERIOR COURTYARD IS CLEARED, TO ALLOW
CONTRACTOR TO TRANSPORT CONTRUCTION TOOLS AND
MATERIALS.
3. ONCE INSIDE THE DESIGNATED AREA OF WORK,
CONTRACTOR TO ERECT A LOCKOUT DOOR, IN PLACE OF
REMOVED LOUVER, SO THAT THE LOCKABLE DOOR CANNOT
BE OPENED FROM THE GENERATOR ROOM SIDE. LOCKOUT
DOOR MUST BE UNLOCKED FROM THE EXTERIOR SIDE (FIRE
LANE SIDE OF THE DOOR) ONLY. CONTRACTOR TO ALSO
ERECT TEMPORARY WALL AND LOCKABLE DOOR IN EXISTING
STORAGE ROOM.
A. INTERIOR SECURITY WALL 3A TO HAVE 5/8" PLYWOOD
SHEATHING ON BOTH SIDES OF STUD, SET AT 12"
CENTERS. TEMPORARY SECURITY DOOR TO BE
SECURED WITH A PAD-LOCK AND SECURITY
FASTENERS.
B. CONSTRUCT TEMPORARY WALL 3B AS A 90 DEGREE
WALL RETURNING BACK TO ROOM A231. TEMPORARY
WALL 3C TO BE A SHEET OF 3/4" PLYWOOD,
SCREWED DIRECTLY INTO THE STORAGE RACKS IN
THE ROOM (SEE PHOTO OF STORAGE RACK AND
DOOR INTO A231).
C. CONSTRUCT TEMPORARY WALL 3C AFTER
TEMPORARY GENERATOR IS INSTALLED AND
ACCEPTED FOR USE. TEMPORARY WALL 3B TO HAVE
5/8" PLYWOOD SHEATHING ON BOTH SIDES OF STUD,
SET AT 12" CENTERS. TEMPORARY SECURITY DOOR
TO BE SECURED WITH PAD-LOCK AND SECURITY
FASTENERS.
4. ONCE LOCKOUT DOORS/TEMPORARY WALLS ARE
ESTABLISHED, CONTRACTOR CAN USE THEIR OWN KEYS TO
UNLOCK THE TEMPORARY LOCKABLE DOORS AND ACCESS
THE GENERATOR ROOM FROM THE EXTERIOR SIDE (FIRE
LANE SIDE). CONTRACTOR TO CARRY OUT WORK IN
HATCHED AREA, AS NEEDED.
5. DOOR BETWEEN ROOM A230 AND ROOM A229 IS TO REMAIN
LOCKED AT ALL TIMES, EXCEPT AS APPROVED BY OWNER.
6. ALL OTHER SPACES ACCESSED BY OWNER ESCORT, ONLY.
7. AFTER NEW GENERATOR AND EXTERIOR OPERABLE WALL
LOUVER IS INSTALLED, USE ROUTE NUMBER 1 FOR THE
REMAINDER OF THE PROJECT.
8. CONTRACTOR TO ENSURE ROOF OPENING IS SECURED WITH
PLYWOOD AT THE THE END OF EACH DAY.
9. FOR EACH LOCATION, CONTRACTOR SHALL WORK WITH
OWNER TO DETERMINE THE BEST LOCATION AND MEANS OF
INSTALLING/SECURING TEMPORARY WALLS AND CEILINGS.
SECURITY & FIRE WALL LEGEND
SW2: SECONDARY SECURITY WALLS
(Restraint/Staff Protection)
SW1: PRIMARY SECURITY WALLS
(Glass / Mech / Hardware / Movement Doors)
FB2: 2-HOUR OCCUPANCY
FIRE SEPARATION WALL
FB1: 1-HOUR OCCUPANCY
FIRE SEPARATION WALL
SW3: TERTIARY SECURITY WALLS
STORAGE RACK & DOOR A231
ROOM A231
EXISTING STORAGE RACK
D
L R
G ro u p
REVISIONS
KEY PLAN
A B C D E F
O Y
A R
E G
IO
N
A L G
E N
E R
A T
O R
R E
P L A
C E
M E
N T
O A
K C
R E
E K
Y O
U T
H C
O R
R E
C T
IO
N
A L F
A C
IL
IT
Y
A L
T E
R N
A T
E N
O
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y L
O C
H N
E R
R O
A D
S E
A L B
A N
Y O
R
NORTH
/1
/2
:3
:3
P
M
A u to d e s k D o c s /7
-2
-0
O
Y A
R e g io n a l G e n e ra to r
R e p la c e m e n t/
-2
-0
O Y
A G e n e ra to r_ A
R
.r v t
#74-23108-00
JULY 11, 2023
CONSTRUCTION
DOCUMENTS
OAK CREEK -
ORIENTATION &
CODE PLANS
A0.1OC
SCALE: 1/16" = 1'-0"A0.1OC
3D OAK CREEK - TEMPORARY SECURITY PLAN
N
SCALE: 1/32" = 1'-0"A0.1OC
5D OAK CREEK - ORIENTATION PLAN
N
SCALE: 1/32" = 1'-0"A0.1OC
3A OAK CREEK - FIRE SEPARATION DIAGRAM
SCALE: 1/32" = 1'-0"A0.1OC
5B OAK CREEK - SECURITY SEPARATION DIAGRAM
N N
REVISIONS
07/11/2023
CD OWNER
REVIEW
METAL BACKING PLATE IN METAL STUD PARTITIONS FOR THE
PROPER ANCHORAGE OF ALL WALL ATTACHED ITEMS; I.E.
TOILET ACCESSORIES, CASEWORK, MILLWORK, WALL-
MOUNTED FIXTURES, MARKER BOARDS, TACK BOARDS, DOOR
STOPS, AUDIO VISUAL BRACKETS, AND OTHER WALL ATTACHED
ITEMS.
2. SCRIBE GYPSUM WALL BOARD OF WALLS AND PARTITIONS TO
IRREGULARITIES OF DECK ABOVE. SEAL TIGHTLY AROUND ALL
PENETRATIONS.
(EXST)
CLASSROOM
A229
(EXST)
MECHANICAL
ROOM
A236
(EXST) LIFE
SAFETY
A231
(EXST)
ELECTRICAL
ROOM
A230
(EXST)
STORAGE
A232
(EXST)
GENERATOR
ROOM
A235
(EXST) OFFICE
A234
(EXST) LOW
VOLTAGE
A233
A1.1OC 5E
2.OC
2.OC
5A
A1.4OC
5C
A1.1OC
C.OCC.OC
3.OC
3.OC
1.OC
1.OC
D.OCD.OC
B.OCB.OC
A.OC
A.OC
/4
/8
/4
/1
"17' - 10"
V
IF
/4
/4
V
IF
18' - 7" 17' - 11"
OFFICE WAITINGEXAMEXAM
MATCHLINE A
MATCHLINE A
MATCHLINE B MATCHLINE B
INSTALL OPERABLE
WALL LOUVER
OVERHEAD JOIST
OVERHEAD JOIST
OVERHEAD JOIST
OVERHEAD JOIST
OVERHEAD JOIST
OVERHEAD JOIST
GRAVITY VENTILATOR
ROUGH OPENING ABOVE
TOILETSHOWER
BRACED FRAME
GENERATOR
ASSEMBLY
CENTER GENERATOR
AND LOUVER AT
ROOM CENTERLINE
A9.1
2B
A9.1
2B
INSTALL NEW CONC. EQUIPMENT
PAD TO MATCH NEW GENERATOR
PAD REQUIREMENTS
A9.1
3A
A9.1
3A
(EXST) MUFFLER/EXHAUST
ASSEMBLY PENETRATION TO
REMAIN
1' - 10"
E Q
E Q
VIF
2' - 0" 12' - 11 1/2" 3' - 0" MIN.
E Q
E Q
DOCKING STATION -
SEE ELECTRICAL
FUEL FILL PANEL -
SEE ELECTRICAL
DEMOLITION GENERAL NOTES
THE CONTRACTOR SHALL:
A. COORDINATE ALL DEMOLITION AND PHASING EFFORTS WITH THE
OWNER’S REPRESENTATIVE. EVERY EFFORT SHALL BE MADE TO
MINIMIZE DISRUPTION OF OWNER’S OPERATIONS. EXCESSIVE
NOISE OR VIBRATION SHALL BE PRE-APPROVED AND
COORDINATED WITH THE OWNER’S REPRESENTATIVE. IN ALL
CASES, PROVISIONS SHALL BE MADE FOR USER’S SAFETY.
B. COORDINATE ANY DISRUPTION OF UTILITY SERVICES WITH THE
OWNER AND AS SPECIFIED.
C. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS WITHIN
THE EXISTING BUILDING WHICH OFFER A ONE-HOUR ENCLOSURE
TO ISOLATE ANY DEMOLITION/CONSTRUCTION WORK FROM THE
GENERAL PUBLIC AND AS DEEMED NECESSARY BY THE OWNER
AND CODE OFFICIAL HAVING JURISDICTION. COORDINATE
LOCATIONS WITH THE OWNER AND MAINTAIN MEANS OF EGRESS
THROUGHOUT THE WORK.
D. MAINTAIN A SECURE, WEATHER-TIGHT ENCLOSURE AT ALL
TIMES.
E. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND
ELEVATIONS AND NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES.
F. REMOVE IN THEIR ENTIRETY ALL ITEMS, AS REQUIRED TO
EXECUTE THE DEMOLITION/CONSTRUCTION WORK DESCRIBED
BY THE DRAWINGS.
G. THE OWNER SHALL RESERVE THE RIGHT TO SALVAGE ANY
MATERIALS.
H. PROVIDE PROTECTION FOR ALL EXISTING BUILDING MATERIALS
AND EQUIPMENT FROM DAMAGE DUE TO ANY DEMOLITION OR
CONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THIS
CONTRACT.
I. REPAIR OR REPLACE ITEMS THAT ARE DAMAGED AS A RESULT
OF DEMOLITION OR CONSTRUCTION TO MATCH EXISTING FINISH
AND/OR CONDITION.
J. EXISTING MATERIALS SHALL NOT BE REUSED UNLESS NOTED
OTHERWISE OR AS AUTHORIZED BY ARCHITECT.
K. VERIFY AND MAINTAIN THE LOCATION OF EXISTING POWER,
COMMUNICATION AND DATA CABLES TO PREVENT
INTERRUPTION OF THEIR SERVICE.
L. PATCH FLOOR, WALL AND CEILING PENETRATIONS RESULTING
FROM REMOVAL OR RE-ROUTING OF NEW OR EXISTING PIPING,
DUCTWORK, CONDUIT, AND OTHER ITEMS, AS REQUIRED TO
MAINTAIN FIRE-RESISTANCE-RATED SEPARATIONS. FINISH AS
REQUIRED FOR NEW OR EXISTING ADJACENT SURFACES.
M. CAP ALL DISCONNECTED MECHANICAL PIPING LINES WITHIN THE
WALL OR FLOOR. PATCH AND FINISH AS REQUIRED TO MATCH
NEW OR EXISTING ADJACENT SURFACES.
N. SEE MECHANICAL AND ELECTRICAL DRAWINGS AND NOTES FOR
FURTHER SEQUENCING AND SCOPE OF WORK.
O. WHERE PLASTER/STUD WALLS ARE INDICATED TO BE REMOVED,
PREPARE ADJACENT WALLS TO RECEIVE NEW PATCH/FINISH BY
SAWCUTTING ADJACENT PLASTER FINISH A MINIMUM OF 1'-0"
BEYOND DEMOLITION.
DEMOLITION NOTES APPLY TO ALL DEMOLITION SHEETS.
T .O
S
T U
D
/2
5A
A1.4OC
B.OCA.OC
OPERABLE WALL
LOUVER
INFILL WALL
V
IF
/2
1' - 8 1/4" VIF 10' - 2" VIF 7' - 0" VIF
DOCKING STATION -
SEE ELEC.
FUEL FILL PANEL - SEE ELEC.
(PROVIDE BLOCKING FOR FUEL
FILL PANEL ATTACHMENT)
EXISTING DOWNSPOUT
TO REMAIN
A1.4OC
5E
A1.4OC
2E
A9.1
2C
A9.1
3A
A9.1
3A
A1.4OC
4E
A1.4OC
3E
V
IF
V
IF
EXST REVEALS TO REMAIN
5A
A1.4OC
B.OCA.OC
23' - 11"
EQ EQ EQ
VIF
1' - 6 1/2" (+/-)
4' - 0"
12' - 11 3/4" (+/-) VIF
NEW
GENERATOR
ASSEMBLY
MUFFLER
ASSEMBLY
GRAVITY
VENTILATOR
BEYOND
VIF
1' - 8"
VIF
3' - 8 5/8" (+/-)
' 1
/4
V
IF
/2
V
IF
M A
T C
H
LI
N E
A
EQ EQ
A9.1
2E
MIN.
0' - 6"
MIN.
0' - 6"
M A
X
M
IN
NOTE: INSTALL NEW CONC.
EQUIPMENT PAD TO MATCH NEW
GENERATOR PAD REQUIREMENTS
A1.1OC 5E
2.OC
2.OC
5A
A1.4OC
5C
A1.1OC
C.OCC.OC
3.OC
3.OC
1.OC
1.OC
D.OCD.OC
B.OCB.OC
A.OC
A.OC
(EXST)
CLASSROOM
A229
(EXST)
MECHANICAL
ROOM
A236
(EXST) LIFE
SAFETY
A231
(EXST)
ELECTRICAL
ROOM
A230
(EXST)
STORAGE
A232
(EXST)
GENERATOR
ROOM
A235
(EXST) OFFICE
A234
(EXST) LOW
VOLTAGE
A233
/4
V
IF
/8
V
IF
/4
V
IF
V
IF
/1
V
IF
V
IF
V
IF
/4
1' - 8" VIF
9' - 0" VIF 7' - 2" VIF
/4
V
IF
V
IF
/4
18' - 7" 17' - 11"
OFFICE WAITINGEXAMEXAM
MATCHLINE A MATCHLINE A
MATCHLINE B MATCHLINE B
EXISTING MUFFLER PENETRATION
ABOVE TO REMAIN - SEE RCP FOR
LOCATION
(EXST) OVERHEAD JOIST
REMOVE (EXST) GENERATOR
ASSEMBLY, DUCTWORK, MUFFLER,
AND ASSOCIATED CONC. EQUIP. PAD
REMOVE EXISTING LOUVER
A9.1
2B
A9.1
2B
(EXST) OVERHEAD JOIST
(EXST) OVERHEAD JOIST
(EXST) OVERHEAD JOIST
(EXST) OVERHEAD JOIST
(EXST) OVERHEAD JOIST
(EXST) BRACED FRAME
(EXST) OVERHEAD JOIST
17' - 11 1/2" VIF
DEMO ATTACHED
SHROUD
REMOVE AND REPLACE EXST CEILING & WALL ASSEMBLIES TO
INSTALL JOIST REINFORCEMENTS - SEE RCPs & DETAIL A5/A9.1
2.OC
2.OC
C.OCC.OC
3.OC
3.OC
1.OC
1.OC
D.OCD.OC
B.OCB.OC
A.OC
A.OC
(EXST)
CLASSROOM
A229
(EXST)
MECHANICAL
ROOM
A236
(EXST) LIFE
SAFETY
A231
(EXST)
ELECTRICAL
ROOM
A230
(EXST)
STORAGE
A232
(EXST)
GENERATOR
ROOM
A235
(EXST) OFFICE
A234
(EXST) LOW
VOLTAGE
A233
MATCHLINE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .