Addendum 2 S-DASOBO-00008606 (OYA Regional Generator Replacement)_DOJ approved_for posting1.pdf

PDF 13 MB Posted

Attached to
OYA Regional Generator Replacement
Solicitation number
S-DASOBO-00008606
Issued by
Harney County, Jackson County, Lake County, Gladstone City, Amity City, Oregon

About this file

This document is Addendum 2 to the Invitation to Bid (ITB) for the OYA Regional Generator Replacement project in Oregon. The ITB solicits bids for the removal and replacement of generators at three youth correctional facilities located in Grants Pass, Burns, and Albany. The affected jurisdictions include Harney, Josephine, and Linn Counties, as well as the city of Albany. The bid responses are due by a specified date, and site visits and a bidder's conference may be required prior to submission. The contract will be awarded after the bid evaluation process, and the term of the contract, including any renewal options, is not specified.

The document does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient information. It focuses solely on the scope of work and the bidding process for this generator replacement project across the three identified youth correctional facilities in Oregon.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB S-DASOBO-00008606 - Addendum #2 (Oregon Youth Authority Regional Generator Replacement) Page 1 of 3

Invitation to Bid

S-DASOBO-00008606

Solicitation Addendum #2

This Solicitation Addendum (“Addendum”) modifies the Bid Document(s) for Work only to the extent indicated herein. All other areas not specifically mentioned or affected by this Addendum shall remain in full force. The Addendum shall be added as part of the original Invitation to Bid.

This Addendum must be acknowledged by inserting its number on the appropriate blank lines in Section H of the Invitation to Bid, and by providing all required signatures prior to Bid Closing. Failure to do so may result in rejection of the Bidder’s Bid.

SECTION 1: PURPOSE

The purpose of this Addendum is to modify the Invitation to Bid Exhibit 7 Supplemental General Conditions, as well as to answer clarifying questions. Except as changed by this Addendum, all terms, conditions, scope of work, requirements, deadlines and other provisions in the original ITB and any previous addenda remain unchanged.

SECTION 2: MODIFICATIONS

New language is indicated by bold underlined font, deleted language is indicated by strikethrough font.

• Add the following to Exhibit 7 Supplemental General Conditions:

SGC-13. Section B.4, PERMITS is removed and revised to read as follows:

“Agency shall be responsible for obtaining the primary project building permit.

Contractor shall obtain and pay for all necessary trade permits and licenses, except for those specifically excluded in the Supplemental General Conditions, that are associated with the following: the project Work, temporary obstructions, enclosures, opening of streets for pipes, walls, utilities, environmental Work, etc., as required for the project. Contractor shall be responsible for all violations of the law, in connection with the project Work or caused by the obstruction of streets, sidewalks or other project site areas. Contractor shall provide all requisite notices to public authorities on a timely basis. The Contractor shall pay any and all royalties and license fees associated with these permits and licenses. The Contractor shall indemnify, hold harmless and defend the Owner, Owner’s Authorized Representative, Architect/Engineer, Architect/Engineer’s consultants, and their respective officers, directors, agents, employees, partners, members, stockholders and affiliated companies from any and all suits, claims or other actions associated with infringement of any patent or other proprietary rights associated with the Contractor’s Work on the project and these permits and licenses, consistent with the indemnification, hold harmless and defense provisions of Section G.1, Section K.3 and Section F.5.1 of the General Conditions, as modified by the Supplemental General Conditions or any other provisions of the Contract.”

(Oregon Youth Authority Regional Generator Replacement) Page 2 of 3

• The following revisions have been made to Attachment B – Plans. Revised Attachment B – Plans attached hereto:

o A0.1RV – ROGUE VALLEY – ORIENTATION & CODE PLANS:

Delete sheet A0.1RV in its entirety and substitute sheet A0.1RV as indicated in the attached

Revised Attachment B - Plans to this Addendum.

o A0.1OC – OAK CREEK – ORIENTATION & CODE PLANS:

Delete sheet A0.1OC in its entirety and substitute sheet A0.1OC as indicated in the attached

Revised Attachment B - Plans to this Addendum.

o A1.1OC – OAK CREEK – FLOOR PLANS & ELEVATIONS:

Delete sheet A1.1OC in its entirety and substitute sheet A1.1OC as indicated in the attached

Revised Attachment B - Plans to this Addendum.

o A2.1OC – OAK CREEK – REFLECTED CEILING PLANS:

Delete sheet A2.1OC in its entirety and substitute sheet A2.1OC as indicated in the attached

Revised Attachment B - Plans to this Addendum.

o A3.1OC – OAK CREEK – ROOF PLANS:

Delete sheet A3.1OC in its entirety and substitute sheet A3.1OC as indicated in the attached

Revised Attachment B - Plans to this Addendum.

o A0.1EO – EASTERN OREGON – ORIENTATION & CODE PLANS:

Delete sheet A0.1EO in its entirety and substitute sheet A0.1EO as indicated in the attached

Revised Attachment B - Plans to this Addendum.

o M1.1 – MECHANICAL PLAN – OAK CREEK:

Delete sheet M1.1 in its entirety and substitute sheet M1.1 as indicated in the attached

Revised Attachment B - Plans to this Addendum.

o E0.2 – BASIS OF DESIGN:

Delete sheet E0.2 in its entirety and substitute sheet E0.2 as indicated in the attached Revised

Attachment B - Plans to this Addendum.

o E4.1 – POWER PLAN – GENERATOR ROOM – OAK CREEK:

Delete sheet E4.1 in its entirety and substitute sheet E4.1 as indicated in the attached Revised

Attachment B - Plans to this Addendum.

o E4.4 – LIGHTING PLAN – GENERATOR ROOM – OAK CREEK:

Delete sheet E4.4 in its entirety and substitute sheet E4.4 as indicated in the attached Revised

Attachment B - Plans to this Addendum.

SECTION 3: QUESTIONS AND ANSWERS

1. Does DLR/OYA have any design requirements for the temporary generators?

• Design requirements for acceptable temporary generators are 300 kW, 480Y/277V, 3PH, 4W mobile diesel generators. Preliminary footprint sizes for acceptable 300kW, 480Y/277V mobile diesel generators include, but are not limited to (L x W x H):

Length Width Height Caterpillar (w/ trailer) 23’-8” 8’-5” 10’-6” Caterpillar (w/o trailer) 17’-5” 5’-0” 8’-8” Cummins 14’-0” 4’-8” 9’-1”

(Oregon Youth Authority Regional Generator Replacement) Page 3 of 3

*Note: the above table is only used as examples of acceptable generators. A substitution request is not required for alternate generator brands.

2. Can you please confirm that per B.4 in the GC’s that the Contractor is responsible for the building permits?

• Agency is responsible for the primary project building permit, as more particularly described in SGC-13 of the Supplemental General Conditions. Contractor is responsible for obtaining and paying for all trade permits and licenses, as more particularly described in SGC-13 of the Supplemental General Conditions.

2.RV

2.RV

RV.CRV.C

3.RV

3.RV

1.RV

1.RV

RV.DRV.D

RV.BRV.B

RV.A

RV.A

(EXST)

MECHANICAL

ROOM

A236

(EXST) LIFE

SAFETY

A231

(EXST)

ELECTRICAL

ROOM

A230

(EXST)

STORAGE

A232

(EXST)

GENERATOR

ROOM

A235 (EXST) OFFICE

A234

(EXST) LOW

VOLTAGE

A233

(EXST)

CORRIDOR

(EXST)

PERSONNEL

SALLYPORT

3B

INTERIOR COURTYARD SIDEEXTERIOR FIRE LANE SIDE

(EXST)

DUMPSTER

PAD

STAFF ENTRANCE FROM FIRE LANE

AREA OF WORK

AREA OF WORK

2 2

3A

(EXST) OFFICE

(EXST) WORK

AREA

(EXST)

RECEPTION

(EXST) LOBBY

(EXST)

CONFERENCE /

VISIT ROOM

(EXST)

CONTROL

(EXST)

CONFERENCE

(EXST)

ADMITTING

(EXST)

SALLYPORT

(EXST)

VOCATIONAL

EDUCATION

CLASSROOM

(EXST) TOILET

(EXST) OFFICE

(EXST)

SHOWER

(EXST)

STORAGE

A229

EXTERIOR FIRE LANE SIDE INTERIOR COURTYARD SIDE

GENERATOR ROOM

TEMPORARY SECURITY DIAGRAM

A1.1RV

4D

FB1

F B

FB2

FB2

FB2

FB2

F B

MAINTAIN EXISTING

1-HR OCCUPANCY

SEPARATION WALL

2 HOUR OCCUPANCY

SEPARATION WALL

MAINTAIN EXISTING

2-HR RATED WALL

FB1: 1-HOUR OCCUPANCY FIRE SEPARATION WALL

FB2: 2-HOUR OCCUPANCY FIRE SEPARATION WALL

FIRE BARRIER LEGEND

F B

F B

(EXST) LOW VOLTAGE ROOM

(EXST) OFFICE

(EXST) GENERATOR ROOM

(EXST) STORAGE

(EXST) STORAGE(EXST) MECHANICAL ROOM

(EXST) ELECTRICAL ROOM

(EXST) LIFE SAFETY

A1.1RV

5A

(EXST) LOW VOLTAGE ROOM

(EXST) OFFICE

(EXST) GENERATOR ROOM

(EXST) STORAGE

(EXST) STORAGE

(EXST) MECHANICAL ROOM

(EXST) ELECTRICAL ROOM

(EXST) LIFE SAFETY

EXTERIOR FIRE LANE SIDE INTERIOR COURTYARD SIDE

SW2 SECONDARY SECURITY WALLS

(Restraint / Staff Protection)

SW3 TERTIARY SECURITY WALLS

SW1 PRIMARY SECURITY WALLS

(Glass / Mech / Hardware / Movement Doors

SECURITY WALL LEGEND

SW2

S W

S W

SW1

SW1

S W

2SW2

S W

SW1

S W

SW1

SW1

S W

S W

S

W

S W

S W

SW1

S W

SW1

S W

SW1 S

W

S W

S W

S W

S W

SW1

SW1

SW1

SW1

SW1

S W

S

W

SW1

SW1

SW1

S W

SW1

S W

S W

S W

S W

S W

S W

S W

S W

S W

SW2

SW2

SW2 SW2

S W

S W

S W

S W

S W

S W

S W

SW2

SW2

SW2

SW2

SW2

SW2

S W

S W

S W

SW2

SW2

S W

SW2

SW2

SW2

SW3

SW3

SW3

SW3

SW3

SW3

S W

S W

S W

S W

S W

S W

S W

S W

SW3

SW3

SW3

SW1

SW1

S W

SW1

S W

S W

S W

2 SW2

SW2

SW2

S W

SW2

SW2

S W

S W

S W

A1.1RV

5BVIF

10' - 0"

V

IF

(E X

S T

F

IR

E

L A

N E

B O

U N

D A

R Y

VIF

24' - 0"

(EXST) EQUIPMENT STORAGE

M A

X

8' - 5" MAX

TEMPORARY GENERATOR

ADD-02

SECURITY & FIRE WALL LEGEND

SW2: SECONDARY SECURITY WALLS

(Restraint/Staff Protection)

SW1: PRIMARY SECURITY WALLS

(Glass / Mech / Hardware / Movement Doors)

FB2: 2-HOUR OCCUPANCY

FIRE SEPARATION WALL

FB1: 1-HOUR OCCUPANCY

FIRE SEPARATION WALL

SW3: TERTIARY SECURITY WALLS

TEMPORARY SECURITY NOTES

TO MAINTAIN 2-LOCKABLE-DOOR SECURITY SEPARATION

BETWEEN YOUTH CORRECTIONAL FACILITY AND EXTERIOR AT

ALL TIMES, THE CONTRACTOR SHALL FOLLOW THE NECESSARY

STEPS TO ACCESS AND SECURE THE AREA OF WORK DURING

CONSTRUCTION:

1. INITIALLY, CONTRACTOR TO GO THROUGH STAFF ENTRANCE

AND PERSONNEL SALLYPORT (MUST BE BUZZED IN BY

OREGON YOUTH AUTHORITY SECURITY CONTROL, WITH

PERMISSION FROM AUTHORIZED FIELD REPRESENTATIVE).

2. OREGON YOUTH AUTHORITY SECURITY CONTROL CAN OPEN

BOTH DOORS OF THE PERSONNEL SALLYPORT IF/WHEN THE

INTERIOR COURTYARD IS CLEARED, TO ALLOW

CONTRACTOR TO TRANSPORT CONTRUCTION TOOLS AND

MATERIALS.

3. ONCE INSIDE THE DESIGNATED AREA OF WORK,

CONTRACTOR TO ERECT A LOCKOUT DOOR, IN PLACE OF

REMOVED LOUVER, SO THAT THE LOCKABLE DOOR CANNOT

BE OPENED FROM THE GENERATOR ROOM SIDE. LOCKOUT

DOOR MUST BE UNLOCKED FROM THE EXTERIOR SIDE (FIRE

LANE SIDE OF THE DOOR) ONLY. CONTRACTOR TO ALSO

ERECT TEMPORARY WALL AND LOCKABLE DOOR IN EXISTING

STORAGE ROOM.

A. INTERIOR SECURITY WALL 3A TO HAVE 5/8" PLYWOOD

SHEATHING ON BOTH SIDES OF STUD, SET AT 12"

CENTERS. TEMPORARY SECURITY DOOR TO BE

SECURED WITH A PAD-LOCK AND SECURITY

FASTENERS.

B. CONSTRUCT TEMPORARY WALL 3B AFTER

TEMPORARY GENERATOR IS INSTALLED AND

ACCEPTED FOR USE. TEMPORARY WALL 3B TO HAVE

5/8" PLYWOOD SHEATHING ON BOTH SIDES OF STUD,

SET AT 12" CENTERS. TEMPORARY SECURITY DOOR

TO BE SECURED WITH PAD-LOCK AND SECURITY

FASTENERS.

4. ONCE LOCKOUT DOORS/TEMPORARY WALLS ARE

ESTABLISHED, CONTRACTOR CAN USE THEIR OWN KEYS TO

UNLOCK THE TEMPORARY LOCKABLE DOORS AND ACCESS

THE GENERATOR ROOM FROM THE EXTERIOR SIDE (FIRE

LANE SIDE). CONTRACTOR TO CARRY OUT WORK IN

HATCHED AREA, AS NEEDED.

5. DOOR BETWEEN ROOM A230 AND ROOM A229 IS TO REMAIN

LOCKED AT ALL TIMES, EXCEPT AS APPROVED BY OWNER.

6. ALL OTHER SPACES ACCESSED BY OWNER ESCORT, ONLY.

7. AFTER NEW GENERATOR AND EXTERIOR OPERABLE WALL

LOUVER IS INSTALLED, USE ROUTE NUMBER 1 FOR THE

REMAINDER OF THE PROJECT.

8. CONTRACTOR TO ENSURE ROOF OPENING IS SECURED WITH

PLYWOOD AT THE THE END OF EACH DAY.

9. FOR EACH LOCATION, CONTRACTOR SHALL WORK WITH

OWNER TO DETERMINE THE BEST LOCATION AND MEANS OF

INSTALLING/SECURING TEMPORARY WALLS AND CEILINGS.

10. FOR EACH LOCATION, CONTRACTOR TO VERIFY TEMPORARY

GENERATOR FOOTPRINT AND LOCATION WITH OWNER AND

AUTHORITY HAVING JURISDICTION (AHJ).

D

L R

G ro u p

REVISIONS

KEY PLAN

A B C D E F

O Y

A R

E G

IO

N

A L G

E N

E R

A T

O R

R E

P L A

C E

M E

N T

R O

G U

E V

A L L

E Y

Y O

U T

H C

O R

R E

C T

IO

N

A L F

A C

IL

IT

Y

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y N

E F

S T

G

R A

N T

S P

A S

S O

R

NORTH

/4 /2

:3

:3

P

M

A u to d e s k D o c s /7

-2

-0

O

Y A

R e g io n a l G e n e ra to r

R e p la c e m e n t/

-2

-0

O Y

A G e n e ra to r_ A

R

.r v t

#74-23108-00

JULY 11, 2023

CONSTRUCTION

DOCUMENTS

ROGUE VALLEY -

ORIENTATION &

CODE PLANS

A0.1RV

N

SCALE: 1/16" = 1'-0"A0.1RV

3D ROGUE VALLEY - TEMPORARY SECURITY DIAGRAM

SCALE: 1/32" = 1'-0"A0.1RV

5D ROGUE VALLEY - ORIENTATION PLAN

NN

N

ADD-02 12/5/2023

SCALE: 1/32" = 1'-0"A0.1RV

3B ROGUE VALLEY - FIRE SEPARATION DIAGRAM

SCALE: 1/32" = 1'-0"A0.1RV

5B ROGUE VALLEY - TEMPORARY SECURITY DIAGRAM

ADD-02

2.OC

C.OCC.OC

3.OC

3.OC

1.OC

1.OC

D.OC

D.OC

B.OCB.OC

A.OCA.OC

3C

INTERIOR COURTYARD SIDEEXTERIOR FIRE LANE SIDE

STAFF ENTRANCE FROM FIRE LANE

AREA OF WORK

AREA OF WORK

2 2

(EXST)

CLASSROOM

A229

(EXST)

MECHANICAL

ROOM

A236

(EXST) LIFE

SAFETY

A231

(EXST)

ELECTRICAL

ROOM

A230

(EXST)

STORAGE

A232

(EXST)

GENERATOR

ROOM

A235

(EXST) OFFICE

A234

(EXST) LOW

VOLTAGE

A233

(EXST)

CORRIDOR

(EXST)

PERSONNEL

SALLYPORT

(EXST)

DUMPSTER

PAD

(EXST) OFFICE

(EXST) WORK

AREA

(EXST)

RECEPTION

(EXST) LOBBY

(EXST)

CONFERENCE /

VISIT ROOM

(EXST)

CONTROL

(EXST)

CONFERENCE

(EXST)

ADMITTING

(EXST)

SALLYPORT

3A

(EXST)

HOLDING

(EXST)

HOLDING

(EXST)

CORRIDOR (EXST)

STORAGE

(EXST)

STORAGE

(EXST) VISIT /

WAIT

(EXST)

HOLDING

(EXST)

HOLDING

(EXST) TOILET

(EXST) OFFICE

(EXST)

SECURE FILES

(EXST) OFFICE

(EXST)

CORRIDOR

(EXST) OFFICE (EXST)

STORAGE

(EXST)

WAITING(EXST) OFFICE

(EXST)

SHOWER

(EXST) TOILET

(EXST) TOILET

3B

EXTERIOR FIRE LANE SIDE INTERIOR COURTYARD SIDE

GENERATOR ROOM

T E

M P

O R

A R

Y S

E C

U R

IT

Y

D

IA

G R

A M

T E

M P

O R

A R

Y S

E C

U R

IT

Y

D

IA

G R

A M

(EXST)

MECHANICAL

ROOM

(EXST)

ELECTRICAL

ROOM

(EXST) LIFE

SAFETY

(EXST)

STORAGE

(EXST)

GENERATOR

ROOM

(EXST) OFFICE

(EXST) LOW

VOLTAGE

FB1

F B

FB2

FB2

FB2

FB2

F B

MAINTAIN EXISTING

1-HR OCCUPANCY

SEPARATION WALL

2 HOUR OCCUPANCY

SEPARATION WALL

MAINTAIN EXISTING

2-HR RATED WALL

F B

F B

FB1

FB1: 1-HOUR OCCUPANCY FIRE SEPARATION WALL

FB2: 2-HOUR OCCUPANCY FIRE SEPARATION WALL

FIRE BARRIER LEGEND

(EXST) CLASSROOM

A1.1OC

5A

SW2

S W

S W

SW1

SW1

S W

S W

SW2

S W

SW1

S W

SW1

SW1

S W

S W

S

W

S W

S W

S W

SW1

S W

SW1

S W

SW1

SW1

S W

S W

S W

S W

S W

SW1

SW1

SW1

SW1

SW1

S W

S

W

SW1

SW1

SW1

S W

SW1

SW1

S W

S W

S W

S W

S W

S W

S W

S W

S W

S W

S W

SW2

SW2

SW2 SW2

S W

S W

S W

S W

S W

S W

S W

SW2

SW2

SW2

SW2

SW2

SW2

S W

S W

S W

S W

SW2

SW2

SW2

S W

SW2

SW2

SW2

SW3

SW3

SW3

SW3

SW3

SW3

S W

S W

S W

S W

S W

S W

S W

S W

SW3

SW3

SW3

EXTERIOR FIRE LANE SIDE INTERIOR COURTYARD SIDE

(EXST) GENERATOR

ROOM

(EXST) MECHANICAL ROOM

(EXST) ELECTRICAL ROOM

(EXST) LIFE SAFETY

(EXST) LOW VOLTAGE ROOM

(EXST) STORAGE

(EXST) CLASSROOM

(EXST) OFFICE

SW2 SECONDARY SECURITY WALLS

(Restraint / Staff Protection)

SW3 TERTIARY SECURITY WALLS

SW1 PRIMARY SECURITY WALLS

(Glass / Mech / Hardware / Movement Doors

SECURITY WALL LEGEND

A1.1OC

5B

M A

X

8' - 5" MAX

TEMPORARY GENERATOR

VIF

32' - 0"

(E X

S T

F

IR

E

L A

N E

VIF

20' - 0" MIN

ADD-02

TEMPORARY SECURITY NOTES

TO MAINTAIN 2-LOCKABLE-DOOR SECURITY SEPARATION

BETWEEN YOUTH CORRECTIONAL FACILITY AND EXTERIOR AT

ALL TIMES, THE CONTRACTOR SHALL FOLLOW THE NECESSARY

STEPS TO ACCESS AND SECURE THE AREA OF WORK DURING

CONSTRUCTION:

1. INITIALLY, CONTRACTOR TO GO THROUGH STAFF ENTRANCE

AND PERSONNEL SALLYPORT (MUST BE BUZZED IN BY

OREGON YOUTH AUTHORITY SECURITY CONTROL, WITH

PERMISSION FROM AUTHORIZED FIELD REPRESENTATIVE).

2. OREGON YOUTH AUTHORITY SECURITY CONTROL CAN OPEN

BOTH DOORS OF THE PERSONNEL SALLYPORT IF/WHEN THE

INTERIOR COURTYARD IS CLEARED, TO ALLOW

CONTRACTOR TO TRANSPORT CONTRUCTION TOOLS AND

MATERIALS.

3. ONCE INSIDE THE DESIGNATED AREA OF WORK,

CONTRACTOR TO ERECT A LOCKOUT DOOR, IN PLACE OF

REMOVED LOUVER, SO THAT THE LOCKABLE DOOR CANNOT

BE OPENED FROM THE GENERATOR ROOM SIDE. LOCKOUT

DOOR MUST BE UNLOCKED FROM THE EXTERIOR SIDE (FIRE

LANE SIDE OF THE DOOR) ONLY. CONTRACTOR TO ALSO

ERECT TEMPORARY WALL AND LOCKABLE DOOR IN EXISTING

STORAGE ROOM.

A. INTERIOR SECURITY WALL 3A TO HAVE 5/8" PLYWOOD

SHEATHING ON BOTH SIDES OF STUD, SET AT 12"

CENTERS. TEMPORARY SECURITY DOOR TO BE

SECURED WITH A PAD-LOCK AND SECURITY

FASTENERS.

B. CONSTRUCT TEMPORARY WALL 3B AS A 90 DEGREE

WALL RETURNING BACK TO ROOM A231. TEMPORARY

WALL 3C TO BE A SHEET OF 3/4" PLYWOOD,

SCREWED DIRECTLY INTO THE STORAGE RACKS IN

THE ROOM (SEE PHOTO OF STORAGE RACK AND

DOOR INTO A231).

C. CONSTRUCT TEMPORARY WALL 3C AFTER

TEMPORARY GENERATOR IS INSTALLED AND

ACCEPTED FOR USE. TEMPORARY WALL 3B TO HAVE

5/8" PLYWOOD SHEATHING ON BOTH SIDES OF STUD,

SET AT 12" CENTERS. TEMPORARY SECURITY DOOR

TO BE SECURED WITH PAD-LOCK AND SECURITY

FASTENERS.

4. ONCE LOCKOUT DOORS/TEMPORARY WALLS ARE

ESTABLISHED, CONTRACTOR CAN USE THEIR OWN KEYS TO

UNLOCK THE TEMPORARY LOCKABLE DOORS AND ACCESS

THE GENERATOR ROOM FROM THE EXTERIOR SIDE (FIRE

LANE SIDE). CONTRACTOR TO CARRY OUT WORK IN

HATCHED AREA, AS NEEDED.

5. DOOR BETWEEN ROOM A230 AND ROOM A229 IS TO REMAIN

LOCKED AT ALL TIMES, EXCEPT AS APPROVED BY OWNER.

6. ALL OTHER SPACES ACCESSED BY OWNER ESCORT, ONLY.

7. AFTER NEW GENERATOR AND EXTERIOR OPERABLE WALL

LOUVER IS INSTALLED, USE ROUTE NUMBER 1 FOR THE

REMAINDER OF THE PROJECT.

8. CONTRACTOR TO ENSURE ROOF OPENING IS SECURED WITH

PLYWOOD AT THE THE END OF EACH DAY.

9. FOR EACH LOCATION, CONTRACTOR SHALL WORK WITH

OWNER TO DETERMINE THE BEST LOCATION AND MEANS OF

INSTALLING/SECURING TEMPORARY WALLS AND CEILINGS.

10. FOR EACH LOCATION, CONTRACTOR TO VERIFY TEMPORARY

GENERATOR FOOTPRINT AND LOCATION WITH OWNER AND

AUTHORITY HAVING JURISDICTION (AHJ).

SECURITY & FIRE WALL LEGEND

SW2: SECONDARY SECURITY WALLS

(Restraint/Staff Protection)

SW1: PRIMARY SECURITY WALLS

(Glass / Mech / Hardware / Movement Doors)

FB2: 2-HOUR OCCUPANCY

FIRE SEPARATION WALL

FB1: 1-HOUR OCCUPANCY

FIRE SEPARATION WALL

SW3: TERTIARY SECURITY WALLS

STORAGE RACK & DOOR A231

ROOM A231

EXISTING STORAGE RACK

D

L R

G ro u p

REVISIONS

KEY PLAN

A B C D E F

O Y

A R

E G

IO

N

A L G

E N

E R

A T

O R

R E

P L A

C E

M E

N T

O A

K C

R E

E K

Y O

U T

H C

O R

R E

C T

IO

N

A L F

A C

IL

IT

Y

A L

T E

R N

A T

E N

O

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y L

O C

H N

E R

R O

A D

S E

A L B

A N

Y O

R

NORTH

/4 /2

:3

:2

P

M

A u to d e s k D o c s /7

-2

-0

O

Y A

R e g io n a l G e n e ra to r

R e p la c e m e n t/

-2

-0

O Y

A G e n e ra to r_ A

R

.r v t

#74-23108-00

JULY 11, 2023

CONSTRUCTION

DOCUMENTS

OAK CREEK -

ORIENTATION &

CODE PLANS

A0.1OC

SCALE: 1/16" = 1'-0"A0.1OC

3D OAK CREEK - TEMPORARY SECURITY PLAN

N

SCALE: 1/32" = 1'-0"A0.1OC

5D OAK CREEK - ORIENTATION PLAN

N

ADD-02 12/5/2023

SCALE: 1/32" = 1'-0"A0.1OC

3A OAK CREEK - FIRE SEPARATION DIAGRAM

SCALE: 1/32" = 1'-0"A0.1OC

5B OAK CREEK - SECURITY SEPARATION DIAGRAM

N N

ADD-02

N O

R T

H

NORTH N

O

R T

H

JULY 11, 202307/11/2023

GENERAL ARCHITECTURAL NOTES

1. FURNISH AND INSTALL FIRE-TREATED WOOD BLOCKING OR

METAL BACKING PLATE IN METAL STUD PARTITIONS FOR THE

PROPER ANCHORAGE OF ALL WALL ATTACHED ITEMS; I.E.

TOILET ACCESSORIES, CASEWORK, MILLWORK, WALL-

MOUNTED FIXTURES, MARKER BOARDS, TACK BOARDS, DOOR

STOPS, AUDIO VISUAL BRACKETS, AND OTHER WALL ATTACHED

ITEMS.

2. SCRIBE GYPSUM WALL BOARD OF WALLS AND PARTITIONS TO

IRREGULARITIES OF DECK ABOVE. SEAL TIGHTLY AROUND ALL

PENETRATIONS.

(EXST)

CLASSROOM

A229

(EXST)

MECHANICAL

ROOM

A236

(EXST) LIFE

SAFETY

A231

(EXST)

ELECTRICAL

ROOM

A230

(EXST)

STORAGE

A232

(EXST)

GENERATOR

ROOM

A235

(EXST) OFFICE

A234

(EXST) LOW

VOLTAGE

A233

A1.1OC 5E

2.OC

2.OC

5A

A1.4OC

5C

A1.1OC

C.OCC.OC

3.OC

3.OC

1.OC

1.OC

D.OCD.OC

B.OCB.OC

A.OC

A.OC

/4

/8

/4

/1

"17' - 10"

V

IF

/4

/4

V

IF

18' - 7" 17' - 11"

OFFICE WAITINGEXAMEXAM

MATCHLINE A

MATCHLINE A

MATCHLINE B MATCHLINE B

INSTALL OPERABLE

WALL LOUVER

OVERHEAD JOIST

OVERHEAD JOIST

OVERHEAD JOIST

OVERHEAD JOIST

OVERHEAD JOIST

OVERHEAD JOIST

GRAVITY VENTILATOR

ROUGH OPENING ABOVE

TOILETSHOWER

BRACED FRAME

GENERATOR

ASSEMBLY

CENTER GENERATOR

AND LOUVER AT

ROOM CENTERLINE

A9.1

2B

A9.1

2B

INSTALL NEW CONC. EQUIPMENT

PAD TO MATCH NEW GENERATOR

PAD REQUIREMENTS

A9.1

3A

A9.1

3A

(EXST) MUFFLER/EXHAUST

ASSEMBLY PENETRATION TO

REMAIN

1' - 10"

E Q

E Q

VIF

2' - 0" 12' - 11 1/2" 3' - 0" MIN.

E Q

E Q

DOCKING STATION -

SEE ELECTRICAL

FUEL FILL PANEL -

SEE ELECTRICAL

DEMOLITION GENERAL NOTES

THE CONTRACTOR SHALL:

A. COORDINATE ALL DEMOLITION AND PHASING EFFORTS WITH THE

OWNER’S REPRESENTATIVE. EVERY EFFORT SHALL BE MADE TO

MINIMIZE DISRUPTION OF OWNER’S OPERATIONS. EXCESSIVE

NOISE OR VIBRATION SHALL BE PRE-APPROVED AND

COORDINATED WITH THE OWNER’S REPRESENTATIVE. IN ALL

CASES, PROVISIONS SHALL BE MADE FOR USER’S SAFETY.

B. COORDINATE ANY DISRUPTION OF UTILITY SERVICES WITH THE

OWNER AND AS SPECIFIED.

C. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS WITHIN

THE EXISTING BUILDING WHICH OFFER A ONE-HOUR ENCLOSURE

TO ISOLATE ANY DEMOLITION/CONSTRUCTION WORK FROM THE

GENERAL PUBLIC AND AS DEEMED NECESSARY BY THE OWNER

AND CODE OFFICIAL HAVING JURISDICTION. COORDINATE

LOCATIONS WITH THE OWNER AND MAINTAIN MEANS OF EGRESS

THROUGHOUT THE WORK.

D. MAINTAIN A SECURE, WEATHER-TIGHT ENCLOSURE AT ALL

TIMES.

E. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND

ELEVATIONS AND NOTIFY THE ARCHITECT OF ANY

DISCREPANCIES.

F. REMOVE IN THEIR ENTIRETY ALL ITEMS, AS REQUIRED TO

EXECUTE THE DEMOLITION/CONSTRUCTION WORK DESCRIBED

BY THE DRAWINGS.

G. THE OWNER SHALL RESERVE THE RIGHT TO SALVAGE ANY

MATERIALS.

H. PROVIDE PROTECTION FOR ALL EXISTING BUILDING MATERIALS

AND EQUIPMENT FROM DAMAGE DUE TO ANY DEMOLITION OR

CONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THIS

CONTRACT.

I. REPAIR OR REPLACE ITEMS THAT ARE DAMAGED AS A RESULT

OF DEMOLITION OR CONSTRUCTION TO MATCH EXISTING FINISH

AND/OR CONDITION.

J. EXISTING MATERIALS SHALL NOT BE REUSED UNLESS NOTED

OTHERWISE OR AS AUTHORIZED BY ARCHITECT.

K. VERIFY AND MAINTAIN THE LOCATION OF EXISTING POWER,

COMMUNICATION AND DATA CABLES TO PREVENT

INTERRUPTION OF THEIR SERVICE.

L. PATCH FLOOR, WALL AND CEILING PENETRATIONS RESULTING

FROM REMOVAL OR RE-ROUTING OF NEW OR EXISTING PIPING,

DUCTWORK, CONDUIT, AND OTHER ITEMS, AS REQUIRED TO

MAINTAIN FIRE-RESISTANCE-RATED SEPARATIONS. FINISH AS

REQUIRED FOR NEW OR EXISTING ADJACENT SURFACES.

M. CAP ALL DISCONNECTED MECHANICAL PIPING LINES WITHIN THE

WALL OR FLOOR. PATCH AND FINISH AS REQUIRED TO MATCH

NEW OR EXISTING ADJACENT SURFACES.

N. SEE MECHANICAL AND ELECTRICAL DRAWINGS AND NOTES FOR

FURTHER SEQUENCING AND SCOPE OF WORK.

O. WHERE PLASTER/STUD WALLS ARE INDICATED TO BE REMOVED,

PREPARE ADJACENT WALLS TO RECEIVE NEW PATCH/FINISH BY

SAWCUTTING ADJACENT PLASTER FINISH A MINIMUM OF 1'-0"

BEYOND DEMOLITION.

DEMOLITION NOTES APPLY TO ALL DEMOLITION SHEETS.

T .O

S

T U

D

/2

5A

A1.4OC

B.OCA.OC

OPERABLE WALL

LOUVER

INFILL WALL

V

IF

/2

1' - 8 1/4" VIF 10' - 2" VIF 7' - 0" VIF

DOCKING STATION -

SEE ELEC.

FUEL FILL PANEL - SEE ELEC.

(PROVIDE BLOCKING FOR FUEL

FILL PANEL ATTACHMENT)

EXISTING DOWNSPOUT

TO REMAIN

A1.4OC

5E

A1.4OC

2E

A9.1

2C

A9.1

3A

A9.1

3A

A1.4OC

4E

A1.4OC

3E

V

IF

V

IF

EXST REVEALS TO REMAIN

5A

A1.4OC

B.OCA.OC

23' - 11"

EQ EQ EQ

VIF

1' - 6 1/2" (+/-)

4' - 0"

12' - 11 3/4" (+/-) VIF

NEW

GENERATOR

ASSEMBLY

MUFFLER

ASSEMBLY

GRAVITY

VENTILATOR

BEYOND

VIF

1' - 8"

VIF

3' - 8 5/8" (+/-)

' 1

/4

V

IF

/2

V

IF

M A

T C

H

LI

N E

A

EQ EQ

A9.1

2E

MIN.

0' - 6"

MIN.

0' - 6"

M A

X

M

IN

NOTE: INSTALL NEW CONC.

EQUIPMENT PAD TO MATCH NEW

GENERATOR PAD REQUIREMENTS

A1.1OC 5E

2.OC

2.OC

5A

A1.4OC

5C

A1.1OC

C.OCC.OC

3.OC

3.OC

1.OC

1.OC

D.OCD.OC

B.OCB.OC

A.OC

A.OC

(EXST)

CLASSROOM

A229

(EXST)

MECHANICAL

ROOM

A236

(EXST) LIFE

SAFETY

A231

(EXST)

ELECTRICAL

ROOM

A230

(EXST)

STORAGE

A232

(EXST)

GENERATOR

ROOM

A235

(EXST) OFFICE

A234

(EXST) LOW

VOLTAGE

A233

/4

V

IF

/8

V

IF

/4

V

IF

V

IF

/1

V

IF

V

IF

V

IF

/4

1' - 8" VIF

9' - 0" VIF 7' - 2" VIF

/4

V

IF

V

IF

/4

18' - 7" 17' - 11"

OFFICE WAITINGEXAMEXAM

MATCHLINE A MATCHLINE A

MATCHLINE B MATCHLINE B

EXISTING MUFFLER PENETRATION

ABOVE TO REMAIN - SEE RCP FOR

LOCATION

(EXST) OVERHEAD JOIST

REMOVE (EXST) GENERATOR

ASSEMBLY, DUCTWORK, MUFFLER,

AND ASSOCIATED CONC. EQUIP. PAD

REMOVE EXISTING LOUVER

A9.1

2B

A9.1

2B

(EXST) OVERHEAD JOIST

(EXST) OVERHEAD JOIST

(EXST) OVERHEAD JOIST

(EXST) OVERHEAD JOIST

(EXST) OVERHEAD JOIST

(EXST) BRACED FRAME

(EXST) OVERHEAD JOIST

17' - 11 1/2" VIF

DEMO ATTACHED

SHROUD

REMOVE AND REPLACE EXST CEILING & WALL ASSEMBLIES TO

INSTALL JOIST REINFORCEMENTS - SEE RCPs & DETAIL A5/A9.1

2.OC

2.OC

C.OCC.OC

3.OC

3.OC

1.OC

1.OC

D.OCD.OC

B.OCB.OC

A.OC

A.OC

(EXST)

CLASSROOM

A229

(EXST)

MECHANICAL

ROOM

A236

(EXST) LIFE

SAFETY

A231

(EXST)

ELECTRICAL

ROOM

A230

(EXST)

STORAGE

A232

(EXST)

GENERATOR

ROOM

A235

(EXST) OFFICE

A234

(EXST) LOW

VOLTAGE

A233

MATCHLINE A MATCHLINE A

MATCHLINE B MATCHLINE B

MAINTAIN EXISTING

1-HR OCCUPANCY

SEPARATION WALL

2 HOUR OCCUPANCY

SEPARATION WALL

MAINTAIN EXISTING

2-HR RATED WALL

FB1

F B

FB2

FB2

FB2

FB2

F B

(EXST) FIRE EXTINGUISHER

2.OC

2.OC

C.OCC.OC

3.OC

3.OC

1.OC

1.OC

D.OCD.OC

B.OCB.OC

A.OC

A.OC

(EXST)

CLASSROOM

A229

(EXST)

MECHANICAL

ROOM

A236

(EXST) LIFE

SAFETY

A231

(EXST)

ELECTRICAL

ROOM

A230

(EXST)

STORAGE

A232

(EXST)

GENERATOR

ROOM

A235

(EXST) OFFICE

A234

(EXST) LOW

VOLTAGE

A233

MATCHLINE A MATCHLINE A

MATCHLINE B MATCHLINE B

S E

C O

N D

A R

Y S

E C

U R

IT

Y

W A

LL

S E

C O

N D

A R

Y S

E C

U R

IT

Y

W A

LL

P R

IM

A

R Y

S E

C U

R

IT

Y W

A

LL

S W

SW2

S W

SW1

SW2

S W

SW2

S W

SECURITY & FIRE WALL LEGEND

SW2: SECONDARY SECURITY WALLS

(Restraint/Staff Protection)

SW1: PRIMARY SECURITY WALLS

(Glass / Mech / Hardware / Movement Doors)

FB2: 2-HOUR OCCUPANCY

FIRE SEPARATION WALL

FB1: 1-HOUR OCCUPANCY

FIRE SEPARATION WALL

SW3: TERTIARY SECURITY WALLS

D

L R

G ro u p

REVISIONS

KEY PLAN

A B C D E F

O Y

A R

E G

IO

N

A L G

E N

E R

A T

O R

R E

P L A

C E

M E

N T

O A

K C

R E

E K

Y O

U T

H C

O R

R E

C T

IO

N

A L F

A C

IL

IT

Y

A L

T E

R N

A T

E N

O

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y L

O C

H N

E R

R O

A D

S E

A L B

A N

Y O

R

NORTH

/1

/2

:3

:5

P

M

A u to d e s k D o c s /7

-2

-0

O

Y A

R e g io n a l G e n e ra to r

R e p la c e m e n t/

-2

-0

O Y

A G e n e ra to r_ A

R

.r v t

#74-23108-00

JULY 11, 2023

CONSTRUCTION

DOCUMENTS

OAK CREEK -

FLOOR PLANS &

ELEVATIONS

A1.1OC

SCALE: 1/4" = 1'-0"A1.1OC

4D OAK CREEK - FLOOR PLAN

SCALE: 1/4" = 1'-0"A1.1OC

5E OAK CREEK - WEST ELEVATION

SCALE: 1/4" = 1'-0"A1.1OC

5C OAK CREEK SECTION DIAGRAM - N-S

SCALE: 1/4" = 1'-0"A1.1OC

4A OAK CREEK - DEMO PLAN

SCALE: 1/8" = 1'-0"A1.1OC

5A OAK CREEK - FIRE SEPARATION DIAGRAM

SCALE: 1/8" = 1'-0"A1.1OC

5B OAK CREEK - SECURITY SEPARATION DIAGRAM

N N

N N

REVISIONS

07/11/2023

CD OWNER

REVIEW

CONSTRUCTION

DOCUMENTS

T .O

S

T U

D

/2

5A

A1.4OC

B.OCA.OC

OPERABLE WALL

LOUVER

INFILL WALL

V

IF

/2

1' - 8 1/4" VIF 10' - 2" VIF 7' - 0" VIF

DOCKING STATION -

SEE ELEC.

FUEL FILL PANEL - SEE ELEC.

(PROVIDE BLOCKING FOR FUEL

FILL PANEL ATTACHMENT)

EXISTING DOWNSPOUT

TO REMAIN

A1.4OC

5E

A1.4OC

2E

A9.1

2C

A9.1

3A

A9.1

3A

A1.4OC

4E

A1.4OC

3E

V

IF

V

IF

EXST REVEALS TO REMAIN

SEE ELEC.

3' - 0"

SCALE: 1/4" = 1'-0"A1.1OC

5E OAK CREEK - WEST ELEVATION

T .O

S

T U

D

/2

5A

A1.4OC

B.OCA.OC

OPERABLE WALL

LOUVER

INFILL WALL

V

IF

/2

1' - 8 1/4" VIF 10' - 2" VIF 7' - 0" VIF

DOCKING STATION -

SEE ELEC.

FUEL FILL PANEL - SEE ELEC.

(PROVIDE BLOCKING FOR FUEL

FILL PANEL ATTACHMENT)

EXISTING DOWNSPOUT

TO REMAIN

A1.4OC

5E

A1.4OC

2E

A9.1

2C

A9.1

3A

A9.1

3A

A1.4OC

4E

A1.4OC

3E

V

IF

V

IF

EXST REVEALS TO REMAIN

SEE ELEC.

3' - 0"

5A

A1.4OC

B.OCA.OC

23' - 11"

EQ EQ EQ

5' - 2"

MUFFLER TAIL TO EDGE OF VENTILATOR

10' - 0" MIN. HORIZONTAL DISTANCE

VIF

1' - 6 1/2" (+/-)

4' - 0"

12' - 11 3/4" (+/-) VIF

NEW

GENERATOR

ASSEMBLY

MUFFLER

ASSEMBLY

GRAVITY

VENTILATOR

BEYOND

VIF

1' - 8"

VIF

3' - 8 5/8" (+/-)

' 1

/4

V

IF

M A

T C

H

LI

N E

A

EQ EQ

A9.1

2E

MIN.

0' - 6"

MIN.

0' - 6"

M A

X

M

IN

NOTE: INSTALL NEW CONC.

EQUIPMENT PAD TO MATCH NEW

GENERATOR PAD REQUIREMENTS

SCALE: 1/4" = 1'-0"A1.1OC

5E OAK CREEK - WEST ELEVATION

SCALE: 1/4" = 1'-0"A1.1OC

5C OAK CREEK SECTION DIAGRAM - N-S

/2

V

IF

N O

R T

H

ADD-02 12/5/2023

GENERAL ARCHITECTURAL NOTES

1. FURNISH AND INSTALL FIRE-TREATED WOOD BLOCKING OR

METAL BACKING PLATE IN METAL STUD PARTITIONS FOR THE

PROPER ANCHORAGE OF ALL WALL ATTACHED ITEMS; I.E.

TOILET ACCESSORIES, CASEWORK, MILLWORK, WALL-

MOUNTED FIXTURES, MARKER BOARDS, TACK BOARDS, DOOR

STOPS, AUDIO VISUAL BRACKETS, AND OTHER WALL ATTACHED

ITEMS.

2. SCRIBE GYPSUM WALL BOARD OF WALLS AND PARTITIONS TO

IRREGULARITIES OF DECK ABOVE. SEAL TIGHTLY AROUND ALL

PENETRATIONS.

DEMOLITION GENERAL NOTES

THE CONTRACTOR SHALL:

A. COORDINATE ALL DEMOLITION AND PHASING EFFORTS WITH THE

OWNER’S REPRESENTATIVE. EVERY EFFORT SHALL BE MADE TO

MINIMIZE DISRUPTION OF OWNER’S OPERATIONS. EXCESSIVE

NOISE OR VIBRATION SHALL BE PRE-APPROVED AND

COORDINATED WITH THE OWNER’S REPRESENTATIVE. IN ALL

CASES, PROVISIONS SHALL BE MADE FOR USER’S SAFETY.

B. COORDINATE ANY DISRUPTION OF UTILITY SERVICES WITH THE

OWNER AND AS SPECIFIED.

C. CONSTRUCT TEMPORARY CONSTRUCTION PARTITIONS WITHIN

THE EXISTING BUILDING WHICH OFFER A ONE-HOUR ENCLOSURE

TO ISOLATE ANY DEMOLITION/CONSTRUCTION WORK FROM THE

GENERAL PUBLIC AND AS DEEMED NECESSARY BY THE OWNER

AND CODE OFFICIAL HAVING JURISDICTION. COORDINATE

LOCATIONS WITH THE OWNER AND MAINTAIN MEANS OF EGRESS

THROUGHOUT THE WORK.

D. MAINTAIN A SECURE, WEATHER-TIGHT ENCLOSURE AT ALL

TIMES.

E. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND

ELEVATIONS AND NOTIFY THE ARCHITECT OF ANY

DISCREPANCIES.

F. REMOVE IN THEIR ENTIRETY ALL ITEMS, AS REQUIRED TO

EXECUTE THE DEMOLITION/CONSTRUCTION WORK DESCRIBED

BY THE DRAWINGS.

G. THE OWNER SHALL RESERVE THE RIGHT TO SALVAGE ANY

MATERIALS.

H. PROVIDE PROTECTION FOR ALL EXISTING BUILDING MATERIALS

AND EQUIPMENT FROM DAMAGE DUE TO ANY DEMOLITION OR

CONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THIS

CONTRACT.

I. REPAIR OR REPLACE ITEMS THAT ARE DAMAGED AS A RESULT

OF DEMOLITION OR CONSTRUCTION TO MATCH EXISTING FINISH

AND/OR CONDITION.

J. EXISTING MATERIALS SHALL NOT BE REUSED UNLESS NOTED

OTHERWISE OR AS AUTHORIZED BY ARCHITECT.

K. VERIFY AND MAINTAIN THE LOCATION OF EXISTING POWER,

COMMUNICATION AND DATA CABLES TO PREVENT

INTERRUPTION OF THEIR SERVICE.

L. PATCH FLOOR, WALL AND CEILING PENETRATIONS RESULTING

FROM REMOVAL OR RE-ROUTING OF NEW OR EXISTING PIPING,

DUCTWORK, CONDUIT, AND OTHER ITEMS, AS REQUIRED TO

MAINTAIN FIRE-RESISTANCE-RATED SEPARATIONS. FINISH AS

REQUIRED FOR NEW OR EXISTING ADJACENT SURFACES.

M. CAP ALL DISCONNECTED MECHANICAL PIPING LINES WITHIN THE

WALL OR FLOOR. PATCH AND FINISH AS REQUIRED TO MATCH

NEW OR EXISTING ADJACENT SURFACES.

N. SEE MECHANICAL AND ELECTRICAL DRAWINGS AND NOTES FOR

FURTHER SEQUENCING AND SCOPE OF WORK.

O. WHERE PLASTER/STUD WALLS ARE INDICATED TO BE REMOVED,

PREPARE ADJACENT WALLS TO RECEIVE NEW PATCH/FINISH BY

SAWCUTTING ADJACENT PLASTER FINISH A MINIMUM OF 1'-0"

BEYOND DEMOLITION.

DEMOLITION NOTES APPLY TO ALL DEMOLITION SHEETS.

A1.1OC 5E

2.OC

2.OC

5A

A1.4OC

5C

A1.1OC

C.OCC.OC

3.OC

3.OC

1.OC

1.OC

D.OC

D.OC

B.OCB.OC

A.OCA.OC

18' - 7" 17' - 11"

E Q

E Q

E Q

E Q

E Q

E Q

EXISTING JOIST

EXISTING BRACED FRAME

EXISTING JOIST EXISTING JOIST

EXISTING JOISTEXISTING JOIST

EXISTING JOIST

EXISTING JOIST

EXISTING JOIST

EXISTING JOIST

EXISTING JOIST

EXISTING JOIST

V

IF

V

IF

/4

V

IF

(EXST) MUFFLER

PENETRATION TO REMAIN

(EXST) LIFE

SAFETY

A231

(EXST)

ELECTRICAL

ROOM

A230

(EXST)

MECHANICAL

ROOM

A236

(EXST)

CLASSROOM

A229

(EXST)

STORAGE

A232

(EXST) LOW

VOLTAGE

A233

(EXST) OFFICE

A234

(EXST)

GENERATOR

ROOM

A235

/4

V

IF

V

IF

/4

REMOVE MUFFLER ABOVE

ROOF - SEE ROOF PLANS

4' - 9" (+/-) VIF

RELOCATE (EXST)

LIGHT STRIP

REMOVE ATTACHED

SHROUD

1' - 8" VIF 10' - 3 1/2" (+/-) VIF

V

IF

V

IF

/4

A1.1OC 5E

2.OC

2.OC

5A

A1.4OC

5C

A1.1OC

C.OCC.OC

3.OC

3.OC

1.OC

1.OC

D.OCD.OC

B.OCB.OC

A.OCA.OC

MECH R.O. LENGTH

6' - 0"

M E

C H

R .O

W

ID

T

H

EXISTING JOIST

EXISTING BRACED FRAME

1' - 10"

E Q

E Q

E Q

18' - 7" 17' - 11"

(EXST) MUFFLER

PENETRATION

E Q

E Q

E Q

S U

S P

. L T

G

V

IF

S U

S P

. L T

G

V

IF

(EXST) OFFICE

A234

(EXST) LIFE

SAFETY

A231

(EXST)

ELECTRICAL

ROOM

A230

(EXST)

MECHANICAL

ROOM

A236

(EXST)

CLASSROOM

A229

(EXST)

STORAGE

A232

(EXST) LOW

VOLTAGE

A233

(EXST) OFFICE

A234

(EXST)

GENERATOR

ROOM

A235

EXISTING JOIST

EXISTING JOIST

EXISTING JOIST

EXISTING JOIST

EXISTING JOIST

EXISTING JOIST

VIF

4' - 9"

VIF

4' - 4"

RELOCATED LIGHT

V

IF

GRAVITY VENTILATOR ROUGH OPENING -

SEE ROOF PLANS & 5A/A9.1

D

L R

G ro u p

REVISIONS

KEY PLAN

A B C D E F

O Y

A R

E G

IO

N

A L G

E N

E R

A T

O R

R E

P L A

C E

M E

N T

O A

K C

R E

E K

Y O

U T

H C

O R

R E

C T

IO

N

A L F

A C

IL

IT

Y

A L

T E

R N

A T

E N

O

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y L

O C

H N

E R

R O

A D

S E

A L B

A N

Y O

R

NORTH

/1

/2

:3

:1

P

M

A u to d e s k D o c s /7

-2

-0

O

Y A

R e g io n a l G e n e ra to r

R e p la c e m e n t/

-2

-0

O Y

A G e n e ra to r_ A

R

.r v t

#74-23108-00

JULY 11, 2023

CONSTRUCTION

DOCUMENTS

OAK CREEK -

REFLECTED

CEILING PLANS

A2.1OC

SCALE: 1/4" = 1'-0"A2.1OC

4A OAK CREEK - DEMO REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"A2.1OC

4D OAK CREEK - REFLECTED CEILING PLAN

N N

REVISIONS

07/11/2023

CD OWNER

REVIEW

CONSTRUCTION

DOCUMENTS

2.OC 3.OC1.OC

SCALE: 1/4" = 1'-0"A2.1OC

4A OAK CREEK - DEMO REFLECTED CEILING PLAN

N

2.OC

A1.1OC 5E

5A

A1.4OC

C.OC

1.OC

D.OC

B.OC

A.OC

S U

S P

. L T

G

V

IF

S U

S P

. L T

G

V

IF

EX

N O

R T

H

NORTH N

O

R T

H

5A

A1.4OC

5C

A1.1OC

C.OCC.OC

3.OC

3.OC

1.OC

1.OC

D.OC

D.OC

B.OCB.OC

A.OCA.OC

Z.OC Z.OC

REMOVE EXISTING MUFFLER,

SUPPORT CURB FOR EXHAUST

PIPE TO REMAIN

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

VIF

5' - 10" (+/-)

MATCHLINE AMATCHLINE A

35' - 7 5/8"

/8

V

IF

MATCHLINE B MATCHLINE B

EXISTING ROOF WALKWAY

DEMO + REROUTE EXISTING

ROOF WALKWAY

) REMOVE EXISTING ROOF

DECK FOR NEW ROUGH

OPENING

REMOVE AND REPLACE

ROOFING FOR MUFFLER

SUPPORT CURBS

JOIST BELOW DECK

JOIST BELOW DECK

2.OC

2.OC

5A

A1.4OC

5C

A1.1OC

C.OCC.OC

3.OC

3.OC

1.OC

1.OC

D.OCD.OC

B.OCB.OC

A.OCA.OC

ENSURE NEW MUFFLER ASSEMBLY EXHAUST

POINT IS AT LEAST 10' - 0" AWAY (HORIZONTALLY)

FROM GRAVITY VENTILATOR

Z.OC Z.OC

M U

F F

LE

R

T A

IL

T

O E

D G

E O

F V

E N

T

IL

A T

O R

M

IN

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

MATCHLINE AMATCHLINE A

MATCHLINE B MATCHLINE B

EXISTING ROOF WALKWAY

NEW OPENING FOR GRAVITY

VENTILATOR - SEE RCP FOR

LOCATION

TYPICAL ROOF TOP OPENING

FRAME BELOW GRAVITY

VENTILATOR

G R

A V

V

E N

T

IL

A T

O R

R .O

GRAV. VENTILATOR R.O.

6' - 0"

REROUTED WALKWAY

TAPERED INSUL. AND

CRICKETS

ADD 2-INCHES ADDITIONAL

INSULATION AND TAPERED

INSULATION TO PROVIDE MIN.

2-INCHES COVER ABOE NEW

STEEL SUPPORT ANGLES

MUFFLER AND EXHAUST SUPPORT

CURBS - QTY DETERMINED BY

MUFFLER PROVIDER

DECK SUPPORT ANGLES

ABOVE DECK IN PLANE OF

ROOF ASSEMBLY - SEE 5A/A9.1

JOIST BELOW DECK

JOIST BELOW DECK

D

L R

G ro u p

REVISIONS

KEY PLAN

A B C D E F

O Y

A R

E G

IO

N

A L G

E N

E R

A T

O R

R E

P L A

C E

M E

N T

O A

K C

R E

E K

Y O

U T

H C

O R

R E

C T

IO

N

A L F

A C

IL

IT

Y

A L

T E

R N

A T

E N

O

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y L

O C

H N

E R

R O

A D

S E

A L B

A N

Y O

R

NORTH

/1

/2

:3

:1

P

M

A u to d e s k D o c s /7

-2

-0

O

Y A

R e g io n a l G e n e ra to r

R e p la c e m e n t/

-2

-0

O Y

A G e n e ra to r_ A

R

.r v t

#74-23108-00

JULY 11, 2023

CONSTRUCTION

DOCUMENTS

OAK CREEK -

ROOF PLANS

A3.1OC

SCALE: 1/4" = 1'-0"A3.1OC

4A OAK CREEK - DEMO ROOF PLAN

SCALE: 1/4" = 1'-0"A3.1OC

4C OAK CREEK - ROOF PLAN

N N

REVISIONS

07/11/2023

CD OWNER

REVIEW

CONSTRUCTION

DOCUMENTS

2.OC

2.OC

5A

A1.4OC

5C

A1.1OC

C.OCC.OC

3.OC

3.OC

1.OC

1.OC

D.OC

D.OC

B.OCB.OC

A.OCA.OC

Z.OC Z.OC

REMOVE EXISTING MUFFLER,

SUPPORT CURB FOR EXHAUST

PIPE TO REMAIN

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

VIF

5' - 10" (+/-)

MATCHLINE AMATCHLINE A

35' - 7 5/8"

/8

V

IF

MATCHLINE B MATCHLINE B

EXISTING ROOF WALKWAY

DEMO + REROUTE EXISTING

ROOF WALKWAY

) REMOVE EXISTING ROOF

DECK FOR NEW ROUGH

OPENING

REMOVE AND REPLACE

ROOFING FOR MUFFLER

SUPPORT CURBS

JOIST BELOW DECK

JOIST BELOW DECK

2.OC

2.OC

5A

A1.4OC

5C

A1.1OC

C.OCC.OC

3.OC

3.OC

1.OC

1.OC

D.OCD.OC

B.OCB.OC

A.OCA.OC

ENSURE NEW MUFFLER ASSEMBLY EXHAUST

POINT IS AT LEAST 10' - 0" AWAY (HORIZONTALLY)

FROM GRAVITY VENTILATOR

Z.OC Z.OC

M U

F F

LE

R

T A

IL

T

O E

D G

E O

F V

E N

T

IL

A T

O R

M

IN

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

JOIST BELOW DECK

MATCHLINE AMATCHLINE A

MATCHLINE B MATCHLINE B

EXISTING ROOF WALKWAY

NEW OPENING FOR GRAVITY

VENTILATOR - SEE RCP FOR

LOCATION

TYPICAL ROOF TOP OPENING

FRAME BELOW GRAVITY

VENTILATOR

G R

A V

V

E N

T

IL

A T

O R

R .O

GRAV. VENTILATOR R.O.

6' - 0"

REROUTED WALKWAY

TAPERED INSUL. AND

CRICKETS

ADD 2-INCHES ADDITIONAL

INSULATION AND TAPERED

INSULATION TO PROVIDE MIN.

2-INCHES COVER ABOE NEW

STEEL SUPPORT ANGLES

MUFFLER AND EXHAUST SUPPORT

CURBS - QTY DETERMINED BY

MUFFLER PROVIDER

DECK SUPPORT ANGLES

ABOVE DECK IN PLANE OF

ROOF ASSEMBLY - SEE 5A/A9.1

JOIST BELOW DECK

JOIST BELOW DECK

SCALE: 1/4" = 1'-0"A3.1OC

4A OAK CREEK - DEMO ROOF PLAN

SCALE: 1/4" = 1'-0"A3.1OC

4C OAK CREEK - ROOF PLAN

N N

N O

R T

H

NORTH N

O

R T

H

EXTERIOR FIRE LANE SIDE

INTERIOR COURTYARD SIDE

TEMPORARY SECURITY DIAGRAM

GENERATOR ROOMA1.1EO

3C

(EXST) PARKING LOT

ADD-02

1.EO

1.EO

2.EO

2.EO

3.EO

3.EO

4.EO

4.EO

A.EO A.EO

B.EO

B.EO

C.EO

C.EO

(EXST)

MECHANICAL

ROOM

A221

(EXST) LIFE

SAFETY

A224

(EXST)

ELECTRICAL

ROOM

A223

(EXST) OFFICE

A227

(EXST) LOW

VOLTAGE

A226

(EXST)

GENERATOR

ROOM

A228

(EXST)

CORRIDOR

EXTERIOR FIRE LANE SIDE

INTERIOR COURTYARD SIDE

A R

E A

O F

W O

R K

AREA OF WORK

3A

3A 4

(EXST)

WAITING

(EXST)

SALLYPORT

(EXST) OFFICE

(EXST) OFFICE

(EXST)

STORAGE

(EXST) TOILET

(EXST) OFFICE

(EXST) OFFICE

(EXST)

SECURE FILES

(EXST) OFFICE

(EXST) WORK

AREA

(EXST)

CONTROL

(EXST)

SALLYPORT

(EXST)

VOCATIONAL

EDUCATION

CLASSROOM

(EXST)

SALLYPORT

(EXST)

COMPUTER

CLASSROOM

(EXST) DRY

STORAGE

(EXST) DRY

STORAGE

(EXST)

DUMPSTER

PAD

(EXST) LOBBY

(EXST)

CORRIDOR

(EXST)

CONFERENCE /

VISIT ROOM

(EXST)

ADMITTING

(EXST) VISIT /

WAIT

(EXST)

SALLYPORT(EXST)

CORRIDOR

(EXST)

HOLDING

(EXST)

HOLDING

(EXST)

STORAGE

(EXST)

STORAGE

(EXST)

CONFERENCE

(EXST) TOILET

(EXST) EXAM

(EXST) EXAM

(EXST) TOILET

(EXST)

SHOWER

3B

(EXST) FOOD

SERVICE

(EXST)

STORAGE

A222

FB1: 1-HOUR OCCUPANCY FIRE SEPARATION WALL

FB2: 2-HOUR OCCUPANCY FIRE SEPARATION WALL

FIRE BARRIER LEGEND

FB2

F B

F B

F B

F B

F B

F

B

FB2

F B

(EXST)

STORAGE

(EXST) OFFICE

(EXST) LOW

VOLTAGE

(EXST)

GENERATOR

ROOM

(EXST) LIFE

SAFETY

(EXST)

ELECTRICAL

ROOM

(EXST)

MECHANICAL

ROOM

FB2

FB2

A1.1EO

5A

(EXST)

STORAGE

(EXST) OFFICE

(EXST) LOW

VOLTAGE

(EXST)

GENERATOR

ROOM

(EXST) LIFE

SAFETY

(EXST)

ELECTRICAL

ROOM

(EXST)

MECHANICAL

ROOM

SW2 SECONDARY SECURITY WALLS

(Restraint / Staff Protection)

SW3 TERTIARY SECURITY WALLS

SW1 PRIMARY SECURITY WALLS

(Glass / Mech / Hardware / Movement Doors

SECURITY WALL LEGEND

INTERIOR COURTYARD SIDE

EXTERIOR FIRE LANE SIDE

S W

S

W

SW1

SW1

SW1

SW1

SW1

SW1

SW1

SW1

S W

SW1

SW1

SW1

S W

SW1

SW1SW1

SW1

SW1

SW1

SW1

SW1

SW1

S W

SW1

S W

SW1

S W

S W

SW3

SW3

SW3

SW3

SW3

SW2

SW2

S W

S W

S W

S W

S W

S W

S W

S W

S W

SW2

SW2

SW2

SW2

SW2

SW2

SW2

SW2

SW2

SW2

SW2

S W

S W

S W

S W

S W

2 SW2

SW2

SW2

S W

SW2

SW2

SW2

SW2

S W

S W

S W

S W

S

W

S W

S W

S

W

S W

S W

S W

S W

S W

S W

S W

S W

SW2

SW2

SW2

SW2

SW2

S W

S W

S W

SW2

SW2SW2SW2SW2

S W

S W

S

W

A1.1EO

5B

S W

M

A X

8' - 5" MAX

52' - 0" VIF

(EXST) FIRE LANE

V

IF

(EXST) PARKING LOT

TEMPORARY GENERATOR

ADD-02

TEMPORARY SECURITY NOTES

TO MAINTAIN 2-LOCKABLE-DOOR SECURITY SEPARATION

BETWEEN YOUTH CORRECTIONAL FACILITY AND EXTERIOR AT

ALL TIMES, THE CONTRACTOR SHALL FOLLOW THE NECESSARY

STEPS TO ACCESS AND SECURE THE AREA OF WORK DURING

CONSTRUCTION:

1. INITIALLY, CONTRACTOR TO GO THROUGH STAFF ENTRANCE

AND PERSONNEL SALLYPORT (MUST BE BUZZED IN BY

OREGON YOUTH AUTHORITY SECURITY CONTROL, WITH

PERMISSION FROM AUTHORIZED FIELD REPRESENTATIVE).

2. OREGON YOUTH AUTHORITY SECURITY CONTROL CAN OPEN

BOTH DOORS OF THE PERSONNEL SALLYPORT IF/WHEN THE

INTERIOR COURTYARD IS CLEARED, TO ALLOW

CONTRACTOR TO TRANSPORT CONTRUCTION TOOLS AND

MATERIALS.

3. ONCE INSIDE THE DESIGNATED AREA OF WORK,

CONTRACTOR TO ERECT A LOCKOUT DOOR, IN PLACE OF

REMOVED LOUVER, SO THAT THE LOCKABLE DOOR CANNOT

BE OPENED FROM THE GENERATOR ROOM SIDE. LOCKOUT

DOOR MUST BE UNLOCKED FROM THE EXTERIOR SIDE (FIRE

LANE SIDE OF THE DOOR) ONLY. CONTRACTOR TO ALSO

ERECT TEMPORARY WALL AND LOCKABLE DOOR IN EXISTING

STORAGE ROOM.

A. INTERIOR SECURITY WALL 3A TO HAVE 5/8" PLYWOOD

SHEATHING ON BOTH SIDES OF STUD, SET AT 12"

CENTERS. TEMPORARY SECURITY DOOR TO BE

SECURED WITH A PAD-LOCK AND SECURITY

FASTENERS.

B. CONSTRUCT TEMPORARY WALL 3B AFTER

TEMPORARY GENERATOR IS INSTALLED AND

ACCEPTED FOR USE. TEMPORARY WALL 3B TO HAVE

5/8" PLYWOOD SHEATHING ON BOTH SIDES OF STUD,

SET AT 12" CENTERS. TEMPORARY SECURITY DOOR

TO BE SECURED WITH PAD-LOCK AND SECURITY

FASTENERS.

4. ONCE LOCKOUT DOORS/TEMPORARY WALLS ARE

ESTABLISHED, CONTRACTOR CAN USE THEIR OWN KEYS TO

UNLOCK THE TEMPORARY LOCKABLE DOORS AND ACCESS

THE GENERATOR ROOM FROM THE EXTERIOR SIDE (FIRE

LANE SIDE). CONTRACTOR TO CARRY OUT WORK IN

HATCHED AREA, AS NEEDED.

5. DOOR BETWEEN ROOM A223 AND ROOM A222 IS TO REMAIN

LOCKED AT ALL TIMES, EXCEPT AS APPROVED BY OWNER.

6. ALL OTHER SPACES ACCESSED BY OWNER ESCORT, ONLY.

7. AFTER NEW GENERATOR AND EXTERIOR OPERABLE WALL

LOUVER IS INSTALLED, USE ROUTE NUMBER 1 FOR THE

REMAINDER OF THE PROJECT.

8. CONTRACTOR TO ENSURE ROOF OPENING IS SECURED WITH

PLYWOOD AT END OF EACH DAY.

9. FOR EACH LOCATION, CONTRACTOR SHALL WORK WITH

OWNER TO DETERMINE THE BEST LOCATION AND MEANS OF

INSTALLING/SECURING TEMPORARY WALLS AND CEILINGS.

10. FOR EACH LOCATION, CONTRACTOR TO VERIFY TEMPORARY

GENERATOR FOOTPRINT AND LOCATION WITH OWNER AND

AUTHORITY HAVING JURISDICTION (AHJ).

SECURITY & FIRE WALL LEGEND

SW2: SECONDARY SECURITY WALLS

(Restraint/Staff Protection)

SW1: PRIMARY SECURITY WALLS

(Glass / Mech / Hardware / Movement Doors)

FB2: 2-HOUR OCCUPANCY

FIRE SEPARATION WALL

FB1: 1-HOUR OCCUPANCY

FIRE SEPARATION WALL

SW3: TERTIARY SECURITY WALLS

D

L R

G ro u p

REVISIONS

KEY PLAN

A B C D E F

O Y

A R

E G

IO

N

A L G

E N

E R

A T

O R

R E

P L A

C E

M E

N T

E A

S T

E R

N O

R E

G O

N Y

O U

T H

C O

R R

E C

T

IO

N A

L F

A C

IL

IT

Y

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y W

E S

T M

O N

R O

E B

U R

N S

O

R

NORTH

/4 /2

:3

:2

P

M

A u to d e s k D o c s /7

-2

-0

O

Y A

R e g io n a l G e n e ra to r

R e p la c e m e n t/

-2

-0

O Y

A G e n e ra to r_ A

R

.r v t

#74-23108-00

JULY 11, 2023

CONSTRUCTION

DOCUMENTS

EASTERN

OREGON -

ORIENTATION &

CODE PLANS

A0.1EO

N

TRUE

ADD-02 12/5/2023

SCALE: 1/32" = 1'-0"A0.1EO

3D EASTERN OREGON - ORIENTATION PLAN

SCALE: 1/16" = 1'-0"A0.1EO

5C EASTERN OREGON - TEMPORARY SECURITY DIAGRAM

N

TRUESCALE: 1/32" = 1'-0"A0.1EO

3A EASTERN OREGON - FIRE SEPARATION DIAGRAM

N

TRUE

SCALE: 1/32" = 1'-0"A0.1EO

5A EASTERN OREGON - SECURITY SEPARATION DIAGRAM

N

TRUE

ADD-02

SW2 SECONDARY SECURITY WALLS

(Restraint / Staff Protection)

SW3 TERTIARY SECURITY WALLS

SW1 PRIMARY SECURITY WALLS

(Glass / Mech / Hardware / Movement Doors

SECURITY WALL LEGEND

D

L R

G ro u p

REVISIONS

KEY PLAN

A B C D E F

O Y

A R

E G

IO

N

A L

G E

N E

R A

T O

R R

E P

L A

C E

M E

N T

O A

K C

R E

E K

Y O

U T

H C

O R

R E

C T

IO

N

A L F

A C

IL

IT

Y

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y L

O C

H N

E R

R O

A D

S E

A L B

A N

Y O

R

NORTH

/1

/2

:4

:2

P

M

A u to d e s k D o c s

/7

-2

-0

O

Y A

R e g io n a l G e n e ra to r

R e p la c e m e n t/

-2

-0

O

Y A

G e n e ra to r_

M E

P

.r v t

#74-23108-00

07/11/2023

CONSTRUCTION

DOCUMENTS

MECHANICAL

PLAN - OAK

CREEK

M1.1OC

N

SCALE: 1/8" = 1'-0"

HVAC PLAN - OCYCF

1. RE-SUPPORT CONDUITS IF THEY TRAVERSE NEW OPENING AND CANNOT BE

MOVED. RELOCATE PLUMBING PIPES AS NEEDED TO KEEP THEM OUT OF THE

AIRSTREAM. PROVIDE HEAT TRACE ON ANY PIPING THAT IS IN THE AIRTREAM OF

VENTILATION AIR.

2. PROVIDE OFFSETS IN DUCTWORK AS NEED TO DISCHARGE AIR FROM RADIATOR

THROUGH NEW OPERABLE LOUVER. COORDINATE WITH ALL OTHER TRADES.

KEYED NOTES

A. CONTRACTOR TO REVIEW JOB SITE AND COORDINATE ANY OBSTRUCTIONS FOR

NEW ROOF HOOD OPENING.

B. RELOCATE UTILITIES AS NEED TO ACCOMODATE ROOF HOOD INSTALLATION.

SHEET NOTES

A. DESCRIPTION:

a. THE EXISTING VENTILATION SHORT-CIRCUITS SO THE WARM AIR DISCHARGED

THROUGH THE LOUVER IS SUCKED ABOUT INTO THE ROOM AND THROUGH

THE RADIATOR AGAIN. THIS SYSTEM ALSO LEAVES THE BACK END OF THE

GENERATOR STAGNANT.

B. SEQUENCE:

a. GRAVITY VENTILATOR (RH-1) IS INTAKE FOR COOLING AND COMBUSTION AIR.

THE RADIATOR FAN PUSHES THIS FRESH AIR THROUGH THE RADIATOR AND

THROUGH THE DUCT TO THE DISCHARGE AIR LOUVER.

b. GENERATOR TO SEND SIGNAL TO MOTORIZED DAMPER AT RH-1 AND

ADJUSTABLE LOUVER. DAMPER AND LOUVER TO BE 100% OPEN WHEN

GENERATOR IS RUNNING.

c. DAMPERS TO BE NORMALY CLOSED WHEN GENERATOR IS NOT RUNNING.

C. ALARMS

a. DAMPER CLOSED WHEN GENERATOR IS RUNNING.

b. DAMPER OPEN WHEN GENERATOR IS NOT RUNNING.

c. LOUVER CLOSED WHEN GENERATOR IS RUNNING.

d. LOUVER OPEN WHEN GENERATOR IS NOT RUNNING.

CONTROL SEQUENCE

12/31/2024

KEY PLAN

NORTH

KEY PLAN

NORTH N

O

R T

H

NORTH N

O

R T

H

D

L R

G ro u p

REVISIONS

A B C D E F

O Y

A R

E G

IO

N

A L G

E N

E R

A T

O R

R E

P L A

C E

M E

N T

R E

G

IO

N A

L Y

O U

T H

C O

R R

E C

T

IO

N A

L F

A C

IL

IT

IE

S

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y A

D D

R E

S S

V A

R

IE

S F

R O

M S

IT

E

T O

S

IT

E

/4 /2

:4

:4

P

M

A u to d e s k D o c s

/7

-2

-0

O

Y A

R e g io n a l G e n e ra to r

R e p la c e m e n t/

-2

-0

O

Y A

G e n e ra to r_

M E

P

.r v t

#74-23108-00

07/11/2023

CONSTRUCTION

DOCUMENTS

BASIS OF DESIGN

E0.2

A. REPLACE EXISTING 300 KW GENERATORS AND AUTOMATIC TRANSFER SWITCHES SERVING THE EMERGENCY POWER TRACKS FOR THREE (3) OREGON YOUTH AUTHORITY (OYA) FACILITIES IN THE STATE OF OREGON. THE EXISTING GENERATORS WERE INSTALLED IN

1997 AND ARE DUE FOR REPLACEMENT.

B. EACH OF THE EXISTING GENERATORS TO BE REMOVED ARE 300 KW, 480Y/277V, 3PH, 4W DIESEL GENSETS MANUFACTURED BY KOHLER, MODEL NUMBER 300R0ZD.

C. PROVIDE TEMPORARY GENERATOR AND BYPASS TRANSFER SWITCH DURING FULL LENGTH OF GENERATOR REPLACEMENT WORK.

TEMPORARY GENERATOR TO BE AVAILABLE TO OWNER DURING ENTIRETY OF THE WORK, UNTIL NEW GENERATOR AND TRANSFER SWITCH ARE TESTED AND ACCEPTED FOR OWNER'S USE. UPON COMPLETION, CONTRACTOR IS TO REMOVE TEMPORARY GENERATOR AND TEMPORARY BYPASS SWITCH. THE COST FOR THIS WORK WILL FALL ON THE CONTRACTOR AND SHOULD BE FACTORED INTO THE

BASE BID.

D. STRUCTURAL CRITERA:

1. I-3 OCCUPANCY

2. COMPONENT IMPORTANCE FACTOR: 1.5

3. SDS = 0.66

PROJECT REQUIREMENTS:

A. FOR EACH OF THE THREE PROJECT SITES, PROCURE AND INSTALL THE FOLLOWING:

1. 300KW GENERATOR WITH INTEGRAL 600 GALLON SUB-BASE FUEL TANK

2. AUTOMATIC TRANSFER SWITCH FROM SAME MANUFACTURER AS GENERATOR

3. DOCKING STATION MOUNTED ON GENERATOR ROOM EXTERIOR THAT INCLUDES CONNECTIONS FOR LOAD BANK TESTING AND

TEMPORARY GENERATOR HOOKUP

4. FUEL FILL PANEL MOUNTED ON EXTERIOR WALL OF GENERATOR ROOM

5. GENERATOR BATTERY CHARGER WITH EQUIVALENT LOAD TO EXISTING BATTERY CHARGER

6. GENERATOR JACKET HEATER WITH EQUIVALENT LOAD TO EXISTING JACKET HEATER

GENERATOR REPLACEMENT PROCESS PHASING

A. CONSTRUCTION ORDER OF OPERATIONS:

1. INSTALL DOCKING STATION.

2. PROCURE AND INSTALL TEMPORARY DIESEL GENERATOR (300 KW, 480Y/277V, 3PH, 4W) FOR DURATION OF CONSTRUCTION.

3. CONNECT TEMPORARY GENERATOR THROUGH NEWLY INSTALLED DOCKING STATION.

a. REFER TO 5B/A0.1RV FOR TEMPORARY GENERATOR LOCATION AT ROGUE VALLEY.

b. REFER TO 5B/A0.1OC FOR TEMPORARY GENERATOR LOCATION AT OAK CREEK.

c. REFER TO 5B/A0.1EO FOR TEMPORARY GENERATOR LOCATION AT EASTERN OREGON.

4. REPLACE EXISTING AUTOMATIC TRANSFER SWITCH.

5. DISCONNECT EXISTING STANDBY GENERATOR AND REMOVE FROM SITE.

6. INSTALL NEW STANDBY GENERATOR.

7. INSTALL NEW FUEL FILL PANEL.

8. REMOVE TEMPORARY GENERATOR ONCE NEW PERMANENT STANDBY GENERATOR IS INSTALLED, TESTED AND APPROVED FOR USE

BY OWNER.

ELECTRICAL LOAD ADJUSTMENTS:

LOAD BEING REMOVED: 3.3 kW LOAD BEING ADDED: 2.75 kW NET CHANGE: -0.55 kW

GENERAL ELECTRICAL NOTES

ADD 02 12/05/2023

ADD 02

. CONTRACTOR TO VERIFY FINAL FUEL FILL PANEL LOCATION

4. FUEL FILL PANEL MOUNTED ON EXTERIOR WALL OF GENERATOR ROOM

5. GENERATOR BATTERY CHARGER WITH EQUIVALENT LOAD TO EXISTING BATTERY CHARGER

6. GENERATOR JACKET HEATER WITH EQUIVALENT LOAD TO EXISTING JACKET HEATER

GENERATOR REPLACEMENT PROCESS PHASING

A. CONSTRUCTION ORDER OF OPERATIONS:

1. INSTALL DOCKING STATION.

2. PROCURE AND INSTALL TEMPORARY DIESEL GENERATOR (300 KW, 480Y/277V, 3PH, 4W) FOR DURATION OF CONSTRUCTION.

3. CONNECT TEMPORARY GENERATOR THROUGH NEWLY INSTALLED DOCKING STATION.

a. REFER TO 5B/A0.1RV FOR TEMPORARY GENERATOR LOCATION AT ROGUE VALLEY.

b. REFER TO 5B/A0.1OC FOR TEMPORARY GENERATOR LOCATION AT OAK CREEK.

c. REFER TO 5B/A0.1EO FOR TEMPORARY GENERATOR LOCATION AT EASTERN OREGON.

4. REPLACE EXISTING AUTOMATIC TRANSFER SWITCH.

5. DISCONNECT EXISTING STANDBY GENERATOR AND REMOVE FROM SITE.

6. INSTALL NEW STANDBY GENERATOR.

7. INSTALL NEW FUEL FILL PANEL.

8. REMOVE TEMPORARY GENERATOR ONCE NEW PERMANENT STANDBY GENERATOR IS INSTALLED, TESTED AND APPROVED FOR USE

BY OWNER.

WITH OWNER'S REPRESENTATIVE AT EACH LOCATION.

J

J

J

ATS-1

FUEL FILL

PANEL

DOCKING

STATION

GENSET

(E) T2

(E) T1

(E) MDH

(E

M D

L

(E) SDP

(E

LA

(E) EDH

(E

E D

L

(EXST) LIFE

SAFETY

A231

(EXST)

ELECTRICAL

ROOM

A230

(EXST)

GENERATOR

ROOM

A235

(EXST) OFFICE

A234

(EXST) LOW

VOLTAGE

A233

(EXST)

STORAGE

A232

(EXST)

CLASSROOM

A229

(EXST)

MECHANICAL

ROOM

A236

(E)

(E)

(E

A T

S -2

(E)

(E)

(E)EUH-1

(E) ELB

ELB-264

BATT

(E) FACP

D

L R

G ro u p

REVISIONS

KEY PLAN

A B C D E F

O Y

A R

E G

IO

N

A L G

E N

E R

A T

O R

R E

P L A

C E

M E

N T

O A

K C

R E

E K

Y O

U T

H C

O R

R E

C T

IO

N

A L F

A C

IL

IT

Y

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y L

O C

H N

E R

R O

A D

S E

A L B

A N

Y O

R

NORTH

/1

/2

:5

:1

P

M

A u to d e s k D o c s

/7

-2

-0

O

Y A

R e g io n a l G e n e ra to r

R e p la c e m e n t/

-2

-0

O

Y A

G e n e ra to r_

M E

P

.r v t

#74-23108-00

07/11/2023

CD OWNER

REVIEW

POWER PLAN -

GENERATOR

ROOM - OAK

CREEK

E4.1

SCALE: 1/4" = 1'-0"

POWER PLAN - OAK CREEK - GENERATOR ROOM

1. EXTERNAL DOCKING STATION FOR PROVIDING ALTERNATE SOURCE OF

TEMPORARY POWER DURING GENERATOR MAINTENANCE, IN ACCORDANCE WITH

NEC 700.3(F). DOCKING STATION ALSO ALLOWS CAPABILITY FOR LOAD BANK

TESTING. BASIS OF DESIGN FOR DOCKING STATION IS TRYSTAR MEDIUM-19

SERIES.

2. FUEL FILL PANEL TO BE USED INSTEAD OF EXISTING HOLE IN EXTERIOR WALL OF

GENERATOR ROOM. MOUNT AT 44" AFF TO BOTTOM OF ENCLOSURE. BASIS OF

DESIGN IS PRYCO, INC. REMOTE FUEL FILL STATION.

3. PROVIDE PERMANENT 2" FUEL FILL LINE TO GENERATOR GAS TANK. FILL LINE TO

HAVE 0'-1" DROP FOR EVERY 10'-0" OF RUN, UNLESS OTHERWISE SPECIFIED BY

MANUFACTURER. REFER TO FUEL FILL PANEL CUTSHEET FOR ADDITIONAL

DETAILS AND SPECIFICATIONS.

4. CIRCUIT FUEL FILL PANEL TO PANEL ELB, CIRCUIT #26, OR NEXT AVAILABLE

CIRCUIT. EXISTING LOAD ON PANEL ELB IS 88 AMPS. FUEL PANEL CONNECTION

ADDS AN ADDITIONAL LOAD OF 0.4 AMPS.

5. REPLACE EXISTING KOHLER BATTERY CHARGER WITH NEW 10A BATTERY

CHARGER CONFIGURED FOR NEW GENERATOR. CIRCUIT TO PANEL AND CIRCUIT

SERVING EXISTING CHARGER.

6. CIRCUIT NEW GENERATOR JACKET WATER HEATER TO EXISTING 20A/2P BREAKER

ON DISTRIBUTION BOARD EDL THAT IS CURRENTLY SERVING "GENERATOR BLOCK

HEATER." EXISTING BREAKER AND CONDUIT MAY BE REUSED. PROVIDE NEW

FEEDERS.

KEYED NOTES

A. AREA WITHIN DOTTED LINE REPRESENTS EXTENT OF PROJECT SCOPE.

B. BASIS OF DESIGN FOR NEW GENERATOR IS CATERPILLAR, CAT D300 GC DIESEL

GENERATOR SET.

C. BASIS OF DESIGN FOR GENERATOR MUFFLER IS HARCO ENGINE PRODUCTS

ROOF-MOUNTED ENGINE MUFFLER DESIGNED FOR 300 KW CATERPILLAR C9

GENERATOR. GENERATOR MANUFACTURER TO PROVIDE MUFFLER AS PART OF

GENERATOR PACKAGE. CONTRACTOR IS RESPONSIBLE FOR BOTH INSTALLING

MUFFLER AND PROVIDING MUFFLER RACK. COORDINATE MUFFLER INSTALLATION

WITH DIV. 23 AND ARCHITECTURAL ROOF PLAN. REFER TO MECHANICAL DETAIL

2A/M7.1 FOR MORE INFORMATION ON MUFFLER.

SHEET NOTES

REVISIONS

JULY 11, 2023

CONSTRUCTION

DOCUMENTS

REVISIONS

07/11/2023

CD OWNER

REVIEW

CONSTRUCTION

DOCUMENTS

KEY PLAN

NORTH

KEY PLAN

NORTH

KEY PLAN

NORTH

SCALE: 1/4" = 1'-0"

POWER PLAN - OAK CREEK - GENERATOR ROOM

A1.1RV

5B

E4.2E4.1

N

N O

R T

H

NORTH N

O

R T

H

(D)

(RL)

D

L R

G ro u p

REVISIONS

KEY PLAN

A B C D E F

O Y

A R

E G

IO

N

A L G

E N

E R

A T

O R

R E

P L A

C E

M E

N T

O A

K C

R E

E K

Y O

U T

H C

O R

R E

C T

IO

N

A L F

A C

IL

IT

Y

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y L

O C

H N

E R

R O

A D

S E

A L B

A N

Y O

R

NORTH

/1

/2

:5

:1

P

M

A u to d e s k D o c s

/7

-2

-0

O

Y A

R e g io n a l G e n e ra to r

R e p la c e m e n t/

-2

-0

O

Y A

G e n e ra to r_

M E

P

.r v t

#74-23108-00

07/11/2023

CD OWNER

REVIEW

LIGHTING PLAN -

GENERATOR

ROOM - OAK

CREEK

E4.4

SCALE: 1/4" = 1'-0"

LIGHTING PLAN - OAK CREEK

A. ALL LUMINAIRES SHOWN ARE EXISTING. NEW GENERATOR DUCTWORK

INTERFERES WITH EXISTING LIGHTING IN ONE LOCATION. RELOCATE EXISTING

LUMINAIRE TO NEW LOCATION INDICATED ON DRAWINGS. RETAIN EXISTING

CIRCUITING.

SHEET NOTES

REVISIONS

JULY 11, 2023

CONSTRUCTION

DOCUMENTS

REVISIONS

07/11/2023

CD OWNER

REVIEW

CONSTRUCTION

DOCUMENTS

KEY PLAN

NORTH

KEY PLAN

NORTH

KEY PLAN

NORTH

SCALE: 1/4" = 1'-0"

LIGHTING PLAN - OAK CREEK

A1.1RV

4C

E4.6E4.5E4.4

N

N O

R T

H

NORTH N

O

R T

H

Addendum 2 S-DASOBO-00008606 (OYA Regional Generator Replacement)_DOJ approved_for posting
Attachment 1 to Addendum No. 2 - Revised Drawings
COMBINED CONSTRUCTION DOCUMENTS
ARCHITECTURAL
A1.1OC - OAK CREEK - FLOOR PLANS & ELEVATIONS
A2.1OC - OAK CREEK - REFLECTED CEILING PLANS
A3.1OC - OAK CREEK - ROOF PLANS
MECHANICAL
M1.1OC - MECHANICAL PLAN - OAK CREEK
ELECTRICAL
E0.2 - BASIS OF DESIGN
E4.1 - POWER PLAN - GENERATOR ROOM - OAK CREEK
E4.4 - LIGHTING PLAN - GENERATOR ROOM - OAK CREEK

File details come from the government source that posted it. Updated .