Attachment_AREVISED_Drawings.pdf

PDF 1 MB Posted

Attached to
Agriculture Center Roof Replacement
Solicitation number
B-2-26-28
Issued by
Brevard County, Clewiston City, Florida

About this file

This file consists of revised architectural drawings for the Agriculture Center Roof Replacement project located at 3695 Lake Drive, Cocoa, Florida 32926. The drawings depict the design specifications and technical details for the removal and replacement of the modified bitumen roof system at the facility. The document provides the visual representation and construction guidelines necessary for contractors to understand the scope of work, including the configuration of roofing materials, flashing details, penetration treatments, and all associated hardware required for the complete roof replacement project. The drawings serve as the primary technical reference document that contractors must follow to ensure compliance with the project specifications and successful completion of the work.

The revised drawings establish the standard by which all roofing materials, labor, and installation methods will be evaluated and performed. These architectural documents are essential for bid preparation, allowing contractors to accurately assess material quantities, labor requirements, and equipment needs for the removal of the existing roof system and installation of the new modified bitumen roof. The drawings supersede any previous versions and represent the final design intent that all bidders must use as the basis for their cost estimates and project scheduling.

View the file

Other files

File Type Posted
Notice_of_Award.pdf PDF
Bid_Tabulation__Intent_to_Award.pdf PDF
Bid_Tabulation__Names_Only.pdf PDF
Addendum_2.pdf PDF
Addendum_1.pdf PDF
Attachment_D__Draft_Contract.pdf PDF
Attachment_ADrawings.pdf PDF
Attachment_C__Substitution_Form.pdf PDF
INV__SPECS.pdf PDF
Attachment_BSpecifications_Project_Manual.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

HVAC

HVAC

HVAC

HVAC

HVAC

A

CL

CL CL

CL

CL

CLCL

CL

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

D.S.

CL

CL

DESIGNATED

ROOF ASSEMBLY

SLOPE

LEGEND:

X

SOIL PIPE

EXHAUST FAN

NOT INCLUDEDN.I.C.

ROOF DRAIN

R.D.

DOWNPOUT

D.S.

ANTENNAA

CHANGE IN

ELEVATION

CONDENSATE LINECL

HVAC UNITHVAC

OVERFLOW

SCUPPER

SPLASH PAN

WALK PAD

GENERAL NOTES:

1. ALL PLANS ARE NOT TO SCALE UNLESS NOTED

OTHERWISE.

2. DIMENSIONS SHOWN ARE APPROXIMATE.

CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS PRIOR TO BID.

3. ROOF PENETRATIONS, EQUIPMENT, QUANTITIES

AND LOCATIONS ARE APPROXIMATE, FIELD

VERIFY PRIOR TO BID.

4. DRAWINGS CANNOT BE USED WITHOUT PBA

DESIGN GROUP INVOLVEMENT.

NEW CONSTRUCTION SCOPE:

1. TYPICAL: PATCH AREAS OF LIGHT WEIGHT

CONCRETE SURFACES AFTER TEAR-OFF AND

FILL ALL HOLES, DIVETS, SAW CUT LINES WITH

SECUROCK GYPSUM/CONCRETE PATCH REPAIR

OR OTHER PRODUCT APPROVED BY THE

ROOFING MEMBRANE MANUFACTURER.

2. TYPICAL: INSTALL NEW INSULATION, NEW COVER

BOARD AND A (2) PLY MODIFIED BITUMEN ROOF

SYSTEM. NEW INSULATION TO BE MINIMUM R=25.

3. TYPICAL: TOP OF ALL SOIL PIPES SHALL BE A

MINIMUM OF 8" ABOVE THE NEW FINISHED ROOF

SYSTEM. EXTEND AS NEEDED.

4. TYPICAL: FLASH ALL SOIL PIPES AND

PENETRATIONS (STEEL, ALUMINUM, CAST IRON,

GALVANIZED OR PVC PIPES) WITH

MANUFACTURER'S APPROVED FLASHING

SYSTEM AND FOLLOW MANUFACTURER'S

INSTRUCTIONS.

5. TYPICAL: HVAC, ELECTRICAL AND LOW VOLTAGE

SYSTEMS ARE TO REMAIN IN OPERATION DURING

CONSTRUCTION. IF EQUIPMENT MUST BE

BRIEFLY DISCONNECTED TO ACCOMPLISH THE

WORK, ALL COSTS FOR RECONNECTION ARE TO

BE INCLUDED IN THE BASE BID AS REQUIRED BY

THE AUTHORITY HAVING JURISDICTION.

6. TYPICAL: PATCH ANY HOLES IN WALL WHERE

DOWNSPOUT BRACKET FASTENERS HAVE BEEN

REMOVED AND PAINT PATCHES AND WALL

APPROXIMATE 24" WIDE BEHIND DOWNSPOUT

PRIOR INSTALLING. COLOR TO MATCH ADJACENT

FINISHES. CONTRACTOR TO REQUIRE A

LICENSED PAINTER TO CLEAN, PRESSURE WASH,

REPAIR AND PAINT TO PERFORM THE WORK.

7. TYPICAL: INSTALL CURB ADAPTERS AND CURB

EXTENSIONS AS REQUIRED BY THE AUTHORITY

HAVING JURISDICTION.

NEW CONSTRUCTION PLAN KEY

NOTES:

REPLACE WOOD NAILERS WHERE DAMAGED WITH

NEW PRESSURE TREATED WOOD MEMBER. SIZE

AND WIDTH TO MATCH EXISTING.

RE-FASTEN EXISTING 2x CONTINUOUS NAILERS AT

PERIMETER OF ROOF AND PARAPET WALL.

INSTALL NEW 2x PRESSURE TREATED NAILERS AT

PERIMETER OF ROOF, WIDTH AND SIZE TO MATCH

EXISTING, HEIGHT OF NAILERS TO MATCH NEW

INSULATION AND COVER BOARD AT ROOF EDGE.

INSTALL NEW 2x PRESSURE TREATED NAILERS AT

PERIMETER OF PARAPET WALL, WIDTH AND SIZE TO

MATCH EXISTING. MAINTAIN 8" (MIN.) HEIGHT ABOVE

NEW ROOF AND TOP OF PARAPET WALL.

SCOPE ALL EXISTING ROOF DRAIN LINE

APPROXIMATE 20'-0" TO VERIFY THE LINE IS CLEAR.

SUBMIT VIDEO FOR EACH DRAIN. REFER TO

SPECIFICATIONS FOR VIDEO REQUIREMENTS.

CONTRACTOR TO REQUIRE A DRAIN LINE VIDEO

CAMERA DIAGNOSTIC SERVICE TO PERFORM THE

WORK.

INSTALL ALL NEW PRE-FABRICATED SUMP AT ROOF

DRAIN LOCATIONS.

INSTALL NEW CRICKETS. MINIMUM 1/4 IN 12 SLOPE.

MAINTAIN 8" (MIN.) AT HIGHEST POINT OF CRICKET

TO TOP OF PARAPET WALL.

INSTALL ALL NEW EDGE METAL GRAVEL STOP

FASCIA.

INSTALL ALL NEW OVERFLOW METAL SCUPPERS.

INSTALL ALL NEW METAL COUNTER-FLASHING.

INSTALL ALL NEW METAL COPING.

CLEAN AND PRESSURE WASH STUCCO WALL

ABOVE ALL METAL COUNTER-FLASHING LOCATIONS

AND PAINT. PAINT TO MATCH EXISTING COLOR.

INSTALL ALL NEW GUTTERS.

INSTALL NEW GUTTER SCREENS AT ALL NEW

GUTTERS.

INSTALL ALL NEW DOWNSPOUTS.

PAINT SEALANT ABOVE METAL COUNTER-FLASHING.

INSTALL ALL NEW CONCRETE SPLASH BLOCKS AT

DOWNSPOUT LOCATIONS AND SECURE TO WALL.

REFER TO DETAIL A/A6.11.

INSTALL NEW GUARD RAILING SYSTEM.

INSTALL WALK PADS AROUND ALL MECHANICAL

EQUIPMENT, GUARD RAILING SYSTEM, SPLASH

PANS, METAL TRAY AT ANTENNA LOCATION AND

TOP AND BOTTOM LANDINGS OF LADDER.

CLEAN WALLS WHERE ROOF BITUMEN RESIDUE HAS

BEEN STAINED BY NEW ROOF CONSTRUCTION.

PAINT WALL BELOW NEW METAL COPING AT ENTIRE

PERIMETER WHERE EXPOSED TO VIEW DUE TO

NEW HEIGHT CHANGE. PAINT WALL BELOW

GUTTERS WHERE EXPOSED TO VIEW. PAINT

APPROXIMATE 12" (MIN.).

ROUTE CONDENSATE LINE INTO GUTTER WHERE

INDICATED.

INSTALL NEW CONCRETE PAVERS AT PVC

CONDENSATE LINES.

INSTALL NEW SPLASH PANS WHERE INDICATED.

REFER TO DETAIL B/A6.12.

INSTALL NEW MIL-FINISH ALUMINUM LADDER(S).

REINSTALL METAL TRAY AND C.M.U. BLOCKING AND

ANTENNA.

RE-FLASH ALL ROOF DRAINS.

CLEAN AND PAINT ALL ROOF DRAIN BOWLS,

CLAMPING RINGS AND DOMES.

PROVIDE NEW PVC CONDENSATE DRAIN LINE AND

EXTEND TO NEAREST ROOF DRAIN.

MAINTAIN 8" MINIMUM FROM FINISH ROOF TO TOP

OF PARAPET.

SEE DETAIL FOR DIAGONAL DOWNSPOUT

REQUIREMENTS.

WHERE NEW INSULATION HEIGHT EXCEEDS THE

EXISTING OPENING OF THE OVERFLOW SCUPPER

REFER TO DETAIL 3, 4 & B/A6.8.

32NEW ROOF ASSEMBLY

DESCRIPTION KEY NOTES:

- EXISTING CORRUGATED VENTED

METAL DECK.

- EXISTING 3" +/- TO 6" +/-

EPS INSULATION.

- EXISTING 2 1/2" +/- LIGHT WEIGHT

CONCRETE.

- APPLY NEW

ADHESIVE.

A

A

NEW ROOF ASSEMBLYN1

B

C

D

B C

- INSTALL NEW INSULATION.

- INSTALL NEW COVER

BOARD.

- INSTALL NEW (2) PLY

MODIFIED BITUMEN

ROOFING SYSTEM.

E

F

G

D

E

F

G

4 1/2" +/- EXISTING EXPANDED POLYSTYRENE (EPS ) INSULATION

0.8/INCH

(N1)

R-VALUE TABLE

1/2" NEW COVER BOARD 0.5

TOTAL 31 AVG.

2 1/2" +/- EXISTING LIGHT WEIGHT CONCRETE

3.8/INCH

2" NEW POLYISOCYANURATE INSULATION 11.4

MINIMUM R-VALUE R=25

MATERIAL DESCRIPTION VALUE TOTAL

17.1 AVG.

2 AVG.

0.5

11.4

Scale: AS NOTED

DATE:

(C) THESE DRAWINGS & THEIR

CONTENTS ARE THE SOLE

PROPERTY OF PBA DESIGN GROUP, INC..

USE OR COPY OF

ALL OR ANY PORTIONS IS BY

CONTRACT ONLY; UNAUTHORIZED

USE WILL BE PROSECUTED.

PBA DESIGN GROUP, INC..

SHEET NO.

ISSUE RECORD:

MAY 6, 2026

BI

D

A N

D C

O N

ST

RU

C

TIO

N

PR

O

JE

C T

A D

D

RE

SS

: 3

LA

KE

D R.

C O

C O

A , F

LO

RI

D A

J

A

SO

N S

T.

T

A M

PA

, F

L w w w .p ba d es ig ng ro up .c om

A R

B R

E V

A R

D C o A

G B

U

IL

D

IN

G R

O O

F R

E P

LA

C E M

E N

T

DRAWN BY: S.F.

CHECKED BY: H.P./J.B./M.C.

A5.1

NEW

CONSTRUCTION

ROOF PLAN

A6.5

NEW CONSTRUCTION ROOF PLAN

No Scale:

N1N1

N1

N1

1 2

20 21

20 21

20 21

A6.5

A6.5

A6.1

A6.1

A6.2

A6.11

A6.4

A6.4

A6.4

A6.5

A6.5

A6.6

A6.6

A6.6

A6.7

A6.7

A6.7

(TYP.)

A6.8

A6.8

A6.8

A6.8

A6.9

A6.9

A6.10

A6.11

A6.11

A6.12

A6.3

A6.3

25 25

7 7

45°

45°

A6.4

A6.4

A6.5

A6.5

A6.5

A6.5

A6.5

A6.5

A6.5

A6.5

A6.3

(TYP.)

(TYP.)

13 141314

(TYP.)

(TYP.)

A6.3

(TYP.)

A6.3

(TYP.)

A6.6

A6.6

A6.6

A6.12

A6.12

N1

A6.11

A6.5

(TYP.)

A6.5

(TYP.)

A6.5

(TYP.)

A6.11

A6.11

A6.11

A6.7

A6.7

A6.7

(TYP.)

A6.7

A6.7

A6.7

(TYP.)

(TYP.) (3)

SIDES.

(TYP.) ALL

SIDES.

A A6.1

(TYP.)

(TYP.)

A A6.1

(TYP.)

101216

101216

(TYP.)

(TYP.)

19(TYP.)

1 06-18-2026ADDENDUM #2

At ta ch m en t A

- R

EV

IS

ED

D ra w in gs

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text No.

AutoCAD SHX Text

DATE

SOLDER

DESCRIPTION KEY NOTES:

- GRAVEL STOP SHALL BE 24 GAUGE MIL-FINISHED

STAINLESS-STEEL.

- CANT IN METAL GRAVEL STOP HEIGHT SHALL

MATCH HEIGHT OF ROOF MEMBRANE PLIES ONLY

AT LOW END OF ROOF. ANGLE WILL DEPEND ON

HEIGHT OF PLIES.

- PRIME TOP AND BOTTOM OF HORIZONTAL LEG

WITH BRUSH ONLY.

- PROVIDE CANT AT END.

- PROVIDE END CLOSURE EACH SIDE.

A

B

C

D

- EXPANSION JOINT COVER OR

COUNTER-FLASHING ABOVE.

- EDGE TO BE HEMMED AND APPLY NEW SEALANT.

- PRE-DRILL HOLES IN METAL PRIOR TO FASTENING

WITH SCREWS OR EXPANSION FASTENERS.

PROVIDE 1/4" DIA. ALLOY NAIL DRIVE EXPANSION

FASTENERS OR 3/16" DIA. STAINLESS STEEL

TAPCONS WITH METAL BACKED EPDM WASHER

AT CONCRETE SUBSTRATES. FOR WOOD

SUBSTRATES PROVIDE #12 STAINLESS STEEL

5/16" H.W.H. (HEX WASHER HEAD) WITH METAL

BACK EPDM WASHER.

- PROVIDE END CLOSURE AT END OF

COUNTER-FLASHING.

REFER TO AWS D9.1/D9.1M:2018 - SHEET METAL

CODE FOR SOLDERING GUIDELINES.

NOTES:

1. CONTINUOUS CLEAT IS NOT SHOWN FOR

CLARITY BUT CLEAT SHALL BE ONE GAUGE

HEAVIER THAN FASCIA THICKNESS.

2. PROVIDE MOCK-UP FOR APPROVAL.

3. ALL JOINTS ARE TO BE FULLY SOLDERED AND

MECHANICALLY ATTACHED.

4. USE 2B MIL-FINISH STAINLESS-STEEL.

F

G

H

E

4" (M

IN

PE

R

FI

EL

D

CO

ND

IT

IO

N.

" O

R

AS

N

EE

DE

D.

4"

24" (TYP.)

" O

R

AS

N

EE

DE

D.

24" (TYP.)

4" (M

IN

4" (M

IN.)

4" (M

IN.)

PE

R

FI

EL

D

CO

ND

IT

IO

N.

4"

A

B

C

A

B

C

D E

F

F

G

G

H

H

D E

EDGE METAL FASCIA DETAIL AT END OF WALL1

A6.4 No Scale: TYPICAL

DESCRIPTION KEY NOTES:

- EXISTING WALL.

- EXISTING 2x WOOD NAILERS. 2x PLIES MAY

VARY IN HEIGHT, WIDTH AND

CONFIGURATION PER FIELD CONDITIONS.

a. FOR RE-ATTACHMENT OF EXISTING

WOOD TO STRUCTURAL CONCRETE

SUBSTRATES USE 1/4" DIAMETER

STAINLESS-STEEL DEFORMED SHANK

FASTENERS @ 12" O/C. (MAX.) IN

STAGGERED FASHION. PRE-DRILL HOLES

PRIOR INSTALLING FASTENERS.

PROVIDE 1" EMBEDMENT INTO

SUBSTRATE.

b. FOR RE-ATTACHMENT OF EXISTING

WOOD TO METAL FRAMING SUBSTRATES

USE #15 STAINLESS-STEEL INSULATION

SCREWS @ 12" O/C. (MAX.) IN

STAGGERED FASHION. PROVIDE 1"

EMBEDMENT INTO SUBSTRATE. LENGTH

TO BE DETERMINED IN THE FIELD.

c. FOR RE-ATTACHMENT OF EXISTING

WOOD TO WOOD SUBSTRATES USE

STAINLESS-STEEL PNEUMATIC GUN

NAILS @ 12" O/C. (MAX.) IN STAGGERED

FASHION.

- EXISTING 1x OR 2x WOOD FASCIA.

RE-ATTACH TO SUBSTRATE. SEE NOTES

ABOVE FOR PROPER ATTACHMENT TO

SUBSTRATE.

- NEW PRESSURE TREATED 2x NAILERS.

HEIGHT TO MATCH NEW INSULATION AND

COVER BOARD TOTAL THICKNESS.

- PROVIDE PRESSURE TREATED 1x's OR

PRESSURE TREATED SHIMS TO ADJUST

HEIGHT AS NEEDED.

NOTE: CONDITIONS MAY VARY ONCE

CONSTRUCTION HAS BEEN OPENED.

B

A

C

D

E

A

B

D

E

WOOD NAILER RE-ATTACHEMNT DETAILA

A6.4 No Scale: TYPICAL

LOW GRAVEL STOP FASCIA DETAIL AT GUTTER2

A6.4 Scale: N.T.S. TYPICAL

NOTES:

1. MAY REQUIRE (2) PIECE METAL FASCIA.

FIELD VERIFY PRIOR FABRICATION.

2. PROVIDE MOCK-UP FOR APPROVAL.

- NEW INSULATION AND COVER BOARD. SEE

PLAN FOR REQUIRED R-VALUE INSULATION.

- NEW BASE SHEET. EXTEND OVER NAILERS

AND WALL DOWN AS SHOWN.

- INSTALL NEW GUTTER BRACKET.

- INSTALL NEW GUTTER.

- INSTALL NEW METAL CLEAT.

- INSTALL NEW METAL GRAVEL STOP FASCIA.

PRIME HORIZONTAL LEG OF METAL TOP AND

BOTTOM WITH BRUSH - DO NOT ROLL PRIMER.

- INSTALL NEW STRIPPING PLY.

- INSTALL NEW CAP SHEET.

- APPLY NEW LIQUID FLASHING SEALANT AND

APPLY GRANULES.

- ALTERNATE: "L" SHAPE CLEAT.

DESCRIPTION KEY NOTES:

- EXISTING CONCRETE/C.M.U. WITH STUCCO FINISH.

- EXISTING EPS INSULATION WITH LIGHT WEIGHT

CONCRETE OVER CORRUGATED METAL DECK.

- EXISTING 2x NAILER (RE-ANCHOR). SEE DETAIL A/A6.4 FOR REQUIREMENTS. NUMBER OF 2x PLIES VARY PER

ROOF.

- NEW PRESSURE TREATED 2x NAILER. WIDTH TO

MATCH EXISTING. ATTACH NEW NAILER TO EXISTING

WITH 3" LONG STAINLESS-STEEL NAILS @ 16" O/C.

(MAX.) STAGGERED WITH PNEMATIC NAIL GUN.

- ATTACH NEW PRESSURE TREATED PLYWOOD

PLYWOOD SHIMS TO MATCH HEIGHT OF INSULATION

AND COVER BOARD. ATTACHED WITH 2" LONG

STAINLESS-STEEL NAILS @ 16" O/C. (MAX.)

STAGGERED WITH PNEMATIC NAIL GUN.

B

A

C

D

4"(MIN.)

4"(MIN.)

SEALANT DETAIL

I

H

A

B

C

D E

F

SLOPE

G 1/2" GAP

(TYP.)

E

F

G

H

I

J

K

L

G

M

N

O

H

J

N

N

K

L M

O

4"

TY

P.

24" (TYP.)

FI

EL

D

VE

RI

FY

WIDTH

AS REQ'D.

DESCRIPTION KEY NOTES:

- METAL COPING SHALL BE 24 GAUGE MIL

FINISHED STAINLESS-STEEL.

- SOLDER ALL JOINTS.

- EDGE TO BE HEMMED AND APPLY NEW SEALANT.

- PRE-DRILL HOLES IN METAL PRIOR TO FASTENING

WITH SCREWS OR EXPANSION FASTENERS.

PROVIDE 1/4" DIA. ALLOY NAIL DRIVE EXPANSION

FASTENERS OR 3/16" DIA. STAINLESS STEEL

TAPCONS WITH METAL BACKED EPDM WASHER.

A

B

C

D

REFER TO AWS D9.1/D9.1M:2018 - SHEET

METAL CODE FOR SOLDERING GUIDELINES.

4"

(TYP.)

TY

P.

24" (TYP.)

FI

EL

D

VE

RI

FY

WIDTH

AS REQ'D.

C

D

C

B

A

A

- EXTEND METAL COPING ABOVE WHERE METAL

COPING OR GRAVEL STOP IS REQUIRED OR

EXISTING - MAX. HEIGHT 16" OR LESS.

- PROVIDE COUNTER-FLASHING. SEE DETAIL ON

SHEET A6.6.

- EXTEND COUNTER-FLASHING 4" BEYOND.

- PROVIDE END CAP AT COUNTER-FLASHING.

E

E

B

E

C

D

D

METAL COPING DETAIL AT END OF WALL3

A6.4 Scale: N.T.S. TYPICAL

F

F

F

4" (M

IN.)

4"

G

G

G

H

H

H

I

I

I

SOLDER

NOTES:

1. PROVIDE MOCK-UP FOR APPROVAL.

2. ALL JOINTS ARE TO BE FULLY SOLDERED AND

MECHANICALLY ATTACHED.

3. USE 2B MIL-FINISH STAINLESS-STEEL.

PAINT APPROX. 12"

WIDE CONTINUOUS

AT ENTIRE EXTRIOR

PERIMETER ONLY.

Scale: AS NOTED

DATE:

(C) THESE DRAWINGS & THEIR

CONTENTS ARE THE SOLE

PROPERTY OF PBA DESIGN GROUP, INC..

USE OR COPY OF

ALL OR ANY PORTIONS IS BY

CONTRACT ONLY; UNAUTHORIZED

USE WILL BE PROSECUTED.

PBA DESIGN GROUP, INC..

SHEET NO.

ISSUE RECORD:

MAY 6, 2026

BI

D

A N

D C

O N

ST

RU

C

TIO

N

PR

O

JE

C T

A D

D

RE

SS

: 3

LA

KE

D R.

C O

C O

A , F

LO

RI

D A

J

A

SO

N S

T.

T

A M

PA

, F

L w w w .p ba d es ig ng ro up .c om

A R

B R

E V

A R

D C o A

G B

U

IL

D

IN

G R

O O

F R

E P

LA

C E M

E N

T

DRAWN BY: S.F.

CHECKED BY: H.P./J.B./M.C.

A6.4

DETAILS

1 06-18-2026ADDENDUM #2

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text No.

METAL COPING OR METAL FASCIA LAYOUT DETAILA

A6.5 Scale: N.T.S. TYPICAL

METAL WORK NOTES:

1. ADD METAL SKIRTS TO WALL FACE UNDER

COPING TO EXTEND FACE TO COVER NAILERS

WHERE NEEDED.

2. LINE UP COVER PLATES WHERE SKIRT METAL

IS USED.

3. DRIVE CLEAT JOINT COVER LOCATIONS SHALL

BE DETERMINED BY THE LENGTH OF THE

BUILDING AND TAKE INTO ACCOUNT THE

COPING MITER AT THE CORNERS AND SPACE

JOINT COVERS IN A UNIFORMLY MANNER OR

EQUALLY SPACED AS NEEDED.

4. PROVIDE MOCK-UP FOR APPROVAL.

24" EQ. EQ. EQ. 24"

24"

SHORT

PIECE. 24"

24" LONG PIECE. 24"

MID-PIECE. LONG PIECE.

SHORT

PIECE. LONG PIECE.

ACCEPTED UNIFORMLY

METAL WORK

NOT UNIFORMLY METAL

WORK (NOT ACCEPTED)

NOT UNIFORMLY METAL

WORK (NOT ACCEPTED)

METAL WORK NOT UNIFORMLY

LAID OUT. METAL WORK

SHOWS SHORTER PIECES

TOWARDS AT THE END.

JOINT.JOINT.

JOINT.JOINT.

JOINT.JOINT.

METAL WORK NOT UNIFORMLY

LAID OUT. METAL WORK

SHOWS SHORTER PIECE AT

THE CENTER.

BASE FLASHING DETAIL AT PARAPET WALL2

A6.5 Scale: N.T.S. TYPICAL

ONE PIECE CONSTRUCTION

TWO PIECE CONSTRUCTION

SOLDER.

FILL IN PIECE

NOTES:

1. CLEAT MITER PIECE TO WITHIN 12" OF OUTSIDE CORNER.

2. SOLDER "FILL IN" PIECE INTO PLACE OR USE ONE PIECE CONSTRUCTION.

3. SOLDER MITER AND MECHANICALLY ATTACHED.

4. STANDING SEAM JOINTS ARE NOT ACCEPTABLE.

5. MITERS SHALL SLOPE TO ROOF MATCHING COPING.

6. USE 2B MIL-FINISH STAINLESS-STEEL.

REFER TO AWS D9.1/D9.1M:2018 - SHEET METAL CODE FOR SOLDERING

GUIDELINES.

SLOPESLOPE

SLOPE SLOPE

24" (MAX.) EQUAL. 24" (MAX.) EQUAL.

3/4

(M

IN

1/2

(M

IN

WIDTH PER

FIELD

CONDITIONS.

METAL COPING MITER DETAIL3

A6.5 Scale: N.T.S. TYPICAL

NOTES:

1. REFER TO METAL COPING DETAIL AT PARAPET WALL

FOR ALL REQUIREMENTS REGARDING ALL METAL

WORK AND ANCHORAGE AT TOP OF PARAPET WALL

AND ADDITIONAL REQUIREMENTS.

2. NO FASTENERS SHALL PENETRATE THE BASE

FLASHING ON TOP OF THE PARAPET.

3. MEMBRANE FLASHING'S ARE TO BE 8" MIN.

SLOPE

SLOPE

F

G

H

DESCRIPTION KEY NOTES:

- EXISTING PARAPET WALL.

- EXISTING BLOCKING/NAILER FIELD

VERIFY.

- NEW 2x BLOCKING/NAILER.

- EXISTING ROOF DECK WITH NEW

INSULATION. SEE ROOF ASSEMBLIES

FOR ADDITIONAL REQUIREMENTS.

- PROVIDE NEW PERLITE CANT SET IN

ADHESIVE.

- PRIME WALL AND NAILER.

- INSTALL NEW BASE SHEET. BASE SHEET

SHALL GO UP AND OVER THE PARAPET

WALL AND EXTEND 2" BELOW THE

BLOCKING/NAILER AS SHOWN.

- NEW STRIPPING-PLY.

- PROVIDE NEW MODIFIED BITUMEN

CAP SHEET. CAP SHEET SHALL GO UP

THE PARAPET WALL AND STOP

SHORTLY AT BLOCKING/NAILER.

- INSTALL NEW MEMBRANE FLASHING

- INSTALL NEW METAL CLEAT.

- ONCE CLEAT HAS BEEN INSTALLED

PROVIDE A SELF-ADHERED

MEMBRANE SHEET CONTINUOUS TO

LAP OVER THE VERTICAL LEG OF

CLEAT AND CAP SHEET AS INDICATED.

- INSTALL NEW METAL COPING. FOR ALL

METAL WORK, GAUGES, METAL TYPE,

FINISHES AND FASTENER, SIZE, TYPE

AND SPACING REFER TO "METAL

COPING DETAIL AT PARAPET WALL"

FOR ADDITIONAL REQUIREMENTS.

- PAINT APPROX. 12" WIDE CONTINUOUS AT

ENTIRE EXTERIOR OF PERIMETER ONLY.

B

D

A

C

E

A

A

B

B

C

C

D

D

G

I

J

K

E L

2"

NEW 24 GAUGE MIL

FINISHED

STAINLESS-STEEL.

E F

G H

I

J

K

G H

M

L

L

M

8" (M

IN

METAL COPING DETAIL AT PARAPET WALL1

A6.5 Scale: N.T.S. TYPICAL

EXTEND FACE

AS REQUIRED.

DRIVE CLEAT PARTIALLY

SHOWN.

STEP #2

SLOPE

ROOF SIDE

1" 1"

1/2"

4" (MIN.)

ALTERNATE NAILER

CONDITION

2"

12"

DRIVE CLEAT

JOINT COVER

BACKUP PLATE

STEP #1

STEP #3

STEP #4

1/2" GAP.

1"

1"

6"

LAP.

2" (M

IN

1/2

3/4

12" (MIN.)

3/4" (MIN.)

4" (M

IN

4" (MIN.)

WIDTH OF METAL

COPING & DRIVE

CLEAT PER FIELD

CONDITIONS.

DESCRIPTION KEY NOTES:

- FACE OF C.M.U./CONCRETE WALL.

- EXISTING WOOD NAILER/BLOCKING.

- RE-FASTEN EXISTING WOOD NAILER/BLOCKING TO EXISTING

C.M.U./CONCRETE WALL WITH 1/4" DIA. STAINLESS-STEEL

DEFORMED SHANK SPIKE TYPE FASTENERS @ 12" O/C.

(MAX.) STAGGERED WITH 1" (MIN.) EMBEDMENT.

- INSTALL NEW 2x PRESSURE TREATED NAILER/BLOCKING

CONTINUOUS FASTENED TO EXISTING NAILER/BLOCKING

WITH 3" LONG STAINLESS-STEEL RING SHANK PNEUMATIC

GUN NAILS @ 6" O/C. (MAX.) STAGGERED OR USE 3" LONG

STAINLESS-STEEL SCREWS - WOOD TO WOOD.

- ATTACH NEW 1x2 PRESSURE TREATED SHIM CONTINUOUS ATTACHED TO 2x NAILER/BLOCKING.

- INSTALL NEW UNDERLAYMENT. UNDERLAYMENT SHALL GO

UP AND OVER THE PARAPET WALL AND EXTEND 2" BELOW

THE NAILER/BLOCKING AS SHOWN.

- INSTALL NEW FLASHING MEMBRANE. FLASHING MEMBRANE

SHALL GO UP THE PARAPET WALL AND STOP SHORTLY AT

NAILER/BLOCKING.

- INSTALL NEW 22 GAUGE MIL-FINISH STAINLESS-STEEL

CONTINUOUS CLEAT. ATTACH CLEAT WITH 12 GAUGE x 1 1/2"

LONG 3/8" HEAD (MIN.) STAINLESS-STEEL RING SHANK NAILS

@ 6" O/C. (MAX.) STAGGERED.

- INSTALL NEW SELF-ADHERING MEMBRANE OVER WALL AND

FACE OF CLEAT.

- INSTALL NEW 24 GAUGE MIL-FINISH STAINLESS-STEEL BACK

UP PLATE 12" LONG (MIN.) AT METAL COPING JOINT

LOCATIONS.

- APPLY (2) RIBBONS OF SEALANT TOP AND BOTTOM (BOTH

SIDES) OF BACK UP PLATE.

- INSTALL NEW 24 GAUGE MIL-FINISH STAINLESS-STEEL

CONTINUOUS METAL COPING COVER.

- INSTALL NEW 24 GAUGE MIL-FINISH STAINLESS-STEEL

DRIVE CLEAT JOINT COVER. TURN DOWN DRIVE CLEAT TO

COVER FACES OF METAL COPING AND CRIMP METAL TO

ENGAGE DRIP EDGE.

METAL COPING NOTES:

1. VERTICAL LEGS OF COPING SHALL BE A

MINIMUM OF 4". COPING LAPS SHALL BE 6"

MINIMUM.

2. CONTINUOUS CLEATS ARE REQUIRED.

3. BACKUP PLATES ARE REQUIRED AND ARE TO

BE LOCATED AT DRIVE CLEAT LOCATIONS.

4. CLOSE CLEAT RECEIVERS TIGHT TO CLEAT

CONTINUOUSLY.

5. PROVIDE SLOPE TO ROOF OF 2" IN 12". ADD

SHIMS AS REQUIRED.

6. ADD NAILERS TO PARAPET WALL TO MAINTAIN

8" ABOVE THE ROOF SURFACE.

7. IF NAILERS ARE EXISTING AND MAINTAINS 8"

ABOVE THE ROOF SURFACE, NAILERS ARE TO

BE REATTACHED.

8. ADD METAL SKIRTS TO WALL FACE UNDER

COPING TO EXTEND FACE TO COVER NAILERS.

9. LINE UP COVER PLATES WHERE SKIRT METAL

IS USED.

5. LAP VERTICAL LEGS OF COPING 2" MINIMUM.

8. DO NOT USE DRIVE CLEATS ON STEEP SLOPE

WALLS.

9. USE LAP JOINTS FOR COPING THAT SLOPES

END TO END. LAP COPING COVER SHALL BE 6"

MINIMUM AND SHALL BE INSTALLED IN

DIRECTION OF FLOW.

10.CLEAT JOINTS SHALL ABUT AND SHALL BE

LOCATED MID-WAY AT COPING COVER.

11.DRIVE CLEAT JOINT COVER LOCATIONS SHALL

BE DETERMINED BY THE LENGTH OF THE

BUILDING AND TAKE INTO ACCOUNT THE

COPING MITER AT THE CORNERS AND SPACE

JOINT COVERS IN A UNIFORMLY MANNER OR

EQUALLY SPACED AS NEEDED.

12.PROVIDE MOCK-UP FOR APPROVAL.

13.SEE DETAIL A/A6.5 FOR METAL WORK LAYOUT.

14.USE 2B MIL-FINISH STAINLESS-STEEL.

F

G

H

B

D

A

C

E

I

J

K

L

M

N

DESCRIPTION KEY NOTES CONTINUE BELOW:

- FASTEN ROOF SIDE OF NEW METAL COPING

VERTICAL LEG WITH #12 x 2" LONG

STAINLESS-STEEL HEX HEAD DRIVE SCREWS

WITH STAINLESS-STEEL CAPPED EPDM

WASHER @ 24" O/C. (MAX.)

ROOF SIDE

ROOF SIDE

ROOF SIDE

A

B

C

D E

F

G

H

I

J

2" (M

IN

B

C

E

D

A

A

B

C

D

E

D F G I

JK K

H

WIDTH OF METAL

BACKUP PLATE PER

FIELD CONDITIONS.

L

M

FOLD FLANGE

BACK.

N

L

NEW 24 GAUGE MIL

FINISHED

STAINLESS-STEEL.

N

N

Scale: AS NOTED

DATE:

(C) THESE DRAWINGS & THEIR

CONTENTS ARE THE SOLE

PROPERTY OF PBA DESIGN GROUP, INC..

USE OR COPY OF

ALL OR ANY PORTIONS IS BY

CONTRACT ONLY; UNAUTHORIZED

USE WILL BE PROSECUTED.

PBA DESIGN GROUP, INC..

SHEET NO.

ISSUE RECORD:

MAY 6, 2026

BI

D

A N

D C

O N

ST

RU

C

TIO

N

PR

O

JE

C T

A D

D

RE

SS

: 3

LA

KE

D R.

C O

C O

A , F

LO

RI

D A

J

A

SO

N S

T.

T

A M

PA

, F

L w w w .p ba d es ig ng ro up .c om

A R

B R

E V

A R

D C o A

G B

U

IL

D

IN

G R

O O

F R

E P

LA

C E M

E N

T

DRAWN BY: S.F.

CHECKED BY: H.P./J.B./M.C.

A6.5

DETAILS

1 06-18-2026ADDENDUM #2

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text No.

Sheets and Views
A5.1
A6.5 Details-A6.5.pdf
Sheets and Views
A6.5
A6.4 Details-A6.4.pdf
Sheets and Views
A6.4

File details come from the government source that posted it. Updated .