This Addendum 2 document pertains to the Agriculture Center Roof Replacement project administered by the State of Florida. The addendum modifies the original contract documents for the roof replacement project at the Agriculture Center located at 3695 Lake Drive, Cocoa, Florida 32926. The project scope requires furnishing all labor, materials, tools, equipment, and transportation necessary for the removal and replacement of the modified bitumen roof system, including all associated roofing materials and hardware. The addendum clarifies specifications, requirements, or conditions related to the original bid documents, though specific details regarding quantities, response deadlines, site visits, or bidders' meetings are not detailed within this addendum excerpt.

The addendum serves to modify contractual terms, pricing structures, or technical specifications established in the original solicitation documents. Any pricing adjustments, set-asides, incumbent information, or funding sources would be detailed either within this addendum or cross-referenced to the primary contract documents and original bid solicitation. Contractors responding to this opportunity should review Addendum 2 in conjunction with all original contract documents to ensure full compliance with all current requirements and specifications.

View the file

Other files

File Type Posted
Notice_of_Award.pdf PDF
Bid_Tabulation__Intent_to_Award.pdf PDF
Bid_Tabulation__Names_Only.pdf PDF
Attachment_AREVISED_Drawings.pdf PDF
Addendum_1.pdf PDF
Attachment_D__Draft_Contract.pdf PDF
Attachment_ADrawings.pdf PDF
Attachment_C__Substitution_Form.pdf PDF
INV__SPECS.pdf PDF
Attachment_BSpecifications_Project_Manual.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchasing Services 2725 Judge Fran Jamieson Way

Building C, Room 303 Viera, Florida 32940

Agriculture Center Roof Replacement B-2-26-28

June 19, 2026

ADDENDUM 2

TO ALL PROSPECTIVE BIDDERS

This is an Addendum to and shall be considered as part of the original bid package for the above-mentioned bid. Please acknowledge receipt of Addendum 2 in space provided on Price Sheet. Bidders are requested to acknowledge receipt of this addendum with their bid.

ATTACHMENT A – REVISED DRAWINGS:

Sheet A5.1, dated 06/18/2026 Sheet A6.4, dated 06/18/2026 Sheet A6.5, dated 06/18/2026

CLARIFICATION TO QUESTIONS RECEIVED:

Question 1: Specifications state that the installer shall have an office located within a 100-mile radius of the project site unless otherwise approved. Please confirm whether a qualif ied Florida roofing contractor located outside the 100-mile radius may be considered acceptable, provided all supervision, warranty, manufacturer certif ication, and project requirements can be met.

Answer 1: The requirement below from the Specifications (Project Manual), Attachment B is stricken.

Question 2: Specifications reference walk pads to be installed "where shown on the Drawings. “We were unable to locate any walk pad locations or related detail callouts on the drawings. Could you please confirm whether walk pads are required and, if so, identify the applicable drawing sheets, details, and locations?

Answer 2: Yes, walk pads are required at HVAC units, ladders, and splash pans. Please see revised Drawings Sheet A5.1, Keynotes #19 and #25. Please see Drawings Sheet A6.12 details A & B.

Question 3: The roofing specifications include a field-applied silicone roof coating as part of the roofing system. Could you please confirm whether the coating is intended to be applied over the entire roof area?

Answer 3: The coating is to be applied at the roof drains and overflow scupper openings. Please see Detail A on Sheet A6.1 for roof drains. Please see Detail #4 & B on Sheet A6.8 for overflow scupper.

Question 4: Demolition Note 9 indicates the removal of existing ladders. Please confirm whether the existing ladders are to be removed and reinstalled, replaced with new ladders, or removed and not replaced.

Answer 4: The Contractor shall remove and properly discard existing ladders and install two (2) new mil-f inished aluminum ladders. See Drawings Revised Sheet A5.1 Keynote #25 and Sheet A6.12 Detail #1.

Question 5: Could you confirm whether there is an engineer's estimated budget for this project?

Answer 5: No, there is not an engineer’s estimated budget.

Question 6: Please confirm whether the minimum five (5) years of roofing experience requirement applies specifically to the bidding entity/company itself, or whether the requirement may be satisfied through the documented experience of key personnel in similar roofing systems and scope.

Answer 6: All trades (Contractor and/or Subcontractors) must have five (5) years of applicable experience. Please see Invitation to Bid Section 9 beginning on page 15 for PRE-

QUALIFICATION OF AWARDED CONSTRUCTION BIDDER (FOR BIDS OVER $200,000).

Question 7: Page 13 of the Invitation to Bid under contract period it states 30 Calendar Days to achieve Substantial Completion from the issuance of the Notice To Proceed. I am not sure if that allows enough time. Currently insulation deliveries are running 4-6 weeks for delivery. With current conditions within the world that delivery time may be longer. I would recommend that the number of days to Substantial be changed to 60 or 75 days.

Answer 7: The time to achieve Substantial Completion from the Notice to Proceed is revised to 60 calendar days.

Question 8: Are the vents located on the roof used for moisture only or are they connected to plumbing? Are they one-way or two-way vents?

Answer 8: The breather vents (one-way) on the roof will be removed as indicated on Drawings Sheet A4.1. The plumbing vents (two-way) on the roof are shown as soil pipes on Drawings Sheet A4.1 and Drawings Revised Sheet A5.1.

Question 9: Will direct purchase order be used for this project?

Answer 9: No.

Question 10: Is this building an EHPA facility?

Answer 10: No. The requirement below is removed from the bid.

Provide a 120-mph wind rider for buildings identified as EHPA facilities.

Question 11: Is formal interior protection by an interior protection company required for this project?

Answer 11: Please refer to the Draft Contract General Conditions Article 10 (Attachment D) for requirements of protection of property.

Question 12: Spec lists the cap sheet as Sopralene Flam 250, however, this is a base sheet and not an approved cap sheet. Is it supposed to be Sopralene Flam 250 FR GR?

Answer 12: Yes, the approved cap sheet shall be Sopralene Flam 250 FR GR.

Question 13: Are 2 courses of liquid flashing and 1 course of reinforcing mat acceptable at penetrations?

Answer 13: The Contractor shall follow manufacturer’s directions as required per the Contract Documents, including the Specifications (Project Manual), Attachment B.

Question 14: Adhering insulation directly to LWC is strongly suggested against due to the potential for trapped moisture to release from the LWC and into the new insulation which may cause cupping and separation of the insulation from the deck. We suggest a 6 mil poly over the LWC as a moisture barrier and then fastening the new insulation into the metal deck. Would this method be acceptable?

Answer 14: No, this is not required.

Question 15: Are there any allowances or contingencies to be included on this project?

Answer 15: No. Please see the below note also included on the Price Sheet.

Question 16: Is it possible to provide the nominal wind pressures for these roofs?

Answer 16: Please refer to Drawings Sheet S-001 which indicates to convert to nominal by using a

0.6 multiplier.

Question 17: The wind load diagram provides zone areas for each roof area except for the canopy.

Please provide clarity.

Answer 17: Refer to graphical diagram entitled “section at canopy” and individual canopy pressure table on Drawings Sheet S-001. Maximum canopy pressures are divided as individual face and combined and not by zone.

Question 18: Please clarify which trade is responsible for the roof drain scope, including any required cleaning, repairs, modifications, and providing video inspection of the drain lines.

Answer 18: The awarded Contractor shall be responsible to ensure all work meets permitting requirements by the Authority Having Jurisdiction.

Question 19: Please confirm which trade is responsible for pressure washing and painting the parapet walls.

Answer 19: Please see the response to Question 18.

Question 20: Please clarify which trade is responsible for lifting, temporarily relocating (if required), and reinstalling existing HVAC equipment to accommodate roofing work.

Answer 20: Please see the response to Question 18.

Question 21: Please confirm which trade is responsible for providing and installing any required HVAC curb extensions/adapters.

Answer 21: Please see the response to Question 18.

Question 22: Is the owner providing a moisture survey to confirm the lightweight insulating concrete is acceptable to remain and have ISO adhered to or should the contractor bear the cost for the moisture survey?

Answer 22: No, the County is not providing a moisture survey at this time. If unforeseen conditions are encountered that warrant a moisture survey, please refer to the Draft Contract General Conditions, Article 7.1.6, Claims for Concealed Unknown Conditions/Differing Site Conditions.

Question 23: Page 13 of the ITB; Section 2. Contract Period states that the contractor must achieve substantial completion within 30 days from NTP and these 30 days include 14 days for permitting. 14 days for submittal review/acceptance, permit submission and issuance is improbable. Additionally, the 30 days allotted for construction are equally unlikely given the size and scope of the project (especially if prefabricated metal f lashings are used, considering factory lead times). Please confirm if this contract period is to be updated for a more likely schedule.

Answer 23: Please see response to Question 7.

Question 24: Spec Section 07 61 10 specifies that the warranty must be "Edge to Edge"; to achieve this warranty, metals must be purchased through Metal Era via Soprema. Metal Era metals do not match the project specific metal details provided in the drawings. Please confirm if contractor is to use Metal Era products to match the required edge to edge warranty or use locally shop fabricated metal to match the details.

Answer 24: The Contractor shall use metals that meet the requirements of the Contract Documents, including the Drawings and Specifications.

Question 25: Please confirm if this facility is classified as "EHPA." This is an important distinction as warranties for non-EHPA facilities require 75 mph while EHPA classified facilities require 120 mph.

Answer 25: Please see response to Question 10.

Question 26: Note #21 advises painting walls a minimum of 12" wide where new metals do not cover spaces where old metals were located. When doing this it will likely leave a paint patch mark, please confirm this is acceptable and that edge to edge painting of the whole building will not be required.

Answer 26: Please see Drawings Revised Sheet A6.4 Detail 2 and Revised Sheet A6.5 Detail 2.

Match paint as close as possible.

SUBSTITUTIONS:

1. Johns Manville – Approved Johns Manville is proposing the following SBS roofing system that meets the criteria and intention of the specified roofing assembly:

• The roof assembly shall be composed of the following JM components:

• Cap Ply: DynaWeld Cap 250 FR, torch applied

• Base Ply: DynaWeld 180 S, torch applied

• Cover Board: DensDeck Prime Roof Board, adhered with Roofing Systems Urethane

Adhesive (RSUA)

• Insulation: ENRGY 3, adhered with Roofing Systems Urethane Adhesive (RSUA)

• Wind uplift and coverage riders require approved attachment rates from JM Technical

Services:

• FL17013-R32

• LS-A-26

• This assembly will be eligible for a 25 year No Dollar Limit Johns Manville Peak

Advantage® Guarantee once a Johns Manville Technical Representative inspects and approves the installed JM roofing system.

2. Elevate SBS Modified Bitumen Roofing System - Not approved due to substitution request not submitted by a Contractor. Substitution requests submitted by manufacturers and/or suppliers are not accepted.

3. GAF- Not approved due to incomplete substitution request.

***All other terms and conditions remain the same.

END OF ADDENDUM 2

Sincerely, Mary Bowers Purchasing Manager