ATTACHMENT A TECHNICAL SPECIFICATIONS.pdf
PDF 345 KB Posted
- Solicitation number
- S-63400-00011184
- Issued by
- Clackamas County, Estacada City, Oregon
About this file
This document is a technical specification for a project by the Oregon Parks and Recreation Department for roadway and camp site hardstand overlay work at Milo McIver State Park. The project involves excavating failed asphalt, repairing the base structure, pre-leveling the roadway and parking areas, overlaying the paving limits with hot mix asphalt concrete (HMAC), and installing pavement markings. The project has a substantial completion date and a final completion date as stated in the Invitation to Bid. The contractor is responsible for developing and submitting an Erosion Control Plan, a Traffic Control Plan, and other required submittals for approval prior to commencing work.
The technical specification details the measurement and payment terms for various work items such as mobilization, asphalt excavation, general excavation, base rock, HMAC, shoulder rock, and pavement markings. It also outlines the environmental controls, traffic control requirements, and earthwork for roadway repairs that the contractor must follow. The contractor will be responsible for all costs associated with fines for non-compliance with regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT B PLANS AND DRAWINGS.pdf | ||
| 11964 ITB Milo McIver Roadway and Campsite Hardstand Paving.pdf | ||
| 11964 Bid Tab.xlsx | XLSX spreadsheet | |
| ITA 120061C001 Roof topper RW.pdf | ||
| 11964 Intent to Award Notice~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oregon Parks and
Recreation
Department
ATTACHMENT A TECHNICAL SPECIFICATIONS
For
Roadway and Camp Site Hardstand Overlay at
Milo McIver State Park
Project Number: Hub #37866
Date: 7/10/2024
Prepared by: Michael Taylor
Oregon Parks and Recreation Department
Engineering and Design Division
725 Summer Street NE, Suite C
Salem, Oregon 97301 i
Table of Content
TECHNICAL SPECIFICATIONS
FOR
ROAD AND CAMP SITE HARDSTAND REHABILITATION
AT
MILO MCIVER
FOR
OREGON PARKS AND RECREATION DEPARTMENT
TABLE OF CONTENTS
PAGE
SECTION 01010 – SUMMARY OF WORK
SECTION 01019 – CONTRACT CONSIDERATIONS
SECTION 01025 – MEASUREMENT AND PAYMENT
SECTION 01028 – MODIFICATION PROCEDURES
SECTION 01090 – REFERENCE STANDARDS
SECTION 01300 – SUBMITTALS PROCEDURE
SECTION 01560 – ENVIRONMENTAL CONTROLS
SECTION 01570 – TRAFFIC CONTROL
SECTION 02222 – EARTHWORK FOR ROADWAY REPAIRS
SECTION 02510 – ASPHALTIC CONCRETE PAVING AND RESURFACING
SECTION 02765 – PAVEMENT MARKINGS ...................... ERROR! BOOKMARK NOT DEFINED.
Section 01010 - 1
SUMMARY OF WORK
SECTION 01010 – SUMMARY OF WORK
PART 1 – GENERAL
1.01 DESCRIPTION OF WORK
A. Requirements of the “State of Oregon General Conditions for Public Improvement
Contracts” apply to the Technical Specification and Plans for this Project.
B. The general summary of the project includes but not limited to the following:
• Excavating failed asphalt per the location indicated by the project manager.
• Excavate and repair the base structure per the location indicated by the Project manager.
• Pre level roadway and parking areas with HMAC.
• Overlay the paving limits with HMAC.
• Install pavement marking.
• All other Work necessary to perform the roadway and parking lot rehabilitation as indicated on the project drawings and in the contract specifications.
C. Project is for Oregon Parks and Recreation Department (OPRD), referred to hereafter as
Owner.
D. The Project Manager and Owner’s Authorized Representative is:
Michael Taylor Phone: (503) 800-7678
Oregon Parks and Recreation Department
725 Summer St. NE, Suite C
Salem, OR 97301-1266
1.02 CONSTRUCTION STAKEOUT AND LAYOUT
A. The Plans show approximate locations and dimensions of existing utilities and facilities adjacent to and in the proposed Work, as shown on the Plans, for the Contractor’s information. Final stakeout of the construction Work shall be provided by Contractor and approved by Project Manager. The Contractor will be solely responsible for locating all existing utilities within the project sites. No additional stakeout will be provided by the
Owner.
B. Contractor is responsible for properly laying out the Work and for lines and measurements for the Work. Contractor to verify the figures shown on the Plans before any construction takes place or products are ordered. Report errors or inaccuracies to the
Project Manager for resolution before commencing Work. Submit as-built plans after completion of the project to record any changes that took place in accordance with
Division 1.
1.03 OWNER OCCUPANCY
Section 01010 - 2
SUMMARY OF WORK
A. The Owner will not close any areas of the Park except the area under construction and temporary closures as approved in advance by the Park Manager for approved limited durations.
B. Coordinate all Work with Park Manager to minimize conflict and to facilitate on-going use and operation of the Park.
1.04 CONTRACTOR USE OF SITE AND PREMISES
A. Construction Operations: Limited to construction areas around the project sites.
B. Contractor shall at all times conduct their operations to ensure the greatest public safety and least inconvenience to the public and adjacent land owners.
C. Contractor shall receive approval from the Park Manager as to the staging and stockpiling of the equipment and materials used on the project.
D. Storage of material onsite is at Contractor’s own risk.
E. Hauling Restrictions: Comply with all legal load restrictions in the hauling of material.
Load restrictions shall meet state load restrictions.
F. Parking: Contractor and Subcontractors shall park at approved locations, and as directed by the Park Manager.
G. Rest rooms: Contractor shall provide temporary rest room facilities for its workers and subcontractors as required.
1.05 CONSTRUCTION SCHEDULE
A. Refer to the Invitation to Bid for construction schedule substantial and final completion dates.
B. Contractor shall not begin any on-site Work of this project before required permits have been obtained, a proposed construction schedule is submitted, along with required submittals in accordance with Section 01300, and the Project Manager has given written approval of the submittals and construction schedule provided by the Contractor.
1.06 SPECIFICATION LANGUAGE
A. Portions of the Specifications are written in imperative and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise.
The words “shall be” shall be included by inference where a colon (:) is used within sentences or phrases. Example: Aggregate: ASTM C33.
END OF SECTION
Section 01019 - 3
CONTRACT CONSIDERATIONS
SECTION 01019 – CONTRACT CONSIDERATIONS
1.01 SPECIAL PROJECT REQUIREMENTS
A. While portions of the Park are closed for construction, areas surrounding the construction site and driveways, parking lots and walkways in the area shall be open to the public from start of construction until the completion date. The Contractor shall coordinate with the Project Manager and Park Manager to provide both access and public safety during construction. Devices required to provide for public safety during construction shall be provided and installed by the Contractor at the expense of the Contractor. If required safety devices are not installed, Work shall not be allowed to commence until such devices are installed. Additional Days will not be provided the Contractor based on non-working days due to the non-compliance of safety devices.
B. Construction operations shall be restricted to normal daily operating hours and the normal
Open/Close schedule of the Park but not outside the hours of 7AM – 5PM, Monday –
Friday unless otherwise arranged and approved in writing by the Project Manager and
Park Manager.
C. No Work shall be performed on any legal holiday or weekends without prior written approval from the Park Manager.
D. No smoking is allowed at the project site, except at locations approved by the Park
Manager and Project Manager.
E. Contractor shall notify the Park Manager in advance when Contractor, Subcontractor or any employees of such shall be on Park property.
F. Comply fully with manufacturer’s instructions and recommendations. Should manufacturer’s instructions conflict with Contract Documents, request clarification from
Project Manager before proceeding.
G. Contractor shall furnish all planning, investigation, material, equipment, work and permits to complete the Work in accordance with the Plans, Specifications and terms of this Contract, except as specified otherwise herein.
H. Day Use Park Fees will not be charged by the Park for contractors or deliveries.
I. All changes to normal traffic patterns must be clearly explained in the Traffic Control
Plan and approved by the Project Manager.
J. For paving projects, Contractor shall stay on roadway surfaces at all times. No staging of equipment or storage of materials shall be allowed off the existing roadway surface.
1.02 EXISTING UTILITIES
A. In general, the locations of existing utilities, whether above ground or underground or
Section 01019 - 4
CONTRACT CONSIDERATIONS
under the roof, are to be determined as needed by the Contractor. Work in some cases must be done in close proximity to said utilities and live electrical service lines, pipes, drains, and structures not shown, which may require a change in operations, cost and time.
B. Utilities damaged by Contractor’s activities shall be reestablished, to the satisfaction of the Park Manager and/or Project Manager. If the Contractor fails to repair the damaged utility, costs for repairing the utility shall be deducted from final payment.
C. Comply with Oregon Administrative Rules Division 952, Relating to Abandoned
Underground Facilities. An “Abandoned Facility” means an underground facility that is no longer in service and is physically disconnected from the operating facility that is in service. In addition to notification requirements of this rule, notify Project Manager of any Abandoned Underground Facilities which are discovered during the course of the project.
1.03 PROGRESS CLEANING
A. Maintain areas free of waste materials, debris, and rubbish at all times. Maintain site in a clean and orderly condition. Provide legal debris disposal (or recycle waste materials if feasible) off-site for all debris generated while working on this project.
B. Remove debris and rubbish from pipe chases and other closed or remote spaces on a daily basis.
C. Remove waste materials, debris and rubbish from the site immediately upon such materials becoming unfit for use in the Work. In the event this material is not removed, Project Manager will give one notification in writing as to the removal of such waste materials, debris and rubbish. If the Contractor does not clean up the waste materials, debris and rubbish within 24 hours as directed by the Project Manager, the Project
Manager reserves the right, but does not have the duty, to have the material removed and the expense shall be deducted from payment to the Contractor. This debris shall be removed at the end of each workday.
D. Provide legal debris disposal off-site for all debris generated while working on this project.
1.04 TEMPORARY UTILITIES
A. Connections to existing utilities (electric, water, sewer, telephone service) may be allowed as approved by the Project Manager. Contractor to make arrangements for connections. Contractor to pay for cost of connection and use. Exercise measures to conserve energy and water.
B. Provide toilet and wash-up facilities for the work force at the site. Comply with applicable laws, ordinances and regulations pertaining to public health and sanitation.
PART 2 – MATERIALS (Not Applicable)
PART 3 – EXECUTION (Not Applicable)
Section 01025 - 5
MEASUREMENT AND PAYMENT
SECTION 01025 – MEASUREMENT AND PAYMENT
1.01 DESCRIPTION
A. All Payments shall be as provided in the State of Oregon General Conditions for Public
Improvement Contracts. References to other documents in the Plans and in the
Specifications, such as ODOT and ODOT/APWA are not intended to include references to measurement and payment that may exist in those other documents. Specific
Measurements for Work Items are detailed in this Specification Section 01025.
B. If no Item exists for a portion of the Work, include the costs in a related Item.
C. No separate payment will be made for any item that is not specifically set forth in the
Solicitation, and all costs therefore shall be included in the prices named in the
Solicitation for the various appurtenant items of Work.
D. Quantities listed in the Contract Document do not govern final payment. Payments to the
Contractor will be made only for actual quantities of Contract items performed in accordance with terms of the Contract and for items of Work actually performed under
Change Orders.
E. Indirect costs, such as supervision and overhead, profit, and the general conditions specified in the Contract, all shall be allocated to each item as applicable for Work defined in the item. No separate payment will be made to the Contractor for these items.
F. Payments shall include full compensation for all labor, equipment, and materials necessary to perform the specified Work.
G. Partial payments to be made under the Contract shall be based on the percent of Work complete as approved by the Project Manager according to the State of Oregon General
Conditions for Public Improvement Contracts.
1.02 ITEM MEASUREMENT AND PAYMENT
(NOTE: See the ITB Pricing Submittal Form for applicable Payment items listed below)
1.0 Mobilization:
a. Measurement and payment for Mobilization shall be made on a lump sum basis. The amount to be allowed for Mobilization in the partial payment to be made under the Contract will be as follows:
b. When 5% of the total original contract amount is earned from other items, not including advances on materials, 50% of the amount bid for
Section 01025 - 6
Mobilization, or 2.5% of the original contract amount, whichever is the least, less normal retainage, will be paid.
c. When 10% of the total original contract amount is earned from other items, not including advances on materials, 100% of the amount bid for
Mobilization, or 5% of the original contract amount, whichever is the least, less normal retainage, will be paid.
d. Upon completion of all Work on the project, payment of any amount bid for Mobilization in excess of 5% of the total original contract amount will be paid.
e. The above schedule of progress payments for Mobilization shall not limit or preclude progress payments otherwise provided by the Contract.
2.0 Asphalt Excavation:
a. Measurement and payment for Asphalt Excavation will be based on a per square foot basis to the nearest 0.1 foot as field measured by determining the dimensions of the finished excavation prior to placement of backfill.
b. Work shall include all material, equipment and labor necessary to remove existing asphalt at locations shown on the Plans or as located in the field, including, but not limited to, excavation, and disposal of material at a DEQ approved dump site. Payment will only be made for asphalt excavation Work approved by the Project Manager.
c. If base materials are required to be excavated below asphalt surface, as directed by Project Manager, they shall be paid as General Excavation and Earthwork.
3.0 General Excavation:
a. Measurement and payment for General Excavation shall be made on a cubic yard basis for all material moved or removed to the lines and grades shown on the Contract Documents and as directed by the Project
Manager. Asphalt removed as Asphalt Excavation shall not be included in the General Excavation payment quantities.
b. Payment shall include full compensation for all excavation required to repair or construct roads, paths, pads, building foundations and all other structures as shown in the Contract Documents. No payment will be made for over-excavation except as directed by the Project Manager.
Payment includes compensation for hauling and legal disposal of excess material.
c. Geotextile fabric, if required, shall be incidental to this Work.
Section 01025 - 7
4.0 Base Rock:
a. Measurement and payment for Base Rock installation shall be made on a ton in place basis. The quantities for payment shall be calculated from weight tickets collected at the job site.
b. Work includes providing the labor, equipment, materials and incidentals needed to furnish and install the base rock in conformance with the
Contract Documents and as directed by the project manager.
5.0 Roadway HMAC:
a) Measurement and payment for Roadway HMAC shall be made on a ton in place basis to the nearest 0.01 ton. The quantities for payment shall be calculated from weight tickets collected at the job site.
b) Work shall include installing all pavement overlay including pre-leveling as shown on the Plans and as directed by the Project Manager.
c) HMAC used as cap materials in road base repair shall paid as roadway
HMAC.
d) All pavement outside the project limits, damaged as a result of the
Contractor’s operations will be removed and replaced to the satisfaction of the Project Manager, at the Contractor’s expense.
6.0 Shoulder Rock:
c. Measurement and payment for Shoulder Rock installation shall be made on a ton in place basis. The quantities for payment shall be calculated from weight tickets collected at the job site.
d. Work includes providing the labor, equipment, materials and incidentals needed to furnish and install the Shoulder rock in conformance with the
Contract Documents and as directed by the project manager.
7.0 Pavement Markings:
a) Measurement and payment for Pavement Markings will be made on a lump sum basis.
b) Work includes providing the labor, equipment, materials and incidentals needed to furnish and install the pavement markings in conformance with the
Contract Documents or as directed by the project manager.
PART 2 – MATERIALS (not applicable)
PART 3 – EXECUTION (not applicable)
Section 01025 - 8
Section 01028 - 9
MODIFICATION PROCEDURES
THIS PAGE INTENTIONALLY LEFT BLANK
Section 01028 - 10
SECTION 01028 – MODIFICATION PROCEDURES
1.01 SUMMARY
A. Section includes the administrative requirements for Requests for Information (RFI) and
Proposal Requests (PR).
B. Prior to execution of a Change Order (CO), the following documents shall be submitted as indicated.
1.02 REQUEST FOR INFORMATION
A. General:
1. RFI's are requests for information originated, prepared and submitted by the
Contractor to the Project Manager only when the Contractor is unable to determine from the Contract Documents, the material, process, system or Work to be installed. Endeavor to keep the number of RFI’s to a minimum. For critical or emergency items, contact Project Manager at once.
2. If Project Manager clarification results in additional cost or time, do not proceed with the Work indicated by the RFI until the Project Manager provides an approved copy of the RFI or until a PR is fully-executed. A CO will be processed to include this type of change.
3. Submit RFI’s on form provided by Project Manager.
4. Number RFI's sequentially; include date submitted.
5. Identify Project, pertinent Plan sheet, detail number, and Specification Section.
6. Specifically identify time response information as required to avoid impact on construction schedule or cost. Project Manager will endeavor to respond to proper RFI’s within 7-Days, if possible.
B. RFI’s shall include written and graphic solutions proposed by Contractor. Project Manager will determine if Contractor’s proposal is in accordance with Contract Documents and design intent of Project.
1. Contractor's failure to make a reasonable effort to propose realistic solution may result in RFI's being returned with no action.
2. RFI's that request information that is clearly shown in the Contract Documents will be considered frivolous/improper and will be returned with no action.
C. Maintain current and accurate RFI Log.
Section 01028 - 11
1.03 PROPOSAL REQUEST
1. Provide quotations for extra Work or changes in Work when requested by the
Project Manager, on a PR form to be provided by the Project Manager.
2. Provide a detailed itemization of the costs to the degree necessary for evaluation by the Project Manager. Indicate if a change to the Contract Period is warranted.
B. Maintain current and accurate Proposal Request log.
C. Issuance of a PR is not an authorization to proceed with extra or changed Work until fully executed by Owner and Contractor. Do not proceed with the Work indicated in the PR until the Project Manager provides a fully-executed copy. A CO will be processed to include approved Proposal Requests.
PART 2 – MATERIALS (not applicable)
PART 3 – EXECUTION (not applicable)
Section 01090 - 12
REFERENCE STANDARDS
SECTION 01090 – REFERENCE STANDARDS
1.01 REFERENCED STANDARDS:
All Work shall conform to the issue of following referenced standards which is current at date of receipt of bids. Whenever the following abbreviations are used in these Contract Documents, they are to be construed the same as follows:
AA Aluminum Association
AASHTO American Association of State Highway and Transportation Officials
ACI American Concrete Institute
ACM American Construction Manual
AISC American Institute of Steel Construction
ANSI American National Standards Institute
APA American Plywood Association
APWA American Public Works Association
ASTM American Society for Testing and Materials
AWPA American Wood Preservers' Association
AWS American Welding Society
AWWA American Water Works Association
CRSI Concrete Reinforcing Steel Institute
FM Factory Mutual
FS Federal Specifications (FS)
ICEA. Insulated Cable Engineers Association
IEEE Institute of Electrical and Electronic Engineers
JIC Joint Industrial Council
MIL Military Standards
NEC National Electric Code (Oregon Amended)
NECA National Electrical Contractors Association
NEMA National Electrical Manufacturers Association
NESC National Electrical Safety Code
NFPA National Fire Protection Association
ODOT Oregon Standard Specifications for Highway Construction by the Oregon
Department of Transportation
ODOT/APWA 2002 Oregon Standard Specifications for Construction by the Oregon Department of Transportation and Oregon Chapter of APWA
OSSC Oregon Structural Specialty Code
OSHA Occupational Safety and Health Administration
QPL Qualified Products Listing by the Oregon Department of Transportation, Materials and Research Section
PCI MNL Pre-stressed Concrete Institute
SAMA. Scientific Apparatus Manufactures Association
UBC Uniform Building Code State of Oregon, Structural Specialty Code Amended
UFC Uniform Fire Code with State and Local Amendments
UL Underwriters Laboratories
UPC Uniform Plumbing Code State of Oregon, Plumbing Specialty Code
WCLIB West Coast Lumber Inspection Bureau
Section 01090 - 13
REFERENCE STANDARDS
Section 01300 - 14
SUBMITTALS PROCEDURE
Section 01300 - 15
SECTION 01300 – SUBMITTALS PROCEDURE
A. This section specifies procedures for the technical submittals shown in the Specifications.
B. Submittals shall contain information that will enable the Project Manager to assess whether the Contractor’s proposed materials, equipment or methods of work are in general conformance to the design intent and in compliance with the Plans and Specifications. The information may consist of drawings, specifications, descriptive data, certificates, samples, test results and/or other information, as specifically required in the Specifications.
1.02 CONTRACTOR RESPONSIBILITIES
A. Prior to submittal transmittal to the Project Manager,
1. Ensure the accuracy and completeness of the information contained in each submittal and that the material, equipment or method of work is as described in the submittal.
2. Ensure information is legible by the Owner. Faxed submittals are NOT acceptable.
3. Ensure that the information is transmitted:
a.) Prior to purchasing/leasing/ordering/installing b.) Early enough to allow a 7-day review period by the Owner, and c.) Meet the construction schedule
4. Verify the material and equipment described in each submittal conforms to the requirements of the Specifications and Plans.
5. Ensure there is no conflict with other submittals.
6. Notify the Project Manager in each case where such submittal may affect the
Work of another contractor or Owner.
B. Obtain written approval from the Project Manager, prior to ordering products and/or materials other than those specified, by submitting the Substitution Request Form to the
Project Manager. Form to be provided by the Project Manager.
C. Refer to the ITB and State of Oregon General Conditions for additional information regarding submittals.
PART 2 – PRODUCTS (not applicable)
Section 01300 - 16
PART 3 – EXECUTION
3.01 TRANSMITTAL PROCEDURE
1. For each required submittal, submit four (4) copies of all required information not less than fourteen (14) Days prior to purchase or installation (if previously purchased). Two copies will be returned to the Contractor. Individual sheets shall not exceed 22 inches x 34 inches.
2. Use a Submittal/Transmittal Form for material and equipment submittals. Use a separate form for items specified in separate, discrete sections for which the submittal is required. Use a single form for submittals for various items when the items taken together constitute a manufacturer’s package, or are related such that expediency indicates review of the package as a whole.
3. Note the unique sequentially assigned number, that will accompany each item submitted, on the transmittal form. Original submittal numbers shall have the format: “XXX”; where “XXX” is the sequential number assigned by the
Contractor. Resubmittals shall have the format: “XXX-Y”; where “XXX” is the originally assigned submittal number and “Y” is a sequential letter assigned for resubmittals, i.e., A, B or C being the 1st, 2nd and 3rd resubmittals, respectively.
B. Deviation from Contract: Submit a request for substitution for deviations from the
Specifications or Plans. Include the reason for the deviation and cost differential for the deviation. Deviations from the Contract shall be authorized by Change Order only.
C. Submittal Completeness: submittals that do not have all the information required to be submitted are not acceptable and will be returned without review.
D. Project Manager reserves the right to ask for submittals not referenced in this document.
3.02 REVIEW PROCEDURE
A. The Project Manager will review the submittal and return it to the Contractor. The returned material will consist of two (2) marked-up copies of the submittal. The returned submittal will indicate one of the following actions:
1. If the review indicates the material, equipment or work method is in general conformance with the Plans/Specifications, the submittal copies shall be marked
“Approved.” In this event, the Contractor may begin to incorporate the material/equipment/work method covered in the submittal.
2. If the review indicates the submittal is insufficient or that limited corrections are required, the submittal copies may be marked “Approved as Noted.” The
Contractor may begin to implement the work method or incorporate materials/comments covered in the submittal in accordance with the corrections/comments noted.
Section 01300 - 17
3. If the review reveals the submittal is insufficient or contains incorrect data and the comments require revision and resubmittal, the submittal copies shall be marked “Not Approved, Resubmit.” In this case, the Contractor shall not then undertake Work covered by this submittal until the submittal has been revised, resubmitted and returned to the Contractor with a marking of “Approved” or
“Approved as Noted.”
4. If the review reveals the material, equipment, or Work does not require submittal, then the submitted copies shall be marked “Review Not Required Per Contract
Documents.” In this event, the Contractor may begin to incorporate the material/equipment/Work covered by the submittal and no further action is required.
3.03 EFFECT OF REVIEW OF CONTRACTOR’S SUBMITTALS
A. Submittal review of what the Contractor proposes to provide shall not relieve the Contractor of his responsibility for errors therein, nor shall it be regarded as an assumption of risks or liability by the Owner, or by any officer or employee of the Owner. Contractor shall have no claim under the Contract on account of the failure, or partial failure, of the method of work, material or equipment so reviewed. A mark of “Approved” or “Approved as Noted” shall mean the Project Manager has no objection to the Contractor, upon the Contractor’s own responsibility, using the plan or method of work proposed, or providing the materials or equipment proposed.
B. Furnish to the Project Manager the following items for equipment, articles and materials incorporated in the Work:
1. Submittals for items identified in individual specification sections.
2. Manufacturer’s special tools and special accessories normally furnished by the manufacturer and which, by their specific nature and special design, are suited for convenient and expeditious adjustment, maintenance and repair.
3. Two sets of installation instructions, parts lists; routine preventative maintenance and operation manuals; corrective maintenance instructions; drawings and other like data pertinent for maintenance and repair.
4. Manufacturer’s and dealer’s warranties and guarantees that are normally available to purchasers. Such warranties and guarantees shall be made effective to the State of Oregon as the purchaser.
Section 01300 - 18
SUBSTITUTION REQUEST FORM
TO ____________________________________________________________________________
PROJECT ______________________________________________________________________
We hereby submit for your consideration the following product instead of the specified item for the above
Project
Section _________________ Paragraph ____________________ Specified Item ______________
Proposed Substitution:
Attach complete technical data, including laboratory tests, if applicable. Include complete information on changes to Plans and Specifications that proposed substitution will require for proper installation. Fill in
Blanks Below:
A. Does the substitution affect dimensions shown on Plans? Yes____No____. If yes, clearly indicate changes.
B. Will the undersigned pay for changes to the building design, including architectural, engineering and detailing costs caused by the requested substitution? Yes______ No_______.
C. What effect does substitution have on other trades?
D. What effect does substitution have on construction schedule?
E. Differences between proposed substitution and specified item?
F. Manufacturer's guarantees of the proposed and specified items are:
______ Same _______ Different (explain on attachment)
The undersigned states that the function, appearance and quality are equivalent or superior to the specified item.
Submitted by:
Signature________________________________Title_________________________________________
___ACCEPTED, ___NOT ACCEPTED, ___RECEIVED TOO LATE
Firm______________________________, By____________________________ Date_______________
Telephone__________________________
Section 01560 - 19
ENVIRONMENTAL CONTROLS
SECTION 01560 – ENVIRONMENTAL CONTROLS
A. This section specifies environmental mitigation and temporary environmental controls required to be maintained during construction. Nothing in this section shall relieve
Contractor from the obligation to comply with the regulations or permits of any federal, state, or local authority.
PART 2 – MATERIALS
2.01 PLANS
A. Develop and maintain for the duration of the contract an Erosion Control Plan (ECP) that will effectively incorporate and implement environmental protection precautions and as follows:
1. The ECP shall include methods and interim facilities to be constructed and/or used concurrently during construction to control erosion in such a manner as to ensure that sediment and sediment-laden water does not enter any drainage system, roadways, or violate applicable water quality standards.
2. The ECP shall be in strict conformance with the requirements of the permits.
Visible or measurable erosion which enters, or is likely to enter, a public storm and surface water system, wetland or stream is prohibited.
3. The ECP shall include the name of the Contractor’s employee authorized to supervise and enforce compliance with the Erosion Control Plan and telephone number(s) to contact that person at any time.
B. The ECP shall be submitted at least two (2) weeks prior to initiating clearing activities.
C. In the event a regulatory agency or jurisdiction determines the ECP to be inadequate to protect the environment:
1. The Contractor shall immediately stop the affected Work in progress until adequate environmental protection measures are implemented.
2. The Contractor shall modify the ECP to meet the requirements of said regulatory agencies or jurisdictions and provide the Project Manager with the revisions to the ECP within five (5) Days of the notice of deficiency.
2.02 EROSION CONTROL
A. Temporary Sediment Fences
Section 01560 - 20
1. Synthetic filter fabric shall contain ultraviolet ray inhibitors and stabilizers.
2. Filter fabric fence shall have manufactured stitched loops for 2”x2” post installation. Stitched loops shall be installed on the up-hill side of the sloped area, with posts spaced a maximum of 6 feet apart.
3. Where practical, the filter fabric shall be purchased in a continuous roll to the length required to avoid the use of joints.
4. The physical integrity of all materials shall be sufficient to meet the requirements of their intended use and withstand normal wear and tear.
B. Straw Bale Sediment Barrier/Bio-Filter Bags: Standard 40 to 60-pound rectangular bales of cereal grain or seed straw. Wooden stakes (2”x2”x 3 feet) shall be used for straw bales and bio-filter bags.
C. Plastic Sheeting: Polyethylene and have a minimum thickness of 6 mil.
D Bio-Filter Bags: Provide bio-filter bags of clean 100 percent recycled wood product waste. Size of bag: 18 inches x 8 inches x 30 inches with approximate weight of 45 pounds and ½ inch plastic mesh covering.
3.01 SITE MAINTENANCE
A. Dust shall be minimized by the Contractor to the extent practicable, utilizing all measures necessary including, but not limited to:
1. Sprinkling haul and access roads and other exposed dust-producing areas with water.
2. Use of covered haul equipment.
3.02 STREET CLEANING
A. Prevent dirt, mud, and dust from escaping trucks departing the Work site, by covering dusty loads and cleaning truck tires before leaving the construction site.
B. All streets in the construction area used by Contractor’s trucks or any other equipment hauling material to and from the area, whether within the Contract limits or adjacent thereto, shall be kept clean by the Contractor and shall be continuously serviced by the
Contractor’s use of sprinkling trucks to control dust. All cleaning and sprinkling shall be at the Contractor’s expense. Violations of these requirements are sufficient grounds for the Project Manager to order the streets in question to be cleaned by others. The expense of the street cleaning will be charged against the Contractor and cost withheld from
Contractor's payments.
3.03 NOISE CONTROL
A. Comply with all Park controls and noise level rules, regulations and ordinances.
Section 01560 - 21
B. Each internal combustion engine used on the job, or related to the job, shall be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine shall be operated on the project without said muffler.
C. Noise levels for scrapers, pavers, graders, backhoes and trucks shall not exceed 90 dBA.
For other equipment, noise levels shall not exceed 85 dBA. Equipment that cannot meet these levels shall be quieted by use of improved exhaust mufflers, noise attenuation barriers or other means approved by the Project Manager.
D. If special circumstances or emergency conditions require Work beyond the hours as specified, the Contractor shall:
1. Notify the Project Manager and Park Manager 72 hours in advance of any proposed extended work hours for preauthorization. The Contractor’s written request shall specify the Work to be performed and the circumstances that warrant the request. The request shall include any additional measures to mitigate noise generated by this construction activity, if deemed necessary by the
Project Manager.
2. If an emergency situation occurs that warrants extended hours, the Contractor shall notify the Park Manager and Project Manager immediately upon determining the need for this Work.
3.04 TREE AND PLANT PROTECTION
A. The Contractor shall minimize vegetation removal during construction operations. All hazardous tree removal, pruning for hazards, and pruning for equipment clearance shall take place prior to commencement of construction activities. All pruning shall be done by a qualified Arborist and shall conform to ANSI A300 Pruning Standards. When removal is required, stumps shall be ground below grade and the area shall be graded to match existing contours.
B. The Contractor shall protect all existing ornamental landscaping and trees from damage by construction activities. Work areas shall be carefully located and marked to reduce potential damage. Trees shall not be used as anchors for stabilizing working equipment.
Work performed adjacent to ornamental landscaping and trees shall include protecting each tree or ornamental with a high visibility perimeter barrier fence. The barrier fence shall be an orange snow fence or approved equal. The Contractor shall not remove any ornamental landscaping or trees without written approval from Project Manager.
C. Where existing vegetation or landscaped areas have been removed or disturbed by the
Contractor’s operations, the site shall be regraded and restored by the Contractor as soon as practicable, with no additional cost to the Owner.
D. If ornamental landscaping or trees are damaged or destroyed by the Contractor’s operations without prior authorization by the Project Manager, the Contractor shall replace the ornamental landscaping or tree in species, size and grade to the satisfaction of the Project Manager, at no cost to the Owner. The Contractor shall maintain the replacement ornamental landscaping for a period of 8 weeks, and replacement trees for a period of one year, to assure a satisfactory replacement. Replacement ornamental plantings or trees that are dead or dying, as determined by the Project Manager, at the end
Section 01560 - 22 of the 8 week or one year establishment period shall be replaced by the Contractor to the satisfaction of the Project Manager and at no cost to the Owner. Should it not be practical to replace the ornamental landscaping or tree, the Contractor shall pay damages in accordance with requirements of the Project Manager. In the event the Contractor does not perform this replacement Work in a timely manner as determined by the Project
Manager, the Project Manager reserves the right to have the Work performed by others.
The expense of replacing ornamental landscaping or trees will be charged against the
Contractor and the cost withheld from Contractor’s payments.
E. A Critical Root Zone (CRZ) shall be established for all trees on-site that need protection.
The CRZ shall be the area between the tree trunk and a surrounding protective barrier fence. The protective barrier fence shall be placed at a minimum distance of the dripline for broad-crowned trees (usually deciduous) and 1.5 times the dripline for narrow-crowned trees (usually conifers). For asymmetrical crowns, the dripline shall be determined at the crown’s widest point. The Project Manager shall have the discretion to require fencing to be placed at a distance of a 1-1.5’ radius for each inch of tree diameter at 4.5’ (diameter breast height) if he/she feels that the dripline does not provide adequate protection. Regardless of diameter, fencing shall be placed at a minimum of 6’ from the trunk of a tree. No disturbance of any kind shall take place within the fenced area (CRZ).
Fencing shall not be removed or relocated without approval from Project Manager.
F. When roots greater than 1” diameter are exposed, root pruning with a saw shall take place under the supervision of the Project Manager.
Roots that must be cut shall be treated as follows:
a. All jagged ends of roots caused by excavation shall be pruned cleanly back to a solid root structure with no splits or tears evident. The final cut at the edge of the trench shall be done with a 10 to 14 point hand saw.
b. Roots shall be kept moist until the area is backfilled. Spot placement of backfill to provide support shall be permitted with Project Managers approval.
G. When tree removals are required, stumps shall be ground rather than pulled when roots are intertwined with the root systems of adjacent trees. Stumps may be pulled when there is no danger of interfering with the roots of adjacent trees.
H. The Project Manager may request that a 6-10” layer of mulch be applied over the CRZ of trees on site before any construction activity begins to help reduce soil compaction.
Following construction, the mulch shall be reduced to a depth of 4”. The Project
Manager may also request travel lanes for heavy equipment.
I. Contractor shall monitor tree health throughout the construction process and notify
Project Manager immediately of any damages to trees as a result of construction activities. Contractor shall not implement any tree care practices without approval from
J. Trenching & Tunneling:
Section 01560 - 23
1. When trenching is utilized, it shall be done as far from the tree trunk as possible.
For trees less than 7” in diameter, trenching should be avoided under the dripline.
A general guideline for a minimum trenching distance is .5’ for each inch of trunk diameter measured at 4.5’ (dbh). The following table lists minimum distances for tree diameters:
Tree diameter
(dbh-4.5’)
Minimum trenching distance from trunk
10-12” 5-6’
14-16” 7-8’
18-20” 9-10’
22-24” 11-12’
26-28” 13-14’
30-32” 15-16’
2. In some cases, trenching inside of the minimum distance is unavoidable. When roots greater than 2” diameter are encountered while trenching inside of the minimum distance, equipment operation shall cease and roots shall be exposed by hand digging. Roots shall then be pruned cleanly with a saw to the depth of the required excavation, and on the edge of the trench closest to the tree. No root pruning shall take place without Project Manager’s supervision.
3. Soil removed from the trenches shall be replaced as soon as possible. Exposed, pruned, or broken roots shall not be allowed to dry out prior to final backfill.
Building materials, compacted soil, or soil with a permeability significantly different than the surrounding natural soil shall not be used to fill trenches.
4. Where feasible, a combination of trenching and tunneling may be utilized.
Trenching may be used in gaps between trees where root damage is not an issue.
When the trench approaches a tree’s root zone, tunneling may be implemented until safely out of the root zone. Another guideline is to replace trenching with tunneling when roots 1” in diameter are encountered. The following table lists some tunneling distances for tree diameters:
Tree diameter Minimum tunneling distance from any side of tree
6-9” 5’
10-14” 10’
15-19” 12’
Over 19” 15’
5. Tunneling is the preferred method over trenching for root protection. Tunneling at a minimum depth of 2’ is recommended; 3-4’ is safer. It is best to tunnel at least 1-2’ away from the tree trunk in order to avoid a conflict with a taproot.
K. Grade changes in root zones can cause significant damage and death of trees. Raising the grade can suffocate roots; lowering the grade can be detrimental as valuable feeder roots are destroyed. If enough larger roots are removed, the tree may pose a risk from reduced stability. Changing the grade within the root zone of any tree on the site shall be avoided and shall be approved by the Project Manager.
Section 01560 - 24
3.05 TURF PROTECTION AND RESTORATION
A. Contractor shall minimize disturbance and impacts to turf areas. Precautions shall be taken to prevent rutting, scalping and excessive compaction outside the excavation limits.
Mats, plywood or thick mulch may be used with the Project Manager’s approval, to prevent rutting.
B. Turf damaged by Contractor’s activities shall be filled, as required, with good quality top soil, graded and lightly compacted to match existing contours. Damaged areas shall be reseeded with grass seed suited to the local climate using hydro seeding methods.
Contractor shall provide a submittal for the seed mix and furnish seed label to Project
Manager.
C. Contractor shall provide all final restoration Work and clean up. Sweep all paved areas, rake all lawns, and remove all debris from the job site. Wash and provide final cleaning of all Work as directed by the Project Manager.
3.06 DEWATERING AND WATER CONTROL
A. Maintain excavations free from water while construction is in progress. Keep trenches and other areas free from water as required to permit continuous progress of, or to prevent damage to, the Work or the Work of others. No dewatering equipment shall discharge into area streams at any time, for any reason.
B. The Contractor shall not divert storm drainage or sewer flow through any portion of new sewer or any other new facility until after that portion of the pipeline to be used has been field-acceptance tested in accordance with the Specifications, and until specific written approval from the Project Manager has been received. No direct water from construction activities shall be diverted to new or existing sanitary sewer.
3.07 FISH AND WILDLIFE AND PLANT HABITAT
A. The requirements of local, state, and federal agencies charged with wildlife and fish and plant protection shall be adhered to by the entire construction work force.
B. ALL EQUIPMENT TO BE USED IN THE WORK SHALL BE CLEANED PRIOR TO
MOBILIZATION TO THE SITE to prevent noxious and non-native seed contamination of the site.
3.08 EROSION CONTROL
A. Execute the approved Erosion Control Plan.
B. Temporary Sediment Fences:
1. Filter fabric fence shall have a minimum 6-inch horizontal and 6-inch vertical burial for stability. All excavated material from filter fence installation shall be firmly re-deposited along the entire trenched area on the uphill side of the fence.
2. The filter fabric shall be installed to follow the contours where feasible. The fence posts shall be spaced a maximum of 6 feet apart and driven securely into
Section 01560 - 25 the ground a minimum of 24 inches. Overlap filter fabric fence joints minimum
12-inches prior to backfilling.
3. Sediment fences shall be inspected by the Contractor immediately after each rainfall and at least daily during prolonged rainfall. Any required repairs, relocations or additions shall be made immediately.
4. At no time shall more than one foot of sediment be allowed to accumulate behind a sediment fence. Sediment should be removed or re-graded into slopes, and the sediment fences repaired and reestablished as needed.
C. Straw Bale Sediment Barrier/Bio-Filter Bags: This method may be used to divert runoff around active Work areas or into sediment filtration/sedimentation areas.
1. Bio-filter bags can be used in drainage ditches and/or swales.
2. Straw bales and bio-filter bags shall be secured with stakes driven through them and into the ground to a minimum depth of 12 inches. Straw bales shall be keyed into the existing ground 2 to 4 inches.
3. At no time shall more than one foot of sediment be allowed to accumulate behind a straw bale sediment barrier and/or bio-filter bag system. Sediment should be removed or re-graded into slopes, or new lines of barriers installed uphill of sediment-laden barriers.
D. Plastic Sheeting:
1. Spoils piles and exposed earth slopes shall be covered in wet weather or if wet weather is anticipated. Plastic sheeting shall be installed and maintained tightly in place by using sandbags or tires on ropes with a maximum 10 feet grid spacing in all directions. All seams shall be taped or weighted down full length and there shall be at least 12-inch overlap of all seams. For seams parallel to the slope contour, the uphill sheet shall overlap the downhill sheet. No runoff shall be allowed to run under the plastic covering.
2. Drainage from areas covered by plastic sheeting shall be controlled such that no discharge occurs directly onto uncontrolled, disturbed areas of the construction site.
E. Excavated materials shall be placed on the uphill side of the excavation except when there are overriding safety requirements or lack of available space. In no case shall excavated material be placed in streams, watercourses, or wetlands without required permits.
F. Vegetative Buffer Protection: Areas within or adjacent to the project may have steep slopes, or buffers of associated streams, watercourses, or wetlands that need to be avoided and protected from disturbance. The Contractor shall limit disturbance to existing vegetation in these areas to the extent possible. In no case shall the Contractor cause disturbance in associated streams, watercourses, or wetlands without required permits.
Section 01560 - 26
G. Under no circumstance shall Contractor’s vehicles or equipment enter a property adjacent to a stream, watercourse, or other storm and surface water facility, or a wetland without an Erosion Control Plan having been approved by the Project Manager and implemented.
H. The Contractor shall not drag, drop, track, or otherwise place or deposit, or permit to be deposited, mud, dirt, rock or other such debris into any part of the public storm or surface water system, or any part of a private storm or surface water system. The Contractor, at the Contractor’s expense, shall immediately remove any such deposit of material. No material shall be washed or flushed into any part of the storm or surface water system without erosion control measures installed to the satisfaction of the Project Manager.
I. The Contractor shall maintain the facilities and techniques contained in the approved
Erosion Control Plan so as to continue to be effective during the construction or other permitted activity. If the facilities and techniques approved in an Erosion Control Plan are not effective or sufficient as determined by the Project Manager, the Contractor shall revise the plan upon notification by the Project Manager. Upon approval of the revised plan by the Project Manager, the Contractor shall immediately implement the additional facilities and techniques. In cases where erosion is occurring, the Project Manager may require the Contractor to install interim control measures prior to submittal of the revised
Erosion Control Plan.
J. The Contractor shall ensure that all necessary pollution control equipment, supplies, or materials are available to implement the Erosion Control Plan.
K. Filter fabric fences, sediment barriers and other erosion control devices shall be removed by the Contractor when they have served their useful purpose, but not before the upslope area has been permanently protected and stabilized.
3.09 CULTURAL RESOURCES
A. Attention is directed to the National Historic Preservation Act of 1966 and 36 CFR 800, which provide for the preservation of potential historical, architectural, archaeological or cultural resources (hereinafter "cultural resources").
B. The Project Manager intends to conform to the applicable requirements of the National
Historic Preservation Act of 1966 as it relates to the preservation of cultural resources and fair compensation to the Contractor for delays resulting from such cultural resources investigations.
C. Monitoring: No monitoring is required at the time of bidding.
This is the start of the file's text. The full file is on GovTribe.