Attachment A- Technical Specifications .pdf

PDF 505 KB Posted

Attached to
#10969 ITB 2024 Paving Improvements Project At Beverly Beach State Park
Solicitation number
S-63400-00009622
Issued by
Lake County, Moro City, Oregon

About this file

This document contains the technical specifications for the 2024 Paving Improvements Project at Beverly Beach State Park in Lincoln County, Oregon. The project is being managed by the Oregon Parks and Recreation Department (OPRD) and involves the reconstruction and expansion of the campground roadways and campsites at the park. The work includes items such as asphalt removal, road and campsite reconstruction, aggregate expansion, paving, pavement markings, and installation of wheel stops. Contractors are required to submit a proposed construction schedule, traffic control plan, and various submittals for approval prior to beginning work. The contract will have a specific Substantial and Final Completion date, and the Contractor is required to coordinate work activities with the Park Manager to minimize disruption to park operations and the public.

The payment terms for this contract are based on unit prices for the various work items, with no separate payment for items such as mobilization, traffic control, and site cleanup. The Contractor is responsible for obtaining all necessary permits, and will not be charged park day use fees. The Contractor is also required to follow specific environmental controls and protections, particularly related to working around existing vegetation and trees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oregon Parks and Recreation

Department

TECHNICAL SPECIFICATIONS

For

2024 Paving Improvements At Beverly Beach State Park

Project Number: OPRIS 37450 Contract Number: 10969

Date: February, 2024

Oregon Parks and Recreation Department Engineering Section

725 Summer Street NE, Suite C Salem, Oregon 97301

THIS PAGE INTENTIONALLY LEFT BLANK

i Table of Contents

TABLE OF CONTENTS

PAGE

SECTION 01010 – SUMMARY OF WORK

SECTION 01019 – CONTRACT CONSIDERATIONS

SECTION 01025 – MEASUREMENT AND PAYMENT

SECTION 01028 – MODIFICATION PROCEDURES

SECTION 01062 – PERMITS

SECTION 01090 – REFERENCE STANDARDS

SECTION 01300 – SUBMITTALS PROCEDURE

SECTION 01350 – PROTECTION OF CULTURAL RESOURCES

SECTION 01560 – ENVIRONMENTAL CONTROLS

SECTION 01570 – TRAFFIC CONTROL

SECTION 02100 – SITE CLEARING

SECTION 02200 – EARTHWORK

SECTION 02240 – CONTROL OF WATER

SECTION 02700 – ASPHALTIC CONCRETE PAVING AND RESURFACING

SECTION 02765 – PAVEMENT MARKINGS

ii iv

Beverly Beach State Park Campground Paving 23-25 Project

Section 01010 - 1

SUMMARY OF WORK

SECTION 01010 – SUMMARY OF WORK

PART 1 – GENERAL

1.01 DESCRIPTION OF WORK

A. Requirements of the “State of Oregon General Conditions for Public Improvement Contracts” January 2012 edition as amended by ITB 10969 Exhibit 7, Supplemental General Conditions apply to the Technical Specifications and Plans for this Project.

B. The Work shall be as shown on the Plans and as specified herein at the following location(s):

1. Beverly Beach State Park (the “Park”)

C. Contractor shall furnish all permits, labor, equipment, tools, supervision, materials and incidentals required to complete the Work in accordance with the Plans, Specifications and terms of the Contract. Also refer to the Invitation to Bid (“ITB”) and the Contract for additional requirements and information. Work includes, but is not limited to, the following:

1. Mobilization.

2. Traffic Control.

3. General Project Demolition.

4. Asphalt Removal.

5. Transitions to Existing Asphalt.

6. Roadway Reconstruction.

7. Campsite Reconstruction.

8. Campsite Asphalt Expansion.

9. Campsite Gravel Surface Expansion.

10. Path Transitions.

11. Asphalt Concrete Paving.

12. Installation Aggregate Shoulder.

13. Installing Camp Site Wheel Stops.

14. Installing Parking Area Wheel Stops.

15. Installing Pavement Markings.

D. Specific items furnished by Owner:

1. Campsite wheel stops. Parking area wheel stops are to be furnished by Owner and installed by the contractor.

E. Project is for the Oregon Parks and Recreation Department, herein referred to as Owner.

F. The Owner’s Authorized Representative, herein referred to as Project Manager is:

John Seevers Oregon Parks & Recreation Department 725 Summer St NE, Ste. C Salem, OR 97301 (503)-298-1868

Section 01010 - 2

1.02 CONSTRUCTION STAKEOUT AND LAYOUT

A. The Plans show approximate locations and dimensions of existing utilities and facilities adjacent to and in the proposed Work site, as shown on the Plans, for the Contractor’s information. Final stakeout of the construction Work shall be provided by Contractor and approved by Project Manager. The Contractor will be solely responsible for locating all existing utilities within the Project sites. No additional stakeout will be provided by the Owner.

B. Contractor is responsible for properly laying out the Work and for lines and measurements for the Work. Contractor to verify the figures shown on the Plans before any construction takes place or products are ordered. Report errors or inaccuracies to the Project Manager for resolution before commencing Work. Submit as-built plans after completion of the Project to record any changes that took place in accordance with Section 01300.

1.03 PROJECT RECORD DRAWINGS

A. Maintain at the site one complete set of full-sized original prints for recording installed conditions (As-Builts). Keep record drawings (As-Builts) clean, undamaged and up to date as Work progresses. Accurately indicate all deviations, additions and omissions from the original drawings in red ink.

B. The purpose of these record drawings is to provide the Project Manager with an easy to read, complete record of the installation so that at the end of the Project the Project Manager can revise the original Contract Plans to represent the actual installation. Color-coded and highlighted notes shall be used if these would make the record drawings easier to read.

C. At the completion of the Work, Contractor shall furnish the Project Manager this original set of marked-up drawings. Final payment to the Contractor will not be authorized until these drawings have been submitted to and accepted by the Project Manager.

1.04 OWNER OCCUPANCY

A. The Owner will not close any areas of the Park except the area under construction and temporary closures as approved in advance by the Park Manager for approved limited durations.

B. Coordinate all Work with Park Manager to minimize conflict and to facilitate on-going use and operation of the Park.

C. The Owner and Owner’s other contractors and consultants will be on-site performing other work elsewhere on-site during construction. Coordinate fully with separate contractors so that work under other contracts may be carried out smoothly, without interfering with or delaying Work of this Contract.

1.05 CONTRACTOR USE OF SITE AND PREMISES

Section 01010 - 3

A. Construction Operations: Limited to construction areas around the Project site(s).

B. Contractor shall at all times conduct their operations to ensure the greatest public safety and least inconvenience to the public and adjacent land owners.

C. Contractor shall receive approval from the Park Manager as to the staging and stockpiling of the equipment and materials used on the Project.

D. Storage of material onsite is at Contractor’s own risk.

E. Hauling Restrictions: Comply with all legal load restrictions in the hauling of material.

Load restrictions shall meet state load restrictions.

F. Parking: Contractor and Subcontractors shall park at approved locations, and as directed by the Park Manager.

G. Restrooms: Contractor shall provide temporary rest room facilities for its workers and

Subcontractors as required.

1.06 CONSTRUCTION SCHEDULE

A. Refer to the Contract for construction schedule Substantial and Final Completion dates.

B. Contractor shall not begin any on-site Work of this Project before required permits have been obtained, a proposed construction schedule is submitted, along with required submittals in accordance with Section 01300, and the Project Manager has given written approval of the submittals and construction schedule provided by the Contractor.

1.07 SPECIFICATION LANGUAGE

A. Portions of the Specifications are written in imperative and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise.

1. The words “shall be” shall be included by inference where a colon (:) is used within sentences or phrases. Example: Aggregate: ASTM C33. Singular words will be interpreted as plural and plural words shall be interpreted as singular where applicable and where full context of the Contract Documents so indicates.

2. The word provide or furnish means “furnish and install”.

1.08 PROJECT IDENTIFICATION SIGN

A. The Project identification sign, if used, will be by the Owner.

1.09 CUTTING

A. Perform or arrange and pay for required cutting of asphalt, concrete, masonry, wood, structural framing, etc. and obtain approval from the Project Manager prior to cutting.

Section 01010 - 4

SUMMARY OF WORK

B. Cutting or channeling of underpinning or structural members shall not be permitted without prior permission of the Project Manager and Engineer.

C. No weakening of structural parts is permitted and the Contractor will pay for and correct any Work impaired.

1.10 PATCHING

A. Where trenching is done through existing paving, walks, curbs, etc. (with prior approval from the Project Manager), the Contractor is responsible to patch and repair these structures to original condition.

B. Patch all openings in and through concrete and masonry with dry pack.

C. In new Work, patch and refinish all damaged finished surfaces that are a result of the

Contractor’s activities to match the adjacent surface as approved by the Project Manager.

D. Where new electrical Work is installed in an existing building, patch and refinish surfaces damaged to match existing. Refinishing is to be as directed by the Project Manager.

END OF SECTION

Section 01019 - 5

CONTRACT CONSIDERATIONS

SECTION 01019 – CONTRACT CONSIDERATIONS

1.01 SPECIAL PROJECT REQUIREMENTS

A. While portions of the Park are closed for construction, areas surrounding the construction site and driveways, parking lots and walkways in the area shall be open to the public from start of construction until the completion date. The Contractor shall coordinate with the Project Manager and Park Manager to provide both access and public safety during construction. Devices required to provide for public safety during construction shall be provided and installed by the Contractor at the expense of the Contractor. If required safety devices are not installed, Work shall not be allowed to commence until such devices are installed. The Contract Time will not be extended based on working Days lost due to the non-compliance of safety devices.

B. Construction operations shall be restricted to normal daily operating hours and the normal

Open/Close schedule of the Park but not outside the hours of 7AM – 5PM, Monday – Friday unless otherwise arranged and approved in writing by the Project Manager and Park Manager.

C. No Work shall be performed on any legal holiday or weekends without prior written approval from the Park Manager.

D. If special circumstances or emergency conditions require Work beyond the hours as specified, the Contractor shall:

1. Notify the Project Manager and Park Manager 72 hours in advance of any proposed extended work hours for preauthorization. The Contractor’s written request shall specify the Work to be performed and the circumstances that warrant the request. The request shall include any additional measures to mitigate noise generated by this construction activity, if deemed necessary by the Project Manager.

2. If an emergency situation occurs that warrants extended hours, the Contractor shall notify the Park Manager and Project Manager immediately upon determining the need for this Work.

E. Contractor shall notify the Park Manager in advance when Contractor, Subcontractor or any employees of such shall be on Park property.

F. Comply fully with manufacturer’s instructions and recommendations. Should manufacturer’s instructions conflict with Contract Documents, request clarification from Project Manager before proceeding.

G. Contractor shall furnish all planning, investigation, material, equipment, labor and permits to complete the Work in accordance with the Plans, Specifications and terms of this Contract, except as specified otherwise herein.

H. Day Use Park Fees will not be charged by the Owner for contractors or deliveries.

Section 01019 - 6

CONTRACT CONSIDERATIONS

I. All changes to normal traffic patterns must be clearly explained in the Traffic Control Plan and approved by the Project Manager.

J. For paving projects, Contractor shall stay on roadway surfaces at all times. No staging of equipment or storage of materials shall be allowed off the existing roadway surface.

1.02 EXISTING UTILITIES

A. In general, the locations of existing utilities, whether above ground or underground or under the roof, are to be determined as needed by the Contractor. Work in some cases must be done in close proximity to said utilities and live electrical service lines, pipes, drains, and structures not shown, which may require a change in operations, cost and time.

B. Utilities damaged by Contractor’s activities shall be reestablished, to the satisfaction of the Park Manager and/or Project Manager. If the Contractor fails to repair the damaged utility, costs for repairing the utility shall be deducted from final payment.

C. Comply with Oregon Administrative Rules Chapter 952 Division 1, Relating to abandoned underground facilities. An “Abandoned Facility” means an underground facility that is no longer in service and is physically disconnected from the operating facility that is in service. In addition to notification requirements of this rule, notify Project Manager of any Abandoned Facilities which are discovered during the course of the Project.

1.03 PROGRESS CLEANING

A. Maintain areas free of waste materials, debris, and rubbish at all times. Maintain site in a clean and orderly condition. Provide legal debris disposal (or recycle waste materials if feasible) off-site for all debris generated while working on this Project.

B. Remove debris and rubbish from pipe chases and other closed or remote spaces on a daily basis.

C. Remove waste materials, debris and rubbish from the site immediately upon such materials becoming unfit for use in the Work. In the event this material is not removed, Project Manager will give one notification in writing as to the removal of such waste materials, debris and rubbish. If the Contractor does not clean up the waste materials, debris and rubbish within 24 hours as directed by the Project Manager, the Project Manager reserves the right, but does not have the duty, to have the material removed and the expense shall be deducted from payment to the Contractor. This debris shall be removed at the end of each workday.

D. Provide legal debris disposal off-site for all debris generated while working on this

Project.

1.04 TEMPORARY UTILITIES

A. Connections to existing utilities (electric, water, sewer, telephone service) may be allowed as approved by the Project Manager. Contractor to make arrangements for connections. Contractor to pay for cost of connection and use. Exercise measures to conserve energy and water.

Section 01019 - 7

B. Provide toilet and wash-up facilities for the work force at the site. Comply with applicable laws, ordinances and regulations pertaining to public health and sanitation.

PART 2 – MATERIALS (Not Applicable)

PART 3 – EXECUTION (Not Applicable)

Section 01019 - 8

Section 01025 - 9

MEASUREMENT AND PAYMENT

SECTION 01025 – MEASUREMENT AND PAYMENT

1.01 DESCRIPTION

A. All Payments shall be as provided in the State of Oregon General Conditions for Public Improvement Contracts. References to other documents in the Plans and in the Specifications, such as ODOT and ODOT/APWA are not intended to include references to measurement and payment that may exist in those other documents. Specific Measurements for Work Items are detailed in this Specification Section 01025.

B. If no Item exists for a portion of the Work, include the costs in a related Item.

C. No separate payment will be made for any item that is not specifically set forth in the

Solicitation, and all costs therefore shall be included in the prices named in the Solicitation for the various appurtenant items of Work.

D. Quantities listed in the Contract Document do not govern final payment. Payments to the

Contractor will be made only for actual quantities of Contract items performed in accordance with terms of the Contract and for items of Work actually performed under Change Orders.

E. Indirect costs, such as supervision and overhead, profit, and the General Conditions specified in the Contract, all shall be allocated to each item as applicable for Work defined in the item. No separate payment will be made to the Contractor for these items.

F. Payments shall include full compensation for all labor, equipment, and materials necessary to perform the specified Work.

G. Partial payments to be made under the Contract shall be based on the percent of Work complete as approved by the Project Manager according to the State of Oregon General Conditions for Public Improvement Contracts.

H. Material requiring weighing to be weighed by scale. Allowable scales with Project

Manager approval are commercial vehicle weigh scales, plant automatic weight batching and mixing control printer system, or plant weight hopper printer system.

Pay Items to be measured by weight shall include all Contractor costs for furnishing appropriate weight tickets and transporting materials to the scales or to check weighing.

The scales shall conform to ORS 618, and NIST Handbook 44, and shall be:

• Licensed by the Oregon Department of Agriculture;

• Technically suitable for weighing the materials;

• Properly installed and maintained; and

• Accurate to the required tolerances.

The Owner may periodically have a representative at the scales to observe the weighing procedures.

Section 01025 - 10

1.02 BID ITEMS, MEASUREMENT AND PAYMENT

(NOTE: See the ITB Pricing Submittal Form.) Payment shall include full compensation for all labor, equipment, materials and incidentals needed to accomplish the Work as shown and described in the Contract Documents.

A. BID ITEMS - SITE RELATED:

1.0 Mobilization:

a. Measurement and payment for this bid item shall be made on a lump sum basis. The amount to be allowed for Mobilization in the partial payment to be made under the Contract will be as follows:

b. When 5% of the total original Contract amount is earned from other items, not including advances on materials, 50% of the amount bid for Mobilization, or 2.5% of the original Contract amount, whichever is the least, will be paid.

c. When 10% of the total original Contract amount is earned from other items, not including advances on materials, 100% of the amount bid for Mobilization, or 5% of the original Contract amount, whichever is the least, will be paid.

d. Upon completion of all Work on the Project, payment of any amount bid for Mobilization in excess of 5% of the total original Contract amount will be paid.

e. The above schedule of progress payments for Mobilization shall not limit or preclude progress payments otherwise provided by the Contract.

2.0 Traffic Control:

a. Measurement and payment for this bid item shall be made on a lump sum basis. The lump sum payment shall include all on-highway signage, materials, equipment, and labor necessary to perform the Work as specified.

b. Payment shall be provided on a pro-rated basis allowing an amount equivalent to the percentage of the original Contract amount approved for each payment request, less normal retainage.

3.0 General Project Demolition:

a. Measurement and payment for general project demolition shall be made on a lump sum basis.

b. The Work includes providing all labor, equipment, materials and incidentals needed to complete the Work in conformance with the Contract Documents and as approved by the Project Manager.

Section 01025 - 11

c. This pay item includes all demolition of items not specifically listed on incidental work in other contract pay items. Work includes, but is not limited to: sidewalk removal, concrete pad removal, paver removal, asphalt trail removal, wheel stop removal and other miscellaneous demolition work.

4.0 Asphalt Removal:

a. Measurement and payment for asphalt removal shall be made on a square foot basis.

b. The Work includes providing all labor, equipment, materials and incidentals needed to remove asphalt in conformance with the Contract Documents and as approved by the Project Manager.

c. Payment shall include full compensation for laying out the asphalt removal areas area, saw cutting, asphalt removal and disposal.

d. This pay item is exclusive to asphalt removal areas only. Asphalt removed for base repairs, transitions, road restoration, campsite restoration and campsite expansions shall be incidental to those pay items.

e. Grading, leveling, compaction and preparing the existing base for paving shall be incidental to this work.

f. Base aggregate needed for leveling and asphalt used for re-paving the asphalt removal areas shall be paid under their specific pay items separately.

5.0 Base Repair:

a. Measurement and payment for base repairs shall be made on a cubic foot basis measured to the nearest 0.1 foot.

incidentals needed to repair the road base in conformance with the

c. Payment shall include full compensation for laying out the repair area, saw cutting, asphalt grinding, excavation, asphalt removal and disposal.

d. Geotextile fabric, base aggregate and asphalt used for completing this Work shall be paid under their specific pay items separately.

Section 01025 - 12

6.0 Roadway Transitions:

a. Measurement and payment for transitions shall be made on a lump sum basis. This bid item includes the transitions to the existing roadway at limits of the Project near the east side of the E loop and the water treatment plant entrance road.

incidentals needed to complete the roadway transitions in conformance with the Contract Documents and as approved by the Project Manager.

c. Payment shall include full compensation for laying out the transition areas, saw cutting, asphalt grinding, excavation, asphalt removal and disposal, spoils removal and disposal.

7.0 Roadway Reconstruction and Expansion:

a. Measurement and payment for roadway reconstruction an expansion shall be made on a square foot basis.

incidentals needed to complete the roadway reconstruction areas in conformance with the Contract Documents and as approved by the

c. Payment shall include full compensation for laying out the reconstruction areas, saw cutting, excavation, asphalt removal and disposal, spoils removal and disposal.

8.0 Aggregate Campsite Expansion

a. Measurement and payment for campsite reconstruction shall be made on a square foot basis.

incidentals needed to complete the aggregate campsite expansions areas in conformance with the Contract Documents and as approved by the

c. Payment shall include full compensation for laying out the reconstruction areas, saw cutting, excavation, asphalt removal and disposal, spoils removal and disposal.

Section 01025 - 13

MEASUREMENT AND PAYMENT

d. Hand excavation and extra care required to protecting tree roots and tree root pruning shall be incidental to this Work.

e. Geotextile fabric, base aggregate and asphalt used for completing this

9.0 Geotextile Fabric

a. Measurement and payment for geotextile fabric shall be made on a square foot basis.

incidentals needed to install geotextile fabric in conformance with the

10.0 Base Aggregate:

a. Measurement and payment for base aggregate shall be made on a ton in place basis measured to the nearest 0.01 ton. The quantities for payment shall be calculated from weight tickets collected at the job site.

c. Grading and compaction shall be incident to this pay item.

11.0 Asphalt Concrete Pavement (“ACP”):

a. Measurement and payment for ACP shall be made on a ton in place basis measured to the nearest 0.01 ton. The quantities for payment shall be calculated from weight tickets collected at the job site.

12.0 3/8” Aggregate:

a. Measurement and payment for 3/8” aggregate shall be made on a ton in place basis measured to the nearest 0.01 ton. The quantities for payment shall be calculated from weight tickets collected at the job site.

c. The Work includes providing all labor, equipment, materials and

d. Grading and compaction shall be incident to this pay item.

Section 01025 - 14

13.0 Installing campsite wheel stops:

a. Measurement and payment for installing the owner furnished campsite wheel stops shall be made on a lump sum basis.

b. The Work includes providing all labor, equipment, materials and

c. OPRD shall furnish the wheel stops for contractor installation.

14.0 Parking wheel stops:

a. Measurement and payment for installing wheel stops shall be made on an individual basis.

b. The Work includes providing all labor, equipment, materials and

15.0 Pavement markings:

a. Measurement and payment for installing pavement markings shall be made on a lump sum basis.

b. The Work includes providing all labor, equipment, materials and

PART 2 – MATERIALS (not applicable)

PART 3 – EXECUTION (not applicable)

Section 01028 - 15

MODIFICATION PROCEDURES

SECTION 01028 – MODIFICATION PROCEDURES

1.01 SUMMARY

A. Section includes the administrative requirements for Requests for Information (“RFI”) and

Proposal Requests (“PR”).

B. Prior to execution of a Change Order (“CO”), the following documents shall be submitted as indicated.

1.02 REQUEST FOR INFORMATION

A. General:

1. RFI's are requests for information originated, prepared and submitted by the Contractor to the Project Manager only when the Contractor is unable to determine from the Contract Documents, the material, process, system or Work to be installed. Endeavor to keep the number of RFI’s to a minimum. For critical or emergency items, contact Project Manager at once.

2. If Project Manager clarification results in additional cost or time, do not proceed with the Work indicated by the RFI until the Project Manager provides an approved copy of the RFI or until a PR is fully-executed. A CO will be processed to include this type of change.

3. Submit RFI’s on form provided by Project Manager.

4. Number RFI's sequentially; include date submitted.

5. Identify Project, pertinent Plan sheet, detail number, and Specification Section.

6. Specifically identify time response information as required to avoid impact on construction schedule or cost. Project Manager will endeavor to respond to proper RFI’s within 7-Days, if possible.

B. RFI’s shall include written and graphic solutions proposed by Contractor. Project Manager will determine if Contractor’s proposal is in accordance with Contract Documents and design intent of Project.

1. Contractor's failure to make a reasonable effort to propose realistic solution may result in RFI's being returned with no action.

2. RFI's that request information that is clearly shown in the Contract Documents will be considered frivolous/improper and will be returned with no action.

C. Maintain current and accurate RFI Log.

Section 01028 - 16

MODIFICATION PROCEDURES

1.03 PROPOSAL REQUEST

1. Provide quotations for extra Work or changes in Work when requested by the Project

Manager, on a PR form to be provided by the Project Manager.

2. Provide a detailed itemization of the costs to the degree necessary for evaluation by the Project Manager. Indicate if a change to the Contract Period is warranted.

B. Maintain current and accurate Proposal Request log.

C. Issuance of a PR is not an authorization to proceed with extra or changed Work until fully executed by Owner and Contractor. Do not proceed with the Work indicated in the PR until the Project Manager provides a fully-executed copy. A CO will be processed to include approved Proposal Requests.

Section 01062 - 17

PERMITS

SECTION 01062 – PERMITS

A. The Contractor shall be responsible to abide by permitting requirements as stated in the State of Oregon General Conditions for Public Improvement Contracts

1.02 PERMITS

A. See Supplemental General Conditions for Public Improvement Contract “Exhibit 7” in Invitation to Bid for supplemental or additional permit requirements.

Section 01062 - 18

PERMITS

Section 01090 - 19

REFERENCE STANDARDS

SECTION 01090 – REFERENCE STANDARDS

PART 1 – GENERAL

1.01 REFERENCED STANDARDS:

All Work shall conform to the issue of following referenced standards which is current at date of receipt of bids. Whenever the following abbreviations are used in these Contract Documents, they are to be construed the same as follows:

AA Aluminum Association AASHTO American Association of State Highway and Transportation Officials ACI American Concrete Institute ACM American Construction Manual AISC American Institute of Steel Construction ANSI American National Standards Institute APA American Plywood Association APWA American Public Works Association ASHRAE American Society of Heating, Refrigerating and Air-Conditioning

Engineers ASTM American Society for Testing and Materials AWPA American Wood Preservers' Association AWS American Welding Society AWWA American Water Works Association CRSI Concrete Reinforcing Steel Institute FM Factory Mutual FS Federal Specifications (“FS”) ICEA. Insulated Cable Engineers Association IEEE Institute of Electrical and Electronic Engineers JIC Joint Industrial Council MIL Military Standards NEC National Electric Code (Oregon Amended) NECA National Electrical Contractors Association NEMA National Electrical Manufacturers Association NESC National Electrical Safety Code NFPA National Fire Protection Association ODOT Oregon Standard Specifications for Highway Construction by the Oregon

Department of Transportation ODOT/APWA Oregon Standard Specifications for Construction by the Oregon

Department of Transportation and Oregon Chapter of APWA OSSC Oregon Structural Specialty Code OSHA Occupational Safety and Health Administration QPL Qualified Products Listing by the Oregon Department of Transportation, Materials and Research Section PCI MNL Pre-stressed Concrete Institute SAMA. Scientific Apparatus Manufactures Association SMACNA Sheet Metal and Air Conditioning Contractors' National Association UBC Uniform Building Code State of Oregon, Structural Specialty Code

Amended UFC Uniform Fire Code with State and Local Amendments UL Underwriters Laboratories UPC Uniform Plumbing Code State of Oregon, Plumbing Specialty Code WCLIB West Coast Lumber Inspection Bureau

Section 01090 - 20

REFERENCE STANDARDS

Section 01300 - 21

SUBMITTALS PROCEDURE

SECTION 01300 – SUBMITTALS PROCEDURE

A. This section specifies procedures for the technical submittals required in the Plans and Specifications.

NOTE:

1. The Contractor is responsible for making technical submittals as called for in the Plans and individual Specification Sections. The Contractor shall develop a submittal list within 14 Days after being issued the Notice To Proceed for Owner to review and approve. Contractor shall modify the submittal list as requested by Owner until approved.

2. During construction, if the Contractor installs products or materials which are not in conformance with the Plans and Specifications, that are not approved by the Owner through the submittal process, the Contractor will be required to remove such products or materials and replace with the specified product or material at no additional cost to the Owner.

B. Submittals shall contain information that will enable the Project Manager to assess whether the Contractor’s proposed materials, equipment or methods of work are in general conformance to the design intent and in compliance with the Plans and Specifications. The information may consist of drawings, specifications, descriptive data, certificates, samples, test results and/or other information, as required in the individual Specification Sections and Plans.

1.02 CONTRACTOR RESPONSIBILITIES

A. Prior to submittal transmittal to the Project Manager,

1. Ensure the accuracy and completeness of the information contained in each submittal and that the material, equipment or method of work is as described in the submittal.

2. Ensure information is legible by the Owner. Faxed submittals are NOT acceptable.

3. Ensure that the information is transmitted and approved by Owner and as follows:

a. Prior to purchasing/leasing/ordering/installing

b. Early enough to allow a 7-day review period by the Owner, and to meet the construction schedule.

4. Verify the material and equipment described in each submittal conforms to the requirements of the Specifications and Plans.

Section 01300 - 22

5. Ensure there is no conflict with other submittals.

6. Notify the Project Manager in each case where such submittal may affect the Work of another contractor or Owner.

PART 2 – PRODUCTS (not applicable)

PART 3 – EXECUTION

3.01 TRANSMITTAL PROCEDURE

1. For each required submittal, submit two (2) copies of all required information not less than fourteen (14) Days prior to purchase or installation (if previously purchased). One copy will be returned to the Contractor. Individual sheets shall not exceed 22 inches x 34 inches. NOTE: SUBMITTALS MAY BE MADE

ELECTRONICALLY VIA EMAIL WITH PDF ATTACHMENT(S) AS

APPROVED BY PROJECT MANAGER.

2. Use a Submittal/Transmittal Form for material and equipment submittals. Use a separate form for items specified in separate, discrete sections for which the submittal is required. Use a single form for submittals for various items when the items taken together constitute a manufacturer’s package, or are related such that expediency indicates review of the package as a whole.

3. Note the unique sequentially assigned number that will accompany each item submitted, on the transmittal form. Original submittal numbers shall have the format: “XXX”; where “XXX” is the sequential number assigned by the Contractor. Resubmittals shall have the format: “XXX-Y”; where “XXX” is the originally assigned submittal number and “Y” is a sequential letter assigned for resubmittals, i.e., A, B or C being the 1st, 2nd and 3rd resubmittals, respectively.

B. Deviation from Contract: Submit a request for substitution for deviations from the Specifications or Plans. Include the reason for the deviation and cost differential for the deviation. Deviations from the Contract shall be authorized by Change Order only.

C. Submittal Completeness: submittals that do not have all the information required to be submitted are not acceptable and will be returned without review.

D. Project Manager reserves the right to ask for submittals not referenced in this document.

Section 01300 - 23

SUBMITTALS PROCEDURE

3.02 REVIEW PROCEDURE

A. The Project Manager will review the submittal and return it to the Contractor. The returned material will consist of one (1) marked-up copy of the submittal. The returned submittal will indicate one of the following actions:

1. If the review indicates the material, equipment or work method is in general conformance with the Plans/Specifications, the submittal copies shall be marked “Approved.” In this event, the Contractor may begin to incorporate the material/equipment/work method covered in the submittal.

2. If the review indicates the submittal is insufficient or that limited corrections are required, the submittal copies may be marked “Approved as Noted.” The Contractor may begin to implement the work method or incorporate materials/comments covered in the submittal in accordance with the corrections/comments noted.

3. If the review reveals the submittal is insufficient or contains incorrect data and the comments require revision and resubmittal, the submittal copies shall be marked “Not Approved, Resubmit.” In this case, the Contractor shall not undertake Work covered by this submittal until the submittal has been revised, resubmitted and returned to the Contractor with a marking of “Approved” or “Approved as Noted.”

4. If the review reveals the material, equipment, or Work does not require submittal, then the submitted copies shall be marked “Review Not Required Per Contract Documents.” In this event, the Contractor may begin to incorporate the material/equipment/Work covered by the submittal and no further action is required.

3.03 EFFECT OF REVIEW OF CONTRACTOR’S SUBMITTALS

A. Submittal review of what the Contractor proposes to provide shall not relieve the Contractor of his responsibility for errors therein, nor shall it be regarded as an assumption of risks or liability by the Owner, or by any officer or employee of the Owner. Contractor shall have no claim under the Contract on account of the failure, or partial failure, of the method of work, material or equipment so reviewed. A mark of “Approved” or “Approved as Noted” shall mean the Project Manager has no objection to the Contractor, upon the Contractor’s own responsibility, using the plan or method of work proposed, or providing the materials or equipment proposed.

Section 01300 - 24

01350-25

PROTECTION OF CULTURAL RESOURCES

SECTION 01350 – PROTECTION OF CULTURAL RESOURCES

A. This section details the requirements for protecting cultural resources.

1.02 DEFINITIONS

A. Cultural Resources: Includes both archaeological (at or below-ground) and historical (at or above-ground) sites, features and artifacts.

B. High Probability Areas: Areas that contain potentially significant cultural resources as determined by the Owner.

C. Low Probability Areas: Areas that have a low likelihood of containing potentially significant cultural resources as determined by the Owner.

D. Archaeological Monitor: Representative of the Owner designated to record and collect archaeological resources for compliance with Agency regulations to protect archaeological resources.

E. Tribal Monitor: Designated cultural resource representative from the federally-recognized tribes in Oregon, who may contact the Owner to be notified and present onsite when a specific Work task occurs.

1.03 REFERENCES

A. OREGON REVISED STATUTE ORS 97.740

B. Oregon Revised Statute ORS 358.905

C. Oregon Revised Statute ORS 390.235

1.04 SUBMITTALS

A. As specified in Section 01300.

B. At least two weeks before start of ground-disturbing or other types of construction Work, submit for approval a work plan, detailing construction Work in High Probability Areas.

Key schedule to Plans and include the following information:

1. Start and end dates of the Work.

2. Locations and types of temporary facilities, such as barriers, field offices, staging areas, sanitary facilities, borrow pits, and haul and access roads.

3. Types of Work, such as clearing, topsoil stripping, earthwork, structure or trench excavation, demolition, building construction, landscaping, and post construction clean-up, etc.

4. Methods and equipment used for each type of construction.

01350-26

PROTECTION OF CULTURAL RESOURCES

5. Plan for relocating Work in the event of temporary Work stoppages at each High Probability Area.

1.05 QUALITY ASSURANCE

A. At least one week before on-site Work begins, Contractor shall meet with Owner’s Project Manager, Park Manager and Archeological Monitor to discuss the Work Plan and equipment and special methods to be used in High Probability Areas. Contractor shall ensure that approved Work Plan is followed throughout the Project.

PART 2 - MATERIALS (Not Used)

PART 3 - EXECUTION

3.01 TEMPORARY FACILITIES

A. Furnish and install/construct temporary facilities per approved Work Plan.

3.02 OBSERVATION

A. Archeological Monitor will observe all ground-disturbing Work, including construction of temporary facilities, at all High Probability Areas, from a safe location mutually agreed on by Contractor and Archaeological Monitor. As new ground is broken, Archaeological Monitor will examine excavated materials, using construction layout centerline and perimeter staking as a reference point to record locations of findings.

3.03 DISCOVERY OF RESOURCES

A. If potential cultural resources are discovered, immediate relocation of the Work to a non-sensitive area may be required.

B. If potential cultural resources are discovered while Archeological Monitor is absent, stop Work immediately and report the discovery to the Park Manager and Owner’s Project Manager.

C. If potential cultural resources are discovered during the Work, the following procedures will be instituted:

1. Project Manager will issue a verbal Work suspension directing the Contractor to cease all construction operations at the location of a potential cultural resources discovery. Project Manager will contact a qualified archaeologist to evaluate the significance of the find. A written work suspension order will be issued within twenty four hours of the verbal work suspension order.

2. Such Work suspension will be effective until such time as the qualified archaeologist can evaluate the potential cultural resources for their significance and make recommendations to the State Historic Preservation Officer. Any Work suspension direction will contain the following:

a) A clear description of the Work to be suspended including the physical location and limits of the area in which Work is to be suspended.

01350-27

PROTECTION OF CULTURAL RESOURCES

b) Any instructions regarding issuance of further orders by the Contractor for material services.

c) Specific direction to the Contractor to minimize the Work suspension costs (i.e., Work elsewhere while archaeologist is evaluating find).

d) Estimated duration of the temporary suspension.

3. If the archaeologist determines the cultural resource is eligible to be nominated to the National Register of Historic Places, Project Manager may extend the duration of the Work Suspension Order in writing.

4. Equitable adjustment of the construction Contract time will be made for temporarily suspended Work in accordance with the General Conditions.

3.04 WORK STOPPAGE

A. Contractor shall plan, schedule, and execute the Work to prevent stoppages at one area from stopping all Work at the construction site.

3.05 FINES

A. Contractor shall be responsible for all fines incurred from non-compliance with regulations of governing authorities.

01350-28

PROTECTION OF CULTURAL RESOURCES

Section 01560 - 29

ENVIRONMENTAL CONTROLS

SECTION 01560 – ENVIRONMENTAL CONTROLS

A. This section specifies environmental mitigation, applicable state and federal fire regulations and temporary environmental controls required to be maintained during construction. Nothing in this section shall relieve Contractor from the obligation to comply with the regulations or permits of any federal, state, or local authority.

B. This section specifies that the Contractor and all Subcontractors follow conservation and recycling practices to the extent practicable.

PART 2 – MATERIALS

2.01 PLANS

A. Develop and maintain for the duration of the Contract an Erosion Control Plan (“ECP”) that will effectively incorporate and implement environmental protection precautions and as follows:

1. The ECP shall include methods and interim facilities to be constructed and/or used concurrently during construction to control erosion in such a manner as to ensure that sediment and sediment-laden water does not enter any drainage system, roadways, or violate applicable water quality standards.

2. The ECP shall be in strict conformance with the requirements of the permits.

Visible or measurable erosion which enters, or is likely to enter, a public storm and surface water system, wetland or stream is prohibited.

3. The ECP shall include the name of the Contractor’s employee authorized to supervise and enforce compliance with the ECP and telephone number(s) to contact that person at any time.

B. The ECP shall be submitted at least two (2) weeks prior to initiating clearing activities.

C. In the event a regulatory agency or jurisdiction determines the ECP to be inadequate to protect the environment:

1. The Contractor shall immediately stop the affected Work in progress until adequate environmental protection measures are implemented.

2. The Contractor shall modify the ECP to meet the requirements of said regulatory agencies or jurisdictions and provide the Project Manager with the revisions to the ECP within five (5) Days of the notice of deficiency.

2.02 EROSION CONTROL

Section 01560 - 30

ENVIRONMENTAL CONTROLS

A. Soil disturbance shall be minimized to the extent practical, consistent with Project objectives.

B. Only certified weed-free straw, erosion control mats, or other weed-free mulch and weed free erosion control materials shall be used.

C. Temporary Sediment Fences

1. Synthetic filter fabric shall contain ultraviolet ray inhibitors and stabilizers.

2. Filter fabric fence shall have manufactured stitched loops for 2”x2” post installation. Stitched loops shall be installed on the up-hill side of the sloped area, with posts spaced a maximum of 6 feet apart.

3. Where practical, the filter fabric shall be purchased in a continuous roll to the length required to avoid the use of joints.

4. The physical integrity of all materials shall be sufficient to meet the requirements of their intended use and withstand normal wear and tear.

D. Straw Bale Sediment Barrier/Bio-Filter Bags (certified weed free): Standard 40 to 60-pound rectangular bales of cereal grain or seed straw. Wooden stakes (2”x2”x 3 feet) shall be used for straw bales and bio-filter bags.

E. Plastic Sheeting: Polyethylene and have a minimum thickness of 6 mil.

F. Bio-Filter Bags (certified weed free): Provide bio-filter bags of clean 100 percent recycled wood product waste. Size of bag: 18 inches x 8 inches x 30 inches with approximate weight of 45 pounds and ½ inch plastic mesh covering.

2.03 CONSERVATION AND RECYCLING

A. The Contractor and all Subcontractors shall, to the extent practicable, plan and perform their Work in such a manner as to minimize their use of fuel and other consumable products while providing high quality Work.

B. The Contractor and all Subcontractors shall, to the extent practicable, make use of area recycling and composting facilities that may be available. This effort shall be initiated prior to the start of any demolition or clearing Work.

C. The Contractor and all Subcontractors shall dispose of all hazardous materials at

Department of Environmental Quality licensed disposal facilities or at appropriate recycling sites.

2.04 FIRE REGULATIONS

A. The Contractor and all Subcontractors shall conduct the Work in accordance with applicable fire requirements and regulations.

B. The Contractor is hereby notified that basic fire fighting tools and equipment may be required to be on site when working in a forest environment.

Section 01560 - 31

2.05 WEED CONTROL REQUIREMENTS FOR GROUND-DISTURBING PROJECTS

A. To reduce risk of spreading weed infestations, Project operations shall proceed by beginning in un-infested areas before operating in weed-infested areas, rather than vice-versa.

B. Weed-free Project staging areas shall be located prior to beginning operations and used during operations. All types of travel through weed-infested areas shall be avoided or minimized, or restricted to those periods when spread of seed or propagules are least likely. When working in weed-infested areas, secondary staging areas will be necessary to avoid contaminating clean areas.

C. All equipment to be brought onsite shall be cleaned prior to arrival to prevent noxious and non-native seed contamination of the site. Mud, dirt, seeds, plant parts, and other debris shall be removed from equipment before moving it into the Project area. This requirement also applies to service trucks, water trucks, pickup trucks, cars and other passenger vehicles used in the daily transport of personnel if they will travel off the existing road surface. Contractor shall certify in writing that all off-road vehicles and equipment are free of noxious weeds prior to the start of operations. Contractor shall employ whatever cleaning methods are necessary to ensure that equipment and vehicles are free of noxious weeds. Disassembly of equipment components or specialized inspection tools is not required. Visual inspections will be conducted without warning during operations.

D. Stockpiled, un-infested sand, gravel, soil, boulders, logs, borrow and fill material shall be maintained in a weed-free condition until used for the Project. Secondary stockpiles for infested areas may be necessary to avoid contaminating clean stockpiles with dirty equipment.

E. Workers shall inspect, remove, and properly dispose of mud, weed seed and plant parts found on their clothing, shoes, tools and small equipment on a daily basis prior to entering the site and beginning operations.

3.01 SITE MAINTENANCE

A. Dust shall be minimized by the Contractor to the extent practicable, utilizing all measures necessary including, but not limited to:

1. Sprinkling haul and access roads and other exposed dust-producing areas with water.

2. Use of covered haul equipment.

3.02 STREET CLEANING

A. Prevent dirt, mud, and dust from escaping trucks departing the Work site, by covering dusty loads and cleaning truck tires before leaving the construction site.

Section 01560 - 32

ENVIRONMENTAL CONTROLS

B. All streets in the construction area used by Contractor’s trucks or any other equipment hauling material to and from the area, whether within the Contract limits or adjacent thereto, shall be kept clean by the Contractor and shall be continuously serviced by the Contractor’s use of sprinkling trucks to control dust. All cleaning and sprinkling shall be at the Contractor’s expense. Violations of these requirements are sufficient grounds for the Project Manager to order the streets in question to be cleaned by others. The expense of the street cleaning will be charged against the Contractor and cost withheld from Contractor's payments.

3.03 NOISE CONTROL

A. Comply with all Park controls and noise level rules, regulations and ordinances.

B. Each internal combustion engine used on the job, or related to the job, shall be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine shall be operated on the Project without said muffler.

C. Noise levels for scrapers, pavers, graders, backhoes and trucks shall not exceed 90 dBA.

For other equipment, noise levels shall not exceed 85 dBA. Equipment that cannot meet these levels shall be quieted by use of improved exhaust mufflers, noise attenuation barriers or other means approved by the Project Manager.

D. If special circumstances or emergency conditions require Work beyond the hours as specified, the Contractor shall:

1. Notify the Project Manager and Park Manager 72 hours in advance of any proposed extended work hours for preauthorization. The Contractor’s written request shall specify the Work to be performed and the circumstances that warrant the request. The request shall include any additional measures to mitigate noise generated by this construction activity, if deemed necessary by the

2. If an emergency situation occurs that warrants extended hours, the Contractor shall notify the Park Manager and Project Manager immediately upon determining the need for this Work.

E. The Contractor and all Subcontractors shall shut down all vehicle and equipment engines and motors when the equipment or vehicles are not engaged in active Work to the extent practicable to minimize noise and fuel consumption.

3.04 TREE AND PLANT PROTECTION

A. The Contractor shall minimize vegetation removal during construction operations. All hazardous tree removal, pruning for hazards, and pruning for equipment clearance shall take place prior to commencement of construction activities.