Addendum 1 2024 Paving Improvements Beverly Beach State Park.docm

DOCM document 72 KB Posted

Attached to
#10969 ITB 2024 Paving Improvements Project At Beverly Beach State Park
Solicitation number
S-63400-00009622
Issued by
Lake County, Moro City, Oregon

About this file

This document is an Addendum to the Invitation to Bid (ITB) for the 2024 Paving Improvements Project at Beverly Beach State Park in Lincoln County, Oregon. The project is being managed by the Oregon Parks and Recreation Department (OPRD). The addendum modifies the original ITB by revising the technical specification for compaction of the aggregate base, updating the pricing submittal form, and providing clarifications in response to questions from potential bidders. Prospective bidders have until March 22, 2024 to submit written questions or protests regarding this addendum.

The pricing submittal form has been revised to increase the quantity on line item #4. All other aspects of the ITB, including the closing date and time, remain unchanged. The contract requires the successful bidder to perform paving improvements at the Beverly Beach State Park located in Lincoln County, Oregon. Density testing of the aggregate base and asphalt concrete pavement will be the responsibility of the contractor, as specified in the addendum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1

OregonBuys # S-63400-00009622

OPRD Contract #10969

2024 Paving Improvements Project At Beverly Beach State Park

This addendum modifies the Invitation to Bid (“ITB”) document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original ITB document(s) and shall become part of the work required.

ADDENDUM

Changes to the Invitation to Bid document (s):

1. Attachment A – Technical Specifications, Section 02200 – Earthwork:

DELETE Subsection 3.04, paragraph D in its entirety and REPLACE with the following:

“D. Compaction – Aggregate base shall be compacted to achieve not less than 95% of maximum dry density as measured using AASHTO T-180 test method. One test shall be performed for every 4000 square feet of baserock placed. Provide test result to the Project Manager.”

2. DELETE Exhibit 1 – Pricing Submittal Form in its entirety and REPLACE with Exhibit 1 – Pricing Submittal Form REV 3-21-24 (increases quantity on line item #4).

All references to the ITB CLOSING DATE AND TIME remain unchanged.

Addendum prepared by:

Melody Waight Sr. Contracts Specialist melody.waight@oprd.oregon.gov

End of Addendum 1

Prospective Bidders have until 5:00 PM on March 22, 2024 to submit written questions or protests regarding this Addendum #1.

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

5.

6.

This Addendum constitutes a MATERIAL change to the solicitation document. Its receipt by the Offeror shall be acknowledged per Section H of the ITB.

CLARIFICATIONS AND RESPONSE(S) TO QUESTIONS

The following provides OPRD’s answers and clarifications to questions received from potential Bidders. The information provided below is for clarification purposes only and does NOT constitute a change to the solicitation documents or requirements.

1. QUESTION: Will contractors be allowed to camp at Beverly Beach during construction?

RESPONSE: No, the campground will be closed to all camping until park opening.

2. QUESTION: What is expected for surface cleaning in moss covered areas?

RESPONSE: The contractor is expected to make a good faith effort to mechanically remove organic materials prior to tack coat and paving. OPRD Project Manager will assess areas with excessive organic materials that can not be removed by mechanical means and direct contractor on how to proceed during construction.

3. QUESTION: Does OPRD expect the contractor to construct the inlay transition details 2/C4.1,3/C4.1 and 3/C4.2?
RESPONSE: The detail assumes existing asphalt is at sufficient depth to construct transitions per the contract plans. The detail requirement will not be required in areas with insufficient asphalt depths or brittle asphalt. Butt joint transitions will be required in areas where these specific details cannot be reasonable constructed.

4. QUESTION: How will the base repairs in road restoration sections be measured?

RESPONSE: Road restoration areas are calculated on a square foot basis with a defined depth. Base repairs within road restoration areas will be calculated as a cubic foot volume below the defined road restoration depth.

5. QUESTION: What is required for density testing the base aggregate and asphalt concrete pavement

RESPONSE: All density testing will be furnished by the Contractor. The frequency of density testing shall be as required in section 02700 and as modified in addendum item #1.

6. QUESTION: Is there a specific pay item for manhole risers.

RESPONSE: Adjusting sanitary manholes and water valve boxes are incidental to the project. All materials needed to complete this work properly shall be incidental.

Addendum #1 ITB #10969 OregonBuys #S-63400-00009622 2024 Paving Improvements Project at Beverly Beach State Park image1.jpeg

File details come from the government source that posted it. Updated .