Attachment_A_-_Tank_Project_Information_handout_REV_03-2023.pdf
PDF 58 KB Posted
- Attached to
- Diesel Fuel Tank Replacement
- Solicitation number
- Y25-173
- Issued by
- Orange County, Orlando City, Florida
About this file
The document is a Tank Project Information Handout issued by Orange County Risk Management, detailing requirements and procedures for fuel storage tank installations, upgrades, and removals at Orange County owned facilities. The handout provides comprehensive guidelines for contractors working on tank projects, including specific documentation requirements such as shop drawings, specifications, surveys, event schedules, and disposal documentation for existing tank systems. Contractors must use a PSSSC (Professional Service Specialty Contractor) certified under Chapter 489, Florida Statutes, and ensure all proposed storage tank equipment is registered with the Florida Department of Environmental Protection (FDEP) and has an Equipment (EQ) number.
Risk Management will serve as the liaison between FDEP and the contractor, with specific responsibilities including coordinating site visits, conducting closure integrity evaluations, submitting notifications to FDEP, scheduling inspections, preparing storage tank registration forms, and ensuring financial responsibility documentation. Critical requirements include that fuel cannot be placed in the tank system until all testing is complete, approved inspections are passed, financial responsibility is demonstrated, and an FDEP placard is present. The document emphasizes thorough documentation, timely notifications, and compliance with Florida Administrative Code rules 62-761 and 62-762, with contact information provided for Orange County Risk Management personnel to facilitate the process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV 03/2023
Tank Project Information Handout
Risk Management will be the Orange County liaison between the FDEP and the Contractor for fuel storage tanks during installation, upgrades, and/or removals at Orange County (OC) owned facilities.
Outlined below are some deadlines which require Risk to be kept in the loop as well as some information that is needed to ensure the tank portion of this project moves forward smoothly.
In accordance with 62-761 & 62-762, F.A.C., effective 10/17/19, an install will be considered “the date a storage tank system or system component(s) will begin”.
All installs, upgrades and/or removals must be performed by a PSSSC, certified in accordance with Chapter 489, FS, per Orange County requirements.
CONTRACTOR TO PROVIDE:
• Shop drawings, specifications, and submittals o Must include manufacturer’s instructions for O&M of the system, testing for release detection, all records [including integrity testing] for installs, re-certifications, replacements & upgrades, concrete secondary construction/coating specs, and Cathodic Protection information.
• A survey, if the system or system components will be in contact with the soil o All proposed Storage Tank Equipment must be Registered with the
FDEP/State and have an FDEP issued Equipment (EQ) number Exemptions are listed in 62-761.850 (2)(d) & 62-762.851(2)(d), F.A.C.
• A schedule of events, even if it is tentative, for notification purposes
• If existing Tank System will not be retained / repurposed by Orange County, Contractor must:
o Document how tank was rendered inert of gases and cleaned, Provide manifest for fuel/PCW/sludge disposal, AND o Have equipment removed from Property via the Comptroller’s office, AND o Provide manifest for tank system as proof of proper disposal, OR o Provide a Release of Lien (“Recycling Form”) to transfer equipment to another entity.
A copy of the “Recycling Form” can be provided upon request.
RISK MANAGEMENT RESPONSIBILITIES:
• No more than 45 Days before Install/Closure/Change in Status:
o Coordinate site visit(s) for completion of “Closure Integrity Evaluation
Report” form Includes review of release detection (RD) records with no lapse in
RD, etc.
The need for Closure Sampling will be determined based on the results of the Closure Integrity Evaluation
REV 03/2023
If Closure Sampling is required, it must be performed in accordance with the FDEP Guidance Documents:
• Instructions for Conducting Sampling During UST Closure, July 2019
• Instructions for Conducting Sampling During AST Closure, July 2019 o Submit written notification to FDEP [30-45 days] Include EQ numbers and tentative schedule
• 48-72 Hours before Install/Closure/Change in Status o Send written notification to FDEP to confirm date and time
Notification refers to “business days” o Re-send notification if there are large timeframes between component installs
• Schedule required Inspections with FDEP o Inspections to be coordinated with Tank Integrity Testing, Piping Testing, and Release Detection, etc. [62-761.700(3)(a) and 62-762.701(4)(a)] Proper documentation of all testing to be provided to Risk (EX. PEI
1200 forms)
• Prepare & Submit Storage Tank Registration Form (STRF) to FDEP-Tallahassee once tank and/or components are installed (a.k.a. delivered and in final location on-site) o Per Rule, 30 days prior to install at a new facility & no later than 7 days prior to regulated substance placed in the system at an existing facility o Per Rule, within 10 days after change in service status or closure, change of operator/owner, change of substance stored, or discovery of an unregistered system.
o Representative OC Department will pay for Tank registration and provide Risk with copy of Placard once issued
• Prepare & provide Financial Responsibility (Insurance) paperwork (Part P) o Signed copies of Insurance Policy and other required documents will be available upon request
• Fuel cannot be placed in the tank system until all testing is complete and approved (passed inspection) [62-761.500(1)(b) and 62-762.501(1)(b)], tank demonstrates Financial Responsibility [62-761.420 and 62-762.421], and a FDEP issued placard is present at the tank system [62-761.400(5) and 62-762.401(5)].
Please copy Risk on all aspects involving the tanks. Risk will make sure the FDEP is properly notified and all paperwork (registration, insurance, etc.) for the FDEP is filed in a timely manner.
Copies of referenced Rules can be provided upon request and are the defining authority regarding Storage Tanks. This document is merely a summary of some pertinent aspects of the Rule(s).
Tisha Pence, CHMM, CIE, CES, CESCO Patrick Farris, LEP
(407) 836-9638 (407) 836-9679 Cell: (321) 239-2382 Cell: (407) 675-7621 Tisha.pence@ocfl.net Patrick.Farris@ocfl.net mailto:Tisha.pence@ocfl.net mailto:Patrick.Farris@ocfl.net