This document is a Statement of Work (SOW) for the Environmental Test and Integration Services (ETIS) IV contract at the Goddard Space Flight Center (GSFC). The SOW specifies the requirements for on-site, contractor-supplied environmental test, integration, and other laboratory operations services at GSFC. Key services include structural testing, electromagnetic testing, space simulation testing, mechanical integration, optical integration, facility maintenance, engineering support, and contamination control. The contractor shall provide goods such as electrical cable harnesses and thermal blankets. Management requirements include senior management, project management, cost control, and equipment/property control. The SOW is related to the ETIS IV Draft RFP Solicitation Number 80GSFC24R0012, which has been posted under separate attachment. The Draft RFP includes details on the overall contract opportunity, such as the opportunity type, description, federal agency involved, and key dates.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A
ENVIRONMENTAL TEST AND INTEGRATION
SERVICES (ETIS) IV CONTRACT
STATEMENT OF WORK (SOW)
February 2024
Contents
Attachment A
I INTRODUCTION
II OVERVIEW AND SCOPE
III WORK BREAKDOWN STRUCTURE OVERVIEW
IV WORK BREAKDOWN STRUCTURE ELEMENT DESCRIPTIONS
1.0 ENVIRONMENTAL TEST AND INTEGRATION SUPPORT SERVICES
1.1 SERVICES
1.1.1 STRUCTURAL TEST
1.1.1.1 STEADY STATE ACCELERATION
1.1.1.2 VIBRATION TESTING
1.1.1.3 MODAL SURVEY
1.1.1.4 MASS PROPERTIES TESTING
1.1.1.5 STATIC LOADS TESTING
1.1.1.6 ACOUSTIC TESTING
1.1.2 ELECTROMAGNETIC TEST
1.1.2.1 ELECTROMAGNETIC COMPATIBILITY (EMC) TESTING
1.1.2.2 MAGNETIC TESTING
1.1.3 SPACE SIMULATION TEST
1.1.4 MECHANICAL INTEGRATION
1.1.4.1 MECHANICAL INTEGRATION SERVICES FOR THE ENVIRONMENTAL TEST
ENGINEERING AND INTEGRATION BRANCH CODE 549
1.1.4.2 SERVICES FOR THE ADVANCED MANUFACTURING BRANCH CODE 547
1.1.5 LIFTING DEVICES AND EQUIPMENT (LDE)/ PRESSURE VESSELS AND SYSTEMS
(PVS) – (RECERTIFICATION)
1.1.5.1 LIFTING DEVICES AND EQUIPMENT (LDE)
1.1.5.2 GROUND-BASED PRESSURE VESSEL AND PRESSURIZED SYSTEMS (PVS)
1.1.5.3 CONFIGURATION MANAGEMENT
1.1.5.4 COMPLIANCE REQUIREMENT DOCUMENTS
1.1.6 OPTICAL INTEGRATION
1.1.6.1 OPTICAL TESTING
1.1.6.2 OPTICAL FABRICATION
1.1.6.3 OPTICAL ASSEMBLY
1.1.7 FACILITY ACQUISITION OR MODIFICATION
1.1.8 NONDESTRUCTIVE EXAMINATION (NDE)
1.2 GOODS
1.2.1 ELECTRICAL CABLE HARNESS
1.2.2 THERMAL BLANKETS
1.3 FUNCTIONAL SUPPORT
1.3.1 SAFETY
1.3.2 FACILITY MAINTENANCE
1.3.2.1 FACILITY EQUIPMENT
1.3.2.2 PHYSICAL PLANT
1.3.2.3 CLEANROOM MAINTENANCE
1.3.2.4 SOFTWARE
1.3.2.5 HOUSEKEEPING
1.3.2.6 MACHINE TOOL MAINTENANCE
1.3.2.7 PLATING FACILITY MAINTENANCE
1.3.2.8 CALIBRATION
1.3.2.9 COMPUTER MAINTENANCE MANAGEMENT SYSTEM (CMMS) AND RELIABILITY
CENTERED MAINTENANCE (RCM)
1.3.3 ENGINEERING
1.3.3.1 TEST ENGINEERING
1.3.3.2 INTEGRATION ENGINEERING
1.3.3.3 FACILITIES ENGINEERING
1.3.3.4 ENGINEERING DESIGN AND ANALYSIS
1.3.4 CLEANROOM OPERATIONS AND CONTAMINATION CONTROL
1.3.5 LOGISTICS
1.3.6 QUALITY ASSURANCE
1.3.7 COMPUTER SYSTEMS MANAGEMENT
1.3.8 FACILITY OPERATIONS MANAGER
1.4 MANAGEMENT
1.4.1 Senior Management
1.4.2 Project Management
1.4.3 Contractual Management and General Controls
1.4.4 Systems Management/Support
1.4.5 Cost Control
1.4.6 Special Procurements
1.4.7 Equipment and Property Control
V CONTRACT ADMINISTRATION
Figure V-1. Work Directive Process
I INTRODUCTION
The mission of the Goddard Space Flight Center (GSFC) is to serve as a national resource for discovery in Earth Science, Space Science, and Technology Development. This mission is carried out through the use of scientific instruments, spacecraft, sounding rockets, balloons, satellite servicing, and supporting ground systems. To fulfill this mission GSFC maintains the onsite capability to function as a full spectrum end-to-end research and development laboratory.
Scientific missions can be carried out from concept, through design, manufacture, test, and operations. GSFC is committed through its strategic institutional goals to maintaining and upgrading GSFC’s core infrastructure, laboratory facilities, and equipment to preserve the
Center’s preeminence as a national resource and Center of Excellence.
The GSFC Environmental Test and Integration facilities are managed by the Engineering and Technology Directorate’s Mechanical Systems Division to provide environmental test capability that ensures spacecraft and flight experiments will withstand the rigors of launch and will operate properly in the space environment. Other technical facilities managed by a variety of GSFC organizational codes provide a full spectrum of technology and flight mission development capabilities. In addition to operations, these technical facilities have on-going goals of advancing the state-of-the-art in the development of improved space flight systems. The GSFC Environmental Test and Integration Facilities are one of the most complete and comprehensive complexes within the United States Government.
II OVERVIEW AND SCOPE
This Statement of Work (SOW) specifies the requirements for on-site, contractor supplied Environmental Test and Integration and other laboratory operations services to the Goddard Space Flight Center (GSFC). The scope of these services includes the following:
• Operation, maintenance, and upgrade of environmental test equipment and facilities located in the GSFC Building 7/10/15/29 complex, Area 300 Magnetic
Test Site and other technical facilities located at various locations within GSFC including the manufacturing and electroplating equipment and facilities primarily located in GSFC Building 5/10/21 shops
• Mechanical and optical integration of spacecraft, flight experiment components, instruments, sub-assemblies and systems
• Fabricate, manufacture, and assembly of custom spacecraft, flight experiment components, instruments, sub-assemblies and systems
• Design, manufacture, and operation of ground handling equipment and fixtures
• Design, manufacture, and operation of optical alignment and calibration systems
• Design, manufacture, and installation of space flight thermal blankets
• Design, manufacture and installation of space flight and ground support system cable harnesses
• Design, manufacture, and installation of technical facilities including buildings, building elements, utility systems, and technical equipment and systems
• Define, analyze, and resolve electromagnetic radiation issues relating to facility and satellite ground support equipment operation within the test complex.
Support spectrum signature analysis to insure interference-free and safe operation of all facility-located near electromagnetic wave sensing devices.
• Test and Integration Engineering and engineering analysis
• Cleanroom operation and maintenance
• Contamination control services using qualified and experienced personnel
• Maintenance and operation of certain physical plant systems such as processed water, emergency power, LN2/GN2 storage systems, conditioned cleanroom air
HVAC and humidity systems
• Facility and operations safety
• Data acquisition and analysis system development and management.
The SOW includes the following management functions required to support on-site operation and administration of the required services
• Executive and supervisory management
• Management for facility improvements and Environmental Project Engineering
• Cost control and contract administration
• Human resources
• Equipment and property control
• Configuration control
This Statement of Work (SOW) defines the technical scope of the contract. Task Orders issued under the contract shall define the quantity of work in terms of numbers of tests or operations that will be required, the applicable period of performance, and the identification of facilities and equipment. Together the SOW and Task Order establish the basis for the contractor to respond with a Task Order proposal. The proposal shall include organization, skill mix, and staffing level proposed to meet the contract requirements.
III WORK BREAKDOWN STRUCTURE OVERVIEW
Contractor requirements are organized in a Work Breakdown Structure (WBS) and are identified in WBS element descriptions. The contractor is required to provide goods and services in accordance with the GSFC Management System as described in the GSFC
Management System Manual GPR 1280.1F1. Information concerning the GSFC quality management system can be found at the Goddard Directives Management System (GDMS) site2. Specific, applicable GSFC ISO documents are referenced throughout this statement of work and also can be found at the GDMS site referenced above (Reference deleted)3. The contractor shall comply with the referenced and supporting documents in accordance with this SOW.
IV WORK BREAKDOWN STRUCTURE ELEMENT DESCRIPTIONS
1.0 ENVIRONMENTAL TEST AND INTEGRATION SUPPORT SERVICES
WBS elements are organized by the services, goods (products), functional support, and management provided by the contractor. The integrated whole of the goods and services provided by the contract is represented by WBS Element 1.0.
1.1 SERVICES
The services specified in this statement of work are those services that are provided by the contractor to customers of the GSFC Mechanical Systems Division. The role of the contractor in providing these services is defined in the following WBS element descriptions.
For those services that utilize the Environmental Test and Integration Facilities a description of the facilities can be found in the 549-PG-8700.1.1H - Environmental Test Engineering and Integration Process4.
1.1.1 STRUCTURAL TEST
The contractor shall provide structural testing services for space flight program hardware, atmospheric flight (balloon and aircraft), and ground support hardware. This element includes the supporting tasks necessary for test set up and execution. Examples of these tasks are design, engineering analysis, fabrication of test fixturing, mechanical ground support equipment (MGSE), and analysis/modification of project supplied test fixturing.
The contractor shall provide services in accordance with the 549-PG-8700.1.5A Structural
Dynamics Test Operations Process6.
1.1.1.1 STEADY STATE ACCELERATION
The contractor shall provide testing services associated with steady state acceleration testing of hardware using the GSFC High Capacity Centrifuge (HCC). The contractor shall provide services in accordance with the Steady State Acceleration Testing Process Operating
Procedure (POP) 09PC-PP01 (Document currently unavailable. Reference deleted)5. GSFC shall provide the test plan, and HCC test facility, and also fulfill the roles of Product Design
Lead, Process Owner and Test Engineer.
1.1.1.2 VIBRATION TESTING
The contractor shall provide data processing and testing services associated with sinusoidal, random, sine burst, and shock testing of hardware using the GSFC Vibration Test Facility.
The Vibration Test Facility consists of six electrodynamic vibration exciters and their associated amplifiers and control systems. Also provided is a small machine shop for fixture modification and maintenance support. The contractor shall provide services in accordance with the Vibration Laboratory Operating Manual6. GSFC shall provide the test plan, and
Vibration Test Facility, and also fulfill the roles of Product Design Lead, Process Owner and
Test Engineer.
1.1.1.3 MODAL SURVEY
The contractor shall provide testing services associated with performing modal survey testing and data reduction for mechanical structures using the GSFC Modal Survey Test Facility.
The Modal Survey Test Facility is housed in the payload assembly area of GSFC Building
15 and consists of a concrete seismic block including a set of stanchion assemblies that simulate a payload bay, a steel T-slot plate for quick rigid mounting of test items and a steel plate for rigid mounting of test items, dedicated facility cranes for hanging shakers, small and large impact hammers, 220 and 20 lbf electrodynamic shakers, power amplifiers to operate shakers, data acquisition system, and an instrumentation trailer that provides data acquisition, signal conditioning and shaker control (Reference deleted).7GSFC shall provide the test plan, and Modal Survey Test Facility, and also fulfill the roles of Product Design
Lead, Process Owner and Test Engineer.
1.1.1.4 MASS PROPERTIES TESTING
The contractor shall provide testing services associated with performing mass properties measurement, spin balance, and static balance of structural assemblies and components using the GSFC Mass Properties Measurement Facilities. These facilities consist of a measurement unit, control console and personal computer system used for mass properties measurement of payloads from 50 – 10,000 pounds. A Tridyne machine is used for items less than 20 pounds. Both systems are located in the high bay area of GSFC Building 15. The contractor shall provide services in accordance with the Mass Properties Facility Manual8. GSFC shall provide the test plan, and Mass Properties Measurement System, and also fulfill the roles of
Product Design Lead, Process Owner and Test Engineer.
1.1.1.5 STATIC LOADS TESTING
The contractor shall provide testing services associated with performing static load testing of mechanical structures using the GSFC Universal Static Test Facility (USTF), the Portable
Static Test Facility (PSTF), and two Tinius Olsen Tensile Test Machines. The USTF and
PSTF consist of steel beam structures for reacting loads that are applied to the test article by hydraulic pressure cylinders. The facilities include a data acquisition system for measuring and controlling induced loads (Reference deleted).9 GSFC shall provide the test plan, and
Static Loads Facilities, and also fulfill the roles of Product Design Lead, Process Owner, and
Test Engineer.
1.1.1.6 ACOUSTIC TESTING
The contractor shall provide testing services associated with performing acoustic testing of system, sub-systems and components using the GSFC Acoustic Test Facility. The Acoustic
Test Facility consists of a 40,000 cubic foot reverberation chamber, acoustic horns, noise generators, control console, and data handling system. The contractor shall provide services in accordance with the Acoustic Facility Operating Manual10. GSFC shall provide the test plan, and Acoustic Test Facilities, and also fulfill the roles of Product Design Lead, Process
Owner, and Test Engineer.
1.1.2 ELECTROMAGNETIC TEST
The contractor shall provide the following electromagnetic testing services for space flight, atmospheric flight (balloon and aircraft) and ground support hardware.
The contractor shall provide services in accordance with the 549-PG-8700.1.4F
Electromagnetic Test Engineering and Area 300 Magnetic Test Facility Process
Management Plan11. GSFC shall provide the test plan, EMC Test Facilities and Magnetic
Test Facilities, and also fulfill the roles of Product Design Lead, Process Owner and Test
Engineer.
1.1.2.1 ELECTROMAGNETIC COMPATIBILITY (EMC) TESTING
The contractor shall provide testing services associated with performing electromagnetic interference (EMI) emissions and susceptibility testing using the GSFC Small EMI Facility, Large (Radio Frequency Interference (RFI) Facility and the EMI portable test set.
The Small EMC test facility consists of an anechoic- shielded 16’ x 16’ x 10’ test enclosure and two contiguous shielded enclosures; an operational control room; and an experimenter’s test equipment area. The facility includes associated electric and magnetic field antennas, line conductance transducers, signal generators, amplifiers, spectrum analyzers, control computers, and data acquisition and analysis systems.
The Large RFI Facility consists of a 21’ x 21’ x 20’H semi-anechoic shielded enclosure that can be operated as a Class 10k cleanroom; and two shielded anterooms that house test equipment and support equipment for the test article. The facility includes associated electric and magnetic field antennas, line conductance transducers, signal generators, amplifiers, spectrum analyzers, control computers, and data acquisition and analysis systems.
The contractor shall also provide testing services associated with performing electromagnetic emissions and susceptibility testing using Code 549’s Mobile EMC Test
Set. The Mobile EMC test set is comprised of portable Commercial-Off-The-Shelf (COTS) hardware and software that has been customized to support GEVS EMI testing. The Mobile system is designed such that certain EMI tests may be performed in a customer’s design facility. Mobile tests may be performed in facilities at GSFC or at external locations.
The contractor shall provide services in accordance with the Electromagnetic Test
Engineering Process Management Plan 549-PG-8700.1.4. GSFC shall provide the test plan, and EMC Test Facilities, and fulfill the roles of Product Design Lead, Process Owner, and
Test Engineer.
1.1.2.2 MAGNETIC TESTING
The contractor shall provide testing services associated with magnetic properties testing and magnetic field simulation testing using the GSFC Spacecraft Magnetic Test Facility or the
Mobile Magnetic Test System.
The contractor shall provide testing services associated with magnetic properties testing and magnetic field simulation testing at the GSFC Spacecraft Magnetic Test Facility. The facility includes a three axis Braunbek coil system consisting of 12 loops, 4 loops on each of the three orthogonal axes; a remote Earth field sensing magnetometer and servo controller; a remote power control and instrumentation building; and auxiliary equipment such as degaussing coils and power supplies. The inner coils of the Braunbek system are 42-foot in diameter with a
10-foot by 10-foot opening through the outer coils to accommodate spacecraft access into the test volume (Reference deleted).12
The contractor shall also provide testing services associated with performing low frequency magnetic emission measurements using a Mobile Magnetic Test System. The mobile system can perform measurements from DC to 5 Hz with a resolution of < 2 nano-Tesla and a range of ±65,000 nano-Tesla. COTS hardware and custom software were developed to perform static and dynamic DC magnetic tests, as well as dipole moment testing. The software provides a virtual strip chart recorder from which spreadsheets and graphs can automatically be generated. Mobile tests may be performed in facilities at GSFC or at external locations after environmental conditions have been verified.
The contractor shall provide services in accordance with the Electromagnetic Test
Engineering Process Management Plan 549-PG-8700.1.4. GSFC shall provide the test plan, Magnetic Test Facilities, and fulfill the roles of Product Design Lead, Process Owner, and
Test Engineer.
1.1.3 SPACE SIMULATION TEST
The contractor shall provide testing services associated with performing thermal vacuum testing using the GSFC thermal vacuum test laboratory. This laboratory consists of 10 thermal vacuum chambers, 2 temperature and humidity chambers, and related support equipment. The test volumes of the thermal vacuum chambers range in size from 2’ diameter by 2’deep, to 27’ diameter by 40’ high. The operating pressure is from atmospheric to 1.0 x 10-8 torr with a temperature range from –190°C to +150°C. A helium skid is available that can provide a 20 K environment to test articles in the large thermal vacuum chamber.
The contractor shall provide services in accordance with the Thermal Vacuum Operations
Process 549-PG-8071.0.1A13. GSFC shall provide the test plan, and thermal vacuum test facility, and also fulfill the roles of Product Design Lead, Process Owner and Test Engineer.
1.1.4 MECHANICAL INTEGRATION
The WBS for Mechanical Integration Services is divided between those services that are provided to the Mechanical Systems Division Advanced Manufacturing Branch Code 547, and those services that are provided to the Environmental Test Engineering and Integration
Branch Code 549. Although the capabilities that the contractor needs in order to provide mechanical integration services for both Branches are similar, there are sufficient differences in facilities and the nature of the work between the Branches to warrant separate WBS elements.
1.1.4.1 MECHANICAL INTEGRATION SERVICES FOR THE ENVIRONMENTAL
TEST ENGINEERING AND INTEGRATION BRANCH CODE 549
The contractor shall provide mechanical integration services necessary to mechanically integrate space flight components into a finished spacecraft or space flight experiment that is ready to launch. These services include integration operations in the GSFC Building
7/10/15/29 complex, transportation to the launch site, and pre-flight and post-flight operations at the launch site. The contractor shall provide the following mechanical services for space flight, atmospheric flight (balloon and aircraft) and Mechanical Ground Support
Equipment (MGSE). MGSE includes payload transporters and transporter environmental control systems. Mechanical integration services shall be provided in accordance with the
Environmental Test Engineering and Integration Process 549-PG-8700.1.1H14. Work is performed via Work Order Authorizations (WOAs) that are provided to the contractor, or that are developed by the contractor as required. Work Order Authorizations provide the technical data that is required to accomplish a task such as drawings, specifications, and step-by-step procedures. WOAs are a formal part of the GSFC Quality Management System.
1.1.4.1.1 ASSEMBLY
The contractor shall provide assembly services for payload components and structures, and
Mechanical Ground Support Equipment (MGSE). Assembly services shall be performed in accordance with Work Order Authorizations and 540 policies.
1.1.4.1.2 INTEGRATION
The contractor shall provide integration services for installation and mechanical fit verification of components and subassemblies into completed spacecraft, flight experiments, or Ground Support Mechanical Equipment. Integration services shall be performed in accordance with Work Order Authorizations and 540 policies.
1.1.4.1.3 PAYLOAD HANDLING
The contractor shall provide lifting and handling services for instruments, spacecraft, spacecraft related subassemblies and components, and Ground Support Equipment. Lifting and handling shall be performed in accordance with Work Order Authorizations and 540 policies.
1.1.4.1.4 INTEGRATION ENGINEERING DESIGN AND ANALYSIS
The contractor shall perform mechanical designs studies, and provide designs and drawings of, but not limited to spacecraft, aircraft instruments, balloon, instrument, and mechanical ground support equipment (including launchers and instrumentation trailers). These services involve the translation of a system (or subsystem, program, project, or activity) concept into a preliminary and detailed design (engineering plans and specifications), and then integrating the various components to produce a working prototype or model of the system. Typical associated tasks include, but are not limited to computer-aided design and engineering design and analysis. Also included are fabrication, assembly, modeling, training, outsourcing and integration activities.
1.1.4.1.5 FABRICATION
The contractor shall provide fabrication services for rapid response to unexpected mechanical integration fabrication requirements. GSFC’s on site machine tools include tools such as computer numerical control (CNC) machines, 3D printers, drill press, lathe, milling machine, band saw, hand power tools, and hand tools.
1.1.4.1.6 PURGE SYSTEMS
The contractor shall provide purge systems and services to Code 549 projects, as needed per project requirement. Procedures, work orders, failure mode analysis, and any other project requested documentation shall be documented in each respective projects’
Technical Data Management System (TDMS).
The contractor shall provide transportation, travel, and as needed on call support for project purge needs, per project request.
For Code 549 only, the contractor shall provide purge ground-pressure system certification/recertification in accordance with NASA standard 8719.17 (latest issue) and GPR 8710.3 (latest issue) with all necessary analysis to meet the standard and GPR, respectively. Analysis and as-built computer assisted design (CAD) drawings, and any other applicable paperwork shall be uploaded to GSFC Lab Quality Management
System (LQMS), and may be submitted to GSFC pressure systems manager (PSM) and/or project TDMS if requested.
The contractor shall maintain safety training for all applicable personnel in accordance with NASA NPR 8715.3 and 360-PG-8710.0.2. The pressure system safety training sessions shall be offered to owner/operators who seek to obtain High Pressure system operator’s license/certification.
1.1.4.2 SERVICES FOR THE ADVANCED MANUFACTURING BRANCH CODE
The contractor shall provide manufacturing services necessary to fabricate and assemble space flight components into a spacecraft or space flight experiment. These services include fabrication and assembly operations in the GSFC Building 5 Advanced Manufacturing
Branch facilities, and transportation to the Integration and Test Complex. The contractor shall perform precision fabrication and assembly by operating a variety of Government-furnished manufacturing tools/equipment that are, both manual and computer numerically controlled. The machines to be used include lathes, vertical and horizontal computer-numerically controlled machines, sheet metal tools, turning, milling, grinding, and Electrical
Discharge Machining (both wire and sinker EDM's). Work is performed via Work Order
Authorizations (WOAs) that are provided to the contractor or are developed by the contractor as noted. Work Order Authorizations provide the technical data that is required to accomplish a task such as drawings, specifications, and step-by-step procedures. WOAs are a formal part of the GSFC Quality Management System.
1.1.4.2.1 PAYLOAD HANDLING
The contractor shall provide lifting and handling services for instruments, spacecraft, spacecraft related subassemblies and components, and Ground Support Equipment in accordance with Work Order Authorizations and 540 policies.
1.1.4.2.2 ACQUISITION AND LIFE CYCLE MANAGEMENT FOR PRECISION
FABRICATION
The contractor shall provide fabrication services for rapid response to unexpected mechanical integration fabrication requirements. The contractor shall provide fabrication services for Goddard in-house projects and programs. Services also required by the contractor under this element involve planning, budgetary, contract and systems/program/project management execution functions required to procure and or produce, render operational and provide life cycle support (maintenance, repair, supplies, engineering-specific logistics) to activities, equipment, subsystems, projects, etc. Typical tasks associated include, but are not limited to operation and maintenance, program/project management, configuration management, engineering retrofit improvements and similar functions. These services may include actual manufacturing and fabrication of parts. Work is performed to Work Requests that are provided to the Advanced Manufacturing Branch.
1.1.4.2.3 MECHANICAL EQUIPMENT AND LOGISTICS SUPPORT
The contractor shall provide mechanical equipment support to include the installation, repair, maintenance, assembly modification, setup, operation, and testing of a variety of
Government-owned Computer Numerical Control (CNC) and conventional machinery and equipment. Associated tasks include inventory planning, standards/procedures development, training of civil service trainees and technicians when applicable, operation and maintenance requirements, and replacement procedures.
Logistics support includes the following:
Maintain, calibrate, and control storage of all tools in the Code 547 tool crib located in
GSFC Building 5.
• Inspect tools to determine which tools require rework or sharpening, and preparation of cutting tools for shipment to a tool grinding facility for routine sharpening as necessary;
• Issuing items from the tool crib in good working order and examining all returned items to determine their condition;
• Maintain accurate records of the location of all tools issued including the name and location of the person last issued the item;
• Inventory control of consumable supplies and materials;
• Material handling, cutting, material certification, and restocking support for all shop operations in accordance with GSFC Work instruction, 547-WI-4520.2.2F Receipt, Verification, Testing, and Storage of Raw Materials15;
• Maintain the equipment and chemicals at the required standards in the Plating shop; and
• Provide shipping, receiving, and inventory control of the building 5 Truck Lock in conformance with GSFC Work Instruction 547-WI-4520.2.1I, Building 5 East
Truck Lock Receiving Procedures16.
1.1.4.2.4 MECHANICAL INSPECTION
The Contractor shall provide metrology services for flight (including protoflight), and non-flight (including prototype) hardware. The contractor shall have experience with relevant metrology software, such as PC-DMIS or Verisurf, have expertise in geometric dimensioning and tolerancing (GD&T), experience using coordinate measuring machines
(CMM), Faro arms, laser scanners and optical measurement systems.
The Contractor shall develop, review and modify processes for NASA GDMS documents, improve process control documents within the branch, manage cause and corrective action processes on discrepant parts and/or manufacturing anomalies, and monitor out of tolerance
(OOT) reports. The contractor shall also provide traceability of measurement gages, and components that used the gage.
The Contractor shall perform metrology, alignment, and related technical support for spacecraft, space flight, GSE, and other structures, components, systems, and scientific instruments. These services may require integration operations in the GSFC Building
7/10/15/29 integration facilities, other NASA centers or contractor sites, and preflight operations at the launch site. The contractor shall provide optical alignment verification, testing, and calibration services on flight, engineering model, and ground system optical instruments, breadboards and components.
1.1.5 LIFTING DEVICES AND EQUIPMENT (LDE)/ PRESSURE VESSELS AND
SYSTEMS (PVS) – (RECERTIFICATION)
The contractor shall provide manpower and expertise for management, engineering, technical, and clerical support to implement the certification and recertification packages for the Center’s LDE/PVS Program for LDE and PVS owned by Code 540. After the certification and recertification packages are developed by the contractor, Code 360 shall review and approve those packages.
LDE/PVS provides for test, inspection for certification, and recertification of Lifting Devices and Equipment (LDE), for the inspection, certification, and recertification of ground-based
Pressure Vessels and Pressurized Systems (PVS), and for the nondestructive examination of both LDE and PVS. The primary location of work is at Building 7/10/15/29 complex and at
Building 5 at NASA Goddard Space Flight Center (GSFC). GSFC is located in Greenbelt, Maryland.
In addition, the contractor shall certify and recertify LDE and PVS Operators for Code 540
Division at Goddard Space Flight Center (GSFC).
Current LDE and PVS inventory shall be provided as a reference within Task Orders. There are approximately 240 pressure systems, 50 overhead cranes/gantries/monorails/etc., 3 mobile cranes, 14 mobile aerial platforms/powered industrial trucks, and 3,500 pieces of lifting equipment.
In implementing the Program, the contractor must maintain the flexibility to be able to alter personnel work schedules, when required, to accommodate on-going critical Center operations by performing tests and/or inspections that require system or building outages during off-duty hours including weekends and/or holidays.
The contractor shall provide program management and engineering support to the GSFC
LDE and PVS Managers for the Code 540 portion of the contract, including the development and preparation of status reports, cost estimates, engineering analyses, management review materials, attending and documenting meetings, program planning (cost, manpower, and procurement) and special presentations as required on an ad-hoc basis.
Required contractor expertise must include extensive knowledge and experience in applying applicable codes and standards, such as: Department of Labor (OSHA), ANSI, CMAA, ASME (such as the Boiler and Pressure Vessel Code, pressure piping codes, overhead or mobile crane, rigging, etc..), ASTM, NBIC, NFPA, API, ASNT, and other national consensus codes and standards that are pertinent to LDE and PVS design, fabrication, installation, operation, test, and inspection. The contractor shall provide expertise in performing hazard analysis (fault tree, failure mode effects analysis (FMEA), event tree, or cause/effect analysis) on both PVS and LDE.
Certification of LDE and PVS includes review of the existing documentation, preparation for inspection, visual and non-destructive examinations, engineering evaluation, risk assessment and recommendation to meet NASA/GSFC requirements. The contractor shall review all related existing documentation, generate new drawings, if required, make all necessary preparations for inspection, perform all visual and nondestructive examinations, conduct all engineering evaluations, develop risk assessment documentation; and the contractor shall review all supporting documentation involved with repairs to PVS and LDE.
The contractor shall be responsible for periodic in-service inspections and shall be responsible for maintaining the accuracy of the database on certification activities.
Certification is defined as all activities including recertification and periodic in-service inspections.
The contractor shall identify innovative and creative approaches in organizing, staffing, managing, and implementing all LDE/PVS work to maximize program value to the
Government. However, all LDE/PVS work must be in compliance with all referenced
Compliance Requirement Documents listed herein.
The contractor shall provide personnel that have the appropriate skills, training, and certifications for that trade that meet industry standards, or to otherwise perform the requirements of this contract. The contractor shall ensure that the degree of skills be commensurate with that required to perform the work. Those personnel working in trades, whose performance requires license or certification or both, shall be so licensed/certified and said documentation shall be made available to the LDE and PVS Managers upon request.
The contractor shall ensure that all necessary licensing, certification, qualification and training requirements for performing work under this contract remain current. Training classes shall be approved by the LDE and PVS Managers. Certification records shall be kept in an electronic format accessible to the LDE and PVS Managers at any time. The contractor shall develop a process to ensure that all licensing, certification, qualification, and training records can pass annual audits.
The contractor shall communicate, inform, and interact with other Government personnel including, but not limited to: Systems Managers; Facilities Managers; Building Managers;
Engineers; Safety and Environmental Management Office Personnel; System & Research
Engineers and other Government and contractor personnel. This communication shall take place during the normal operations and in emergency situations. The contractor shall maintain communications in the coordination of activities, troubleshooting of problems, preparation of equipment for inspections and testing, and conducting necessary system isolation and safety Lockout/Tagout (LO/TO) activities.
1.1.5.1 LIFTING DEVICES AND EQUIPMENT (LDE)
The contractor shall provide LDE testing, inspection, certification, and recertification services in accordance with existing LDE Program requirements (see section below –
Compliance Requirement Documents), configuration management (CM) schedule, and procedures. LDE includes a variety of cranes, gantry cranes, hoists, mobile cranes, Hydra-sets, Load Cells, slings, structural slings, sling assemblies, and other lifting and rigging hardware and components. The LDE Program also covers powered industrial trucks (PIT) including forklifts, tugs, trailer, and mobile elevated work platforms (MEWP) used for lifting and handling activities in support of critical space flight projects, and institutional and industrial type operations. Additionally, the program may include other LDE and material handling equipment and operations at the discretion of the LDEM. Maintenance and repair task is included for cranes, PITs and MEWP’s owned by the Code 540
Mechanical Systems Division.
Train, certify, and recertify Code 540 contractor for rigging, mobile elevated work platform operations, powered industrial truck operations, crane operations (pendant and radio-controlled cranes), including instructing lift team members in critical lift coordination/operations. Training classes shall be conducted in accordance with LDEM approved syllabi. Administrative tasks for candidate recall, scheduling, coordinating training facilities, correspondence, issuing licenses, and record keeping are required.
Perform periodic LDE program requirement reviews to support continuous improvement.
Update and/or develop inspection and maintenance procedures. Assist in the turn-key projects for installation of new cranes and replace/upgrade existing cranes. Provide consulting services to LDE user organizations for special tasks on rigging, material handling, and lifting; and on LDE compliance requirements, design, installation, and testing.
1.1.5.2 GROUND-BASED PRESSURE VESSEL AND PRESSURIZED SYSTEMS
(PVS)
The contractor shall provide PVS inspection, certification, and recertification services in accordance with Program requirement (see section below – Compliance Requirement
Documents), Configuration Management schedule, and procedure. PVS includes cryogenic, vacuum, hydraulic, and compressed gases (including air) systems, subsystems, purge carts, payload environmental transportation systems (PETS), R&D systems, relief valves, gages, flexible hoses, and other components. PVS are utilized for the storage, transfer, and distribution of high-pressure media. Most of the pressure systems are over 30 years old and may not be designed to the current national consensus codes and standards. The purpose of the certification process is to assure that the systems are recertified and maintained to the current standards to the extent possible; pressure system certification is a continuous process.
Pressure systems and components are recertified on a periodic basis to meet the current requirements. The systems and equipment to be certified under this contract are housed in various buildings and locations throughout GSFC (onsite and offsite locations).
The Contractor shall certify and recertify pressure systems and components on a periodic basis, including in-service inspections (ISIs), to meet the current requirements. The systems and equipment to be certified under this contract are housed in various buildings and locations throughout GSFC Installations and Facilities. All certifications, ISIs, and re-certifications shall be approved by the GSFC PSM.
The Contractor shall determine the requirements necessary for the certification of systems and or components by interpreting the NASA requirements documents and applicable national codes and standards. The Contractor shall be responsible for determining what equipment needs recertification and how best to achieve this with minimum cost.
For each specific certification task, the Contractor shall review all related existing documentation, generate new drawings, if required, make all necessary preparations for inspection, perform all visual and non-destructive examinations by certified personnel, conduct all engineering evaluations, develop risk assessment documentation, identify and document discrepancies/deficiencies, and upon completion of the repairs, review and approve all supporting documentation involved with the repairs.
The Contractor shall use qualified engineers and technicians in the performance of certification work.
Located within Appendix 1 are references on how the certification process is currently conducted and the minimum qualifications of the key personnel involved.
The Contractor shall participate in NASA GSFC Pressure Vessel Safety Committee meetings.
The contractor shall provide training, certification, and recertification of contractor personnel and, if tasked, NASA GSFC customers/partners for High Pressure Systems, cryogenic safety, and oxygen deficiency hazard. The contractor is to manage employee certifications for High Pressure Systems. Administrative tasks for candidate recall, scheduling, coordinating training facilities, correspondence, issuing licenses, and records keeping are required. Training classes shall be approved by the GSFC PSM and Cryogenic
Safety Program Lead.
Perform periodic PVS program requirement reviews to support continuous improvement.
Update or develop in-service inspection procedures. Provide consulting services to user organizations on PVS compliance requirements, design, fabrication, installation, and testing.
1.1.5.3 CONFIGURATION MANAGEMENT
The CM system keeps track of the total LDE and PVS inventory for all equipment and systems owned by Code 540. The contractor shall maintain and update the CM system to reflect any additions, deletions, or changes, and ensure that the documentation for each
LDE and PVS reflects its current field conditions. The CM system provides pertinent information including the certification status and required test, inspection, and recertification schedules for each LDE and PVS. The CM system also provides the capability to search/screen components from the database using criteria such as serial number, model number, etc., in response to OEM recalls or Safe Alerts. The current software supporting the CM system is a SQL based software program, Lab Quality
Management System (LQMS), housed in Code 585.
The contractor shall schedule and complete work in a manner that minimizes disruption of the GSFC mission and daily activities. The contractor shall work together with the LDE and PVS Managers and others in the research community to maintain awareness of the
Code 540’s recertification priorities. The Government prioritizes the recertification work efforts. The Government reserves the right to upgrade or change the current CM system at any point in time during the life of this contract. The contractor shall be able to perform the required CM system functions at the start and for the duration of this contract. The contractor shall continually update/maintain the CM database and shall be responsible for its accuracy as it relates to this SOW.
LDE Requirements – The CM system provides an inventory of each uniquely identified
Lifting Device (LD) and piece of Lifting Equipment (LE). In addition to delineation of
LDE inspection dates, the system provides criticality categorizations (critical/noncritical), service classifications (active service/standby service/idle service), and information regarding the compliance with NASA requirements such as (FMEAs, which define single failure and redundant components, etc.) for critical certified LDE, as well as the LDE owner and location. The CM system will also be a central point for record keeping of material handling equipment used for critical flight hardware.
PVS Requirements – The PVS CM system maintains documentation for all existing, modified, and new systems owned by Code 540. Documentation includes the necessary information to certify PVS in accordance with NASA standards. Examples could include original design drawings, manufacturer’s fabrication drawings, test and inspection reports, and data sheets. CM system documentation also includes PVS modification, repair, replacement drawings and history, as well as the certification status and in-service inspection (ISI) schedules for each PVS. Each PVS within the CM system is uniquely identified by a system number. Components within each System is also uniquely identified, including manufacturer, serial number, model number, size, etc.
1.1.5.4 COMPLIANCE REQUIREMENT DOCUMENTS
The contractor shall assure that the LDE and PVS Certification Programs are in compliance with the following documents (enforcement of edition at time of non-compliance or contract start):
• NPR 8715.3, “NASA General Safety Requirements”17
• NASA-STD-8719.9, “NASA Lifting Standard”18
• NPR 8715.1, “NASA Safety and Health Programs,” Chapter 7, “Ground-based Pressure
Vessels and Pressurized Systems Safety” 19
• NASA-STD-8719.17, “NASA Requirements for Ground-Based Pressure Vessels and
Pressurized Systems”20
• GPR 8710.3, “Certification and Recertification of Ground-Based Pressure Vessels and Pressurized Systems”22
• GPR 8719.1 “Lifting Devices and Equipment Certifications and Operations” 23
• OSHA 29 CFR 1910/1926 24
• GPR 8710.7 “Cryogenic Safety”25
• 500-PG-8715.1.2 “Engineering and Technology Directorate Safety Manual”26
• 540-PG-8715.1.2 “Mechanical Systems Division Safety Manual”27
• 540-PG-8719.1.1 “Lift Sling Design”30
• ASNT SNT-TC-1A “Recommend Practice for the Personnel Qualification and
Certification in Nondestructive Testing” 31
1.1.6 OPTICAL INTEGRATION
The contractor shall provide optical integration services necessary to install, align, and calibrate spacecraft or flight experiment instruments, components, or elements. These services include integration operations in the GSFC Building 7/10/15/29 integration facilities, other GSFC facilities, other NASA centers or contractor sites, and pre-flight and post-flight operations at the launch site. The contractor shall provide the following optical services for space flight, atmospheric flight (balloon and aircraft) and ground support hardware. These services are provided in support of GSFC Code 551 Optics Branch.
1.1.6.1 OPTICAL TESTING
The contractor shall utilize the GSFC Optical Test Facility in Building 7, optical laboratories in Building 5, and associated optical instrumentation, equipment, and facilities to verify alignment of flight, engineering model, and ground system optical instruments, breadboards and components; perform active alignment of systems; and perform pre and post environmental test distortion effects measurements. In addition, the contractor shall conceive and construct optical breadboards, test and evaluate optical components, collect and analyze data, document procedures, and write and present results. Task Orders shall include facility information.
The contractor shall use the GSFC provided optical laboratory facilities and equipment to perform optical testing and performance verification in accordance with the work instruction entitled Optical Alignment and Test, 551-WI-8730.1.232.
1.1.6.2 OPTICAL FABRICATION
The contractor in accordance with the Optical Alignment and Test, 551-WI-8730.1.2 shall use GSFC facilities to fabricate specialized optical fixtures and tooling required during optical alignment, fabrication, and assembly. The staff shop consists of typical machine tools including a band saw, milling machine, lathe, drill press, and grinder.
1.1.6.3 OPTICAL ASSEMBLY
The contractor shall use GSFC facilities and equipment to assemble flight and non-flight optical systems in accordance with Work Order Authorizations. GSFC will provide WOAs and optical components and subassemblies as required per the WOA. Optical systems to be assembled include calibration systems, flight and non-flight instruments, and supporting optical GSE.
1.1.7 FACILITY ACQUISITION OR MODIFICATION
The contractor shall provide all support required to acquire and put into service new technical facilities or to modify existing technical facilities to meet new requirements.
These services include project management, administration, procurement, subcontractor management, engineering, installation, construction, configuration documentation and control, and facility commissioning. Technical facilities include the technical equipment and building modifications or development as necessary to deliver a complete, functioning system in accordance with performance or design specifications provided by the customer.
Any required building modification or development shall be coordinated with and reviewed by all appropriate GSFC organizations.
1.1.8 NONDESTRUCTIVE EXAMINATION (NDE)
The contractor shall have NDE capabilities or services that meet ASNT-SNT-TC-1A33.
1.2 GOODS
1.2.1 ELECTRICAL CABLE HARNESS
The contractor shall use GSFC facilities and equipment to provide flight and ground support system wiring harnesses and cables in accordance with Harness/Cable Fabrication Function
Level Procedure 549-PG-8072.0.1A34. This function level procedure includes design, procurement, fabrication, verification, modification, delivery, and installation. GSFC will provide the facilities, tools, and equipment, and serve as Product Design Lead and
Verification Engineer as specified in 549-PG-8072.0.1A. Work is performed to Work Order
Authorizations that are provided to the contractor, or WOA’s may be generated by the contractor as part of the design effort.
1.2.2 THERMAL BLANKETS
The contractor shall use GSFC facilities and equipment to provide flight and ground support system thermal blankets and tape application in accordance with 549-PG-
8071.0.2A Thermal Systems Support35. This procedure includes requirement development, design, procurement, fabrication, verification, delivery and installation.
GSFC will provide the facilities, tools, and equipment, and serve as Product Design Lead as specified. Work is performed to Work Order Authorizations that are provided to the contractor, or WOA’s may be generated by the contractor as part of the design effort.
Installation or modification support may be required at the launch site, other NASA facilities, or commercial sites.
Thermal Blanket engineering support shall be provided in terms of providing the capability of evaluating and assessing blanket and fabrication requirements for spacecraft and instruments. Contractor shall provide the capability of interfacing with the customer to provide guidance with scheduling the progression of blanket fabrication and installation and resolving issues and customer concerns. The contractor shall provide the capability of creating templates from electronic drawing formats. The contractor shall maintain an inventory of electronic and hard copy blanket templates.
1.3 FUNCTIONAL SUPPORT
1.3.1 SAFETY
The contractor shall ensure that all services and operations that are provided by this
Statement of Work are conducted in a manner that is safe to personnel, facilities, flight hardware and ground support equipment. The contractor shall:
• Ensure that services provided under this contract conform to the requirements of the
Mechanical Systems Division Safety Manual 540-PG-8715.1.2D36 and other applicable safety requirements including…