attachment A SOW_ HAARP.docx
DOCX document 134 KB Posted
- Solicitation number
- 19AQMM26Q0439
About this file
This is a Statement of Work (SOW) for the Department of State's Bureau of Diplomatic Security, Physical Security Division, establishing requirements for large-scale blast testing and fragmentation characterization of anti-ram perimeter barriers. The effort is divided into two phases over a 24-month performance period, with compressed schedules preferred to minimize travel and costs.
Phase 1 requires evaluation and characterization of debris generated from simulated Vehicle Borne Improvised Explosive Device (VBIED) attacks against six baseline anti-ram systems, including bar fences, picket fences, and various steel anti-climb and anti-ram fence configurations. Test articles must be constructed in lengths of 30, 45, and 60 feet per provided drawings. The testing will use a 2,000-pound TNT equivalent charge in a cylinder configuration positioned on a 32-inch table with a 24-inch gap from the test article. Phase 2 involves testing the best-performing fence designs from Phase 1 fitted with opaque cladding materials to determine which produce the least hazardous fragmentation while meeting concealment requirements. The performer must propose feasible cladding materials that are opaque, weather-resistant, aesthetically pleasing, cost-effective, and designed to break apart in non-hazardous ways.
The performer must secure a test facility capable of supporting 2,000-pound TNT minimum range limits with topography suitable for instrumentation, large clear flat test spaces, and the ability to characterize dynamic debris at 75, 100, 200, and 300 feet, as well as debris at rest up to 1,500 feet. The performer will design and propose instrumentation and post-processing plans to capture high-speed video, debris dimensions, weight, velocity, height, and dispersion patterns at specified distances and at final resting locations. Deliverables include quick-look reports within 14 days of test completion, full written reports within 45 days containing test descriptions, gauge data, high-resolution photos and videos, updated drawings suitable for inclusion in the Physical Security Handbook, and monthly status updates on the 15th of each month. All final materials shall be delivered via FedEx or UPS to the specified Arlington, Virginia address upon completion of all testing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Example Price Organization.xlsx | XLSX spreadsheet | |
| QA for HAARP.docx | DOCX document | |
| 19AQMM26Q0439.pdf | ||
| Appendix B- Barrier Designs.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF STATE BUREAU OF DIPLOMATIC SECURITY
PHYSICAL SECURITY DIVISION
STATEMENT OF WORK FOR
HAZARDS ASSOCIATED WITH
ANTI-RAM PERIMETERS
22 May 2026
Background
The Department’s Bureau of Diplomatic Security, Physical Security Division, Research and Development Branch (DS/PSD/RD) is investigating debris generated from perimeter anti-ram barriers during a Vehicle Borne Improvised Explosive Device (VBIED) attack.
DS/PSD/RD is seeking proposals to conduct large scale blast testing and fragmentation tracking.
Government Furnished Information to Performer:
· DOS DS PSD Standard Practice for Blast Tests
· Final report and test data from previous anti-ram barrier debris characterization testing
· Physical Security Handbook (Red Book) drawing templates
Scope This effort will be broken into two phases. Phase 1 will be to evaluate and characterize the debris generated from a simulated VBIED attack against baseline Department anti-ram systems, identified in this document. Phase 2 will be to evaluate and characterize debris generated from modified Department anti-ram systems.
Performers will be evaluated on:
1. Ability to perform testing in accordance with Blast Testing SOP for DS/PSP/PSD
2. Responders shall provide a narrative for test site setup as part of performer evaluation.
· Test facility capabilities:
· Topography suitable for instrumentation
· Large, clear, flat, and level test spaces are ideal to best characterize the debris:
· Ability to characterize dynamic debris at 75ft, 100ft, 200ft, and 300ft
· Ability to character debris at rest post test (as far as 1,500ft from initial test article location)
· Free of debris from previous tests
· Widths that can accommodate HS camera views that capture overall events
· A 2,000 lbs. TNT NEW range limit is the minimum required to conduct this testing.
· DS/PSD/RD will accept either single test article test, or if appropriate, test two test articles simultaneously as seen in Figure 1:
· Will require larger test range, ~3,000ft
Figure 1: Example of Setup to Test Two Anti-Ram Fences in One Test
· Instrumentation plan:
· Required to characterize debris generated from the anti-ram barriers:
· At 75ft, 100ft, 200ft, 300ft, and at rest
· Characterize the following from debris:
· Dimensions
· Weight
· Velocity
· Height from ground
· Dispersion
· Plan to differentiate debris from one test to the next (concrete dye, paint, etc.) and/or clear range of debris from prior tests
DS/PSD/RD has no prescribed methodology to capture the above data; The performer shall propose their instrumentation and post processing plans including the types of data acquisition equipment and any software needed to do the analysis.
3. Schedule: Complete the project within 24 months, with more consideration given to condensed schedules.
· Compressed testing dates are preferred to avoid excess testing travel lengths or multiple trips.
· DS/PSD/RD Understands cost and schedule need to be balanced. Testing two anti-ram fences simultaneously saves time, explosives, and setup labor but requires duplicate instrumentation and a much larger test range. Performer should provide their plan and justify. Performer is also welcome to provide several; approaches and let DS/PSD/RD decide which is most advantageous to the government.
Phase 1: Initial Anti-Ram Barrier Debris Characterization:
Set up:
For planning purposes, the surrogate Vehicle Borne Improvised Explosive Device will be a charge with the NEW of 2,000lbs TNT, in a cylinder with a L/D of 1, sat atop a 32in table, centered on a 10ft x 10ft concrete pad, and placed so that there is a 24in gap between the edge of charge and the test article. The boundary conditions of the test articles will influence the amount of debris generated during the testing, but the government needs to balance cost with real world simulation. Therefore, the government would like the performer to provide options to build and test the test articles in lengths of 30ft, 45ft and 60ft long sections and constructed per the drawings in Appendix A.
Figure 2: Example Test Article Layout
Phase 1 Test Articles:
| Test Sample |
| Design Being Tested |
Drawings in Appendix B
| Brief Description (See Appendix A for Details) |
| Potential to Combine tests |
| Length of Test sample Options |
| Base 1 |
| AC-41-05 Bar Fence on top of DS-50 Knee Wall |
| 20x20mm Bars @ 65mm OC |
| N |
| B1.1: 30ft |
B1.2: 45ft B1.3:60ft
| Base 2 |
| AC-41-06 Picket Fence on top of DS-50 Knee Wall |
| 50mm x 6mm Pickets @200mm OC |
| N |
| B2.1: 30ft |
B2.2: 45ft B2.3:60ft
| Base 3 |
| DS-40 Anti- Climb & Ram Fence |
| 20x20mm Bars @ 130 mm OC w/ DN250 XS Pipes @ 1,720mm OC |
| Yes w/ base 4 or Option 2 |
| B3.1: 30ft |
B3.2: 45ft B3.3:60ft
| Base 4 |
| DS-44 Steel Anti- Climb & Ram Fence |
| 100mm x 50mm x 6mm Tubes @ 175mm OC |
| Yes w/ base 3 or Option 2 |
| B4.1: 30ft |
B4.2: 45ft B4.3:60ft
| Option 1 |
| AC-41-04 Tube Fence on top of DS-50 Knee Wall |
| 38mm dia. x 3mm Tubes @150mm OC |
| N |
| O1.1: 30ft |
O1.2: 45ft O1.3:60ft
| Option 2 |
| DS-43 Steel Anti- Climb & Ram Fence with Kickers |
| 100mm x 50mm x 6mm Tubes @ 175mm OC with Kickers @ 350mm OC |
| Yes w/ base 2 or base 3 |
| O2.1: 30ft |
O2.2: 45ft O2.3:60ft
After the Phase 1 test data will be analyzed by the performer and DS/PSD will determine which test samples produced the most and least hazardous fragmentation based of level of hazardous debris produced.
Phase 2: Modified Anti-Ram Barrier Debris Characterization:
In certain scenarios the Department requires perimeters to employ opaque barriers to prevent easy external observation. To meet this requirement the test samples that produced the least hazardous fragmentation in Phase 1 will be fitted with various opaque claddings and tested to determine which produce the least hazardous fragmentation. The performer will research various opaque claddings that will provide concealment with preference to those that would mitigate and reduce the level of hazardous debris generated.
The performer will research and propose feasible fence and knee-wall cladding materials that can be tested in Phase 2. The criteria for potential fence cladding are:
1. Opaque
2. Weather resistant
3. Aesthetically pleasing
4. Potential to break up in a non-hazardous way
a. Large yet low mass pieces
b. Small pieces
c. Consumed by VBIED’s thermal energy
d. Etc.
5. Readily available construction materials
a. Cost effective and easily constructable
| Test Sample |
| Design Being Tested |
| Example Cladding Options will be Researched and Suggested by Performer and Accepted by DS/PSD/RD |
| Potential to Combine tests |
| Length of Test sample Options |
| Option 3 |
| Best Performing Fence on knee wall with opaque cladding |
| E.g.: 24-gauge stainless steel 316L or Alum equivalent decorative panel on fence and steel plate behind knee wall |
| N |
| O3.1: 30ft |
O3.2: 45ft O3.3:60ft
| Option 4 |
| Best Performing Fence on knee wall with opaque cladding |
| E.g.: Metal plate material on fence and knee wall |
| N |
| O4.1: 30ft |
O4.2: 45ft O4.3:60ft
| Option 5 |
| Best Performing Anti-Ram Fence with Opaque cladding |
| E.g.: Stainless steel 316L or Alum equivalent decorative panel on fence |
| Yes w/ Option 6 |
| O5.1: 30ft |
O5.2: 45ft O5.3:60ft
| Option 6 |
| Best Performing Anti-Ram Fence with Opaque cladding |
| E.g.: Light weight material |
| Yes w/ Option 5 |
| O6.1: 30ft |
O6.2: 45ft O6.3:60ft
Deliverables
Test Data:
· The performer will determine the best method to place video cameras, gauges, surveying equipment, etc. necessary to capture the desired data. The performer shall present their instrumentation plan to DS for feedback and approval prior to the test.
· Dynamic data to be collected is as follows:
· HS Video:
· Overall Event and downrange point of view (e.g. at 1,000ft)
· At 75ft, 100ft, 200ft and 300ft
· Dimension/description of debris (steel, concrete, steel and concrete, etc.)
· At 75ft, 100ft, 200ft, and 300ft
· Estimated weight of debris
· At 75ft, 100ft, 200ft, and 300ft
· Velocity of debris
· At 75ft, 100ft, 200ft and 300ft
· Height of debris
· At 75ft, 100ft, 200ft, and 300ft
· Dispersion pattern of debris
· At 75ft, 100ft, 200ft, and 300ft
· Post blast debris assessment will be conducted to characterize the debris. The performer shall determine the search area necessary to capture 90% of the debris weighing one pound or more (estimated to be 1,000ft to 1,500ft from originating position but performer needs to confirm).
· Data to be collected:
· Dimensions of debris/ description of debris (steel, concrete, steel and concrete, etc.)
· At final resting place
· Weight of debris
· At final resting place
· Dispersion pattern of debris
· At final resting place Drawings:
· Provide updated and/or generate new drawings of modified anti-ram systems from Phase 2, drawings are intended to be included in the OBO Physical Security Handbook (Red Book). The updated, or new, drawings shall convey all details necessary to serve as a basis of design for OBO’s architects, engineers, and planners.
Reports:
A quick look report will be provided within 14 days of test completion, with full written reports within 45 days. Reports will include test descriptions, raw gauge data, processed gauge data, high resolution photos and videos, and documented descriptions of layup and witness panel condition posttest. All final reports, photos, and full testing videos shall be delivered at the completion of all samples testing on a hard drive mailed via FedEx or UPS to:
Attention: Alec Williamson
| 1400 Wilson Blvd |
| 9th Floor |
| Arlington, VA 22209 |
A monthly status update on progress, scheduling, delays or other information shall be provided on the 15th of the month. Status updates shall be in the format of an email with subject “Hazards Associated with Anti-Ram Perimeters– Month”. An example monthly status update template is provided in Appendix A.
Appendix A:
Example Monthly Status Report DS/C/PSP/PSD/RD – Project Name Task Manager: TBD Developer PI: (Fill in name, phone number once contract is awarded) Contract Number: (fill in)
MONTHLY STATUS REPORT
1) TASK TITLE: ((fill in)
2) DESCRIPTION/REQUIREMENT: (fill in)
3) DEVELOPER(S): (add any significant subcontractors)
4) TECHNICAL APPROACH: (In five or six sentences, summarize the projectfts technical approach.)
5) MILESTONES: (fill in relevant milestones)
| Milestone |
| Planned |
| Rescheduled |
| Actual |
Project Plan
Kickoff Meeting
Preliminary Design Review
Operations and Maintenance Manual
Critical Design Review
Test Plan
Test Report
Etc.
6) FUNDING & COSTS:
Project Funding History
| Funding Action |
| Date |
| Amount |
| Comment |
| Contract Award |
| 7/15/2016 |
| $68,000.00 |
| Contract award, funds through Nov 2016 |
| Mod 1 |
| 10/15/2016 |
| $58,000.00 |
| Incremental funding, funds through Dec 2016. |
| Mod 2 |
| 1/15/2017 |
| $65,000.00 |
| Fully funds effort |
Funding Provided to Date Expenditures (Current Month)
| Accrued Expenditures (Cumulative) |
| Remaining |
Obligated Funds
| Funding |
| $100,000.00 |
| $25,000.00 |
| $100,000.00 |
| $0.00 |
| Total Funding Provided |
| $200,000.00 |
| Contract Value |
| $300,000.00 |
Insert graph showing planned expenditures, current funding level, and actual expenditures here. The graph must cover from contract start date to end date. If a revised spend plan becomes necessary, be sure to include the original plan as well. (See sample below):
| 7) | TASK STATUS / MONTHLY ACTIVITIES: | ||
| a. | Report month – | ||
| b. | Upcoming Month – |
8) ISSUES: (Identify any issue that affects the progress of the project, funds requirements, payment of invoices, potential schedule problems. Include requirements for resolution of the issue.)
9) PHOTOS/VIDEO: (Include at least two current digital images of 300 pixel/inch quality or better, in “.jpg”, “.tif”, or “.bmp” format that show a conceptual application, design, physical prototype, or other meaningful representation of the project progress If applicable, provide video compatible with Windows Media Player.)
image1.png image2.png image3.jpg
File details come from the government source that posted it. Updated .