19AQMM26Q0439.pdf

PDF 265 KB Posted

Attached to
HAARP large scale blast testing and fragmentation characterization
Solicitation number
19AQMM26Q0439
Issued by

About this file

This is a Request for Proposal (RFP) for blast testing and fragmentation characterization services related to anti-ram perimeter barriers. The solicitation number is 19AQMM26Q0439, issued by the Department of State's Bureau of Diplomatic Security, Physical Security Division, Research and Development Branch on August 26, 2026, with an offer due date of August 28, 2026 at 7:00 AM ET. The contract is anticipated to be a firm fixed-price award for one contract, though the government reserves the right to award multiple contracts.

The scope consists of two phases conducted over a 24-month base period. Phase 1 involves evaluating and characterizing debris generated from simulated Vehicle Borne Improvised Explosive Device (VBIED) attacks against six baseline and two optional Department anti-ram barrier configurations in lengths of 30, 45, and 60 feet. Phase 2 involves testing the best-performing barriers from Phase 1 fitted with various opaque cladding materials. The contractor must conduct large-scale blast testing with a 2,000 lbs TNT NEW minimum range capacity, characterize dynamic debris at 75, 100, 200, and 300 feet, and characterize debris at rest up to 1,500 feet. Deliverables include quick-look reports within 14 days of test completion, full reports within 45 days, high-resolution photos and videos, updated drawings suitable for the Department's Physical Security Handbook, and monthly status updates on the 15th of each month. Evaluation criteria include technical approach (solution requirements narrative, instrumentation and facility capability, schedule and deployment strategy), management approach, key personnel qualifications, and past performance. The government will use a best-value tradeoff methodology with non-price factors significantly more important than price, using confidence ratings (High, Some, Low, or Neutral) for technical evaluation.

View the file

Other files

File Type Posted
Example Price Organization.xlsx XLSX spreadsheet
QA for HAARP.docx DOCX document
attachment A SOW_ HAARP.docx DOCX document
Appendix B- Barrier Designs.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Number: 19AQMM26Q0439 PROCESSED Page 1 of 48

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 & 30 1. REQUISITION NUMBER PAGE 1 OF 48

5. SOLICITATION NUMBER

19AQMM26Q0439

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE DATE

08/25/2026

4. ORDER NUMBER 6. SOLICITATION ISSUE

DATE

08/25/2026

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME Richard B. Crum

b. TELEPHONE NUMBER (No collect calls) 703-875-6881

8. OFFER DUE DATE / LOCAL

TIME

08/28/2026

07:00 ET

CODE GAAM_

BUREAU OF GLOBAL ACQUISITIONS (GA)

1200 Wilson Blvd., SA-6B

ATTN: GA

ARLINGTON, VA 22209

9. ISSUED BY X UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED WOMEN-

OWNED SMALL BUSINESS (EDWOSB)

8(A)

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SIZE STANDARD:

10. THE ACQUISITION IS

SEE

SCHEDULE

X

11. DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS BLOCK IS

MARKED

0 Days: 0.00 %

0 Days: 0.00 % 0 Days: 0.00 % 0 Days: 0.00 %

12. DISCOUNT TERMS

13a. THIS CONTRACT IS

RATED ORDER UNDER THE

DEFENSE PRIORITIES AND

ALLOCATIONS SYSTEM -

DPAS (15 CFR 700)

13b. RATING

REQUEST

FOR

QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

X REQUEST

FOR

PROPOSAL

(RFP)

14. METHOD OF SOLICITATION

CODE15. DELIVER TO CODE GAAM16. ADMINISTERED BY

Security Staffing & Countermeasures

GA/AM/DMS/SEC/SSC

Bureau of Global Acquisitions 1200 Wilson Blvd (SA-06B) Arlington, VA 22209

FACILITY

CODE

CODE

Contact UEI:

Telephone No.

17a. CONTRACTOR/

OFFEROR

IPPCODE18a. PAYMENT WILL BE MADE BY

IPP

Invoices to be uploaded to Invoice Processing Platform at http://www.ipp.gov

CHARLESTON, SC 29415

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER SEE ADDENDUM

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS

CHECKED

19. ITEM NUMBER 20. SCHEDULE OF SUPPLIES/SERVICES

(Use Reverse and/or Attach Additional Sheets as Necessary)

21. QUANTITY 22. UNIT 23. UNIT PRICE 24. AMOUNT

See Line Information

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

X 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE X ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE

TERMS AND CONDITIONS SPECIFIED.

29. AWARD OF CONTRACT: REFERENCE _____________________________

OFFER DATED _________________ . YOUR OFFER ON SOLICITATION (BLOCK

5) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (TYPE OR PRINT) Heather F Keeton

31c. DATE SIGNED 08/24/2026

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

Document Number: 19AQMM26Q0439 PROCESSED Page 2 of 48

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

PARTIAL FINAL

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

COMPLETE PARTIAL FINAL

36. PAYMENT 37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 11/2021) BACK

Document Number: 19AQMM26Q0439 PROCESSED Page 3 of 48

Section A - Solicitation/Contract Form

Line Item Summary

Solicitation Number:

19AQMM26Q0439

Contract Number: Title:

HAARP

Date of Solicitation:

08/26/2026

Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)

PSC: H256

PSC Description: EQUIPMENT AND MATERIALS

TESTING- CONSTRUCTION AND BUILDING

MATERIALS

Type of Contract Pricing: Firm Fixed Price

0.0 LT $0.00 $0.00

Period of Performance: 08/30/2026 - 08/29/2028

Description: Project Manager

Pricing Options: Base

CLIN Funding: Cost:

Base Totals: $0.00 $0.00

Exercised Options Totals: $0.00 $0.00

Unexercised Options Totals: $0.00 $0.00

Base and Options Totals: $0.00 $0.00

Clause Title Fill-ins

52.246-4 Inspection of Services-Fixed-Price (Aug 1996)

52.203-3 Gratuities (Apr 1984)

52.203-12 Limitation On Payments to Influence Certain Federal Transactions (Jun 2020)

52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021)

52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011)

(DEVIATION)

52.204-12 Unique Entity Identifier Maintenance (Oct 2016)

52.204-13 System for Award Management-Maintenance (DEVIATION JAN 2026)

52.204-14 Service Contract Reporting Requirements (DEVIATION JAN 2026)

52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020)

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

(DEVIATION JAN 2026)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations

(DEVIATION JAN 2026)

Document Number: 19AQMM26Q0439 PROCESSED Page 4 of 48

Clause Title Fill-ins

52.212-4 Terms and Conditions-Commercial Products and Commercial Services

(DEVIATION JAN 2026)

52.215-2 Audit and Records-Negotiation (DEVIATION FEB 2026)

52.215-8 Order of Precedence - Uniform Contract Format (DEVIATION FEB 2026)

52.222-54 Employment Eligibility Verification (DEVIATION FEB 2026)

52.224-1 Privacy Act Notification (Apr 1984)

52.224-2 Privacy Act (Apr 1984)

52.224-3 Privacy Training (JAN 2017)(DEVIATION)

52.237-2 Protection of Government Buildings, Equipment, and Vegetation (Apr 1984)

52.203-11 Certification And Disclosure Regarding Payments to Influence Certain

Federal Transactions (Sept 2024)

52.212-3 Offeror Representations and Certifications-Commercial Products and

Commercial Services (Oct 2025)

52.204-7 System for Award Management - REGISTRATION (DEVIATION JAN

2026)

52.204-16 Commercial and Government Entity Code Reporting (Aug 2020)

52.204-22 Alternative Line Item Proposal (Jan 2017)

52.215-1 Instructions to Offerors-Competitive Acquisition (DEVIATION FEB 2026)

52.237-1 Site Visit (Apr 1984)

B - SUPPLIES OR SERVICES AND PRICES/COSTS

Background

The Department’s Bureau of Diplomatic Security, Physical Security Division, Research and Development Branch (DS/PSD/RD) is investigating debris generated from perimeter anti-ram barriers during a Vehicle Borne Improvised Explosive Device (VBIED) attack.

DS/PSD/RD is seeking proposals to conduct large scale blast testing and fragmentation tracking.

Government Furnished Information to Performer:

• DOS DS PSD Standard Practice for Blast Tests

• Final report and test data from previous anti-ram barrier debris characterization testing

• Physical Security Handbook (Red Book) drawing templates

Scope

Document Number: 19AQMM26Q0439 PROCESSED Page 5 of 48

This effort will be broken into two phases. Phase 1 will be to evaluate and characterize the debris generated from a simulated VBIED attack against baseline Department anti-ram systems, identified in this document. Phase 2 will be to evaluate and characterize debris generated from modified Department anti-ram systems.

Performers will be evaluated on:

1. Ability to perform testing in accordance with Blast Testing SOP for DS/PSP/PSD

2. Responders shall provide a narrative for test site setup as part of performer evaluation.

• Test facility capabilities:

• Topography suitable for instrumentation

• Large, clear, flat, and level test spaces are ideal to best characterize the debris:

• Ability to characterize dynamic debris at 75ft, 100ft, 200ft, and 300ft

• Ability to character debris at rest post test (as far as 1,500ft from initial test article location)

• Free of debris from previous tests

• Widths that can accommodate HS camera views that capture overall events

• A 2,000 lbs. TNT NEW range limit is the minimum required to conduct this testing.

• DS/PSD/RD will accept either single test article test, or if appropriate, test two test articles simultaneously as seen in Figure 1:

• Will require larger test range, ~3,000ft

Figure 1: Example of Setup to Test Two Anti-Ram Fences in One Test

1. • Instrumentation plan:

• Required to characterize debris generated from the anti-ram barriers:

• At 75ft, 100ft, 200ft, 300ft, and at rest

• Characterize the following from debris:

• Dimensions

• Weight

• Velocity

• Height from ground

• Dispersion

• Plan to differentiate debris from one test to the next (concrete dye, paint, etc.) and/or clear range of debris from prior tests

DS/PSD/RD has no prescribed methodology to capture the above data; The performer shall propose their instrumentation and post processing plans including the types of data acquisition equipment and any software needed to do the analysis.

1. Schedule: Complete the project within 24 months, with more consideration given to condensed schedules.

• Compressed testing dates are preferred to avoid excess testing travel lengths or multiple trips.

• DS/PSD/RD Understands cost and schedule need to be balanced. Testing two anti-ram fences simultaneously saves time, explosives, and setup labor but requires duplicate instrumentation and a much larger test range. Performer should provide their plan and justify. Performer

Document Number: 19AQMM26Q0439 PROCESSED Page 6 of 48 is also welcome to provide several; approaches and let DS/PSD/RD decide which is most advantageous to the government.

Phase 1: Initial Anti-Ram Barrier Debris Characterization:

Set up:

For planning purposes, the surrogate Vehicle Borne Improvised Explosive Device will be a charge with the NEW of 2,000lbs TNT, in a cylinder with a L/D of 1, sat atop a 32in table, centered on a 10ft x 10ft concrete pad, and placed so that there is a 24in gap between the edge of charge and the test article. The boundary conditions of the test articles will influence the amount of debris generated during the testing, but the government needs to balance cost with real world simulation. Therefore, the government would like the performer to provide options to build and test the test articles in lengths of 30ft, 45ft and 60ft long sections and constructed per the drawings in Appendix A.

Figure 2: Example Test Article Layout

Phase 1 Test Articles:

Test Sample Design Being Tested Drawings in Appendix B

Brief Description (See Appendix A for Details)

Potential to Combine tests

Length of Test sample Options

Base 1 AC-41-05 Bar Fence on top of DS-50 Knee Wall

20x20mm Bars @ 65mm OC

N B1.1: 30ft B1.2: 45ft B1.3:60ft

Base 2 AC-41-06 Picket Fence on top of DS-50 Knee Wall

50mm x 6mm Pickets @200mm OC

N B2.1: 30ft B2.2: 45ft B2.3:60ft

Base 3 DS-40 Anti- Climb & Ram Fence

20x20mm Bars @ 130 mm OC w/ DN250 XS Pipes @ 1,720mm OC

Yes w/ base 4 or Option 2 B3.1: 30ft B3.2: 45ft B3.3:60ft

Base 4 DS-44 Steel Anti- Climb & Ram Fence

100mm x 50mm x 6mm Tubes @ 175mm OC

Yes w/ base 3 or Option 2 B4.1: 30ft B4.2: 45ft B4.3:60ft

Option 1 AC-41-04 Tube Fence on top of DS-50 Knee Wall

38mm dia. x 3mm Tubes @150mm OC

N O1.1: 30ft O1.2: 45ft O1.3:60ft

Option 2 DS-43 Steel Anti- Climb & Ram

Fence with Kickers

100mm x 50mm x 6mm Tubes @ 175mm OC with

Kickers @ 350mm OC

Yes w/ base 2 or base 3 O2.1: 30ft O2.2: 45ft O2.3:60ft

After the Phase 1 test data will be analyzed by the performer and DS/PSD will determine which test samples produced the most and least hazardous fragmentation based of level of hazardous debris produced.

Phase 2: Modified Anti-Ram Barrier Debris Characterization:

In certain scenarios the Department requires perimeters to employ opaque barriers to prevent easy external observation. To meet this requirement the test samples that produced the least hazardous fragmentation in Phase 1 will be fitted with various opaque claddings and tested to determine which produce the least hazardous fragmentation. The performer will research various opaque claddings that will provide concealment with preference to those that would mitigate and reduce the level of hazardous debris generated.

The performer will research and propose feasible fence and knee-wall cladding materials that can be tested in Phase 2. The criteria for potential fence cladding are:

1. Opaque

Document Number: 19AQMM26Q0439 PROCESSED Page 7 of 48

2. Weather resistant

3. Aesthetically pleasing

4. Potential to break up in a non-hazardous way

a. Large yet low mass pieces

b. Small pieces

c. Consumed by VBIED’s thermal energy

d. Etc.

5. Readily available construction materials

a. Cost effective and easily constructable

Test Sample Design Being Tested Example Cladding Options will be Researched and

Suggested by Performer and Accepted by DS/PSD/RD

Potential to Combine tests

Length of Test sample Options

Option 3 Best Performing Fence on knee wall with opaque cladding

E.g.: 24-gauge stainless steel 316L or Alum equivalent decorative panel on fence and steel plate behind knee wall

N O3.1: 30ft O3.2: 45ft O3.3:60ft

Option 4 Best Performing Fence on knee wall with opaque cladding

E.g.: Metal plate material on fence and knee wall

N O4.1: 30ft O4.2: 45ft O4.3:60ft

Option 5 Best Performing Anti-Ram Fence with

Opaque cladding

E.g.: Stainless steel 316L or Alum equivalent decorative panel on fence

Yes w/ Option 6 O5.1: 30ft O5.2: 45ft O5.3:60ft

Option 6 Best Performing Anti-Ram Fence with

Opaque cladding

E.g.: Light weight material

Yes w/ Option 5 O6.1: 30ft O6.2: 45ft O6.3:60ft

Deliverables

Test Data:

• The performer will determine the best method to place video cameras, gauges, surveying equipment, etc. necessary to capture the desired data. The performer shall present their instrumentation plan to DS for feedback and approval prior to the test.

• Dynamic data to be collected is as follows:

• HS Video:

• Overall Event and downrange point of view (e.g. at 1,000ft)

• At 75ft, 100ft, 200ft and 300ft

• Dimension/description of debris (steel, concrete, steel and concrete, etc.)

• At 75ft, 100ft, 200ft, and 300ft

• Estimated weight of debris

• At 75ft, 100ft, 200ft, and 300ft

• Velocity of debris

• At 75ft, 100ft, 200ft and 300ft

• Height of debris

• At 75ft, 100ft, 200ft, and 300ft

Document Number: 19AQMM26Q0439 PROCESSED Page 8 of 48

• Dispersion pattern of debris

• At 75ft, 100ft, 200ft, and 300ft

• Post blast debris assessment will be conducted to characterize the debris. The performer shall determine the search area necessary to capture 90% of the debris weighing one pound or more (estimated to be 1,000ft to 1,500ft from originating position but performer needs to confirm).

• Data to be collected:

• Dimensions of debris/ description of debris (steel, concrete, steel and concrete, etc.)

• At final resting place

• Weight of debris

• At final resting place

• Dispersion pattern of debris

• At final resting place

Drawings:

• Provide updated and/or generate new drawings of modified anti-ram systems from Phase 2, drawings are intended to be included in the OBO Physical Security Handbook (Red Book). The updated, or new, drawings shall convey all details necessary to serve as a basis of design for OBO’s architects, engineers, and planners.

Reports:

A quick look report will be provided within 14 days of test completion, with full written reports within 45 days.

Reports will include test descriptions, raw gauge data, processed gauge data, high resolution photos and videos, and documented descriptions of layup and witness panel condition posttest. All final reports, photos, and full testing videos shall be delivered at the completion of all samples testing on a hard drive mailed via FedEx or UPS to:

Attention: Alec Williamson 1400 Wilson Blvd

9th Floor Arlington, VA 22209

A monthly status update on progress, scheduling, delays or other information shall be provided on the 15th of the month. Status updates shall be in the format of an email with subject “Hazards Associated with Anti-Ram Perimeters– Month”. An example monthly status update template is provided in Appendix A.

Appendix A:

Example Monthly Status Report

DS/C/PSP/PSD/RD – Project Name Task Manager: TBD

Developer PI: (Fill in name, phone number once contract is awarded) Contract Number: (fill in)

MONTHLY STATUS REPORT

1) TASK TITLE: ((fill in)

2) DESCRIPTION/REQUIREMENT: (fill in)

3) DEVELOPER(S): (add any significant subcontractors)

Document Number: 19AQMM26Q0439 PROCESSED Page 9 of 48

4) TECHNICAL APPROACH: (In five or six sentences, summarize the projectfts technical approach.)

5) MILESTONES: (fill in relevant milestones)

Milestone Planned Rescheduled Actual

Project Plan

Kickoff Meeting

Preliminary Design Review

Operations and Maintenance Manual

Critical Design Review

Test Plan

Test Report

Etc.

6) Funding & Costs:

Project Funding History

Funding Action Date Amount Comment

Contract Award 7/15/2016 $68,000.00 Contract award, funds through Nov 2016

Mod 1 10/15/2016 $58,000.00 Incremental funding, funds through Dec 2016.

Mod 2 1/15/2017 $65,000.00 Fully funds effort

Funding

Provided to Date Expenditures (Current Month)

Accrued Expenditures (Cumulative)

Remaining Obligated Funds

Funding $100,000.00 $25,000.00 $100,000.00 $0.00

Total Funding Provided $200,000.00

Contract Value $300,000.00

Insert graph showing planned expenditures, current funding level, and actual expenditures here. The graph must cover from contract start date to end date. If a revised spend plan becomes necessary, be sure to include the original plan as well. (See sample below):

7) TASK STATUS / MONTHLY ACTIVITIES:

a. Report month –

b. Upcoming Month –

8) ISSUES: (Identify any issue that affects the progress of the project, funds requirements, payment of invoices, potential schedule problems. Include requirements for resolution of the issue.)

9) PHOTOS/VIDEO: (Include at least two current digital images of 300 pixel/inch quality or better, in “.jpg”, “.tif”, or “.bmp” format that show a conceptual application, design, physical prototype, or other meaningful representation of the project progress If applicable, provide video compatible with Windows Media Player.)

(END OF SECTION B)

Document Number: 19AQMM26Q0439 PROCESSED Page 10 of 48

C - PERFORMANCE WORK STATEMENT

C.3 Statement of Work / Performance Work Statement

The detailed requirements for this contract are provided in Attachments, Section B above, and appendix 1. The Performance Work Statement (PWS), which is hereby incorporated by reference into this solicitation and any resulting contract. The Contractor shall perform in accordance with the PWS and all terms and conditions of the contract.

(END OF SECTION C)

D - PACKAGING AND MARKING

D.1 General

All deliverable reports submitted by the Contractor to the Government under this contract shall prominently show on the cover of the report:

1. a. Name and address of the Contractor

b. Contract number

c. Date of report

d. Program Office

All reports become property of the DOS. The Contractor shall not include any company watermarking or statement that would prevent the DOS from utilizing or circulating the information contained in the report. If there are issues with the potential proprietary nature of the information, it shall be brought to the attention of the CO for resolution.

Unless otherwise requested, reports shall be submitted electronically to the Contracting Officer Representative COR.

(End of Section D)

E - INSPECTION AND ACCEPTANCE

E.1 52.252-2 Clauses - (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at:

www.acquisition.gov/FAR

Clauses Incorporated by Reference

FAR Clause Title Date 52.212-4 Contract Terms and Conditions—Commercial

Products and Commercial Services Nov 2023

E.2 Standards for Inspection and Acceptance of Deliverables

Inspection and acceptance of all deliverables shall be in accordance with the requirements and standards set forth in the Performance Work Statement (PWS). The PWS serves as the governing reference for determining the acceptability of supplies and services under this contract.

(End of Section E)

Document Number: 19AQMM26Q0439 PROCESSED Page 11 of 48

F - DELIVERIES OR PERFORMANCE

F.1 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at:

www.acquisition.gov/FAR The following clauses apply at the Order level, as applicable, subject to specific delivery and performance requirements as set forth in the applicable Order.

Clauses Incorporated by Reference – FAR 52.252-2 (FEB 1998)

FAR Clause Title Date 52.212-4 Contract Terms and Conditions—Commercial

Products and Commercial Services Nov 2023

52.242-15 Stop-Work Order Aug 1989

F.2 Period of Performance

This Period of Performance (POP) from date of award one-year base period from the date of award with one, one-year option period that may be exercised solely at the government's discretion.

The base period of performance is on or around TBD based off time of award, anticipated to be August 1, 2025 – August 2, 2027

The Option years one and two shall be priced

F.3 Place of Performance

The Place of Performance of this contract will be as follows:

• TBD

F.4 Deliverables

Performance under this contract shall be in accordance with the Performance Work Statement (PWS) and any task orders issued hereunder. All deliverables, including reports, products, and services, shall be provided in the quantities, at the locations, and within the timeframes specified in the PWS. The applicable terms for delivery and performance are incorporated by reference from FAR 52.212-4(f), Contract Terms and Conditions—Commercial Products and Commercial Services.

F.5 Performance Standards and Evaluation The Contractor shall perform all work in accordance with the Performance Work Statement (PWS), meeting the standards and requirements specified therein. Performance will be evaluated based on the following criteria:

1. Quality of Deliverables

• Deliverables, including reports, products, and services, must meet all technical and contractual requirements outlined in the PWS.

• Any deficiencies must be corrected at the Contractor’s expense within the timeframe specified by the Contracting Officer’s Representative (COR).

2. Timeliness of Performance

• Deliverables shall be submitted by the dates specified in the PWS.

• Late or incomplete submissions may be subject to corrective actions or consideration in performance evaluations.

3. Compliance with Contract Requirements

• Contractor performance shall comply with all applicable Federal regulations, contract clauses, and PWS standards.

4. Customer Satisfaction / Responsiveness

• The Government may assess responsiveness, communication, and overall satisfaction with services provided under the contract.

5. Evaluation Process

• Performance evaluations will be conducted periodically (e.g., monthly, quarterly, or as specified in the PWS).

Document Number: 19AQMM26Q0439 PROCESSED Page 12 of 48

• Results of evaluations may be documented in the Contractor Performance Assessment Reporting System (CPARS) or equivalent Government system, and may influence future tasking or awards.

The Contractor is expected to proactively monitor performance, address deficiencies, and maintain a high standard of quality and responsiveness throughout the contract period.

F.6 Key Personnel

The key personnel that the Contractor must furnish for the performance of this contract are as follows:

Key Personnel Position Name TBD based on proposal of apparent winner who is deemed most valuable to the government.

The Contractor must immediately notify the CO and the COR of any key personnel’s departure and the reasons thereof and propose interim coverage while rectifying the situation. The Contractor will propose a substitute candidate for each vacated position to the CO and the COR along with a budget impact statement in sufficient detail to permit evaluation of the impact on the program. The Contractor must not replace the key personnel without the prior written consent of the COR and prior written approval of the CO, whether provided in advance or by ratification.

F.7 Contractor’s Primary Point of Contact

The contractor’s primary point of contact is TBD and can be reached at TBD and TBD.

(End of Section F)

G - CONTRACT ADMINISTRATION DATA

G.1 Contract Administration

This contract will be administered as follows:

Contracting Officer

TBD

U.S. Department of State Office of Acquisitions Management Email:

Contracting Officer’s Representative (COR)/EVOLVE Program Manager

TBD

U.S. Department of State Bureau of Diplomatic Security Email:

Written communications regarding the administration of this contract shall refer to the contract number and applicable task order number(s), and shall be submitted electronically to the CO, COR, and any alternate points of contact, as delineated herein.

Document Number: 19AQMM26Q0439 PROCESSED Page 13 of 48

G.2 Contracting Officer’s Authority

The Contracting Officer (CO) is the only individual authorized to approve or direct any changes to the requirements of this contract.

Notwithstanding any provisions elsewhere in this contract, this authority remains solely with the CO.

If the Contractor undertakes any changes at the direction of any person other than the CO, such changes shall be considered unauthorized, and no adjustment shall be made to the contract terms, including price, fee, or profit.

G.3 652.242-70 - CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)

(a) The Contracting Officer may designate in writing one or more Government employees, by name and position title, to take action for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer's Representative (COR).

Such designation(s) shall specify the scope and limitations of the authority so delegated; provided, that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted Contracting Officer and this authority is delegated in the designation.

(b) The COR is [insert job title of COR]. TBD

(End of clause)

(c) The responsibilities of the COR and any alternate CORs include, but are not limited to:

1. Recommending, to the Contracting Officer, deductions for payment for hours not worked;

2. Advising the Contracting Officer of nonperformance or unsatisfactory performance;

3. Advising the Contracting Officer of any factors that may cause delay in performance of work; and

4. Reviewing and approving invoices for payment.

(d) The COR, and any other representatives, will be appointed in writing by the Contracting Officer.

(e) The Contracting Officer reserves the right to appoint other individuals, such as, but not limited to, Government Technical Monitors, Property Administrators, and Plant Clearance Officers to assist in the administration of this contract and any resultant task orders. Depending on the nature of required support, the Government reserves the right to utilize third party contractors to assist in contract administration.

(END OF SECTION G)

H - SPECIAL CONTRACT REQUIREMENTS

The following pages set forth the Special Contract Requirements applicable to this contract. These requirements are in addition to the general terms and conditions and are integral to the Contractor’s performance under this contract. Offerors are expected to comply fully with all requirements specified herein.

52.202-1 - Definitions (Jun 2020)

When a solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulation (FAR), the word or term has the same meaning as the definition in FAR 2.101 in effect at the time the solicitation was issued, unless-

(a) The solicitation, or amended solicitation, provides a different definition;

(b) The contracting parties agree to a different definition;

(c) The part, subpart, or section of the FAR where the provision or clause is prescribed provides a different meaning;

(d) The word or term is defined in FAR part 31, for use in the cost principles and procedures; or

Document Number: 19AQMM26Q0439 PROCESSED Page 14 of 48

(e) The word or term defines an acquisition-related threshold, and if the threshold is adjusted for inflation as set forth in FAR 1.109(a), then the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment;

see FAR 1.109(d).

(End of clause)

52.203-5 - Covenant Against Contingent Fees (May 2014)

(a) The Contractor warrants that no person or agency has been employed or retained to solicit or obtain this contract upon an agreement or understanding for a contingent fee, except a bona fide employee or agency. For breach or violation of this warranty, the Government shall have the right to annul this contract without liability or, to deduct from the contract price or consideration, or otherwise recover, the full amount of the contingent fee.

(b) "Bona fide agency," as used in this clause, means an established commercial or selling agency, maintained by a contractor for the purpose of securing business, that neither exerts nor proposes to exert improper influence to solicit or obtain Government contracts nor holds itself out as being able to obtain any Government contract or contracts through improper influence.

"Bona fide employee," as used in this clause, means a person, employed by a contractor and subject to the contractor's supervision and control as to time, place, and manner of performance, who neither exerts nor proposes to exert improper influence to solicit or obtain Government contracts nor holds out as being able to obtain any Government contract or contracts through improper influence.

"Contingent fee," as used in this clause, means any commission, percentage, brokerage, or other fee that is contingent upon the success that a person or concern has in securing a Government contract.

"Improper influence," as used in this clause, means any influence that induces or tends to induce a Government employee or officer to give consideration or to act regarding a Government contract on any basis other than the merits of the matter.

(End of clause)

52.203-6 - Restrictions on Subcontractor Sales to the Government (Jun 2020)

(a) Except as provided in (b) of this clause, the Contractor shall not enter into any agreement with an actual or prospective subcontractor, nor otherwise act in any manner, which has or may have the effect of restricting sales by such subcontractors directly to the Government of any item or process (including computer software) made or furnished by the subcontractor under this contract or under any follow-on production contract.

(b) The prohibition in (a) of this clause does not preclude the Contractor from asserting rights that are otherwise authorized by law or regulation.

(c) The Contractor agrees to incorporate the substance of this clause, including this paragraph (c), in all subcontracts under this contract which exceed the simplified acquisition threshold, as defined in Federal Acquisition Regulation 2.101 on the date of subcontract award.

(End of clause)

52.203-7 - Anti-Kickback Procedures (Jun 2020)

(a) Definitions.

"Kickback," as used in this clause, means any money, fee, commission, credit, gift, gratuity, thing of value, or compensation of any kind which is provided to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for the purpose of improperly obtaining or rewarding favorable treatment in connection with a prime contract or in connection with a subcontract relating to a prime contract.

"Person," as used in this clause, means a corporation, partnership, business association of any kind, trust, joint-stock company, or individual.

"Prime contract," as used in this clause, means a contract or contractual action entered into by the United States for the purpose of obtaining supplies, materials, equipment, or services of any kind.

"Prime Contractor" as used in this clause, means a person who has entered into a prime contract with the United States.

"Prime Contractor employee," as used in this clause, means any officer, partner, employee, or agent of a prime Contractor.

"Subcontract," as used in this clause, means a contract or contractual action entered into by a prime Contractor or subcontractor for the purpose of obtaining supplies, materials, equipment, or services of any kind under a prime contract.

"Subcontractor," as used in this clause, (1)means any person, other than the prime Contractor, who offers to furnish or furnishes any supplies, materials, equipment, or services of any kind under a prime contract or a subcontract entered into in connection with such

Document Number: 19AQMM26Q0439 PROCESSED Page 15 of 48 prime contract, and (2)includes any person who offers to furnish or furnishes general supplies to the prime Contractor or a higher tier subcontractor.

"Subcontractor employee," as used in this clause, means any officer, partner, employee, or agent of a subcontractor.

(b) 41 U.S.C. chapter 87, Kickbacks, prohibits any person from--

(1) Providing or attempting to provide or offering to provide any kickback;

(2) Soliciting, accepting, or attempting to accept any kickback; or

(3) Including, directly or indirectly, the amount of any kickback in the contract price charged by a prime Contractor to the United States or in the contract price charged by a subcontractor to a prime Contractor or higher tier subcontractor.

(c) (1) The Contractor shall have in place and follow reasonable procedures designed to prevent and detect possible violations described in paragraph (b) of this clause in its own operations and direct business relationships.

(2) When the Contractor has reasonable grounds to believe that a violation described in paragraph (b) of this clause may have occurred, the Contractor shall promptly report in writing the possible violation. Such reports shall be made to the inspector general of the contracting agency, the head of the contracting agency if the agency does not have an inspector general, or the Attorney General.

(3) The Contractor shall cooperate fully with any Federal agency investigating a possible violation described in paragraph (b) of this clause.

(4) The Contracting Officer may (i)offset the amount of the kickback against any monies owed by the United States under the prime contract and/or (ii)direct that the Prime Contractor withhold from sums owed a subcontractor under the prime contract the amount of the kickback. The Contracting Officer may order that monies withheld under subdivision (c)(4)(ii) of this clause be paid over to the Government unless the Government has already offset those monies under subdivision (c)(4)(i) of this clause. In either case, the Prime Contractor shall notify the Contracting Officer when the monies are withheld.

(5) The Contractor agrees to incorporate the substance of this clause, including this paragraph (c)(5) but excepting paragraph (c)(1) of this clause, in all subcontracts under this contract that exceed the threshold specified in Federal Acquisition Regulation 3.502-2(i) on the date of subcontract award.

(End of clause)

52.203-17 - Contractor Employee Whistleblower Rights (Nov 2023)

(a) This contract and employees working on this contract will be subject to the whistleblower rights and remedies established at 41 U.S.C. 4712 and Federal Acquisition Regulation (FAR) 3.900 through 3.905.

(b) The Contractor shall inform its employees in writing, in the predominant language of the workforce, of employee whistleblower rights and protections under 41 U.S.C. 4712, as described in FAR 3.900 through 3.905.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts.

(End of clause)

52.204-10 - Reporting Executive Compensation and First-Tier Subcontract Awards (DEVIATION JAN 2026)

(a) Definitions. As used in this clause:

Executive means officers, managing partners, or any other employees in management positions.

First-tier subcontract means a subcontract awarded directly by the Contractor to acquire supplies or services (including construction) for performing a prime contract. It does not include the Contractor’s supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a contractor’s general and administrative expenses or indirect costs.

Month of award means the month in which the Contracting Officer signs a contract or the month in which the Contractor signs a first-tier subcontract.

Total compensation means the cash and noncash dollar value earned by the executive during the Contractor's preceding fiscal year and includes the information described at 17 CFR 229.402(c)(2).

(b) Requirement. Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L. 110-252), requires the Contractor to report information on subcontract awards. The law requires all reported information be made public; therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public. Nothing in this clause requires disclosing classified information.

(c) Reporting. Unless otherwise directed by the Contracting Officer, or as provided in paragraph (f) of this clause, the Contractor shall report the following in the System for Award Management at https://www.sam.gov as follows:

Document Number: 19AQMM26Q0439 PROCESSED Page 16 of 48

(1) Executive compensation of the prime contractor. The Contractor shall report the names and total compensation of each of the five most highly compensated executives for its preceding completed fiscal year, if—

(i) In the Contractor's preceding fiscal year, the Contractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts);

loans, grants (and subgrants); cooperative agreements; and other forms of Federal financial assistance; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts);

loans, grants (and subgrants); cooperative agreements; and other forms of Federal financial assistance; and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C.

78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.).

(2) First-tier subcontract information. The Contractor shall report the following information by the end of the month following the month of award of each first-tier subcontract award:

(i) Unique entity identifier for the subcontractor receiving the award and for the subcontractor’s ultimate parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(vi) The subcontract number assigned by the Prime Contractor.

(vii) Subcontractor’s physical address.

(viii) Subcontractor’s primary performance location.

(ix) The prime contract number, and order number if applicable.

(x) Awarding agency name and code.

(xi) Funding agency name and code.

(xii) Government contracting office code.

(xiii) The applicable North American Industry Classification System code.

(3) Executive compensation of the first-tier subcontractor. The Contractor shall report by the end of the month following the month of award of a first-tier subcontract award and annually thereafter (calculated from the prime contract award date) the names and total compensation of each of the five most highly compensated executives for that subcontractor in the subcontractor’s preceding completed fiscal year, if—

(i) In the subcontractor’s preceding fiscal year, the subcontractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts);

loans, grants (and subgrants); cooperative agreements; and other forms of Federal financial assistance; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts);

loans, grants (and subgrants); cooperative agreements; and other forms of Federal financial assistance; and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C.

78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986 (see http://www.sec.gov/answers/ execomp.htm).

(d) Restriction. The Contractor shall not split or break down subcontracts to a value below the threshold at the Federal Acquisition Regulation 4.208(e), on the date of subcontract award, to avoid the reporting requirements in paragraph (c) of this clause.

(e) Duration. Continued reporting on first-tier subcontracts is not required unless one of the reported data elements changes during the performance of the subcontract. The Contractor is not required to make further reports after a first-tier subcontract expires.

(f) Exceptions. (1) If the Contractor in the previous tax year had gross income, from all sources, under $300,000, the Contractor is exempt from the requirement to report subcontractor awards.

(2) If a subcontractor in the previous tax year had gross income from all sources under $300,000, the Contractor does not need to report awards for that subcontractor.

(g) Prepopulated data. The Subcontract Reports in SAM will prepopulate with some information from SAM and the Federal Procurement Data System (FPDS). If the FPDS information is incorrect, the Contractor should notify the Contracting Officer. If the SAM information is incorrect, the Contractor is responsible for correcting this information.

Document Number: 19AQMM26Q0439 PROCESSED Page 17 of 48

(End of clause)

52.204-19 - Incorporation by Reference of Representations and Certifications (Dec 2014)

The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of clause)

52.204-23 - Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023)

(a) Definitions. As used in this clause--

Kaspersky Lab covered article means any hardware, software, or service that--

(1) Is developed or provided by a Kaspersky Lab covered entity;

(2) Includes any hardware, software, or service developed or provided in whole or in part by a Kaspersky Lab covered entity; or

(3) Contains components using any hardware or software developed in whole or in part by a Kaspersky Lab covered entity.

Kaspersky Lab covered entity means--

(1) Kaspersky Lab;

(2) Any successor entity to Kaspersky Lab, including any change in name, e.g., "Kaspersky";

(3) Any entity that controls, is controlled by, or is under common control with Kaspersky Lab; or

(4) Any entity of which Kaspersky Lab has a majority ownership.

(b) Prohibition. Section 1634 of Division A of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91) prohibits Government use of any Kaspersky Lab covered article. The Contractor is prohibited from--

(1) Providing any Kaspersky Lab covered article that the Government will use on or after October 1, 2018; and

(2) Using any Kaspersky Lab covered article on or after October 1, 2018, in the development of data or deliverables first produced in the performance of the contract.

(c) Reporting requirement.

(1) In the event the Contractor identifies a Kaspersky Lab covered article provided to the Government during contract performance, or the Contractor is notified of such by a subcontractor at any tier or any other source, the Contractor shall report, in writing, to the Contracting Officer or, in the case of the Department of Defense, to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.

(2) The Contractor shall report the following information pursuant to paragraph (c)(1) of this clause:

(i) Within 3 business days from the date of such identification or notification: The contract number; the order number(s), if applicable;

supplier name; brand; model number (Original Equipment Manufacturer (OEM) number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.

(ii) Within 10 business days of submitting the report pursuant to paragraph (c)(1) of this clause: any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use

Document Number: 19AQMM26Q0439 PROCESSED Page 18 of 48 or submission of a Kaspersky Lab covered article, any reasons that led to the use or submission of the Kaspersky Lab covered article, and any additional efforts that will be incorporated to prevent future use or submission of Kaspersky Lab covered articles.

(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts including subcontracts for the acquisition of commercial products or commercial services.

(End of clause)

52.204-25 - Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021)

(a) Definitions. As used in this clause--

Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).

Covered foreign country means The People's Republic of China.

Covered telecommunications equipment or services means--

(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);

(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);

(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or

(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

Critical technology means--

(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;

(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled--

(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or

(ii) For reasons relating to regional stability or surreptitious listening;

(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);

(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);

(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or

Document Number: 19AQMM26Q0439 PROCESSED Page 19 of 48

(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C.

4817).

Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.

Reasonable inquiry means an inquiry designed to uncover…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .