Attachment A-Pricing Schedule Spreadsheet_1.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Visual Guidance-SIR-692M15-21-R-00019
Solicitation number
692M15-21-R-00019
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions:
This spreadsheet shall be returned frozen "protected" with the Government's predefined protected cells still protected by the
Government's passwords.

Should the workbook and spreadsheets be returned unfrozen "not protected", the submission will not be evaluated.

All cells that are green are unfrozen. These cells must be filled in.

One (1) electronic copy and one (1) softcopy of this completed pricing spreadsheet must be provided in accordance with Section L
of the SIR. The spreadsheet must be printed in the pre-formatted landscape style when returned.
Neither the header nor footer, nor other portions of the sheet are to contain extraneous information, such as water marks or
contractor insignias. Additional verbiage is not permitted. The only allowable verbiage per AMS 3.2.2.3-16 shall be located in the
footer.
Notes:
The rates defined within are fully burdened hourly Contractor(Offsite) rates. The rates of the successful Offeror, will be incorporated
into the successful offeror's resultant contract. The FAA reserves the right to negotiate labor rates and travel G&A. The amount in the
"Total Proposed Price" block on the "Total" spreadsheet in Cell B6 will be the price utilized for evaluation purposes.

Labor

SIR No: 692M15-21-R-00019Company Name:ESCALATION
Attachment ADate:(percentage)Ord. Period 2Ord. Period 3Ord. Period 4Ord. Period 5
YearCLINLabor CategoriesLevelOn/Off-siteEstimated HoursBase Contract Labor RateTotal
Base1Program ManagerLevel 1Off-site18800.00
Base1Lead EngineerLevel 1Off-site18800.00
Base1Operations Research AnalystLevel 4Off-site18800.00
Base1Human Factors SpecialistLevel 4Off-site18800.00
Base1Technical Writer/EditorLevel 3Off-site9400.00
Base1Sr Engineering TechnicianLevel 2On-Site18800.00
Base1Engineering TechnicianLevel 3On-Site56400.00
Base1Aeronautical SpecialistLevel 4Off-site9400.00
Base1Physical ScientistLevel 4Off-site4700.00
Base1Subject Matter Expertn/aOff-site4700.00
Base1EngineerLevel 3Off-site9400.00
Base1Pilotn/aOff-site1000.00
Base Year Labor Total18900.00$0.00
OP22Program ManagerLevel 1Off-site1880$0.00
OP22Lead EngineerLevel 1Off-site1880$0.00
OP22Operations Research AnalystLevel 4Off-site1880$0.00
OP22Human Factors SpecialistLevel 4Off-site1880$0.00
OP22Technical Writer/EditorLevel 3Off-site940$0.00
OP22Sr Engineering TechnicianLevel 2On-Site1880$0.00
OP22Engineering TechnicianLevel 3On-Site5640$0.00
OP22Aeronautical SpecialistLevel 4Off-site940$0.00
OP22Physical ScientistLevel 4Off-site470$0.00
OP22Subject Matter Expertn/aOff-site470$0.00
OP22EngineerLevel 3Off-site940$0.00
OP22Pilotn/aOff-site100$0.00
Ordering Period 02 Labor Total18900.00$0.00
OP33Program ManagerLevel 1Off-site1880$0.00
OP33Lead EngineerLevel 1Off-site1880$0.00
OP33Operations Research AnalystLevel 4Off-site1880$0.00
OP33Human Factors SpecialistLevel 4Off-site1880$0.00
OP33Technical Writer/EditorLevel 3Off-site940$0.00
OP33Sr Engineering TechnicianLevel 2On-Site1880$0.00
OP33Engineering TechnicianLevel 3On-Site5640$0.00
OP33Aeronautical SpecialistLevel 4Off-site940$0.00
OP33Physical ScientistLevel 4Off-site470$0.00
OP33Subject Matter Expertn/aOff-site470$0.00
OP33EngineerLevel 3Off-site940$0.00
OP33Pilotn/aOff-site100$0.00
Ordering Period 03 Labor Total18900.00$0.00
OP44Program ManagerLevel 1Off-site1880$0.00
OP44Lead EngineerLevel 1Off-site1880$0.00
OP44Operations Research AnalystLevel 4Off-site1880$0.00
OP44Human Factors SpecialistLevel 4Off-site1880$0.00
OP44Technical Writer/EditorLevel 3Off-site940$0.00
OP44Sr Engineering TechnicianLevel 2On-Site1880$0.00
OP44Engineering TechnicianLevel 3On-Site5640$0.00
OP44Aeronautical SpecialistLevel 4Off-site940$0.00
OP44Physical ScientistLevel 4Off-site470$0.00
OP44Subject Matter Expertn/aOff-site470$0.00
OP44EngineerLevel 3Off-site940$0.00
OP44Pilotn/aOff-site100$0.00
Ordering Period 04 Labor Total18900.00$0.00
Labor Total56700.00$0.00

Travel

SIR No: 692M15-21-R-00019TravelCompany Name:
Attachment 4Date:
YearDirect TravelProposed Travel G&A (Percentage)Total Travel
Base$80,000.00$80,000.00
OP2$80,000.00$80,000.00
OP3$80,000.00$80,000.00
OP4$80,000.00$80,000.00
Travel Total$320,000.00

Materials

SIR No: 692M15-21-R-00019Materials TotalCompany Name:
Attachment 4Date:
YearMaterialsProposed Material G&A (Percentage)Total Material
Base$51,000.00$51,000.00
OP2$51,000.00$51,000.00
OP3$51,000.00$51,000.00
OP4$51,000.00$51,000.00
Materials Total$204,000.00

Total

SIR No: 69M15-21-R-00019Company Name:
Attachment 4Date:
Total Proposed Labor$0.00
Total Proposed Travel$320,000.00
Total Proposed Materals$204,000.00
Total Proposed Price$524,000.00

File details come from the government source that posted it. Updated .