Attachment A - Price Schedule.xls

XLS spreadsheet 55 KB Posted

Attached to
S208-Grounds Maintenance & Headstone Services at Barrancas National Cemetery
Solicitation number
36C78623Q50085
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base YR

ScheduleSummary Totals
Base Year Period:$ - 0
Barrancas National CemeteryOption Year I:$ - 0
Option Year II:$ - 0
Ground Maintenance ServicesOption Year III:$ - 0
Option Year IV:$ - 0
Total Estimated Cost:$ - 0
BASE YEAR: 1 June 2023 to 30 May 2024
CLINDescriptionUnitEst QtyUnit CostTotal Cost
0001Headstone Trimming and other verticle surfacesWK440.000.00
0002Flat Marker stick edgingWK440.000.00
0003Trimming/edging roads, curbs,horizontal surfacesWK440.000.00
0004Mowing turf areaWK440.000.00
0005Headstone cleaning and washingEA20.000.00
0006Leaf Collection & RemovalEA90.000.00
0007Turf maintenance-Disease controlEA20.000.00
0008Aerate,Dethatch, Verti-Cut & debris removal (98 Acres in the spring)EA10.000.00
0009Turf maintenance- FertilizationEA40.000.00
0010Turf maintenance- Weed Control-Pre-EmergentEA60.000.00
0011Turf maintenance- Weed Control-Post EmergentEA60.000.00
0012Turf maintenance-Pest Control-Other PestEA10.000.00
0013Turf maintenance-Pest Control-Army WormsEA10.000.00
0014Turf maintenance- Top DressingEA10.000.00
0015Sunken Grave Repair Davis Bacon WagesEA1000.000.00
0016Sod supply/install/replaceSF5000.000.00
0017Turf maintenance-Buffer Zone AreasAC980.000.00
0018Storm Damage and Debris pick-upEA40.000.00
0019TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - NAVY BUFFEREA120.000.00
0020TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - SHELTER BEA120.000.00
0021TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - CIVILIAN CEMETERYEA120.000.00
0022TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - PLANTING BEDSEA120.000.00
0023MULCHINGEA20.000.00
0024HEADSTONE SET - INITIAL- UPRIGHT Davis Bacon WagesEA12000.000.00
0025HEADSTONE SET - SUBSEQUENT/REPLACEMENT Davis Bacon WagesEA2000.000.00
0026HEADSTONE RESET AND REALIGNMENT Davis Bacon WagesEA10000.000.00
0027HEADSTONE DISPOSAL (AS PER CEMETERY SOP, NCA GUIDANCEEA2000.000.00
0028POWER WASH BUILDING FACILITIESEA40.000.00
0029POWER WASH CURBS, SIDEWALKSEA40.000.00
0030POWER WASH COLUMBARIUMEA40.000.00
0031SUPPORT SERVICES - SPECIAL EVENTSEA20.000.00
0032FLAGPOLE INSPECTION, MAINTENANCE, REPAIREA40.000.00
0033SOIL TESTING AND RECOMMENDATIONSEA10.000.00
0034CLEAN SIGNAGE, MEMORIAL PLAQUES, INSIGNIAEA260.000.00
0035IRRIGATION SYSTEM OPERATION, INSPECTION AND MAINTENANCE Davis Bacon WagesEA10.000.00
Total$ - 0

OP YR 1

Option YEAR 1: 1 June 2024 to 30 May 2025
CLINDescriptionUnitEst QtyUnit CostTotal Cost
1001Headstone Trimming and other verticle surfacesWK440.000.00
1002Flat Marker stick edgingWK440.000.00
1003Trimming/edging roads, curbs,horizontal surfacesWK440.000.00
1004Mowing turf areaWK440.000.00
1005Headstone cleaning and washingEA20.000.00
1006Leaf Collection & RemovalEA90.000.00
1007Turf maintenance-Disease controlEA20.000.00
1008Aerate,Dethatch, Verti-Cut & debris removal (98 Acres in the spring)EA10.000.00
1009Turf maintenance- FertilizationEA40.000.00
1010Turf maintenance- Weed Control-Pre-EmergentEA60.000.00
1011Turf maintenance- Weed Control-Post EmergentEA60.000.00
1012Turf maintenance-Pest Control-Other PestEA10.000.00
1013Turf maintenance-Pest Control-Army WormsEA10.000.00
1014Turf maintenance- Top DressingEA10.000.00
1015Sunken Grave Repair Davis Bacon WagesEA1000.000.00
1016Sod supply/install/replaceSF5000.000.00
1017Turf maintenance-Buffer Zone AreasAC980.000.00
1018Storm Damage and Debris pick-upEA40.000.00
1019TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - NAVY BUFFEREA120.000.00
1020TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - SHELTER BEA120.000.00
1021TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - CIVILIAN CEMETERYEA120.000.00
1022TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - PLANTING BEDSEA120.000.00
1023MULCHINGEA20.000.00
1024HEADSTONE SET - INITIAL- UPRIGHT Davis Bacon WagesEA12000.000.00
1025HEADSTONE SET - SUBSEQUENT/REPLACEMENT Davis Bacon WagesEA2000.000.00
1026HEADSTONE RESET AND REALIGNMENT Davis Bacon WagesEA10000.000.00
1027HEADSTONE DISPOSAL (AS PER CEMETERY SOP, NCA GUIDANCEEA2000.000.00
1028POWER WASH BUILDING FACILITIESEA40.000.00
1029POWER WASH CURBS, SIDEWALKSEA40.000.00
1030POWER WASH COLUMBARIUMEA40.000.00
1031SUPPORT SERVICES - SPECIAL EVENTSEA20.000.00
1032FLAGPOLE INSPECTION, MAINTENANCE, REPAIREA40.000.00
1033SOIL TESTING AND RECOMMENDATIONSEA10.000.00
1034CLEAN SIGNAGE, MEMORIAL PLAQUES, INSIGNIAEA260.000.00
1035IRRIGATION SYSTEM OPERATION, INSPECTION AND MAINTENANCE Davis Bacon WagesEA10.000.00
Total$ - 0

OP YR 2

Option YEAR 2: 1 June 2025 to 30 May 2026
CLINDescriptionUnitEst QtyUnit CostTotal Cost
1001Headstone Trimming and other verticle surfacesWK440.000.00
1002Flat Marker stick edgingWK440.000.00
1003Trimming/edging roads, curbs,horizontal surfacesWK440.000.00
1004Mowing turf areaWK440.000.00
1005Headstone cleaning and washingEA20.000.00
1006Leaf Collection & RemovalEA90.000.00
1007Turf maintenance-Disease controlEA20.000.00
1008Aerate,Dethatch, Verti-Cut & debris removal (98 Acres in the spring)EA10.000.00
1009Turf maintenance- FertilizationEA40.000.00
1010Turf maintenance- Weed Control-Pre-EmergentEA60.000.00
1011Turf maintenance- Weed Control-Post EmergentEA60.000.00
1012Turf maintenance-Pest Control-Other PestEA10.000.00
1013Turf maintenance-Pest Control-Army WormsEA10.000.00
1014Turf maintenance- Top DressingEA10.000.00
1015Sunken Grave Repair Davis Bacon WagesEA1000.000.00
1016Sod supply/install/replaceSF5000.000.00
1017Turf maintenance-Buffer Zone AreasAC980.000.00
1018Storm Damage and Debris pick-upEA40.000.00
1019TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - NAVY BUFFEREA120.000.00
1020TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - SHELTER BEA120.000.00
1021TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - CIVILIAN CEMETERYEA120.000.00
1022TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - PLANTING BEDSEA120.000.00
1023MULCHINGEA20.000.00
1024HEADSTONE SET - INITIAL- UPRIGHT Davis Bacon WagesEA12000.000.00
1025HEADSTONE SET - SUBSEQUENT/REPLACEMENT Davis Bacon WagesEA2000.000.00
1026HEADSTONE RESET AND REALIGNMENT Davis Bacon WagesEA10000.000.00
1027HEADSTONE DISPOSAL (AS PER CEMETERY SOP, NCA GUIDANCEEA2000.000.00
1028POWER WASH BUILDING FACILITIESEA40.000.00
1029POWER WASH CURBS, SIDEWALKSEA40.000.00
1030POWER WASH COLUMBARIUMEA40.000.00
1031SUPPORT SERVICES - SPECIAL EVENTSEA20.000.00
1032FLAGPOLE INSPECTION, MAINTENANCE, REPAIREA40.000.00
1033SOIL TESTING AND RECOMMENDATIONSEA10.000.00
1034CLEAN SIGNAGE, MEMORIAL PLAQUES, INSIGNIAEA260.000.00
1035IRRIGATION SYSTEM OPERATION, INSPECTION AND MAINTENANCE Davis Bacon WagesEA10.000.00
Total$ - 0

OP YR 3

Option YEAR 3: 1 June 2026 to 30 May 2027
CLINDescriptionUnitEst QtyUnit CostTotal Cost
1001Headstone Trimming and other verticle surfacesWK440.000.00
1002Flat Marker stick edgingWK440.000.00
1003Trimming/edging roads, curbs,horizontal surfacesWK440.000.00
1004Mowing turf areaWK440.000.00
1005Headstone cleaning and washingEA20.000.00
1006Leaf Collection & RemovalEA90.000.00
1007Turf maintenance-Disease controlEA20.000.00
1008Aerate,Dethatch, Verti-Cut & debris removal (98 Acres in the spring)EA10.000.00
1009Turf maintenance- FertilizationEA40.000.00
1010Turf maintenance- Weed Control-Pre-EmergentEA60.000.00
1011Turf maintenance- Weed Control-Post EmergentEA60.000.00
1012Turf maintenance-Pest Control-Other PestEA10.000.00
1013Turf maintenance-Pest Control-Army WormsEA10.000.00
1014Turf maintenance- Top DressingEA10.000.00
1015Sunken Grave Repair Davis Bacon WagesEA1000.000.00
1016Sod supply/install/replaceSF5000.000.00
1017Turf maintenance-Buffer Zone AreasAC980.000.00
1018Storm Damage and Debris pick-upEA40.000.00
1019TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - NAVY BUFFEREA120.000.00
1020TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - SHELTER BEA120.000.00
1021TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - CIVILIAN CEMETERYEA120.000.00
1022TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - PLANTING BEDSEA120.000.00
1023MULCHINGEA20.000.00
1024HEADSTONE SET - INITIAL- UPRIGHT Davis Bacon WagesEA12000.000.00
1025HEADSTONE SET - SUBSEQUENT/REPLACEMENT Davis Bacon WagesEA2000.000.00
1026HEADSTONE RESET AND REALIGNMENT Davis Bacon WagesEA10000.000.00
1027HEADSTONE DISPOSAL (AS PER CEMETERY SOP, NCA GUIDANCEEA2000.000.00
1028POWER WASH BUILDING FACILITIESEA40.000.00
1029POWER WASH CURBS, SIDEWALKSEA40.000.00
1030POWER WASH COLUMBARIUMEA40.000.00
1031SUPPORT SERVICES - SPECIAL EVENTSEA20.000.00
1032FLAGPOLE INSPECTION, MAINTENANCE, REPAIREA40.000.00
1033SOIL TESTING AND RECOMMENDATIONSEA10.000.00
1034CLEAN SIGNAGE, MEMORIAL PLAQUES, INSIGNIAEA260.000.00
1035IRRIGATION SYSTEM OPERATION, INSPECTION AND MAINTENANCE Davis Bacon WagesEA10.000.00
Total$ - 0

OP YR 4

Option YEAR 4: 1 June 2027 to 30 May 2028
CLINDescriptionUnitEst QtyUnit CostTotal Cost
1001Headstone Trimming and other verticle surfacesWK440.000.00
1002Flat Marker stick edgingWK440.000.00
1003Trimming/edging roads, curbs,horizontal surfacesWK440.000.00
1004Mowing turf areaWK440.000.00
1005Headstone cleaning and washingEA20.000.00
1006Leaf Collection & RemovalEA90.000.00
1007Turf maintenance-Disease controlEA20.000.00
1008Aerate,Dethatch, Verti-Cut & debris removal (98 Acres in the spring)EA10.000.00
1009Turf maintenance- FertilizationEA40.000.00
1010Turf maintenance- Weed Control-Pre-EmergentEA60.000.00
1011Turf maintenance- Weed Control-Post EmergentEA60.000.00
1012Turf maintenance-Pest Control-Other PestEA10.000.00
1013Turf maintenance-Pest Control-Army WormsEA10.000.00
1014Turf maintenance- Top DressingEA10.000.00
1015Sunken Grave Repair Davis Bacon WagesEA1000.000.00
1016Sod supply/install/replaceSF5000.000.00
1017Turf maintenance-Buffer Zone AreasAC980.000.00
1018Storm Damage and Debris pick-upEA40.000.00
1019TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - NAVY BUFFEREA120.000.00
1020TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - SHELTER BEA120.000.00
1021TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - CIVILIAN CEMETERYEA120.000.00
1022TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - PLANTING BEDSEA120.000.00
1023MULCHINGEA20.000.00
1024HEADSTONE SET - INITIAL- UPRIGHT Davis Bacon WagesEA12000.000.00
1025HEADSTONE SET - SUBSEQUENT/REPLACEMENT Davis Bacon WagesEA2000.000.00
1026HEADSTONE RESET AND REALIGNMENT Davis Bacon WagesEA10000.000.00
1027HEADSTONE DISPOSAL (AS PER CEMETERY SOP, NCA GUIDANCEEA2000.000.00
1028POWER WASH BUILDING FACILITIESEA40.000.00
1029POWER WASH CURBS, SIDEWALKSEA40.000.00
1030POWER WASH COLUMBARIUMEA40.000.00
1031SUPPORT SERVICES - SPECIAL EVENTSEA20.000.00
1032FLAGPOLE INSPECTION, MAINTENANCE, REPAIREA40.000.00
1033SOIL TESTING AND RECOMMENDATIONSEA10.000.00
1034CLEAN SIGNAGE, MEMORIAL PLAQUES, INSIGNIAEA260.000.00
1035IRRIGATION SYSTEM OPERATION, INSPECTION AND MAINTENANCE Davis Bacon WagesEA10.000.00
Total$ - 0

File details come from the government source that posted it. Updated .