Attachment A - Price Schedule.pdf

PDF 44 KB Posted

Attached to
S208-Grounds Maintenance & Headstone Services at Barrancas National Cemetery
Solicitation number
36C78623Q50085
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN Description Unit Est Qty Unit Cost Total Cost

0001 Headstone Trimming and other verticle surfaces WK 44 0.00 0.00

0002 Flat Marker stick edging WK 44 0.00 0.00

0003 Trimming/edging roads, curbs,horizontal surfaces WK 44 0.00 0.00

0004 Mowing turf area WK 44 0.00 0.00

0005 Headstone cleaning and washing EA 2 0.00 0.00

0006 Leaf Collection & Removal EA 9 0.00 0.00

0007 Turf maintenance-Disease control EA 2 0.00 0.00

Aerate,Dethatch, Verti-Cut & debris removal (98 Acres in the spring) EA 1 0.00 0.00

0009 Turf maintenance- Fertilization EA 4 0.00 0.00

0010 Turf maintenance- Weed Control-Pre-Emergent EA 6 0.00 0.00

0011 Turf maintenance- Weed Control-Post Emergent EA 6 0.00 0.00

0012 Turf maintenance-Pest Control-Other Pest EA 1 0.00 0.00

0013 Turf maintenance-Pest Control-Army Worms EA 1 0.00 0.00

0014 Turf maintenance- Top Dressing EA 1 0.00 0.00

0015 Sunken Grave Repair Davis Bacon Wages EA 100 0.00 0.00

0016 Sod supply/install/replace SF 500 0.00 0.00

0017 Turf maintenance-Buffer Zone Areas AC 98 0.00 0.00

0018 Storm Damage and Debris pick-up EA 4 0.00 0.00

TRIM & SHRUB TRIMING/PRUNING MAINTENANCE - NAVY

BUFFER EA 12 0.00 0.00

TRIM & SHRUB TRIMING/PRUNING MAINTENANCE -

SHELTER B EA 12 0.00 0.00

TRIM & SHRUB TRIMING/PRUNING MAINTENANCE -

CIVILIAN CEMETERY EA 12 0.00 0.00

TRIM & SHRUB TRIMING/PRUNING MAINTENANCE -

PLANTING BEDS EA 12 0.00 0.00

0023 MULCHING EA 2 0.00 0.00

HEADSTONE SET - INITIAL- UPRIGHT Davis Bacon Wages

EA 1200 0.00 0.00

HEADSTONE SET - SUBSEQUENT/REPLACEMENT Davis

Bacon Wages EA 200 0.00 0.00

HEADSTONE RESET AND REALIGNMENT Davis Bacon

Wages EA 1000 0.00 0.00

HEADSTONE DISPOSAL (AS PER CEMETERY SOP, NCA

GUIDANCE EA 200 0.00 0.00

0028 POWER WASH BUILDING FACILITIES EA 4 0.00 0.00

0029 POWER WASH CURBS, SIDEWALKS EA 4 0.00 0.00

0030 POWER WASH COLUMBARIUM EA 4 0.00 0.00

0031 SUPPORT SERVICES - SPECIAL EVENTS EA 2 0.00 0.00

0032 FLAGPOLE INSPECTION, MAINTENANCE, REPAIR EA 4 0.00 0.00

0033 SOIL TESTING AND RECOMMENDATIONS EA 1 0.00 0.00

0034 CLEAN SIGNAGE, MEMORIAL PLAQUES, INSIGNIA EA 26 0.00 0.00

IRRIGATION SYSTEM OPERATION, INSPECTION AND

MAINTENANCE Davis Bacon Wages EA 1 0.00 0.00

$ - Total

BASE YEAR: 1 June 2023 to 30 May 2024

Option Year III:

Option Year IV:

Total Estimated Cost:

Summary Totals

Base Year Period:

Schedule

Ground Maintenance Services

Barrancas National Cemetery Option Year I:

Option Year II:

File details come from the government source that posted it. Updated .