Attachment A - Price-Cost Schedule Keokuk National Cemetery Grounds Maintenance.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
Amendment 36C78625Q50037 0001 Grounds Maintenance Keokuk National Cemetery -- S208
Solicitation number
QSE--36C78625Q50037
Issued by

About this file

This is a pricing schedule template for grounds maintenance services at Keokuk National Cemetery, covering a base year (May 2025-April 2026) and four option years through April 2030. The contract is a hybrid containing both Service Contract Act (SCA) and Davis-Bacon Act (DBA) wage determinations.

The scope includes 18 contract line items covering maintenance of 14.5 acres, including mowing (36 times per year), trimming around 4,900 headstones, edging of curbing and sidewalks, core aeration, overseeding, herbicide applications, fertilization, turf renovation, pest control, tree maintenance, irrigation services, and headstone cleaning and alignment. Notable quantities include bi-annual cleaning of 4,900 headstones, maintenance of 19,300 linear feet of curbing/sidewalks, and fine-tune alignment of 980 headstones. The template provides spaces for vendors to input unit prices and total prices for each line item across the base year and option years, with automatic calculation of base, option, and grand totals.

View the file

Other files

File Type Posted
Attachment A - Price-Cost Schedule Keokuk National Cemetery Grounds Maintenance.xlsx XLSX spreadsheet
Attachment D -- Past Performance Questionnaire Grounds Maintenance.pdf PDF
Attachment C - Wage Determination 2015-5001 SCA.pdf PDF
Attachment E - Wage Determination Davis Bacon Act IA20240061.pdf PDF
3678625Q50037 0001 Amendment to solicitatin.docx DOCX document
Attachment H- NCA National Shrine standard.pdf PDF
Attachment B- Keokuk Grounds Maintenance Performance Work Statement (PWS).docx DOCX document
36C78625Q50037 Combined Synopsis Solicitation Keokuk Grounds Maintenance.docx DOCX document
Attachment F Headstone Raise and Realignment Guidance.pdf PDF
Attachment G Subcontractor Participation Document.pdf PDF
Attachment I Keokuk National Cemetery Map.pdf PDF
Attachment F Headstone Raise and Realignment Guidance.pdf PDF
Attachment E - Wage Determination Davis Bacon Act IA20240061.pdf PDF
Attachment D -- Past Performance Questionnaire Grounds Maintenance.pdf PDF
Attachment I Keokuk National Cemetery Map.pdf PDF
36C78625Q50037 Combined Synopsis Solicitation Keokuk Grounds Maintenance.docx DOCX document
Attachment B- Keokuk Grounds Maintenance Performance Work Statement (PWS).docx DOCX document
Attachment H- NCA National Shrine standard.pdf PDF
Attachment G Subcontractor Participation Document.pdf PDF
Attachment C - Wage Determination 2015-5001 SCA.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Keokuk National Cemetery Grounds Maintenance

Base year1 May 2025- 30 April 2026
Keokuk National Cemetery
CLINITEMEST. QTYUNITUNIT PRICETOTAL PRICE
0001SCAMow all turf areas (14.5 acres)36JB1.05
0002SCATrimming (4,900 Headstones)36EA
0003SCABlade Edge All Curbing and Sidewalks (4,399 Linear Feet)18JB
0004SCACore Aerate (14.5 acres)2JB
0005SCAOverseeding (14.5 Acres)1JB
0006SCA2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications4JB
0007SCAFertilize, October, June, September 14.5 Acres3JB
0008SCATurf renovation (19,400 Sq Feet)1SF
0009SCAYellow Nutsedge Herbicide (14.5 Acres)2JB
0010SCAGrub insecticide in April & June (14.5 Acres)1EA
0011SCAMole Control (14.5 Acres)20JB
0012DBAHeadstone cleaning (4,900 Headstones) twice per year2EA
0013SCATree pruning20EA
0014SCATree Removal5EA
0015SCATree Stump Removal1EA
0016SCAIrrigation start up in spring1EA
0017SCAIrrigation winterization in fall1EA
0018DBAFine Tune Alignment (980 Headstones)1EA
BASE TOTAL:$0.00
BASE YEAR OPTION TOTAL:$0.00
Option Year 11 May 2026- 30 April 2027
Keokuk National Cemetery
CLINITEMEST. QTYUNITUNIT PRICETOTAL PRICE
0001SCAMow all turf areas (14.5 acres)36JB
0002SCATrimming (4,900 Headstones)36EA1.05
0003SCABlade Edge All Curbing and Sidewalks (19,300 Linear Feet)18JB
0004SCACore Aerate (14.5 acres)2JB
0005SCAOverseeding (14.5 Acres)1JB
0006SCA2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications4JB
0007SCAFertilize, October, June, September 14.5 Acres3JB
0008SCATurf renovation (19,400 Sq Feet)1SF
0009SCAYellow Nutsedge Herbicide (14.5 Acres)2JB
0010SCAGrub insecticide in April & June (14.5 Acres)1EA
0011SCAMole Control (14.5 Acres)20JB
0012DBAHeadstone cleaning (4,900 Headstones) twice per year2EA
0013SCATree pruning20EA
0014SCATree Removal5EA
0015SCATree Stump Removal1EA
0016SCAIrrigation start up in spring1EA
0017SCAIrrigation winterization in fall1EA
0018DBAFine Tune Alignment (980 Headstones)1EA
BASE TOTAL:$0.00
OPTION TOTAL:$0.00
Option Year 21 May 2027- 30 April 2028
Keokuk National Cemetery
CLINITEMEST. QTYUNITUNIT PRICETOTAL PRICE
0001SCAMow all turf areas (14.5 acres)36JB
0002SCATrimming (4,900 Headstones)36EA1.1
0003SCABlade Edge All Curbing and Sidewalks (19,300 Linear Feet)18JB
0004SCACore Aerate (14.5 acres)2JB
0005SCAOverseeding (14.5 Acres)1JB
0006SCA2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications4JB
0007SCAFertilize, October, June, September 14.5 Acres3JB
0008SCATurf renovation (19,400 Sq Feet)1SF
0009SCAYellow Nutsedge Herbicide (14.5 Acres)2JB
0010SCAGrub insecticide in April & June (14.5 Acres)1EA
0011SCAMole Control (14.5 Acres)20JB
0012DBAHeadstone cleaning (4,900 Headstones) twice per year2EA
0013SCATree pruning20EA
0014SCATree Removal5EA
0015SCATree Stump Removal1EA
0016SCAIrrigation start up in spring1EA
0017SCAIrrigation winterization in fall1EA
0018DBAFine Tune Alignment (980 Headstones)1EA
BASE TOTAL:$0.00
OPTION TOTAL:$0.00
Option Year 31 May 2028- 30 April 2029
Keokuk National Cemetery
CLINITEMEST. QTYUNITUNIT PRICETOTAL PRICE
0001SCAMow all turf areas (14.5 acres)36JB1.15
0002SCATrimming (4,900 Headstones)36EA
0003SCABlade Edge All Curbing and Sidewalks (19,300 Linear Feet)18JB
0004SCACore Aerate (14.5 acres)2JB
0005SCAOverseeding (14.5 Acres)1JB
0006SCA2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications4JB
0007SCAFertilize, October, June, September 14.5 Acres3JB
0008SCATurf renovation (19,400 Sq Feet)1SF
0009SCAYellow Nutsedge Herbicide (14.5 Acres)2JB
0010SCAGrub insecticide in April & June (14.5 Acres)1EA
0011SCAMole Control (14.5 Acres)20JB
0012DBAHeadstone cleaning (4,900 Headstones) twice per year2EA
0013SCATree pruning20EA
0014SCATree Removal5EA
0015SCATree Stump Removal1EA
0016SCAIrrigation start up in spring1EA
0017SCAIrrigation winterization in fall1EA
0018DBAFine Tune Alignment (980 Headstones)1EA
BASE TOTAL:$0.00
OPTION TOTAL:$0.00
Option Year 41 May 2029- 30 April 2030
Keokuk National Cemetery
CLINITEMEST. QTYUNITUNIT PRICETOTAL PRICE
0001SCAMow all turf areas (14.5 acres)36JB
0002SCATrimming (4,900 Headstones)36EA1.2
0003SCABlade Edge All Curbing and Sidewalks (19,300 Linear Feet)18JB
0004SCACore Aerate (14.5 acres)2JB
0005SCAOverseeding (14.5 Acres)1JB
0006SCA2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications4JB
0007SCAFertilize, October, June, September 14.5 Acres3JB
0008SCATurf renovation (97,000 Sq Feet)1SF
0009SCAYellow Nutsedge Herbicide (14.5 Acres)2JB
0010SCAGrub insecticide in April & June (14.5 Acres)1EA
0011SCAMole Control (14.5 Acres)20JB
0012DBAHeadstone cleaning (26,955 Headstones) twice per year2EA
0013SCATree pruning20EA
0014SCATree Removal5EA
0015SCATree Stump Removal1EA
0016SCAIrrigation start up in spring1EA
0017SCAIrrigation winterization in fall1EA
0018DBAFine Tune Alignment (980 Headstones)1EA
BASE TOTAL:$0.00
OPTION TOTAL:$0.00

OPTION TOTAL:

YR GRAND TOTAL: ERROR:#REF!

CONTRACT BASE TOTAL:$0.00
CONTRACT OPTION TOTAL:$0.00
CONTRACT GRAND TOTAL:$0.00

Sheet2

File details come from the government source that posted it. Updated .