Attachment A Plans~6.pdf
PDF 6 MB Posted
- Attached to
- OR 82: Culvert Project, Minam to Wallowa
- Solicitation number
- S-73000-00012771
- Issued by
- Wasco County, Oregon
About this file
This file contains culvert replacement project plans for the Oregon Department of Transportation (ODOT) for the OR82 Culvert Project, located in Union and Wallowa Counties along the Wallowa Lake Highway. The project involves drainage, signing, and roadside development work, with an overall project length of 16.38 miles from Minam to Wallowa. The plans are dated March 2025 and include detailed technical drawings for culvert replacements, rehabilitations, and marker installations at various mile points between MP 30.19 and MP 46.66.
The project documents include comprehensive engineering details such as culvert dimensions, marker placements, embankment protection, fish passage hydraulic data, and temporary water management plans. The technical specifications cover aspects like concrete inlets, culvert coupling bands, temporary sign supports, and intersection work zone details. The plans indicate the use of various culvert types, markers, and installation techniques, with specific attention to environmental considerations like fish passage, sediment control, and roadside drainage improvements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20252004_A2_IT Service Management Platform_Addendum 1.pdf | ||
| 00012771 Preliminary Results.xlsx | XLSX spreadsheet | |
| Invitation.To.Bid~12.docx | DOCX document | |
| 00012771 Intent To Award.xlsx | XLSX spreadsheet | |
| Attachment C Bid Pricing Form~13.xlsx | XLSX spreadsheet | |
| Attachment B_Special Provisions and Specifications.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2025.02.04 09:03:44 -08'00'
2025.02.04 09:04:52
2025.02.04 09:08:51
2025.02.04 09:10:19
2025.02.04 09:11:33
2025.02.04 09:13:01
2025.02.04 09:14:32
2025.02.04 09:16:31
2025.02.04 09:18:01
2025.02.04 09:19:32
2025.02.04 09:21:22
2025.02.04 09:22:41
2025.02.04 09:24:21
RD300
INSTALLATIONS
PIPE ZONE AND MULTIPLE
TRENCH BACKFILL, BEDDING,
R D
.d g n
14-JUL-2014N/A
J U
L
C
"A" note 4)
(See general
Tracer wire
MULTIPLE INSTALLATIONS
DIAMETER MIN. SPACE BETWEEN PIPES
(in)
"A"
(in)
"B"
(in)
"C"
(in)
"D"
TABLE A
Finish grade stabilization, as required
Trench foundation see Table A
"C" Pipe bedding, Top of subgrade as directed
Topsoil or existing material
Surfacing-match
Base material m a te r ia l
E x c a v a te d n a ti v e
C la s s A c r u s h e d r o c k
C la s s B o r m a x c le a n s a n d
C la s s C
A s d ir e c te d m a te r ia l m a x
C la s s D p it o r b a r r u n
C L
S M
C la s s E
T re n c h b a c k fi ll a re a P ip e z o n eS e e T a b le
A
D
Nom."B" "B"
Pipe diameter
24" min.
m in
D ia
Up to 48"
48" to 72"
24"
) dia. of pipe2
One half (
4. See Std. Dwg. RD336 for tracer wire details (When required).
3. Pipes over 72" diameter are structures, and are not applicable to this drawing.
diameter.
used and the pipe is ≥ 36" diameter, increase dimension "B" to nominal pipe
2. For pipe installation in embankment areas where the trench method will not be
1. Surfacing of paved areas shall comply with street cut Std. Dwg. RD302.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
see general note 3.
For pipes over 72" diameter, the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
RD302
STREET CUT
R D
.d g n
20-JUL-2020N/A
J U
L
(Actual)
Trench width whichever is greater. Compact as specified.
4. Place AC mix minimum thkn. of 6" or the thkn. of the removed pavement, details.
3. For joining new concrete to existing concrete, see contract plans for sepecific or to the thickness of removed pavement, whichever is greater.
2. Concrete pavement shall be replaced with concrete to a minimum thickness of 8"
1. All existing AC or PCC pavement shall be sawcut prior to repaving.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
(AC patch only) with tack material and sand
Seal surface over joint concrete as specified
CLSM or full depth asphalt
Compacted aggregate base, backfill as specified
Compacted trench
(Extg.)
Undisturbed base
Extg. pvmt.
see general notes
Pvmt. replacement, min.
6" min.
6"
Min. width=Roller width plus 2" m in
Tack coat cut edges (AC only) the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD316
FOR METAL PIPE
SLOPED ENDS
R D
.d g n
15-JAN-2016N/A
J U
L or
B1
END VIEW
X dimensions are to top edge of corner plates on structural plate pipe.
plans or directed when shown on
Slope protection
RD317
Std. Dwg.
See Table A, Sl op e as d ire ct ed
See general note 4
ROADWAY EMBANKMENT
See general note 4
RD317
Std. Dwg.
See Table A, sections on Std. Dwg. RD317
Configuration varies, see
See general note 8
Slopes as directed.
paved end slope.
0 when used with
Slopes as directed.
Adjacent pipe section
H in f e e t)
D ia
H
I n f e e t)
(Corr. structural plate) Plan and pay length joint
First
Axis of pipe
D ia m e te r
Be ve lY = 0)
Bevel (When min.
12" corrugated metal pipe
6 times dia. min. for
(Corr.) Plan and pay length
X
B1
1H metal pipe.
for corrugated
6 times dia. min.
First joint
Y min.
12"
Bottom � length Plan and pay length
Be ve l
Span
R is e
X
H
H 15 15
1H
H 15 15
1H 6. and only applicable for non-hydraulic applications.
11. See Std. Dwg. RD317 for culvert embankment protection and riprap pads (When reqd.).
(For skew diagram, see Std. Dwg. RD319).
10. For pipes with skew no.'s 50, 70, 110 or 130, omit the top step (Y).
9. Full bevel cuts are not recommended for multiple radius shaped pipes.
8. Cross-sectional dimensions may vary with different materials.
See special details or Standard Drawings as called for on plans.
sections, or other measures).
treament (Slope ends, culvert embankment protection, paved end slopes, safety end
7. Open ends of pipes normally require a site specific design, and may require special
For elliptical pipe increase X and Y dimensions by percent of ellipse.
13 4
12 to 36
8 *
8 *
8 *
8 *
4 *
8 *
8 *
8 *
8 *
1:31:21:1.51:31:21:1.51:31:21:1.5 1:31:21:1.5
1:31:21:1.51:1.5 1:2 1:3
SIZE
CORRUGATED STRUCTURAL PLATE (Dimension in inches) CORRUGATED (Dimension in inches)
SIZEB1 B1
SLOPES
SIZE
ROUND
EQUIVALENT
SPAN RISE XSLOPES
RISESPAN
XX
RISESPAN
SIZE X Y
SIZE
B1
SLOPES SLOPES
X
SLOPES
Y X & Y
SLOPES
ALTERNATE - 2ALTERNATE - 1
CORRUGATED (Dimension in inches) CORRUGATED STRUCTURAL PLATE (Dimension in inches)
CIRCULAR OR ELLIPTICAL PIPEARCH PIPE
SHOWING LENGTH OF END PROJECTIONS
LONGITUDINAL SECTION
PARTIAL BEVEL
LONGITUDINAL SECTION
STEP BEVEL
CIRCULAR OR ELLIPTICAL PIPEARCH PIPE
C B A
C B A
ARCH PIPE
CIRCULAR OR ELLIPTICAL PIPE SECTION
5. Slope protection required for hydraulic installations. See Table A on Std. Dwg. RD317.
than design headwater or tailwater elevation respectively whichever is greater.
4. Minimum elevation of top of riprap at inlet and outlet is one diameter (D) or one foot higher
3. All embankment slopes to be warped where required to provide end projections as shown.
2. See Std. Dwgs. RD300 or RD304 for installation details.
requirements for plate arrangements.
1. All dimensions are subject to necessary tolerances to meet manufacturer's
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD317
AND RIPRAP PADS
PROTECTION
CULVERT EMBANKMENT
R D
.d g n
30-JUN-2022N/A
J U
N
12 3
2B B 2B when directed
Riprap protection
W general note 4
See Std. Drg. RD316, D
T general note 4
See Std. Drg. RD316, D
T on plans or directed
Cutoff wall when shown when directed
Riprap protection
W
B
T = Thickness of riprap blanket, see Table A.
D = Diameter of circular barrel or rise of arch pipe, box, or open-bottom arch.
B = Diameter of circular barrel or span of arch pipe, box, or open-bottom arch.
general note 4
See Std. Drg. RD316, D
T when directed
Riprap protection
BB
W
B listed dimension.
* L is the greater of 4B or the
TABLE A - Embankment Slope Protection
See special details or Standard Drawings as called for on plans.
end sections, or other measures).
treatment (sloped ends, culvert embankment protection, paved end slopes, safety
2. Open ends of pipes normally require a site specific design, and may require special
1. See Std. Drg's. RD300 & RD304 for installation details.
c) Riprap pad, end view
W slope protection.
the width of the embankment pad is the larger of 5B or
3 Top width (W) of the riprap loose riprap.
Class 200 and Class 700
2 Use riprap geotextile under rock in order to place riprap.
1 Do not excavate non-erodible
B
Riprap Class T Distance
36 Inches *
24 Inches *
18 Inches
12 Inches
TABLE B - Riprap Pad Dimensions
Class
Riprap
(ft)
L *
(ft)
T
5.6
4.3
3.3
2.3
4B or 3.3
4B or 2.0
4B or 1.6
4B or 1.3 protection
Embankment
b) Riprap pad with cutoff wall, elevation view
L (See Table B)
L (See Table B)
a) Riprap pad without cutoff wall, elevation view
Cutoff wall
Riprap geotextile culvert invert thickness under
Pad should be full
Riprap geotextile
Channel bottom
T (See Table B)
Embankment protection
Outlet invert
W= Width of top of riprap pad, ft
T = Thickness of riprap pad, ft
L = Length of bottom of riprap pad, ft
B = Diameter or span of conduit, ft
T (See Table B)
A
A
B
B
C
C
B2 11 B2
Riprap pad riprap and embankment
* Riprap geotextile required between on plans or directed
Cutoff wall when shown
Wingwall and headwall
EMBANKMENT PROTECTION
RIPRAP PADS
HEADWALL AND WINGWALLS
SLOPED OR PROJECTING END
SLOPED END WITH SLOPE PAVING
SECTION A-A
SECTION B-B
SECTION C-C
RIPRAP PAD NOTES:
GENERAL NOTES FOR ALL DETAILS:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD325
CORRUGATED METAL PIPE
COUPLING BANDS FOR
R D
.d g n
REVISED DETAILS AND NOTES01-2023
20-JAN-2023N/A
J A
N
⅝
½
⅜
⅝
⅝
½
Band 7"
W
(In) Pipe Dia.
(In) Pipe Dia.W (In)
Ann.Hel. Bolts "2
# Of W (in)
Ann.Hel.
24-84
18-84
12-15
6-10
2-3
36-120
36-84
Bolts "2
# Of
Dim. A
C o rr u g a ti o n s
60-84
24-54
12-21
84-120
60-84
36-54
Rods # Of
Rods # Of
"x
(in) W
(in) W
"x anchors, when required.
See Std. Dwgs. RD330 and RD332 for pipe slope8.
engineer.
or other insulating material as approved by the a full width neoprene gasket or coated with asphalt connected, the connecting band shall be used with To prevent galvanic action when unlike metals are7.
diameters over 42".
bands of two or more pieces are required for pipe pipe diameters up to and including 42". Coupling One or two piece coupling bands are optional for6.
Standard Specifications.
tested for water tightness in accordance with the Joints for sanitary sewers and siphons are to be5.
". 16 3diameter, the gasket thickness may be centering on the joint. For pipes 12" or less in thick of a width equal to the band width and
" 8 3 vulcanized) synthetic, closed-cell sponge rubber all coupling bands shall be (butt-cemented or installations when shown on the plans. Gaskets for irrigation pipes, storm sewers, and other Watertight joints with gaskets are required for4.
corrugation and pipe diameter shown may be used.
width coupling band indicated for the band type, used as an acceptable alternate, the minimum Under conditions where concrete pipe may be3.
that used for the pipe.
aluminum pipe shall be of the same thickness as nominal thickness. Coupling bands for corrugated 0.109" nominal thickness nor less than 0.052" than that used for the pipe but not more than pipes may be two numerical thicknesses lighter Coupling bands for corrugated iron and steel2.
shall be galvanized or aluminum coated.
All steel coupling bands and connection hardware1.
TYPE E
TYPE DTYPE BTYPE A
HELICAL COUPLINGANNULAR COUPLING
CONNECTION ANGLE DETAIL
TOP VIEW
END VIEW END VIEW
COUPLING BAND DIMPLE DETAIL
" Corrugations2 1"x3
22 3"x1" Corrugations
(In) Pipe Dia.
(In) Rod Dia.
Narrow Band Wide Band
Req'd. above 42" dia.
to 42" diameter.
Second angle conn. opt.
Band (See general note 4) where required Watertight joint gasket
"16 32"x2"x
" bolts2 and toe of angle of corrugation at heel fillet weld at crest Rivet, spotweld or bolts "2
Band
Pipe Band
Pipe with cut washers " carriage bolts8
32 -
W W joints req'd. for watertight (Sigma) clips
Band
(See general note 4) where required Watertight joint gasket with cut washers " carriage bolts8
32 -pipe corrugated Helically
Helical pipe
Band
Pipe
(See general note 6) where required Watertight joint gasket
Cast lug
Band
4 - Rods and lugs
Cast lug
Pipe as reqd. to fit the helix angle.
Dimension A: 7" min. between dimples
" bolts2 13 -
Pipe
Band min 12"
"16 32"x2"x to fit the helix angle 8 spaces as reqd.
"2
(For 6"-10" dia. pipes)
(For 12"-30" dia. pipes)
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD326
COUPLING BANDS FOR
R D
.d g n
REVISED DETAILS AND NOTES01-2023
20-JAN-2023N/A
J A
N
"2
TYPE F-2
"2
(See Std. Dwg. RD327) bolt bar
Tension strap and bolt (Typ.)
"x6" carriage 2
21"
(12"-42" diameter)
Spot welded 8" band angle end for helical pipe
Reformed pipe bolt (Typ.)
"x6" carriage 2
(48"-144" diameter) strap with bolt bar
Spot welded tension
SINGLE BAR & STRAP CONNECTOR
DOUBLE BAR & STRAP CONNECTOR
a a
(Typ.)
See INSERT "A"
"4
3"x1" corrugations width is 14
", with8 corrugations width is 13
"2
"x3
For annular pipe with 2 end helical pipe
Reformed rolled
(See general note 4) where required
Watertight joint gasket
(when required) to annular corrugations
Spiral pipe ends reformed sleeve gasket, when required
" neoprene strip or8
(Typ.)
Alternate O-ring gasket
"3
" or 21"2
"2
"3
2"
JOINT DETAIL (TYPE F1 & F2)
INSERT "B"
TYPE F
JOINT DETAIL (TYPE F)
INSERT "A"
"2
21"
SINGLE 12" BAND ANGLE CONNECTOR
DOUBLE BAND ANGLE CONNECTOR
bolt (Typ.)
"x6" carriage 2 connector
12" Band angle for clarity (Typ.)
Band lap not shown
TYPE F-1
bolt (Typ.)
"x6" carriage 2 connector
8" Band angle for clarity (Typ.)
Band lap not shown
(Typ.)
See INSERT "B"
(Typ.)
See INSERT "B"
(Typ.)
"x6" bolts2
2 -
"2 with bolt bar tension strap
Spot welded a
(See Detail "A" on Std. Dwg. RD327)
Tension strap and bolt bar
(12"-84" diameter) with bolt bar
Spot welded tension strap
(48"-84" diameter)
Spot welded 12" band angle
(48"-144" diameter)
Spot welded 20" band angle a anchors, when required.See Std. Dwgs. RD330 and RD332 for pipe slope 8.
other insulating material as approved by the engineer.
band shall be used with a full width neoprene gasket or coated with asphalt or
To prevent galvanic action when unlike metals are connected, the connecting 7.
pipe diameters over 42 inches.
including 42 inches. Coupling bands of two or more pieces are required for diameters up to and One or two piece coupling bands are optional for pipe 6.
accordance with the Standard Specifications.
for water tightness in Joints for sanitary sewers and siphons are to be tested 5.
inch. 16 pipes 12 inches or less in diameter, gasket thickness may be inch thick of a width equal to the band width and centering on the joint. For 8 shall be (butt-cemented or vulcanized) synthetic, closed-cell sponge rubber and other installations when shown on the plans. Gaskets for all coupling bands
Watertight joints with gaskets are required for irrigation pipes, storm sewers, 4.
inch bands).8 inch minimum diameter (14-8 inch bands) and 1-8 and 13-inch2 nch minimum diameter (10- i16 between bands. "O" ring gaskets shall be inch band) shall be placed in lap 4 inch band) or 9 inch (14- 8 band) or 8 inch (13-inch2 inch wide by 5 inch (10-2
1- inch by 8
C443 and a mastic sealant strip
Gaskets for the Type F coupling band shall be "O" rings conforming to ASTM 3.
to arch pipes of equal peripheral measurement.
Type F coupling bands shown for pipes 15 inch to 72 inch in diameter are typical2.
See Std. Dwg. RD325 for general notes, and details not shown.1.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
SINGLE 8" BAND ANGLE CONNECTOR
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD327
COUPLING BANDS FOR
R D
.d g n
REVISED DETAILS AND NOTES01-2023
20-JAN-2023N/A
J A
N are required for pipe diameters over 42 inches.
up to and including 42 inches. Coupling bands of two or more pieces
4. One or two piece coupling bands are optional for pipe diameters
. "16 in diameter, the gasket thickness may be the band width and centering on the joint. For pipes 12 inches or less thick of a width equal to "8 synthetic, closed-cell sponge rubber
Gaskets for all coupling bands shall be (butt-cemented or vulcanized) storm sewers, and other installations when shown on the plans.
3. Watertight joints with gaskets are required for irrigation pipes, approved by the engineer.
gasket or coated with asphalt or other insulating material as the connecting band shall be used with a full width neoprene
2. To prevent galvanic action when unlike metals are connected, not shown.
1. See Std. Dwgs. RD325 and RD326 for general notes, and details provide a tensile strength of 7500 lbs are permissible.
Design variations in fasteners (Straps, bars, & welds) which
NOTE:
provide a tensile strength of 7500 lbs are permissible.
Design variations in fasteners (Straps, bars, & welds) which
NOTE:
Coupling band sealant where required
Watertight joint gasket or
Forged steel bar
" dia.8
(Typ.)
" square hole16
(Typ.)
Spot welds Band sheet
"4
"x84
Tension strapBolt bar
(See general note 3)
"4
"8
" 2
BOLT BAR DETAIL
WATERTIGHT JOINT
TENSION STRAP
DETAIL A
TOP
FRONT
FLAT BAND OR DIMPLE BAND
TYPE K
(FOR PIPE EXTENSIONS ONLY)
or helical end with reformed end
New pipe extension with helical end
Extg. pipe
(See table A)
W connector
Band angle connector
Bar & Strap bolt (Typ.)
"x6" carriage 2
BAND ANGLE CONNECTOR DETAIL
DOUBLE BAR & STRAP CONNECTOR DETAIL
Band Type
Steel
Aluminum
Corrugations (In)
Pipe Dia.
(In)
Min. W Gasket Type
Sleeve
Sleeve
54-144
54-84
12-48
54-96
54-84
12-48
"2 1"x3
* 3"x1" 5"x1"
"2 1"x3
* 3"x1" 5"x1"
TABLE A
* Arch pipe only
Insulating material connecting band
Standard
(See general note 2)
Type varies with pipe of unlike material
Extending existing pipe culvert
CONNECTION DETAILS
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
bolt (Typ.)
"x6" carriage 2 the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD339
CONNECTIONS
PIPE TO STRUCTURE
R D
.d g n
REVISED NOTES07-2021
20-JAN-2023N/A
J A
N
PLAN PLAN
grout
Non-shrink
(See general note 5)
Tracer wire
(See general note 1)
Sump shown
(typ.)
grout
Non-shrink
(See general note 5)
Tracer wire (Typ.)
(See general note 1)
Sump shown
(See general note 5)
Tracer wire (Typ.)
(See general note 7)
Pipe zone (Typ.)
(See general note 7)
Pipe zone (Typ.)
(See general note 6)
Resilient connector
(See general note 5)
Tracer wire
(See general note 1)
Sump shown
(See general note 1)
Sump shown
(See general note 6)
Resilient connector (Typ.)
(See general note 5)
Tracer wire (Typ.)
(See general note 7)
Pipe zone (Typ.)
(See general note 7)
Pipe zone (Typ.)
(See general note 5)
Tracer wire (Typ.)
(See general note 6)
Resilient connector (Typ.)
CONNECTION OF FLEXIBLE PIPE TO STRUCTURECONNECTION OF RIGID PIPE TO STRUCTURE
SECTION C-CSECTION D-DSECTION A-ASECTION B-B
B
B
A A C C
D
D
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
7. Pipe zone varies, see Std. Dwg. RD300.
6. When flexible pipe is used, install resilient connectors conforming to requirements of ASTM C923.
See Std. Dwg. RD336 for tracer wire details.
5. All connecting pipes shall have a tracer wire, or approved alternate.
4. Maximum pipe diameter varies with pipe material.
3. Location, elevation, diameter, slope, and number of pipe(s) varies, see project plans.
2. See appropriate standard drawings or special project details for other similar structures.
1. See Std. Dwgs. RD364, RD365, and RD366 for inlet details not shown.
04-2022 REVISED NOTES
01-2023 REVISED DETAILS AND NOTES
(typ.)
grout
Non-shrink
(typ.)
grout
Non-shrink the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD364
TYPE G-1, G-2, G-2M, & G-2MA
CONCRETE INLETS
R D
.d g n
21-JUL-2015N/A
J U
L
4" drain pipe
Base drain, m in
INLET TYPE W W
G-1
G-2, G-2M, G-2MA
"8 71'-8"8
72'-8
"8 33'-3 "8
32'-3
TYPE G-1, G-2, G-2M
TYPE G-2MA
WITHOUT SUMP
DETAIL A
TABLE A
SECTION A - A
SECTION B - B
SECTION C-C
C C
PLAN
PLAN
B
B
A A
(See general note 5)
Tracer wire when directed
Shape bottom m in (T y p
6" W
W
6" b r e a k
G r a d e
Finish grade
(See general note 9) when required
" preformed filler,4
Subgrade
(See general note 5)
Tracer wire
(See general note 11)
(Typ.)
Pipe connection varies
(See general note 3)
Sump
"2
(See general note 4)
Curb (Type var.)
Aggr. backfill n o r m a l
6"
V a r ie s
W6" 6"
W
Normal pavement slope
(See general note 2)
Frame & grate see inlet G-2
For details not shown, face of concrete unless shown or noted otherwise
All reinforcement to be placed 2" clear of nearest
NOTE:
#4 bars @ 6"
#4 bars "2
(See general note 2)
Frame & grate
6'-0"
"4
2'-46"
"4
3'-4
(See general note 10)
Pay limit for conc. inlet
6"
1'-6"
6"
V a r ie s m in
Top of curb
4" drain pipe (Typ.)
Base drain, (Typ.)
Aggr. backfill
Subgrade
(See general note 5)
Tracer wire (Typ.)
(See general note 11)
(Typ.)
Pipe connection varies
(See general note 3)
Sump normal
6"
(See general note 11)
(Typ.)
Pipe connection varies flow line
Depressed gutter flow line
Normal gutter
(Typ.)
Slope 1:12 nom.
(See general note 9) when required
" preformed filler,4
Top back of curb
Top face of curb
(Typ.)
Aggr. backfill
4" drain pipe (Typ.)
Base drain, (See general note 9) when required
" preformed filler,4
Concrete inlet
(See general note 2)
Frame & grate
(See general note 5)
Tracer wire (Typ.)
Normal gutter flow line
11. See Std. Dwg. RD339 for pipe to structure connections.
10. See Std. Dwg. RD363 for gutter transition section, when curb and gutter are required.
" preformed filler (in concrete pavement or gutter only) to extend through thickness of concrete.4
9.
8. All concrete shall be commercial grade concrete.
7. Location, elevation, diameter, slope, and number of pipe(s) varies, see project plans.
6. Max. pipe diameter varies with pipe material.
5. See Std. Dwg. RD336 for tracer wire details, or approved alternate.
4. For curb details, see Std. Dwgs. RD700 & RD701.
3. Provide sump only where shown on plans, and allowed by jurisdiction. See Detail A for inlet without sump.
For frame and grate details, see Std. Dwg. RD365.
Type 1 grate allowed only in locations not subject to bicycle or pedestrian use.
2. Graphics show G-1 inlet with Type 2 grate. See Table A for inlet dimensions.
crushed aggregate shall be provided. All precast inlets shall conform to requirements of ASTM C913.
"-04
1. Where precast inlets are used as an alternate to cast-in-place inlets, a 4" compacted leveling bed of sand or
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD365
FOR CONCRETE INLETS
FRAMES & GRATES
R D
.d g n
14-JUL-2014N/A
J U
L all bars
Both ends "16
"4
4 corners "4 32'-4 h e x b a r o f e q u iv a le n t a r e a r o u n d r e c t.
o r
C r o s s b a r s h e x b a r o f e q u iv a le n t a r e a r o u n d r e c t.
o r
C r o s s b a s flat bar each end
"2
"x28
"x2" or 8
(Typ.)
" on center8 at 1
" flat bars2
"x28
Bearing bars
T y p ic a l a ll b a rs see general note 3
For cross bars, third inner bar and every outer bars both ends, Typical "16
"2
2" b a r s o n c e n te r s
1'-9"
(Bicycle-safe) edge flat bars
" sq.2
"x22
"8
1'-9
2 each end
"x3" bolt8 angle (Typ.)
"8
"x 2
3"x2
"4
1'-10
"4
4 anchors
"4
4 corners
T y p
" (Typ.)2
2 each end
"x3" bolt8 5 "
2 each end
"x3" bolt8
(Typ.)
" on center8 at 1
" flat bars2
"x28
Bearing bars flat bar each end
"2
"x28
"x2" or 8 see general note 3
For cross bars, third inner bar and every outer bars both ends, Typical
"2
2T y p ic a l a ll b a rs
3 "16
2'-3"
"2
1'-1 "2
1'-1 b a r s o n c e n te r s
(2 grates required per inlet, as shown)
(Bicycle-safe)
2"
2 each end
"x3" bolt8
"8
2'-3 edge flat bars
" sq.2
"x22 angle (Typ.)
"8
"x 2
3"x2
"4
4 anchors
" (Typ.)2
T y p
(Typ.)
sq. edge flat bar
"2
"x28
"2
(Typ.)
sq. edge flat bars
"4
"x2'-62
"x28
Bearing bars
"2
"2
2'-3"
Spacing 3" O.C.
(See general note 2)
5. Cast iron grate and frame are acceptable alternates. See ODOT's QPL.
4. Hot dip galvanize after fabrication.
resistance welded or electroforged to bearing bars.
" cross bars shall be flush with the top of grate surface and may be fillet welded,8
3.
2. Type 1 grate allowed only in locations not subject to bicycle or pedestrian use.
1. For inlet details, see appropriate inlet standard drawing(s).
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
(TYPE 1)
G-2, G-2M, G-2MA, CG-2 GRATE
(TYPE 2)
G-2, G-2M, G-2MA, CG-2 GRATE
(TYPE 2)
G-1, CG-1 GRATE
G-1, CG-1 FRAME G-2, G-2M, G-2MA, CG-2 FRAME
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD370
TYPE D
DITCH INLET
R D
.d g n
21-JUL-2015N/A
J U
L
Grate
Ditch flow
Frame
See Detail A
Frame
V a r ie s
2'-0"
3'-0"
6" 6"
6" "8
2'-3
"8
3'-3
6"
(See general note 10)
(Typ.)
Pipe connection varies(See general note 6)
Tracer wire
Grate
"4
2'-4
2'-3"
(See general note 2) (See general note 2)
See Detail A
(See general note 6)
Tracer wire
Grate
Frame
Ditch flow
6" 2'-0"
3'-0"
6"
(Anchor bolt modication, see general note 2)
"4
4 anchors
Grate
Frame
2 each end
"x3" bolt (Modified)8
SECTION A - A ELEVATION
PLAN
AA
G-2 FRAME G-2 GRATE (TYPE 1)
DETAIL A
11. Location, elevation, diameter, slope, and number of pipe(s) varies, see project plans.
10. See Std. Dwg. RD339 for pipe to structure connections.
All precast inlets shall conform to requirements of ASTM C913.
"-0 crushed aggregate shall be provided.4 leveling bed of sand or
9. Inlet base may be cast-in-place or precast. Where precast inlet base is used as an alternate, a 4" compacted
8. Do not use in locations where inlet can be struck by an errant vehicle, or provide shielding of inlet.
7. Max. pipe diameter varies with pipe material.
6. See Std. Dwg. RD336 for tracer wire details, or approved alternate.
to bearing bars.
" cross bars shall be flush with the grate surface and may be fillet welded, resistance welded or electroforged8
5.
4. Provide sump only when shown on plans, and allowed by jurisdiction. For sump details, see Std. Dwg. RD364.
3. Catch basin, frame, and grates shall meet H20 loading.
G-2 (Type 2) grates may be used if approved by the engineer.
Modify anchor bolt attachment to frame as shown in Detail A.
2. For frame & grate details not shown, see Std. Dwg. RD365.
1. All concrete shall be commercial grade concrete.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM800
PCMS DETAILS
TABLES, ABRUPT EDGE AND
T M
.d g n
12-JUL-2024N/A
J U
L
Freeway
Use aggregate wedge when abrupt edge is 2 inches or greater.
four feet wide protect longitudinal abrupt edge as shown.
When paved shoulders adjacent to excavations are less than
NOTES:
shoulder, as far as practical.
Place cart / generator / power supply off of the on 10' spacing.
Use six tubular markers in shoulder taper outside shoulder, where practical.
Install Flagger Station Lighting beyond the
2" or GreaterExtg. pavement aggregate base rock
Shoulder or message sign (PCMS)
Portable changeable
20'
100'
4' B(III)R
Temp. Plastic Drums
Lighting
Flagger Station
50'
10'
Markers
28" Tubular
Place roll-up signs in advance of barricades.
plaques to the sign face using hook and loop fasteners.
If roll-up signs are used, attach the correct (CW21-9) throughout excavation area at spacings shown.
Continue signing and other traffic control devices
"RIGHT" (CW21-8C) riders with "LEFT" (CW21-8A) riders.
8' B(III)R barricades with 8' B(III)L barricades and replace the
If the excavation is located on left side of traffic, replace the abrupt edges of 1 inch or greater.
or other roadway work. Use abrupt edge signing for longitudinal
Abrupt edges may be created by paving, operations, excavations
GENERAL NOTES FOR ALL TCP DRAWINGS:
for max. spacing.
See TCD Spacing Table
Temp. Plastic Drums for max. spacing.
See TCD Spacing Table
28" Tubular Markers
UNDER TRAFFIC
UNDER CONSTRUCTION
EXCAVATION ABRUPT EDGE SIGN (PCMS) INSTALLATION
PORTABLE CHANGEABLE MESSAGE
LIGHTING DELINEATION
FLAGGER STATION
Sl. 1:3
TAPER TYPES & FORMULAS
TEMPORARY BARRIER FLARE RATE TABLE
TAPER FORMULA
Merging (Lane Closure)
Shifting
Shoulder Closure
Flagging (See Drg. TM850)
Downstream (Termination)
"L"
"L"3 1"L"/3 or
50' - 100'
Varies (See Drawings)
"L"2 1"L"/2 or the Speed from the Tables below:
Use Pre-Construction Posted Speed to select
For Lane closures where W < 10', use "L" value for W = 10'.
Limit spacing adjustments to 30% of the "A" dimension for all speeds.
When necessary, sign spacing may be adjusted to fit site conditions.
Place traffic control devices on 10 ft. spacing for intersection and access radii.
NOTES:
SPEED (mph) MINIMUM FLARE RATE
M I N I M U M L E N G T H S T A B L E
"L" VALUE FOR TAPERS (ft) BUFFER "B" (ft)W = Lane or Shoulder Width being closed or shifted
20:1
19:1
18:1
16:1
14:1
12:1
10:1
9:1
8:1
FREEWAYS
SPEED (mph) W = 12 W = 14 W = 16
TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE
20 - 30
35 - 40
45 - 55
60 - 70 700
100 100
15001000 2640
100 20
Device Spacing (ft)
Max. Channelizing Sign Spacing (ft) SPEED (mph)
A B C
CW21-8A
(As noted)
36x18
C W
(Mount on TSS)
(As needed)
42x18
CW21-8C
OR
C
W
Plaques
CW21-9
Abrupt edge
8' B(III)R 8' B(III)R
mi.4 1 mi.4
1 mi.4
EDGE
ABRUPT
RIGHT
LEFT
(Roll-up sign)
(As needed)
EDGE
ABRUPT 32x11
32x11
32x11
CENTER
RIGHT
LEFT
10≤ W
30≤
W/60, S = Speed, W=WidthS 45: L = WS, Speeds < 45: L = ≥ formula, for Speeds For Shoulder closures where W < 10', use "L" value for W = 10' or calculate "L" using
TYPICAL ABRUPT EDGE DELINEATION
Smart Work Zone Systems Portable Traffic Signals
Detail as shown is used for trailered and non-crashworthy components of:
barricade may be omitted when PCMS is placed behind a roadside barrier.
Use six drums in shoulder taper on 20' spacing. The drums and
Left shoulder, use Type B(III)L Right shoulder, use Type B(III)R Use the appropriate type of barricade panels for PCMS location.
Install PCMS beyond the outside shoulder, when possible.
To be accompanied by Dwg. Nos. TM820 & TM821.
divided highways or freeways when positive protection is not available, or as directed.
Provide a truck mounted attentuator (TMA) to protect the active work area on high speed
Flaggers, Traffic Control Measures, or as directed.
Coordinate and control pedestrian movements through a Temporary Accessible Route using
Combine drawing details to complete temporary traffic control for each work activity.
Do not locate sign supports in locations designated for bicycle or pedestrian traffic.
High speed highways have a pre-construction posted speed of 45 mph or higher.
Low speed highways have a pre-construction posted speed of 40 mph or less.
All other signs mounted on barrier sign supports shall not exceed 12 sq. ft. in total sign area.
All diamond shaped warning signs mounted on barrier sign supports shall be 36" by 36".
background of all temporary warning signs.
Use fluorescent orange sheeting for the All signs are 48" x 48" unless otherwise shown.
to indicate traffic movements.
Arrows shown in roadway are directional arrows sequential arrow boards.
Place a barricade approx. 20' ahead of all shown are the minimum required.
Signs and other Traffic Control Devices (TCD)
07-2022 Added a note for TPARs
07-2024 Added a note for TMAs the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM821
TEMPORARY SIGN SUPPORTS
T M
.d g n
14-JUL-2023N/A
J U
L
4"x 4"x 12'
2 - 2"x 4" @ 45° angle
2"x 6"x 37"
36"
Sandbags per side (typ.)
lag screw
"x 3"8 31 -per side (typ.)
" dia. bolts8 32 -screw per side (typ.)
"x 3" lag 8 31 -per support (typ.)
"x 3" lag screws8 32 -
"x 37"2 1"x 54 sign (typ.)
48"x 48" sign area of 20 sq. ft. or less.
Use Double Post TSS for a total
NOTES:
per support (typ.)
2 - 3/8" dia. bolts per support (typ.)
2 - 3/8" dia. bolts
4 - 2"x 6"
40"
"2 12 - 4"x 4"x 5
NOTES:
2' - 8" Sandbags
2' - 6"
A
"4
" - 12 ga. PSST2
" - 12 ga. x 4" PSST Stub2
PSST Stub
" - 12 ga. x 4" 2 12 A
See DETAIL A
" - 12 ga. PSST4
" - 12 ga. PSST4 sign (typ.)
48"x 48" per support (typ.)
" dia. bolts8 3Two, support (typ.)
joining brace and
" dia. bolt 8
NOTES:
1 - 2"x 4"
1 - 4"x 4"x 4"
2 - 2"x 4"
1 - 4"x 4"x 4"
1- 2"x 4" 40"
Sandbags lag screws
"x 4"8 34 -
4"x 4"x 10'
"x 3" lag screws8 32 -
2"x 4"x35" @ 45° angle
2"x 4"x 6"
"x 3" lag screws8 32 -
"x 4" lag screws8 34 -
" dia. bolts8 31 -
" dia. bolts8 31 -
" dia. bolts8 32 -
" dia. bolts8 31 -sign (typ.)
36"x 36"
" dia. bolts8 32 -
TEMPORARY SIGN SUPPORT GENERAL NOTES:
Sheeting
Retroreflective
Sheeting
Retroreflective
" Sheeting
Retroreflective m in and Right sides)
Sheeting (Left
Retroreflective
NOTES:
SIGN POST REFLECTIVE SHEETING PLACEMENT
Sheeting
Retroreflective Sheeting
Retroreflective signs. Do not mount signs on Type II or III Barricades.
Use Single Post TSS for mounting "Business Access" (CG20-11)
Use Single Post TSS for a total sign area of 12 sq. ft. or less.
Sheeting may be applied directly to post material; or applied to a rigid, lightweight substrate, then securely attached to the posts.
for wood post TSS's. Use 2" wide sheeting for PSST TSS's.
Apply sign post retroreflectivity to each TSS post facing front; and to the left and right sides of the TSS, as shown. Use 3" wide sheeting and "DO NOT ENTER". For "STOP" and "DO NOT ENTER" signs, used red ANSI Type III or IV retroreflective sheeting on the TSS posts.
Apply fluorescent orange, ANSI Type VIII or IX retroreflective sheeting to TSS posts, as shown, for all temporary signs, except "STOP"
Use A325 Bolts or equivalent.
welding. Repair Galvanizing according to ASTM A780.
designation G90. Remove Galvanizing from steel before
Galvanize steel according to ASTM A653 with coating
All members shall have a minimum yield stress of 50 ksi.
Use PSST TSS's for a total sign area of 16 sq. ft. or less.
Society (AWS) D.1.1.
Weld steel according to American Welding
" - 12 ga. x 4" PSST Stub.2 1inside of the 2
" PSST4
1Do not use bolt to secure 2
" - 12 ga. x 4" PSST Stub.2 1inside of the 2
" - 12 ga. PSST to extend entire length 4
See Dwg. No. TM204 for flag board mounting detail.
(25 lb. max per bag) (min. 100 lbs per side of each TSS).
Place a minimum of 50 lbs of sandbags on each of the four TSS supports legs.
TSS posts.
away from traffic, or cover the sign. Do not cover reflective sheeting on the
When not in use, locate TSS as far from Public Traffic as practicable and turn
Do not place or stack ballast more than 24" above the ground.
See "Temporary Sign Placement" detail on TM822 for sign installation heights.
four sides (S4S) and free of heart center (FOHC).
For wooden TSS's, use either Douglas Fir or Hem Fir, which is surfaced
Do not locate TSS's in locations that block pedestrian or bicycle traffic.
Do not tip over TSS at any time.
Double Post Perforated Steel Square Tube (PSST) Single Post
DOUBLE POST DETAIL PERFORATED STEEL SQUARE TUBE (PSST) DETAIL SINGLE POST DETAIL
Front Right Left Front FrontRight Left Side
(No Scale)
DETAIL A
" - 12 ga. PSST 4
" - 12 ga. PSST2
A A
(No scale)
SECTION A-A
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM822
TEMPORARY SIGN SUPPORTS
T M
.d g n
01-JUL-2020N/A
J U
L
¼ ¼ as shown.
pedestrian pathway, maximum of 4" into it may extend a
7' above the sidewalk is installed less than
If bottom of plaque
B a c k o f c u rb m in m in
3' (min.)
4" max. *
2' (min.)
width is less than 6'
2' min. when the shoulder
6' - 12'
E d g e o f tr a ff ic l a n e m in m in . R
/W
1' min.
Urban Areas With Curb/Sidewalk surface, as shown.
minimum of 7'0" above pavement
(plaque) so bottom of sign is a bicycle traffic, install secondary sign shoulder or other surface used by adjacent to or intrude into a paved
Where temporary signs are located
E d g e o f tr a ff ic l a n e
Shoulder
Paved m in
R /W
1' min.
6' - 12'
E d g e o f tr a ff ic l a n e m in m in
TEMPORARY SIGN PLACEMENT
L 2-1/2"x 2-1/2"x 5/16"
"8 d eg head and clip
" dia. pin wth4
"16 5"x 2
1"x 22 1L 2
"2
"16 5"x 2
1"x 22 1L 2
" Sch. 40 pipe2 1210"
"2
"2
6" max.
of total sign area) (or, max. 12 sq. ft.
36" x 36" sign
2" Sch. 40 pipe
" Sch. 40 pipe2
Conc. Barrier
NOTES:
CONCRETE BARRIER SIGN SUPPORT
other than concrete.
Follow manufacturer recommendation when installing signs on barrier
Do not use clipped signs.
Weld steel according to American Welding Society (AWS) D.1.1.
Place support at connection between two concrete barrier sections.
Use for supporting a maximum 12 sq. ft. of total sign area.
Support fits both 32" and 42" tall "F" barrier.
All structural steel shall conform to ASTM A36.
and pinned when not in use.
Drill additional holes so sign can be rotated 90 degrees
To be accompanied by Dwg. Nos. TM670, TM671, TM687, TM688 & TM689.
according TCP Design Manual, MUTCD, ADA, or as directed.
Do not block bicycle lanes, sidewalks, or TPAR's with sign supports. Maintain minimum widths for these facilities
Rural Areas
Bicycles On Shoulder Rural or Urban Areas - Curb or No Curb
No Curb/Sidewalk Divided Highway/Freeway Medians the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM841
INTERSECTION WORK ZONE DETAILS
T M
.d g n
12-JUL-2024N/A
J U
L
L
T a p e r
T a p
A
AHEAD
CLOSED
RIGHT LANE
AHEAD
WORK
ROAD
NOTES:
W
W a
W
B u f f
B
A
B
A
AHEAD
ROAD
ROAD WORK
END
SHOULDER
RIGHT
AHEAD
WORK
ROAD
ROAD WORK
END
W
W
W
ROAD
L
T a p e r
Buffer "B"
8' B(III)R
8' B(III)R
Sequential Arrow
A
B
C
A
AHEAD
WORK
ROAD
ROAD WORK
END
ROAD WORK
END
W
30x30 R3-8 Series
30x30 R3-7
W
W
A
A
B
C
Sequential Arrow
8' B(III)R
A
A
T a p e r
NOTES:
MUST
RIGHT LANE
TURN RIGHT
LEFT
MERGE
TRAFFIC
THRU
ROAD
as shown or directed.
mandatory turn lanes, lane direction legends in more, place temporary
14 consecutive days or
When work is in place for
AHEAD
WORK
ROAD
AHEAD
RIGHT LANE
LEFT LANE
W
W
W
MUST
LEFT LANE
TURN LEFT
30x30 R3-7
Sequential Arrow
8' B(III)L
A
2 A
B
C
A
8' B(III)L
Sequential Arrow
A
T a p e r
50 - 100'
AHEAD
WORK
ROAD
W
L
T a p e r
B
T a p e r1
ROAD WORK
END
ONLYONLY
AHEAD
WORK
ROAD
W
W
W
TO STOP
PREPARED
BE
TO STOP
PREPARED
BE
ROAD WORK
END
AHEAD
WORK
ROAD
Buffer "B"
A
B
C
A
C
B
A
A
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
AHEAD
ROAD
W
W
W
A
A
Buffer "B"
8' B(III)R
A
B
C
Sequential Arrow
8' B(III)R
GENERAL NOTES FOR ALL DETAILS:
UNDER TRAFFIC
UNDER CONSTRUCTION
lanes, as shown or directed.
legends in mandatory turn place temporary lane direction
14 consecutive days or more, When work is in place for
3" L
3" L
L
48x24
CG20-2A
by the Engineer length is determined Left turn lane storage
48x24
CG20-2A
48x24
CG20-2A
48x24
CG20-2A
48x24
CG20-2A
48x24
CG20-2A
48x24
CG20-2A
48x24
CG20-2A
48x24
CG20-2A
48x24
CG20-2A
48x24
CG20-2A
RIGHT LANE CLOSURE, FAR SIDE
4-Lane, 2-Way
LEFT LANE CLOSURE, FAR SIDE
4-Lane, 2-Way
SHOULDER CLOSURE
2-Lane, 2-Way
RIGHT LANE CLOSURE
2-LANE, 1-WAY
ONE LANE CLOSURE
2-Lane, 2-Way
RIGHT LANE CLOSURE, NEAR SIDE
4-Lane, 2-Way
Table on TM800 for max. spacing.
28" Tubular Markers See TCD Spacing
Table on TM800 for max. spacing.
Temp. Plastic Drums See TCD Spacing
(AFAD)
Automated Flagging Assistance Device
HERE ON
RED
STOP
24x36
R10-6
HERE ON
RED
STOP
24x36
R10-6
AHEAD
SIGNAL
W a
AHEAD
SIGNAL
W a
TM821, TM840 & TM854.
To be accompanied by Dwg. Nos. TM820, are expected.
Install a "BICYCLES ON ROADWAY" (CW11-1) sign in advance of the closure when a bike lane is closed, or when the shoulder is closed and bikes
Place channelizing devices around intersection radii, business accesses and driveways at 10' spacing.
Where shoulder width is limited, Sequential Arrow may be placed within the lane closure taper.
Tubular markers may be used in lane closure tapers where posted speed is 40 mph or less.
When a through road intersects within the work zone, place a "ROAD WORK AHEAD" (W20-1) sign in advance of the intersection at sign spacing A.
To determine sign spacing A, B, and C, use "TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE" on Dwg. TM800.
"LEFT LANE ENDS" (W4-2L) symbol sign, or "LEFT SHOULDER CLOSED" (W21-5a) sign, where applicable.
For left lane or shoulder work, place TCD to close left lane or shoulder. Use "LEFT LANE CLOSED AHEAD" (W20-5) sign, To determine Taper Length ("L") and Buffer Length ("B"), use the "MINIMUM LENGTHS TABLE" on Dwg. TM800.
The "SIGNAL AHEAD" (W3-3a) sign may be substituted with the signal ahead symbol (W3-3) sign.
Additional Traffic Control Measures (TCM) may be required for all legs of the intersection.
Added AFADs to drawing.01-2022
07-2024 Fixed a typo.
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM850
2-LANE, 2-WAY ROADWAYS
T M
.d g n
01-JUL-2022N/A
J U
L
01-2022 Added AFADs to drawing.
PASS
NOT
DO
PASS
NOT
DO
PASS
NOT
DO
CENTER
EDGE
ABRUPT
CENTER
BUMP
PASS
DO
PASS
NOT
DO
CENTER
ABRUPT
PASS
NOT
DO
(Relocated sign)
½ mi.
½ mi.
½ mi.
½ mi.½ mi.
Overlay Limit Abrupt edge
Overlay Limit location)
(initial sign
XX XX XX
(As needed)
A or gravel area
Loose sand or gravel area Loose sand
C W a
C W a
C W a
36x48
R4-1
36x48
R4-1
C W a
C W a
C W a
W
W
C W
W
W
W
W
W
W
36x48
R4-1
C W (7 ,9
36x48
R4-1
C W (7 ,9
36x48
R4-1
C W (7 ,9
W
36x48
R4-1
C W (7 ,9
36x48
R4-1
C W (7 ,9
36x48
R4-1
"BE PREPARED TO STOP" (W3-4) and Flagger Ahead (CW23-2) signs, as shown.
Relocate initial "ROAD WORK AHEAD" (W20-1) sign in advance of additional beyond initial warning signing OR when sight distance is restricted.
Place Advance Flagger and additional signing when traffic queues extend
NOTES:
Stations according to FLAGGER STATION DELINEATION detail.
Place additional Tubular Markers for Flagger and Advance Flagger
GENERAL NOTES FOR ALL DETAILS:
flagger tapers and stations
20' max. spacing for
28" Tubular Markers on
TM800 for max. spacing.
See TCD Spacing Table on
28" Tubular Markers
UNDER TRAFFIC
UNDER CONSTRUCTION
CONSTRUCTION UNDER TRAFFIC
on 10' spacing for flagger station delineation.
Use a minimum of 3 tubular markers in shoulder taper
NOTE:
NOTE:
NOTE:
ADVANCE FLAGGER FOR EXTENDED TRAFFIC QUEUES
FLAGGER STATION DELINEATION
28" Tubular Marker
F la g g e r
20'
10'
Move sign as needed for extended traffic queues, or
Move sign when sight distance is restricted
End of traffic queue
Sight distance limit
675'
End of traffic queue
"B"
Buffer
50'-100'
TaperAB CAB C
F la g g e r
A d v a n c e
AHEAD
WORK
ROAD
A mi. 2 1 mi. 2
1 mi. 2
mi. 2 1 A mi. 2
1 mi. 2
NOTE:
WORK
ROAD
MPH
PASS
NOT
DO
GRAVEL
LOOSE
MPH
PASS
NOT
DO
GRAVEL
LOOSE
MPH
MPH
GRAVEL
LOOSE
XX 36x48
R4-1
PASS
NOT
DO
MPH
GRAVEL
LOOSE
XX 36x48
R4-1
PASS
DO
MPH
ROAD
XX
STOP
PREPARED
BE
TO AHEAD
WORK
ROAD
STOP
PREPARED
BE
TO
AHEAD
WORK
ROAD
STOP
PREPARED
BE
TO
100'±
50'-100'
Taper
"B"
BufferABC
A
Activity Area
100'±
Construction
Under
Traffic
2-Way
1-Lane
TPAR
"B"
Buffer
50'-100'
Taper 2
A
AHEAD
WORK
ROAD
STOP
PREPARED
BE
TO
100'± A B C placard shall not exceed a posted speed of 35 mph.
pre-construction posted speed, or as directed. "XX MPH"
Use advisory speed "XX", 15 mph less than the
(R4-1) signing throughout the area at spacing shown.
Continue "LOOSE GRAVEL" (CW8-7a) and "DO NOT PASS" throughout the area at spacing shown.
and "DO NOT PASS" (R4-1) signing
Continue "ABRUPT EDGE" (CW21-(7,9))
SECTION A-A
48x24
CG20-2A
ROAD WORK
END
48x24
CG20-2A
ROAD WORK
END
LOOSE GRAVEL IN ROADWAY SIGNING
2-Lane, 2-Way Roadway
OVERLAY AREA SIGNING
2-Lane, 2-Way Roadway
ONE LANE CLOSURE
2-Lane, 2-Way Roadway
Device (AFAD)
Automated Flagging Assistance provide a minimum of 4' of width for the TPAR.
other TCM, or as directed. When the existing shoulder is greater than or equal to 4' wide, Coordinate and control pedestrians movements through the TPAR using Flaggers, located approx. 50' before each Flagger.
Include "WAIT FOR FLAGGER" (CR4-23) signs mounted on Type II Barricade the Activity Area, as shown or as directed.
the Tubular Marker spacing along centerline may be increased to 200' within
When using pilot cars with flaggers to control traffic during paving operations, TPAR
HERE ON
RED
STOP
24x36
R10-6
HERE ON
RED
STOP
24x36
R10-6
HERE ON
RED
STOP
24x36
R10-6
FLAGGER STATION LIGHTING DELINEATION detail on Dwg No. TM800.
At night, flagger stations shall be illuminated according to the closed and bikes are expected.
the closure when a bike lane is closed, or when the shoulder is
Install a "BICYCLES ON ROADWAY" (CW11-1) sign in advance of
CONTROL DEVICES (TCD) SPACING TABLE" on Dwg. No. TM800.
To determine sign spacing A, B, and C, use "TRAFFIC use the "MINIMUM LENGTHS TABLE" shown on Dwg. No. TM800.
To determine Taper Length ("L") and Buffer Length ("B"), Install temporary striping as required.
Cover existing passing zone signing, as directed.
the Signal Ahead (W3-3) symbol sign.
The "SIGNAL AHEAD" (W3-3a) sign may be substituted with
AHEAD
SIGNAL
W a
AHEAD
SIGNAL
W a
AHEAD
SIGNAL
W a
TM821 & TM854.
To be accompanied by Dwg. Nos. TM820, the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM854
T M
.d g n
14-JUL-2023N/A
J U
L
60'± 80'±
AB 60'± 60'±
50'-100'
Taper
AFAD
AFAD
60'±ABB
60'± A B C A
60'±
A
50'-100'
Taper
50'-100'
TaperC
B
10 feet back from AFAD
"STOP" line (optional)
Temporary 12 inch white
10 feet back from AFAD
"STOP" line (optional)
Temporary 12 inch white
W
1AHEAD
WORK
ROAD
HERE ON
RED
STOP
HERE ON
RED
STOP
W
STOP
PREPARED
BE
TO
AHEAD
SIGNAL
W a
AHEAD
SIGNAL
W a
W
1AHEAD
WORK
ROADW
STOP
PREPARED
BE
TO
CG20-2A
ROAD WORK
END
CG20-2A
ROAD WORK
END
R10-6
R10-6
60'±
"B"
Buffer
100'±
F la g g e r
A
260'±
A
50'-100'
Taper
50'-100'
TaperABBC
10 feet back from AFAD
"STOP" line (optional)
Temporary 12 inch white
CG20-2A
ROAD WORK
END
CG20-2A
ROAD WORK
END
C W
AFAD
60'±
OVER-DIMENSIONAL VEHICLE ACCOMMODATION DETAIL
ONE LANE CLOSURE, ONE AFAD & ONE FLAGGER
2-Lane, 2-Way Roadway
ONE LANE CLOSURE, TWO AFADs
2-Lane, 2-Way Roadway
W
1AHEAD
WORK
ROAD
HERE ON
RED
STOP
W
STOP
PREPARED
BE
TO
AHEAD
SIGNAL
W a
R10-6
W
1AHEAD
WORK
ROADW
STOP
PREPARED
BE
TO
B CA
GENERAL NOTES FOR ALL DETAILS:
STATION" detail shown on Standard Drawing TM800
Flagger station shall be delineated according to "FLAGGER and at least 17 ft. above any portion of the travel lane.
above surface when mounted on shoulder
Bottom of lens housing shall be a minimum of 7 ft.
of the approaching vehicle travel lane.
The gate arm shall cover at least one half with the work area, shall move with the work area.
Signing and other TCD installed in conjunction
Use 1/3 "L" taper for shoulder closure, where necessary.
shown on Drg. No. TM800.
on this sheet, use the "MINIMUM LENGTHS TABLE"
For Taper Length ("L") and Buffer Length ("B") shown been trained in the operation of the AFAD in use.
The AFAD operator shall be a certified flagger who has and have an escape route available for the operator.
AFAD and should be at least 50' away from the AFAD
Designated area should maintain visual presence of the
Operator shall operate AFAD from a designated area.
optional, unless the DO NOT PASS sign is used.
Tubular markers along centerline placed in advance of AFAD to first sign are temporary stop line. Remove temporary stop line when AFAD is no longer in use.
Use temporary pavement markings or a white portable rumble strip for
Do not use the AFAD to control more than one lane of approaching traffic.
accompanying signing from the roadway.
When AFAD is not in use for longer than one work shift, remove AFAD and all
YELLOW lens to flashing mode, and cover or remove all accompanying signing.
When AFAD is not in use for less than one work shift, turn off AFAD, or switch to the "Extended Traffic Queues Detail" shown on Standard Drawing TM850.
protect traffic by providing advance flaggers(s) and signing according
When extended traffic queues develop during AFAD operations, Cover existing passing lane signing (as directed) on Drg. TM800 for sign spacing A, B, and C.
See "TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE"
Remove existing striping and install temporary striping as required.
UNDER CONSTRUCTION
UNDER TRAFFIC
for max. spacing.
See TCD spacing table on TM800
28" Tubular Markers may not simultaneously operate two AFADs.
An AFAD operator shall be provided for each AFAD. A single operator
NOTES:
at the same time.
The AFAD operator shall not flag traffic and operate an AFAD
NOTES:
(AFAD)
Automated Flagger Assistance Device
"B"
Buffer
R4-1
(optional)
PASS
NOT
DO
R4-1
(optional)
PASS
NOT
DO
R4-1
(optional)
PASS
NOT
DO
"B"
Buffer
"B"
Buffer
"B"
Buffer the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .