00012771 Preliminary Results.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- OR 82: Culvert Project, Minam to Wallowa
- Solicitation number
- S-73000-00012771
- Issued by
- Wasco County, Oregon
About this file
This is a bid tabulation document for the Oregon Department of Transportation (ODOT) OR 82 Culvert Repair Project, located between Minam and Wallowa in Union and Wallowa Counties. The invitation to bid (ITB No. S-73000-00012771) was issued for a comprehensive culvert rehabilitation project involving 22 culverts with pipe diameters ranging from 18" to 36", with bid closing on April 2, 2025, at 10:00 AM. The project scope includes work zone traffic control, temporary water management, culvert cleaning, CCTV inspection, CIPP liner installation, and paved invert work. The contract has a substantial completion date of September 12, 2025, and a final completion date of October 3, 2025, with in-water work strictly limited to July 15th through August 15th.
The bid tabulation shows pricing from six bidders, with total bid amounts ranging from $879,907.77 to $1,499,573.00, with HP Civil Inc submitting the lowest bid. Key contract requirements include performance and payment bonds at 100% of the contract price, commercial general liability insurance of $2,000,000 per occurrence, and liquidated damages of $700 per calendar day for failing to meet substantial completion dates. The project is state-funded and subject to prevailing wage rates, with bidders required to be registered with the Oregon Construction Contractors Board and possess current Oregon DEQ Asbestos Abatement Contractor licenses. The contract will be awarded to the lowest responsive bidder, with no specific set-aside designations mentioned.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20252004_A2_IT Service Management Platform_Addendum 1.pdf | ||
| Invitation.To.Bid~12.docx | DOCX document | |
| Attachment A Plans~6.pdf | ||
| 00012771 Intent To Award.xlsx | XLSX spreadsheet | |
| Attachment C Bid Pricing Form~13.xlsx | XLSX spreadsheet | |
| Attachment B_Special Provisions and Specifications.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 4/2/25 | ||||||
| ITB No. | S-73000-00012771 | BIDDER | |||||
| NAME: | HP Civil Inc | JR Carlon Corp | Wildish Standard Paving Co | Jesse Rodriguez Construction LLC | Whitaker Construcion | ||
| Bid Closing: | 04/02/2025 @ 10:00 AM | ||||||
| Description: | OR 82 Culvert Repair Project | ||||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $ 87,990.77 | $ 87,990.77 | $110,000.00 | $ 110,000.00 | $98,558.00 | $ 98,558.00 | $ 110,000.00 | $ 110,000.00 | $322,500.00 | $ 322,500.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 2 | Temporary Protection and Direction of Traffic | 1 | LS | $ 90,000.00 | $ 90,000.00 | $ 49,680.00 | $ 49,680.00 | $ 100,000.00 | $ 100,000.00 | $ 155,976.00 | $ 155,976.00 | $ 89,800.00 | $ 89,800.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 3 | Temporary Signs | 236 | SQFT | $ 25.00 | $ 5,900.00 | $ 75.00 | $ 17,700.00 | $ 40.00 | $ 9,440.00 | $ 12.00 | $ 2,832.00 | $ 170.00 | $ 40,120.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 4 | Flaggers | 432 | HOURS | $ 72.00 | $ 31,104.00 | $ 123.25 | $ 53,244.00 | $ 70.00 | $ 30,240.00 | $ 95.00 | $ 41,040.00 | $ 97.00 | $ 41,904.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 5 | Automated Flagger Assistance Device | 2 | EACH | $ 3,500.00 | $ 7,000.00 | $ 4,060.00 | $ 8,120.00 | $ 1,000.00 | $ 2,000.00 | $ 1,300.00 | $ 2,600.00 | $ 5,450.00 | $ 10,900.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 6 | Flagger station lighting | 2 | EACH | $ 800.00 | $ 1,600.00 | $ 600.00 | $ 1,200.00 | $ 500.00 | $ 1,000.00 | $ 500.00 | $ 1,000.00 | $ 5,950.00 | $ 11,900.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 7 | Temporary Water Management, MP 40.45 | 1 | LS | $ 5,000.00 | $ 5,000.00 | $ 8,500.00 | $ 8,500.00 | $ 7,000.00 | $ 7,000.00 | $ 8,900.00 | $ 8,900.00 | $ 8,180.00 | $ 8,180.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 8 | Temporary Water Management, MP 41.59 | 1 | LS | $ 5,000.00 | $ 5,000.00 | $ 8,500.00 | $ 8,500.00 | $ 7,000.00 | $ 7,000.00 | $ 8,900.00 | $ 8,900.00 | $ 8,180.00 | $ 8,180.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 9 | Temporary Water Management, MP 44.07 | 1 | LS | $ 35,000.00 | $ 35,000.00 | $ 23,018.85 | $ 23,018.85 | $ 35,000.00 | $ 35,000.00 | $ 20,000.00 | $ 20,000.00 | $ 15,000.00 | $ 15,000.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 10 | Erosion Control | 1 | LS | $ 5,000.00 | $ 5,000.00 | $ 1,500.00 | $ 1,500.00 | $ 5,000.00 | $ 5,000.00 | $ 3,295.00 | $ 3,295.00 | $ 13,700.00 | $ 13,700.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 11 | Pollution Control Plan | 1 | LS | $ 500.00 | $ 500.00 | $ 1,500.00 | $ 1,500.00 | $ 1,000.00 | $ 1,000.00 | $ 1,250.00 | $ 1,250.00 | $ 3,590.00 | $ 3,590.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 12 | Contaminated Soil Disposal | 37 | TON | $ 90.00 | $ 3,330.00 | $ 300.00 | $ 11,100.00 | $ 50.00 | $ 1,850.00 | $ 350.00 | $ 12,950.00 | $ 3,720.00 | $ 137,640.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 13 | Remove Asbestos Material, Non-Friable | 86 | FOOT | $ 45.00 | $ 3,870.00 | $ 211.00 | $ 18,146.00 | $ 50.00 | $ 4,300.00 | $ 177.00 | $ 15,222.00 | $ 1,620.00 | $ 139,320.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 14 | Remove Asbestos Material, Non-Friable | 6 | SQFT | $ 200.00 | $ 1,200.00 | $ 1,200.00 | $ 7,200.00 | $ 50.00 | $ 300.00 | $ 518.00 | $ 3,108.00 | $ 2,320.00 | $ 13,920.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 15 | Bulk Asbestos Sampling, Analytical Testing, and Reporting | 1 | LS | $ 4,000.00 | $ 4,000.00 | $ 8,500.00 | $ 8,500.00 | $ 2,000.00 | $ 2,000.00 | $ 24,975.00 | $ 24,975.00 | $ 19,100.00 | $ 19,100.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 16 | Class 100 loose riprap | 15 | CY | $ 175.00 | $ 2,625.00 | $ 200.00 | $ 3,000.00 | $ 300.00 | $ 4,500.00 | $ 225.00 | $ 3,375.00 | $ 270.00 | $ 4,050.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 17 | Rehabilitate 18" culvert | 354 | FOOT | $ 350.00 | $ 123,900.00 | $ 393.30 | $ 139,228.20 | $ 400.00 | $ 141,600.00 | $ 403.00 | $ 142,662.00 | $ 390.00 | $ 138,060.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 18 | Rehabilitate 24" culvert | 412 | FOOT | $ 375.00 | $ 154,500.00 | $ 420.90 | $ 173,410.80 | $ 450.00 | $ 185,400.00 | $ 435.00 | $ 179,220.00 | $ 390.00 | $ 160,680.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 19 | Rehabilitate 36" culvert | 212 | FOOT | $ 575.00 | $ 121,900.00 | $ 579.60 | $ 122,875.20 | $ 625.00 | $ 132,500.00 | $ 523.00 | $ 110,876.00 | $ 570.00 | $ 120,840.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 20 | Mainline Video Inspection | 1956 | FOOT | $ 10.50 | $ 20,538.00 | $ 14.40 | $ 28,166.40 | $ 15.00 | $ 29,340.00 | $ 23.00 | $ 44,988.00 | $ 4.00 | $ 7,824.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 21 | 18 inch culvert Pipe, 5 ft depth | 76 | FOOT | $ 500.00 | $ 38,000.00 | $ 325.00 | $ 24,700.00 | $ 360.00 | $ 27,360.00 | $ 875.00 | $ 66,500.00 | $ 535.00 | $ 40,660.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 22 | 18 inch culvert Pipe, 10 ft depth | 35 | FOOT | $ 500.00 | $ 17,500.00 | $ 810.00 | $ 28,350.00 | $ 500.00 | $ 17,500.00 | $ 1,275.00 | $ 44,625.00 | $ 765.00 | $ 26,775.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 23 | 24 inch culvert pipe, 5 ft depth | 13 | FOOT | $ 715.00 | $ 9,295.00 | $ 600.00 | $ 7,800.00 | $ 600.00 | $ 7,800.00 | $ 975.00 | $ 12,675.00 | $ 840.00 | $ 10,920.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 24 | 36 inch culvert pipe, 5 ft depth | 9 | FOOT | $ 820.00 | $ 7,380.00 | $ 900.00 | $ 8,100.00 | $ 900.00 | $ 8,100.00 | $ 1,275.00 | $ 11,475.00 | $ 1,170.00 | $ 10,530.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 25 | Invert Paving of Existing Culvert | 1 | LS | $ 65,000.00 | $ 65,000.00 | $ 47,120.57 | $ 47,120.57 | $ 100,000.00 | $ 100,000.00 | $ 72,999.00 | $ 72,999.00 | $ 38,500.00 | $ 38,500.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 26 | Filling Abandon structures | 1 | EACH | $ 15,000.00 | $ 15,000.00 | $ 7,850.00 | $ 7,850.00 | $ 7,000.00 | $ 7,000.00 | $ 13,500.00 | $ 13,500.00 | $ 8,200.00 | $ 8,200.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 27 | Remove and reinstall guardrail | 16 | FOOT | $ 80.00 | $ 1,280.00 | $ 650.00 | $ 10,400.00 | $ 200.00 | $ 3,200.00 | $ 50.00 | $ 800.00 | $ 1,100.00 | $ 17,600.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 28 | Trench resurfacing | 32 | SQYD | $ 170.00 | $ 5,440.00 | $ 300.00 | $ 9,600.00 | $ 200.00 | $ 6,400.00 | $ 375.00 | $ 12,000.00 | $ 690.00 | $ 22,080.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 29 | Permanent Seeding | 0.2 | ACRE | $ 9,600.00 | $ 1,920.00 | $ 1,500.00 | $ 300.00 | $ 9,000.00 | $ 1,800.00 | $ 9,600.00 | $ 1,920.00 | $ 37,200.00 | $ 7,440.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 30 | Culvert Drainage Markers, Type 1 | 21 | EACH | $ 200.00 | $ 4,200.00 | $ 275.00 | $ 5,775.00 | $ 200.00 | $ 4,200.00 | $ 200.00 | $ 4,200.00 | $ 230.00 | $ 4,830.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 31 | Culvert Drainage Markers, Type 2 | 21 | EACH | $ 235.00 | $ 4,935.00 | $ 500.00 | $ 10,500.00 | $ 200.00 | $ 4,200.00 | $ 200.00 | $ 4,200.00 | $ 230.00 | $ 4,830.00 | $ - 0 | $ - 0 | $ - 0 | |||
| TOTAL | $ 879,907.77 | $ 955,085.02 | $ 985,588.00 | $ 1,138,063.00 | $ 1,499,573.00 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .