Attachment A Past Performance Project Relevancy Template.docx

DOCX document 16 KB Posted

Attached to
Generator Rewinds, Chief Joseph Dam, WA
Solicitation number
W912DW22R0005
Issued by

About this file

This document contains a past performance project relevancy template and information about a federal contract opportunity for generator rewinds at Chief Joseph Dam in Washington. The opportunity involves rehabilitation of generator rewinds for 16 units and related work. Major items of work include removal of existing stator and field windings, installation of new stator windings and components, optional replacement of stator cores for up to 15 units, replacement of generator breaker CTs and raw water piping, cleaning and reuse of brake systems, replacement of brake rings and pads, installation of new MCM and temperature monitoring systems, stator foundation inspection and repairs, replacement of generator air coolers, and optional model validation testing. The estimated value of the project is between $100-250 million. The solicitation number is W912DW22R0005 and is issued by the US Army Corps of Engineers Seattle District. The closing date is not specified.

View the file

Other files

File Type Posted
W912DW22R0005 R0006.pdf PDF
W912DW22R0005 R0005.pdf PDF
W912DW22R0005-R0004.pdf PDF
W912DW22R0005-R0003.pdf PDF
W912DW22R0005-R0002.pdf PDF
W912DW22R0005-R0001.pdf PDF
Brand Name JA - CJD Generator Rewinds 1-16.pdf PDF
Attachment C PROPOSAL DATA SHEET.docx DOCX document
Attachment B SBPCD.docx DOCX document
Attachment D PPQ.docx DOCX document
W912DW22R0005 CJD GENERATOR REWINDS (1-16).pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Past Performance Project Relevancy Information Summary

Project Name:

Project Location:

Address:

Installation Name (if applicable):

Owners/Client Point of Contract (POC):

POC Name:

POC Phone Number:

POC E-mail:

Contract Number:

Task Order Number (if applicable):

Was the project terminated early, were cure/show-cause letters issued or were Liquidated Damages assessed? Yes or No (if yes, explain)

Offeror’s Role: (Prime or Subcontractor) What specific items of work did you perform as the prime or subcontractor

Percentage of total value of contract performed by the Offeror: (If the Offeror was the Prime, what percentage was subcontracted; if the Offeror was the subcontractor, what dollar amount and percentage of the total project amount, as well as the total contract amount, was awarded to the subcontractor?)

Date Contract and/or Award began:

Original Completion Date:

Actual Completion Date (or ongoing, if applicable):

Initial Award Amount:

Final Contract Amount:

Amount added by modification(s):

Percentage the project is physically complete to date:

Explanation (reason) of any cost growth:

Explanation of any late finish or time extensions:

General Project Narrative: [General scope. Provide a description of the project. Be sure to include features of this project that make it comparable in type or nature to the proposed project described in this request for proposal. At a minimum provide a brief explanation of what was designed, manufactured, and installed including the rating, size, and type of equipment applicable to this experience criterion. Discuss specific details of the project, at a minimum, describe what was constructed and clearly explain the aspects that are similar to construction of this solicitation.]

Performance Issues Encountered: [Describe any performance issues encountered. This could include technical, cost/schedule, health and safety issues, regulatory/stakeholder issues, and other performance issues, as well as what was implemented to overcome these issues and the results.]

Applicable Section 01 11 00.00 26 Criteria: [highlight specific elements from the Section 01 11 00.00 26 of this RFP that each submitted past performance project encompasses]

Major Project Accomplishments: