This file is a monthly tank inspection report example showing inspections of multiple above-ground storage tanks (ASTs) at VA facilities, including detailed inspection checklists and leak test reports. The document includes inspection records for tanks at American Lake, including Building 200 Generator Tank, Golf Course Tanks, 12K Generator Tank, and Substation locations. Each inspection checklist covers key safety elements like visible leaks, tank/piping condition, vegetation control, and spill kit availability.
The leak test reports show detailed monitoring data from January 4, 2025, for two tanks: a 1000-gallon unleaded regular tank and a 1000-gallon diesel tank, including measurements of fuel levels, temperatures, and leak detection results. The inspection reports contain specific technical data like tank capacities, temperature readings, and leak test thresholds set at 0.100 G/H with a 99.0% confidence level. This appears to be a template or example document related to the solicitation for AST/UST inspection services at Puget Sound VA Medical Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26025Q0048 0002.pdf | ||
| 36C26025Q0048 0001.pdf | ||
| 36C26025Q0048.docx | DOCX document | |
| Attachment B - Tank Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inspectors Name:
American Lake ASTs
14/e/i5 Date of Inspection: /
Yes No AST 1/Building 200 Generator Tank
No visible leaks, drips or discoloration.
V
Tank and piping is in good condition, no corrosion.
V No vegetation growing around tank.
Spill kit available and stocked.
Comments (for any "No" check marks):
?/er-ceci/ 1420T-11 7rc/0yr- 74'.0 rernofrel_
Yes No AST 2 & 3/Golf Course Tanks
V Tank and piping is in good condition, no corrosion.
V- No vegetation growing around tank.
. Z Spill kit available and stocked.
Comments (for any "No" check marks
AST 5/12K Generator Tank
Tank and piping is in good condition, no corrosion.
No vegetation growing around tank. -
/ Spill kit available and stocked.
Comments (for any "No" check marks):
7-r l,)c,- - 4i c'77 ,u/9,9rccde_5
SLOPE 0.00 GAL/HR
SLOPE LOW 0.00 GAL/HR
SLOPE HIGH 0.03 - L/HR
TEST RE3,-
bLOPE EQUALS CHLCOL
JEW' RATE
J O
M a l s aj
, u oi p al aa v a r i
Spill kit available and stocke -ci.
(IQ
;EL..
C.').
C) e4
P
6' t7o**
CD co
CD
D ate of Inspection
: /4
-24>
P, .10 I p ti tl j Sf uu B jy
VA HOSPITAL
mAI-TANCELOT
11147= WA
SITE 4 1
1/4/2025 01:59 AM
LEAK TEST REPORT
TANK NO. 1 1000 Gk.
UNLEADED REG
LEAK TEST 0.100 G/H
LEAK THRESHOLD 0.050 G/H
CONFIDENCE LEVEL 99.0%
TEST STARTED 12:00 AM
TEST STARTED 01/04/2025
LAST DELIVERY 10:02 AM
LAST DELIVERY 10/18/2024
% GROSS CAPACITY 86.05
BEGIN GROSS 863.0 GAL
BEGIN NET 868.1 GAL
BEGIN LEVEL 52.694 IN
BEGIN TEMP 51.628 F
BEGIN WATER 20.4 GAL
BEGIN WATER 0.104 IN
END TIME 1:59 AM
END DATE 01/04/2025
END GROSS 863.0 GAL
END NET 868.1 GAL
END LEVEL 52.692 IN
END TEMP 51.618 F
END WATER 20.4 GAL
END WATER 0.104 IN
HOURLY DATA
TIME DEG F GAL
12:59 AM 51.623 888.46
159 AM 51.618 888.45
SLOPE -0.00 GAL/MR
SLOPE LOW -0.00 GAL/HR
SLOPE HIGH -0.00 - -R
TEST RESOlIcl-
SLOPE EQUALS CALL -I-1i
LEAK RATE
VA HOSPITAL
MAINTANCELOT
TP.C44111-WA
SITE 4 1
1/4/2025 02:00 AM
LEAK TEST REPORT
TANK NO. 2 1000 GAL
DIESFL
LEAK TEST 0.100 G/H
LEAK THRESHOLD 0.050 G/H
CONFIDENCE LEVEL 99.0%
TEST STARTED 12:00 AM
TEST STARTED 01/04/2025
LAST DELIVERY 1:55 PM
LAST DELIVERY 11/26,2024
% GROSS CAPACITY 62.17
BEGIN GROSS 623.5 GAL
BEGIN NET 625.8 GAL
BEGIN LEVEL 38.157 IN
BEGIN TEMP 52.105 F
GEGIN WATER 0.0 GAL
BEGIN WATER 0.000 IN
END TIME 1:59 AM
END DATE 01/04/2025
END GROSS 621%5 GAL
END NET 625.8 GAL
END LEVEL :8.157 IN
END TEMP 52.095 F
END WATER 0.0 GAL
END WATER 0.000 IN
HOURLY DATA
TIME DEG F GAL
12:59 AM 52.101 625.76
1:59 AM 52.095 625.76
Leak Detection Test
Date of Test:/-?O9'6 circle one: fail
0: F.
.J2 :Da
LU
0: 02 02 02 :: 02 ::
0] :L 2: 2: f.1.1 uD ,T c0 CD CD O% rn rn CD uD CD -
• • co co — o 0
IIHlI II,lIlIl II
LU o Q..1 LU r
• ' 1H i:4 C:14 .:T.P CD Ell
-.I e? —E. 2:
LU 0 C.., Ell Z
E-• 3 11
6). ....:.
Ul Lia -a if, LLi N X r --• N :::: Lli 04 3:
'7. CD
III c..4. o4 c7,1
Cr4 T.! u..; z Li) w w CI: H' 0./ 0 '71] CD
LID E.- -- Cr: 0 --1 "..--, ,-..
i.21 43 0
'..4 04
CI: C4 Z •
Z Ell al ....z al:. Li 3D 7! .-.1 Hi H'7.. H :') .j
American Lake Tank 1/Substation
Inspectors Name: :re,64 (Ve /0 Date of Inspection: /.--.)-7.- -5
V/
Fill cover, fill pipe and spill bucket are in good condition. No cracks or other anomalies.
No water or fuel in the spill bucket.
V Pad area is in good condition, no significant cracks or destruction, I/
Spill kit available and stocked.
Y Day Tanks have no visual leaks; the secondary containment is free from cracks, dirt and debris. Note there are TWO day tanks for this tank.
I/
Impressed current voltmeter added to logbook, Alarm is functional.
Comments: