This file is a set of architectural maps and floor plans prepared by the Greater Orlando Aviation Authority (GOAA) for parking garage floor scrubbing services at Orlando International Airport. The maps detail the specific areas within multiple parking structures that require semi-annual floor scrubbing and pressure washing, including North Terminal Parking Garages A and B (Levels 1, 2, and rental car areas P-1), South Terminal Parking Garage (Levels 1-2), and North Terminal Level 2 baggage make-up areas divided into northwest, northeast, southwest, and southeast quadrants. Each map identifies the square footage of concrete surfaces requiring scrubbing, organized by rental car company zones including Enterprise Holdings Inc., Avis Budget Group Inc., The Hertz Corporation, and SIXT Rent A Car LLC. The total square footage across all mapped areas ranges from approximately 67,227 square feet for individual rental car areas to over 382,000 square feet for larger terminal sections. The maps were last updated on February 10, 2025, and reference project number P-8020 with documentation prepared by Nina Gilbert and drawn by KDA.

The maps serve as the technical foundation for the solicitation IFB 25-309-IFB, establishing the precise locations and dimensions of all areas subject to the cleaning contract. Individual parking levels and sections are clearly demarcated with space identifications and frequency notes indicating bi-yearly cleaning schedules. The document includes a revision history confirming floor plan updates as of February 10, 2025, supporting the bid timeline with a non-mandatory pre-bid conference on February 14, 2025, and bid responses due March 5, 2025. These detailed maps enable bidders to accurately assess the scope of work, calculate labor and material requirements, and submit responsive pricing for the 60-month contract period running from May 1, 2025, through April 30, 2029.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHIEF EXECUTIVE OFFICER

Kevin J. Thibault

SHEET 2

SHEET 3

SHEET 4

T:\Programs\Janitorial\Garages\Garages Scrubbing P-8020\CAD\Cover.dwg

INDEX OF SHEETS

NORTH TERMINAL PARKING GARAGE B, R-2

NORTH TERMINAL PARKING GARAGE A, R-2

NORTH TERMINAL PARKING GARAGE B, R-1

NORTH TERMINAL PARKING GARAGE A, R-1SHEET 1

SHEET 5 NORTH TERMINAL PARKING GARAGE A, P-1

SHEET 6 NORTH TERMINAL PARKING GARAGE B, P-1

SHEET 7 NORTH TERMINAL LEVEL 2, NW QUAD

SHEET 8 NORTH TERMINAL LEVEL 2, NE QUAD

SHEET 9 NORTH TERMINAL LEVEL 2, SW QUAD

SHEET 10 NORTH TERMINAL LEVEL 2, SE QUAD

SHEET 11 SOUTH TERMINAL PARKING GARAGE, R-1

SHEET 12 SOUTH TERMINAL PARKING GARAGE, R-2

BOARD MEMBERS

Joe Nunziata, Treasurer Tim Weisheyer, Chairman

M. Carson Good Mayor Buddy Dyer

Mayor Jerry Demmings Stephanie Kopelousos

Dan Giordano

AutoCAD SHX Text Orlando International Airport

AutoCAD SHX Text Floor Scrubbing Exhibit/Maps

AutoCAD SHX Text 2025-02-13

AutoCAD SHX Text Parking Garages

I

PARKING GARAGE

FLOOR SCRUBBING

PARKING GARAGE

FLOOR SCRUBBING

NORTH TERMINAL PARKING GARAGE A

LEVEL 01

NORTH TERMINAL PARKING GARAGE A

LEVEL 01

REFERENCE INFO.REFERENCE INFO.

PROJECT NO.:PROJECT NO.:

REQUESTED BY:REQUESTED BY:

CHECKED BY:CHECKED BY:

DATE CREATED:DATE CREATED:

DRAWN BY:DRAWN BY:

P-8020P-8020 Nina GilbertNina Gilbert

Nina GilbertNina Gilbert

05/06/201305/06/2013

KDAKDA

SHEETSHEET

NTPANTPA

LV 01LV 01

Document Path: T:\Programs\Janitorial\Garages\Garages Scrubbing P-8020\MXD\PGL01a_scrubbing.aprx

Enterprise Bi-Yearly

Avis Budget 78,255 Bi-Yearly Total 382,182

SCRUBBING

Space ID SQ FT Frequency

GREATER ORLANDO

AVIATION AUTHORITY

GREATER ORLANDO

AVIATION AUTHORITY

ORLANDO INTERNATIONAL

AIRPORT

ORLANDO INTERNATIONAL

AIRPORTMCOMCO

303,927

REVISION HISTORYREVISION HISTORY

DATEDATE CHANGECHANGE

02/10/202502/10/2025 UPDATE FLOOR PLANSUPDATE FLOOR PLANS

ONLY SHADED AREAS ARE TO BE SCRUBBED

AREAS BY COMPANY

Company Area (SF)

Enterprise Holdings Inc. 303,927 Avis Budget Group 78,255

Concrete, Enterprise Holdings, Inc.

Concrete, Avis Budget Group, Inc.

Floor Cover, Company

SCRUBBING

REVISION HISTORYREVISION HISTORY

DATEDATE CHANGECHANGE PARKING GARAGE

FLOOR SCRUBBING

PARKING GARAGE

FLOOR SCRUBBING

NORTH TERMINAL PARKING GARAGE B

LEVEL 01

NORTH TERMINAL PARKING GARAGE B

LEVEL 01

REFERENCE INFO.REFERENCE INFO.

PROJECT NO.:PROJECT NO.:

REQUESTED BY:REQUESTED BY:

CHECKED BY:CHECKED BY:

DATE CREATED:DATE CREATED:

DRAWN BY:DRAWN BY:

P-8020P-8020 Nina GilbertNina Gilbert

Nina GilbertNina Gilbert

05/06/201305/06/2013

KDAKDA

SHEETSHEET

NTPBNTPB

LV 01LV 01

Document Path: T:\Programs\Janitorial\Garages\Garages Scrubbing P-8020\MXD\PGL01b_scrubbing.aprx

Hertz 68,987 Bi-Yearly

Enterprise 284,710 Bi-Yearly Total 353,697

SCRUBBING

Space ID SQ FT Frequency

GREATER ORLANDO

AVIATION AUTHORITY

GREATER ORLANDO

AVIATION AUTHORITY

ORLANDO INTERNATIONAL

AIRPORT

ORLANDO INTERNATIONAL

AIRPORTMCOMCO

02/10/202502/10/2025 UPDATE FLOOR PLANSUPDATE FLOOR PLANS

ONLY SHADED AREAS ARE TO BE SCRUBBED

Company Area (SF) Enterprise Holdings Inc. 284,710

Avis Budget Group 68,987

AREAS BY COMPANYAREAS BY COMPANY

Company Area (SF)

Enterprise Holdings Inc. 284,710 The Hertz Corporation 68,987

Concrete, Enterprise Holdings, Inc.

Concrete, The Hertz Corporation

GREATER ORLANDO

AVIATION AUTHORITY

GREATER ORLANDO

AVIATION AUTHORITY

ORLANDO INTERNATIONAL

AIRPORT

ORLANDO INTERNATIONAL

AIRPORTMCOMCO

I

REVISION HISTORYREVISION HISTORY

DATEDATE CHANGECHANGE

PARKING GARAGE

FLOOR SCRUBBING

PARKING GARAGE

FLOOR SCRUBBING

NORTH TERMINAL PARKING GARAGE A

LEVEL R-2

NORTH TERMINAL PARKING GARAGE A

LEVEL R-2

REFERENCE INFO.REFERENCE INFO.

PROJECT NO.:PROJECT NO.:

REQUESTED BY:REQUESTED BY:

CHECKED BY:CHECKED BY:

DATE CREATED:DATE CREATED:

DRAWN BY:DRAWN BY:

P-8020P-8020 Nina GilbertNina Gilbert

Nina GilbertNina Gilbert

05/06/201305/06/2013

KDAKDA

SHEETSHEET

NTPANTPA

LV 02LV 02

Document Path: T:\Programs\Janitorial\Garages\Garages Scrubbing P-8020\MXD\PGL02a_scrubbing.aprx

Hertz 178,291 Bi-Yearly

Avis Budget 181,926 Bi-Yearly

Total 360,217

SCRUBBING

Space ID SQ FT Frequency

02/10/202502/10/2025 UPDATE FLOOR PLANSUPDATE FLOOR PLANS

ONLY SHADED AREAS ARE TO BE SCRUBBED

AREAS BY COMPANYAREAS BY COMPANY

Company Area (SF)

The Hertz Corporation 178,291 Avis Budget Group, Inc. 181,926

Concrete, The Hertz Corporation Concrete, Avis Budget Group, Inc.

REPORT 4REPORT 4

REVISION HISTORYREVISION HISTORY

DATEDATE CHANGECHANGE PARKING GARAGE

FLOOR SCRUBBING

PARKING GARAGE

FLOOR SCRUBBING

NORTH TERMINAL PARKING GARAGE B

LEVEL 02

NORTH TERMINAL PARKING GARAGE B

LEVEL 02

REFERENCE INFO.REFERENCE INFO.

PROJECT NO.:PROJECT NO.:

REQUESTED BY:REQUESTED BY:

CHECKED BY:CHECKED BY:

DATE CREATED:DATE CREATED:

DRAWN BY:DRAWN BY:

P-8020P-8020

Nina GilbertNina Gilbert

Nina GilbertNina Gilbert

05/06/201305/06/2013

KDAKDA

SHEETSHEET

NTPBNTPB

LV 02LV 02

Document Path: T:\Programs\Janitorial\Garages\Garages Scrubbing P-8020\MXD\PGL02b_scrubbing.aprx

GREATER ORLANDO

AVIATION AUTHORITY

GREATER ORLANDO

AVIATION AUTHORITY

ORLANDO INTERNATIONAL

AIRPORT

ORLANDO INTERNATIONAL

AIRPORTMCOMCO

02/10/202502/10/2025 UPDATE FLOOR PLANSUPDATE FLOOR PLANS

ONLY SHADED AREAS ARE TO BE SCRUBBED

Hertz 156,666 Bi-Yearly

Avis Budget 208,465 Bi-Yearly Total 365,131

SCRUBBING

Space ID SQ FT Frequency

AREAS BY COMPANYAREAS BY COMPANY

Company Area (SF)

The Hertz Corporation 156,666 Avis Budget Group, Inc. 208,465

Concrete, The Hertz Corporation Concrete, Avis Budget Group, Inc.

DATEDATE CHANGECHANGE PARKING GARAGE

FLOOR SCRUBBING

PARKING GARAGE

FLOOR SCRUBBING

NORTH TERMINAL PARKING GARAGE A

LEVEL P-1

NORTH TERMINAL PARKING GARAGE A

LEVEL P-1

REFERENCE INFO.REFERENCE INFO.

PROJECT NO.:PROJECT NO.:

REQUESTED BY:REQUESTED BY:

CHECKED BY:CHECKED BY:

DATE CREATED:DATE CREATED:

DRAWN BY:DRAWN BY:

P-8020P-8020 Nina GilbertNina Gilbert

Nina GilbertNina Gilbert

05/06/201305/06/2013

KDAKDA

GREATER ORLANDO

AVIATION AUTHORITY

GREATER ORLANDO

AVIATION AUTHORITY

ORLANDO INTERNATIONAL

AIRPORT

ORLANDO INTERNATIONAL

AIRPORTMCOMCO

Document Path: T:\Programs\Janitorial\Garages\Garages Scrubbing P-8020\MXD\PGL03a_scrubbing.aprx

SIXT 67,227 Bi-Yearly

Total 67,227

SCRUBBING

Space ID SQ FT Frequency

SHEETSHEET

NTPANTPA

LV 03LV 03

02/10/202502/10/2025 UPDATE FLOOR PLANSUPDATE FLOOR PLANS

ONLY SHADED AREAS ARE TO BE SCRUBBED

RENTAL

CAR

AREA

AREAS BY COMPANYAREAS BY COMPANY

Company Area (SF) SIXT Rent A Car, LLC 67,227

Concrete, SIXT Rent A Car, LLC

DATEDATE CHANGECHANGE PARKING GARAGE

FLOOR SCRUBBING

PARKING GARAGE

FLOOR SCRUBBING

NORTH TERMINAL PARKING GARAGE B

P-1

NORTH TERMINAL PARKING GARAGE B

P-1

REFERENCE INFO.REFERENCE INFO.

PROJECT NO.:PROJECT NO.:

REQUESTED BY:REQUESTED BY:

CHECKED BY:CHECKED BY:

DATE CREATED:DATE CREATED:

DRAWN BY:DRAWN BY:

P-8020P-8020 Nina GilbertNina Gilbert

Nina GilbertNina Gilbert

05/06/201305/06/2013

KDAKDA

GREATER ORLANDO

AVIATION AUTHORITY

GREATER ORLANDO

AVIATION AUTHORITY

ORLANDO INTERNATIONAL

AIRPORT

ORLANDO INTERNATIONAL

AIRPORTMCOMCO

Document Path: T:\Programs\Janitorial\Garages\Garages Scrubbing P-8020\MXD\PGL03b_scrubbing.aprx

SXIT 68,393 Bi-yearly

Total 68,393

SCRUBBING

Space ID SQ FT Frequency

SHEETSHEET

NTPBNTPB

LV 03LV 03

02/10/202502/10/2025 UPDATE FLOOR PLANSUPDATE FLOOR PLANS

ONLY SHADED AREAS ARE TO BE SCRUBBED

RENTAL

CAR

AREA

AREAS BY COMPANYAREAS BY COMPANY

Company Area (SF) SIXT Rent A Car, LLC 68,393

Concrete, SIXT Rent A Car, LLC

262119131911 19191915 2624

1359 2118

2115 2112

13621369

1422 2133

1425 2130

21291449

1401 2142

43854382

1136 2172

21341421

21451404

21311426

1394 23621378 1390

26332628

1410 2151

21391398

1139 1452

1455 1458

21031440 1443 2100

DRAFT

DRAFT

PROJECT NO.:

REQUESTED BY:

DRAWN BY:

CHECKED BY:

DATE CREATED:

DATE LAST REVISED:

GREATER ORLANDO

AVIATION AUTHORITY

MCO

ORLANDO

INTERNATIONAL

AIRPORT

Parking Garage Floor Scrubbing P-8020

NG

KDA

NG

10/18/2006

NW QUADNW QUAD

North Terminal - Level 2 NTLS

Level 02

2/

/2

T:

\P ro gr am s\ Ja ni to ria l\G ar ag es \G ar ag es S cr ub bi ng

P -8

0\

M X

D \N

T C

_L ev el 2_ sc ru bb in g_ ar ea s_

A _S

ID

E

_S he et 1.

ap rx

0 25 5012.5

Ft.

Legend Floor Cover

Concrete

SpaceID SQ FT Frequency

Multiple as shown 58,007 Bi-yearly

Total 58,007 Bi-yearly

SCRUBBING ONLY SHADED AREAS ARE TO BE SCRUBBED

02/10/2025

3626362528582856 3624

36222854

3109 310623502353

2398 3130

31482383

2377 3142

361336162853 2850

31312399

2380 3145

313424022404 3136

23722362

31512386

2374 3139

2351 3107

310030972341 2344

31142356

DRAFT

DRAFT

PROJECT NO.:

REQUESTED BY:

DRAWN BY:

CHECKED BY:

DATE CREATED:

DATE LAST REVISED:

GREATER ORLANDO

AVIATION AUTHORITY

MCO

ORLANDO

INTERNATIONAL

AIRPORT

Parking Garage Floor Scrubbing P-8020

NG

KA

NG

10/18/2006

NE QUADNE QUAD

North Terminal - Level 2 NTLS

Level 02

2/

/2

T:

\P ro gr am s\ Ja ni to ria l\G ar ag es \G ar ag es S cr ub bi ng

P -8

0\

M X

D \N

T C

_L ev el 2_ sc ru bb in g_ ar ea s_

A _S

ID

E

_S he et 2.

ap rx

0 25 5012.5

Ft.

Legend Floor Cover

Concrete

SpaceID SQ FT Frequency

Multiple as shown 58,007 Bi-yearly

Total 58,007 Bi-yearly

SCRUBBING ONLY SHADED AREAS ARE TO BE SCRUBBED

02/10/2025

7382 73877130 82137395 8210 8245

7627 86297914

7882 8618862078967871

7907 86337913 8630

89287899

7912 8628

86547898

7904 8660

8668866278857872

7908 8634

7911 8631

7910 8636

7398 8199

7883 8639

81878178

86517895

74097133 739974067136

8219 8881

865278947884 8640

88598615

DRAFT

DRAFT

PROJECT NO.:

REQUESTED BY:

DRAWN BY:

CHECKED BY:

DATE CREATED:

DATE LAST REVISED: 02/10/2025

GREATER ORLANDO

AVIATION AUTHORITY

MCO

ORLANDO

INTERNATIONAL

AIRPORT

Parking Garage Floor Scrubbing P-8020

NG

KA

NG

10/18/2006

SW QUADSW QUAD

North Terminal - Level 2 NTLS

Level 02

2/

/2

T:

\P ro gr am s\ Ja ni to ria l\G ar ag es \G ar ag es S cr ub bi ng

P -8

0\

M X

D \N

T C

_L ev el 2_ sc ru bb in g_ ar ea s_

B _S

ID

E

_S he et 1.

ap rx

0 25 5012.5

Ft.

Legend Floor Cover

Concrete

SpaceID SQ FT Frequency

Multiple as shown 58,007 Bi-yearly

Total 58,007 Bi-yearly

SCRUBBING

ONLY SHADED AREAS ARE TO BE SCRUBBED

8878 9223

8447 92429239 92418456

96258931

8862 9622

8916 9633

96308913

96288934 9877

96688937

8904 9654

8910 9660

8907 9657

8917 963496318914

96368919

8872 8879

96398889

8854 9613

8901 9651

91879190

96078856 9604

96418896

89028890 96529640

88598615

DRAFT

DRAFT

PROJECT NO.:

REQUESTED BY:

DRAWN BY:

CHECKED BY:

DATE CREATED:

DATE LAST REVISED: 02/10/2025

GREATER ORLANDO

AVIATION AUTHORITY

MCO

ORLANDO

INTERNATIONAL

AIRPORT

Parking Garage Floor Scrubbing P-8020

NG

KA

NG

10/18/2006

SE QUADSE QUAD

North Terminal - Level 2 NTLS

Level 02

2/

/2

T:

\P ro gr am s\ Ja ni to ria l\G ar ag es \G ar ag es S cr ub bi ng

P -8

0\

M X

D \N

T C

_L ev el 2_ sc ru bb in g_ ar ea s_

B _S

ID

E

_S he et 2.

ap rx

0 25 5012.5

Ft.

Legend Floor Cover

Concrete

SpaceID SQ FT Frequency

Multiple as shown 58,007 Bi-yearly

Total 58,007 Bi-yearly

SCRUBBING

ONLY SHADED AREAS ARE TO BE SCRUBBED

DRAFT

PROJECT NO.:

REQUESTED BY:

DRAWN BY:

CHECKED BY:

DATE CREATED:

DATE LAST REVISED:

0 30 6015

GRAPHIC SCALE IN FEETGREATER ORLANDO

AVIATION AUTHORITY

MCO

ORLANDO

INTERNATIONAL

AIRPORT

Parking Garage Floor Scrubbing P-8020

NG

KA

NG

03/10/2017 02/10/2025

South Terminal Parking Garage

R-1

SPCN

Level 1

2/

/2

T:

\P ro gr am s\ Ja ni to ria l\G ar ag es \G ar ag es S cr ub bi ng

P -8

0\

M X

D \S

T C

_G ar ag e_

S cr ub bi ng _L ev el

.a pr x

Zone CR

ONLY SHADED AREAS ARE TO BE SCRUBBED

SIXT 47,110 Bi-yearly

Total 165,200

SCRUBBING

Space ID SQ FT Frequency

AREAS BY COMPANYAREAS BY COMPANY

Company Area (SF) Enterprise Holdings, Inc. 118,090

SIXT Rent A Car, LLC 47,110

Enterprise 118,090

Concrete, Enterprise Holdings, Inc.

Concrete, SIXT Rent A Car, LLC

PROJECT NO.:

REQUESTED BY:

DRAWN BY:

CHECKED BY:

DATE CREATED:

DATE LAST REVISED:

0 30 6015

GRAPHIC SCALE IN FEETGREATER ORLANDO

AVIATION AUTHORITY

MCO

ORLANDO

INTERNATIONAL

AIRPORT

Parking Garage Floor Scrubbing P-8020

NG

KA

NG

03/10/2017 02/10/2025

South Terminal Parking Garage

R-2

SPCN

Level 2

2/

/2

T:

\P ro gr am s\ Ja ni to ria l\G ar ag es \G ar ag es S cr ub bi ng

P -8

0\

M X

D \S

T C

_G ar ag e_

S cr ub bi ng _L ev el

.a pr x

Zone CR

ONLY SHADED AREAS ARE TO BE SCRUBBED

Hertz 76,130 Bi-yearly

Total 146,455

SCRUBBING

Space ID SQ FT Frequency

Avis Budget 70,325 Bi-yearly

Concrete, The Hertz Corporation Concrete, Avis Budget Group, Inc.

Floor Cover, Company

SCRUBBING

AREAS BY COMPANYAREAS BY COMPANY

Company Area (SF) The Hertz Corporation 76,130 Avis Budget Group, Inc. 70,325

00 - Cover 2025_02_13
Layout1
01 - PGL01a_Scrubbing_PAGE01
02 - PGL01b_Scrubbing_PAGE02
03 - PGL02a_Scrubbing_PAGE03
04 - PGL02b_Scrubbing_PAGE04
05 - PGL03a_Scrubbing_PAGE05
06 - PGL03b_Scrubbing_PAGE06
07 - NTC_Level2_scrubbing_areas_A_SIDE_sheet1_PAGE07
08 - NTC_Level2_scrubbing_areas_A_SIDE_sheet2_PAGE08
09 - NTC_Level2_scrubbing_areas_B_SIDE_sheet1_PAGE09
10 - NTC_Level2_scrubbing_areas_B_SIDE_sheet2_PAGE10
11 - STC_GarageScrubbing_LV01_PAGE11
12 - STC_GarageScrubbing_LV02_PAGE12

File details come from the government source that posted it. Updated .