Attachment A - Itemized Schedule of Values Cost Breakdown (1).pdf

PDF 66 KB Posted

Attached to
Z1DA--FY24: NRM (PROJ: 673-21-152) BB - Replace AHUs 22 and 23
Solicitation number
36C24824R0010
Issued by

About this file

This document contains an itemized schedule of values cost breakdown for a construction project and the associated federal contract opportunity solicitation. The cost breakdown lists estimated labor and material costs by construction division, totaling to a base offer cost of $0 with overhead, profit, and bond percentages to be determined by the offeror. The related federal contract opportunity is solicitation number 36C24824R0010 to replace two air handling units at a Veterans Affairs medical center for the Department of Veterans Affairs Veterans Health Administration VISN 8. The solicitation does not provide the response due date or award date.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number: Date:

Project Title

Project Location

Offeror Name

Offeror Street

Offeror City State Zip

Item Labor Cost Material Cost Total Cost

Division 1 $ - $ - $ -

Division 2 - - -

Division 3 - - -

Division 4 - - -

Division 5 - - -

Division 6 - - -

Division 7 - - -

Division 8 - - -

Division 9 - - -

Division 10 - - -

Division 11 - - -

Division 12 - - -

Division 13 - - -

Division 14 - - -

Division 21 - - -

Division 22 - - -

Division 23 - - -

Division 26 - - -

Division 27 - - -

Division 28 - - -

Division 31 - - -

Division 32 - - -

Division 33 - - -

Division 34 - - -

Overhead % -

Profit % -

Bond % -

Description

Base Offer Cost Breakdown

Masonry

Metals

Wood and Plastic

General Requirements

Existing Conditions

Concrete

Specialties

Equipment

Furnishings

Thermal & Moisture Protect

Doors and Windows

Finishes

Plumbing

HVAC

Electrical

Special Construction

Conveying Equipment

Fire Suppression

Exterior Improvements

Utilities

Transportation Subtotal

Communications

Electronic Safety & Security

Earthwork

Total Base Offer Cost

Overhead/Profit Subtotals :

Division Subtotals :

0.00%

0.00%

0.00%

File details come from the government source that posted it. Updated .