This Statement of Work (SOW) details the procurement of a Ventilated Modular Wet Cleaning Bench for Oak Ridge National Laboratory (ORNL), a Department of Energy facility managed by UT-Battelle, LLC. The project requires the design, fabrication, testing, and delivery of one specialized wet cleaning bench with multiple functional requirements, including base cabinets, a work surface for equipment cleaning, a liquid rinse collection system using 5-gallon carboys, a ventilation enclosure with four-sided access, electrical and compressed air outlets, and an exhaust flow alarm system.
The SOW outlines a comprehensive seven-task work process requiring multiple documentation submissions, including design proposals, manufacturing plans, specialized staff certifications, and factory acceptance test results. Key technical specifications mandate compliance with numerous standards including OSHA, National Electric Code, and ASHRAE regulations. The seller must provide a fully functional system with NRTL certification, perform detailed inspections, and submit comprehensive documentation. The estimated delivery is March 2026, with pricing structured as a fixed-price contract delivered to Oak Ridge, Tennessee, and the project is part of a broader facility construction and production capability expansion initiative.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Ventilated Modular Wet Cleaning Bench Doc Number: EX-05-ES00116
Revision: 00
AUTHOR:
Name: Darryl Dowling Title: Sr Mechanical Engineer
Date
REVIEWERS:
Name: Clint Ausmus Title: Sr Process Engineer
Name: Seth Wilder Title: Group Leader, Plasma Enrichment Deployment & Engineering
Name: Darryl Dowling Reviewing Official
APPROVER:
Name: Chad Hasbrouck Title: Project Manager
Statement of Work – Ventilated Modular Wet Cleaning Bench
EX-05-ES00116, Rev 00
CHANGE HISTORY
REV. DESCRIPTION
REVISION
TYPE
Major Minor
00 Initial Issue ☒ ☐
01 Complete Re-write, no rev bars shown ☐ ☐
TABLE OF CONTENTS
1. Introduction
2. Scope
3. References, Acronyms and Applicable Documents
3.1 References
3.2 Acronyms & Definitions
3.3 Applicable Documents
4. Performance Requirements
4.1 Work Tasks
4.2 Project Management
4.3 Data Management
5. Quality Assurance
5.1 Process Monitoring
5.2 Access for Source Surveillance Inspections
5.3 Seller-Requested Deviations
5.4 Non-Conformances
5.5 Contractor Release Note
6. Deliverables
6.1 Documentation
6.2 Packaging, Shipping, Storage and Delivery
1. INTRODUCTION
UT-Battelle, LLC (the Company), is the Management & Operations contractor for the Oak Ridge
National Laboratory (ORNL) located in Oak Ridge, TN. In support of a Department of Energy
(DOE) funded project, the company is currently constructing a new facility and to expedite production capabilities within the facility, the company is procuring the necessary components in parallel with facility construction.
2. SCOPE
The scope of this Statement of Work (SOW) includes design, material procurement, fabrication, assembly, assembly and installation instructions, inspection, testing, and delivery of one (1)
Ventilated Modular Wet Cleaning Bench. The required delivery schedule will be finalized at time of purchase order award, however when this document was issued, the estimated delivery required was
March of 2026.
The Ventilated Modular Wet Cleaning Bench has been conceptualized by the Company to accept certain Company owned equipment and to fit within a designated space in the facility, utilizing the
Company’s facility exhaust system for generation of the exhaust flow. An integrated or additional exhaust fan is not envisioned to be required. The Ventilated Modular Wet Cleaning Bench functions as both a multiple side-access fume hood similar to an Instructional Fume Hood and a Wet Cleaning
Bench for cleaning parts and equipment. It will consist of base cabinets, a work surface capable of supporting equipment to be cleaned, a liquid rinse collection and drain system employing 5 gallon carboys in the base cabinets, a ventilation enclosure that functions like a fume hood with vertical and horizontal split sash enabling work access on four sides, lights, 120V 60Hz electrical outlets, compressed air/inert gas outlets, process water fixtures, exhaust flow alarm capability, overhead exhaust connection(s) and a shroud. The equipment specification, conceptual drawings & conceptual 3D CAD models outline physical & functional requirements of the assembly, defines the process for refining the final design, and identifies minimum required verification tests. Seller shall also be responsible for complying with listed codes & standards as well as codes and standards normally required for this type of equipment but not identified by the Company and providing any ancillary items necessary to successfully complete required inspections & tests (e.g., external exhaust ventilation source for testing, etc).
Items and work not included in this scope: installation at Company facility.
3. REFERENCES, ACRONYMS AND APPLICABLE DOCUMENTS
3.1 References
Codes & Standards:
• Applicable OSHA Standards and Regulations
• National Electric Code NFPA No 70-2020
• AWS Structural Welding Code - Steel AWS D1.1/D1.1M:2020
• AWS Structural Welding Code - Stainless Steel AWS D1.6/D1.6M:2017
• ASME Section IX -2021 Welding, Brazing and Fusing Qualifications
• ASNT SNT-TC-1A Personnel Qualification and Certification in Nondestructive Testing
• ANSI/ASHRAE 110-1985 Standard for Testing Performance of Fume Hoods
• ANSI/ASHRAE III Testing and Balancing
• ASHRAE 110 Test Compliant “As Manufactured” and “As Installed”
• ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials
• ANSI/ASSP Z9.5-2022, Laboratory Ventilation
• NFPA 45, Standard on Fire Protection for Laboratories Using Chemicals
• UL 19805, Laboratory Hoods and Cabinets
• UL 723, Test for Surface Burning Characteristics of Building Materials
3.2 Acronyms & Definitions
ASHRAE American Society of Heating, Refrigeration, and Air-Conditioning Engineers
ASME American Society of Mechanical Engineers
ASNT American Society for Nondestructive Testing
ASSP American Society of Safety Professionals
ASTM American Society for Testing and Materials
AWS American Welding Society
BOM Bill of Material
Company UT-Battelle, LLC
COTS Commercial, Off-The-Shelf
CRN Contractor Release Note
DOE Department of Energy
GS General Project Specification
IP Installation Plan
MIP Manufacturing and Inspection Plan
NDE Non-Destructive Examination
NEC National Electric Code
NFPA National Fire Protection Association
NRTL Nationally Recognized Testing Laboratory
ORNL Oak Ridge National Laboratory
PO Procurement Officer
POC Point of Contact
PQR Procedure Qualification Record
QA Quality Assurance
Seller Provider of Goods or Services under this Contract (includes Seller contracted sub-suppliers)
SOW Statement of Work
TPO Technical Project Officer
TS Technical/Equipment Specification
UL Underwriter Laboratories
WHMA Wiring Harness Manufacturer's Association
WPS Welding Procedure Specification
3.3 Applicable Documents
• EX-05-ES00115 – Technical Specification - Ventilated Modular Wet Cleaning Bench
• EX-00-ES00086 – General Project Specification
• SE-02-00310.pdf – Ventilated Modular Wet Cleaning Bench-Drawings and Schematics (PDF binder of all drawings and schematics)
• SE-02-00310.sldprt – Ventilated Modular Wet Cleaning Bench Solidworks 3D Model
• Appendix A, Document Submittal Schedule
4. PERFORMANCE REQUIREMENTS
4.1 Work Tasks
4.1.1 General
Seller shall use the Company provided conceptual design drawings, model and Specification to create a working design and fabrication/shop drawings as required for manufacturability of the
Ventilated Modular Wet Cleaning Bench. All documentation submittals identified as required prior to fabrication by Appendix A must be provided by the Seller and receive written approval by the Company prior to start of any fabrication activities unless a deviation has been approved
(see Section 5.3). Approvals will generally be provided by the Company to the Seller within 1 to
2 weeks, depending upon the complexity of the request.
The Seller shall also obtain separate, written approval of any deviations to the Sellers final design which was approved by the Company per Section 5.3 of this SOW before proceeding with such deviations. Approval of a design document does not constitute approval of a deviation and does not relieve Seller of meeting a design requirement.
The Company is the owner of all designs, documentation, and electronic models produced for this project. This design cannot be fabricated or sold to third parties without written authorization.
4.1.2 Work Task 1: Evaluation of Conceptual Design of the Ventilated Modular Wet Cleaning Bench
Seller shall evaluate the Company’s conceptual design of the Ventilated Modular Wet Cleaning
Bench in the TS, drawings and models to include conformance with relevant standards and codes.
4.1.3 Work Task 2: Propose Design of the Ventilated Modular Wet Cleaning Bench
The Seller shall propose an overall design including scope and function based on the Company’s conceptual design and required modifications based on Work Task 1 and obtain written approval from the Company prior to progressing to Work Task 3.
4.1.4 Work Task 3: Final Design of the Ventilated Modular Wet Cleaning Bench
Seller shall develop a final design of the Ventilated Modular Wet Cleaning Bench based on the agreed upon scope and function developed in Work Task 2. Seller shall obtain written approval from the Company prior to progressing to Work Task 4.
4.1.5 Work Task 4: Procure, Fabricate and Test Ventilated Modular Wet Cleaning Bench
4.1.5.1 After approval by the Company of the design provided in Work Task 3, Seller shall procure all materials and components necessary to complete the design, fabrication, assembly and testing of the Ventilated Modular Wet Cleaning Bench and provide a fully functional system. Seller is also responsible for procuring all items and services needed to fully inspect and test the assembly per specification requirements. Seller shall also ensure all requirements set forth in this contract are passed down to all sub-suppliers and is responsible for obtaining the necessary information, supplying required documentation to the Company for approval, and requesting approval for any deviations to sub-supplier items. All components must be new, unused, and traceable to the original equipment manufacturer to reduce risk of suspect/counterfeit items.
4.1.5.2 Fabrication shall include base cabinets, a work surface capable of supporting equipment to be cleaned, a liquid rinse collection and drain system employing 5 gallon carboys in the base cabinets, a ventilation enclosure that functions like a fume hood with vertical and horizontal split sash enabling work access on four sides, lights, 120V 60Hz electrical outlets, compressed air/inert gas outlets, process water fixtures, exhaust flow alarm capability, overhead exhaust connection(s) and an upper shroud.
4.1.5.3 All equipment provided by the Seller shall conform to applicable Occupational, Safety, and
Health (OSHA) and National Electrical Code (NEC) regulation which are in force at the time the contract is signed.
4.1.5.4 The Seller shall perform a Factory Acceptance Test that demonstrates all functionality of the equipment to include, but limited to, flow stream/ventilation performance, low sash flow velocity alarm, sash operation, lighting, electrical circuits, and fluid circuit integrity.
4.1.5.5 Equipment must have a NRTL certification to U.S. standards. It will be Seller’s responsibility to coordinate with vendors to perform NRTL inspection/testing or coordinate Field
Evaluations prior to final acceptance and delivery.
4.1.5.6 All welding and weld inspections shall be performed per applicable standards listed in Sec 3.0 of the GS and/or Section 2.0 of the TS. All welders/operators and weld inspectors shall be certified for weld type, materials, sizes, and standards being applied and qualifications must be provided to, and approved by, the Company prior to performing any welds. Documentation requirements to support welding operations are defined in the GS, & Appendix A (Submittal
Schedule).
4.1.5.7 Electrical equipment, cables, etc. shall be protected from exposure to weather and moisture throughout the duration of fabrication, assembly and shipping. Fluid tubing and fittings shall be shipped and stored with end caps in place.
4.1.5.8 Periodic inspection and review of fabrication, partial assembly and the Factory Acceptance
Test(s) shall be available for participation by Company representatives. Photo and video reviews of progress and tests may also be requested.
4.1.6 Work Task 5: Post Fabrication Design Changes of the Modular Wet Cleaning Bench
If substantial design changes affecting the use, accessibility, specifications, footprint, useable interior space, etc. are required due to issues discovered in the fabrication and/or testing of the
Ventilated Modular Wet Cleaning Bench, the Seller shall notify the Company of the required changes and shall obtain written approval prior to incorporating the changes.
4.1.7 Work Task 6: Post Fabrication Documentation Package of the Modular Wet Cleaning Bench
The Seller shall develop the following documentation for supply to the Company:
• As-built design drawings
• As-built bill of materials list
• Installation and assembly instructions
• Maintenance/Operations Requirements
4.1.8 Work Task 7: Disassembly, Packaging and Shipment of the Modular Wet Cleaning Bench
Upon successful testing and certification of the Modular Wet Cleaning Bench and Approval by the Company, the Seller shall disassemble, package and ship the system to the Company. Prior to shipment, the Seller shall provide a shipping plan to the Company for Approval. See Section
6.2 for specific requirements.
4.2 Project Management
Seller shall also comply with the Project Management requirements defined in GS, Section 6.0.
4.2.1 Project Pricing
Project pricing will be fixed-price and will be based on Delivery-At-Place (DAP) Oak Ridge, TN. The Seller is thus responsible for all shipment coordination, cost, and liability to the delivery destination of the Company.
4.3 Data Management
Seller shall also comply with Data Management requirements defined in GS, Section 7.0
4.3.1 Documentation
All documentation associated with this contract that is under the control of the Seller will become the property of and must be made available to the Company as requested.
Documentation shall be provided to the Company for the Ventilated Modular Wet Cleaning
Bench as identified in TS & GS and defined in Appendix A, Submittal Schedule. Approval is required to deviate from the submittal schedule. This schedule also defines the timeline for documentation submittal, identifies documents that require approval, required format, technical specification references, and indicates what documentation is required to be included with shipment.
5. QUALITY ASSURANCE
Seller shall also comply with Quality Assurance requirements defined in GS, Section 5.0
5.1 Process Monitoring
5.1.1 The Seller shall prepare a Manufacturing and Inspection Plan (MIP) to include procedures, plans and schedules that will be executed to accomplish the design, fabrication, Factory Acceptance
Testing and shipping of the equipment by the contractual date. Documentation required to support Seller activities will be defined in the TS, GS and in Appendix A, Submittal Schedule.
Plans and schedules must be approved by the Company prior to the activity occurring.
5.1.2 The MIP shall include and indicate in-house work as well as outsourced work.
5.1.3 Manufacturing may not begin until notice is received that the MIP has been approved by the
Company. The requirement for a MIP shall be flowed down contractually from the Seller to the
Seller’s suppliers and subcontractors unless the requirement is waived in writing on a case-by-case basis by the Company.
5.1.4 Inspections & tests may require individuals to be certified for the specific activity per the TS, GS, codes or regulations. Results of all inspections and tests including Factory Acceptance Tests are required to be submitted to the Company prior to shipment.
5.2 Access for Source Surveillance Inspections
As part of the Company’s quality assurance program, source surveillance activities may be conducted at the Seller’s facility or any sub-tier seller facility that the Company determines necessary to ensure quality objectives are met. See section 5.1 of GS for additional information.
5.3 Seller-Requested Deviations
The Seller may propose deviations from the specifications, drawings, or other technical requirements from this procurement. See section 5.2 of the GS for additional information on how to request a deviation.
5.4 Non-Conformances
The Seller shall report nonconformance per the requirements in GS, section 5.3 and using Form
ORNL-311.
5.5 Contractor Release Note
Prior to shipment and delivery, the Seller shall submit a Contractor Release Note per the requirements identified in GS Section 8.10. The equipment will not be released for shipment until the CRN has been submitted to and approved by the Company.
6. DELIVERABLES
The Seller shall prepare the following deliverables and submit them to the TPO and the PO in a timeframe and manner that supports the approved schedule for the tasks.
6.1 Documentation
Required documentation is summarized in Appendix A, Submittal Schedule with additional guidance contained in the TS & GS.
6.2 Packaging, Shipping, Storage and Delivery
Additional requirements are presented in the GS and the TS.
6.2.1 Transportation
The Seller is responsible for packaging, storage, loading of the equipment, and shipment of all items covered by this scope of work. General shipping and packaging information can be found in the GS, while specific shipping configurations for the items within this scope of work is located in the TS.
Equipment shall be shipped by soft ride conventional enclosed motor freight. The Seller shall package and skid mount equipment in a manner that facilitates movement, loading, and unloading with a fork truck. The equipment shall be shipped in shock-resistant packaging as appropriate. Instructions for handling upon receipt by the Company shall be provided by the
Seller.
6.2.2 Storage and Delivery
The Seller shall store the finished Ventilated Modular Wet Cleaning Bench per the requirements presented in the GS, Section 13.0. The Company, at its discretion, may require the Seller to postpone the date of shipment by up to 60 days from the agreed upon date of shipment and the
Seller shall, at no additional cost, store finished products in a safe and secure manner that protects their condition and preserves the integrity of all components and packaging. If shipment is delayed and storage is required beyond 60 days, Seller agrees to good faith negotiation of extended storage terms.
Appendix A: Document Submittal Schedule
PO #
PO Description: Ventilated Modular Wet Cleaning Bench
Supplier
Doc # Reference
Section Reference
Document Type/Title Submittal Schedule
Format Approval Req'd to Proceed
Hard copy to be included w/ shipment
Notes:
EX-00-ES00086 6.1 Project Plan 30 calendar days after award Electronic No No
EX-00-ES00086 6.2 Project Schedule Monthly Electronic No No
EX-05-ES00116 4.1.3 Design Proposal 30 calendar days after award Electronic Yes No
EX-05-ES00116
EX-00-ES00086
5.1
5.4, 8.9 Manufacturing and Inspection Plan
Prior to Fabrication
4.1.4
14.0 Final Design
Prior to Procurement /
Fabrication Electronic Yes Yes
Final Design documentation shall include both drawings and complete Bill of Materials list
4.1.5.6
8.6, 10.5 Welding Documentation
Prior to Use / Prior to
Shipment Electronic Yes No
Procedures, Specs, Records required prior to use Post-Weld reports required prior to shipment
EX-05-ES00116 5.1.4
Specialized Staff and Subcontractor Certifications
Prior to Fabrication
Electronic Yes No e.g. NDE certification, Testing and Balancing, NRTL
4.1.8, 6.2
8.7, 13.0 Shipping / Packaging Plan Prior to Use Electronic Yes No
4.1.5.4, 5.1.4
12.0 Factory Acceptance Test Results
Prior to Shipment
Electronic Yes No Full functionality test
4.1.5.5
10.1 NRTL Certification
Prior to Shipment
Electronic Yes No Includes all electrical equipment and field evaluations (as needed)
EX-05-ES00116 4.1.7
Finished As-Built Drawings / Bill of Materials List
Prior to Shipment
Electronic Yes No As-Built documentation shall include both drawings and complete Bill of Materials list
5.5
8.10 Contractor Release Note
Prior to Shipment
4.1.7
8.8, 14.0
Installation and Assembly Instructions - Operations/Maintenance Requirements
Prior To Shipment
Electronic No Yes
4.1.1, 4.1.6 5.3, 5.4
5.2, 5.3
Final Design - Deviations and Non- Conformances
As Needed Electronic Yes No Changes to final design to meet FAT, codes, and regulations
Appendix A: Document Submittal Schedule (cont.)
Notes:
1. One document submittal may satisfy multiple documents listed above. Indicate on each submittal what category it is intended to satisfy.
2. Document # and Section Reference is the location(s) that discuss the document and can provide additional information regarding the requirement and/or expectation.
3. Submittal Schedule provides the required timeframe when that document is expected. This can be expressed as a # of days after award, or prior to an activity. For documents that need approval to proceed, it is recommended these documents be provided at least 30 calendar days ahead of the need date to ensure the approval process does not negatively impact Supplier schedule.
4. Deviations to this submittal schedule shall be approved by the Company. All requested documentation shall be submitted and given a Code 1 or 4 status before release for shipment can occur. Exceptions may be granted on a case-by-case basis and will be noted on the CRN.
5. For additional guidance regarding documentation submittals, see EX-00-ES00086, Section 7.6.
| 2025-03-25T09:12:57-0400 | |
| Darryl Dowling |
| 2025-03-25T09:13:14-0400 | |
| Darryl Dowling |
| 2025-03-25T09:46:05-0400 | |
| Seth Wilder |
| 2025-03-27T08:35:59-0400 | |
| CLINT AUSMUS (Affiliate) |
| 2025-03-27T08:51:20-0400 | |
| Chad Hasbrouck |
File details come from the government source that posted it. Updated .