Attachment A_eMASS_Authorization_Requirements_SOP_Guide.pdf

PDF 1 MB Posted

Attached to
DA01--Appraisal Management Requirement SB Set Aside Federal contract opportunity
Solicitation number
36C10D25R0008
Issued by
Department of Veterans Affairs

About this file

This document is a comprehensive Standard Operating Procedures (SOP) guide for the Department of Veterans Affairs' Office of Information and Technology, detailing the Authorization Requirements for the Enterprise Mission Assurance Support Service (eMASS) system. The 218-page document provides extensive guidance for obtaining and maintaining an Authorization to Operate (ATO) for various types of information systems within the VA's technology infrastructure.

The SOP covers multiple system boundaries including on-premises networks, managed services, cloud environments (such as VA Enterprise Cloud and FedRAMP), facilities, medical devices, and platforms. It outlines detailed requirements for security documentation, technical testing, continuous monitoring, and risk management across different system types. Key components include mandatory documentation like Configuration Management Plans, Disaster Recovery Plans, Incident Response Plans, Privacy Impact Assessments, and technical requirements such as vulnerability scanning, penetration testing, and security configuration compliance data collection. The document is designed to ensure comprehensive cybersecurity assessment and management across VA information systems, with specific procedures tailored to different system environments and technology platforms.

View the file

Other files for this federal contract opportunity

Other files attached to DA01--Appraisal Management Requirement SB Set Aside, newest first.
File Type Posted
36C10D25R0008 0002.docx DOCX document
QA 36C10D25R0008.xlsx XLSX spreadsheet
36C10D25R0008 0001.docx DOCX document
Attachment E__Excel Price Schedule.xlsx XLSX spreadsheet
Attachment D_Past Performance Questionnaire.docx DOCX document
Attachment B_6500 Appendix C.pdf PDF
36C10D25R0008.docx DOCX document
Attachment C_Vendor Q and A Format.xlsx XLSX spreadsheet
Performance Work Statement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Office of Information and Technology

FOR INTERNAL USE ONLY

Office of Information and Technology

Authorization

Requirements Standard Operating Procedures

June 12, 2024| Version 1.64| U.S. Department of Veterans Affairs, Table of Contents

Authorization Requirements

Table of Contents

Purpose

Scope

Authorization Prerequisites and Registration Application Prerequisites System Boundary Guidance

Assessment and Authorization Requirements Application Hosted On-Premises/VA Network

Security Documentation Configuration Management Plan (CMP) Disaster Recovery Plan (DRP) Incident Response Plan (IRP) Systems-Based Business Impact Analysis (BIA) Information System Contingency Plan (ISCP) Interconnection Security Agreement (ISA)/Memorandum of Understanding (MOU) Privacy Threshold Analysis (PTA)/Privacy Impact Assessment (PIA)

Privacy Threshold Analysis (PTA) Privacy Impact Assessment (PIA)

Risk Assessment Report (RAR) System Security Plan (SSP) Application Threat Modeling

Technical Scans/Testing Requirements Nessus Scan Database Scan Penetration Test/Application Assessment Security Configuration Compliance Data (SCCD) Control Review

Application Hosted in Managed Service Security Documentation

Configuration Management Plan (CMP) Disaster Recovery Plan (DRP) Incident Response Plan (IRP) Systems-Based Business Impact Analysis (BIA) Information System Contingency Plan (ISCP) Interconnection Security Agreement (ISA)/Memorandum of Understanding (MOU) Privacy Threshold Analysis (PTA)/Privacy Impact Assessment (PIA)

Privacy Threshold Analysis (PTA)

Privacy Impact Assessment (PIA) Risk Assessment Report (RAR) System Security Plan (SSP) Application Threat Modeling

Technical Scans/Testing Requirements Nessus Scan Database Scan Penetration Test/Application Assessment Security Configuration Compliance Data (SCCD) Control Review

Application Hosted in the VA Enterprise Cloud (VAEC) Security Documentation

Configuration Management Plan (CMP) Disaster Recovery Plan (DRP) Incident Response Plan (IRP) Systems-Based Business Impact Analysis (BIA) Information System Contingency Plan (ISCP) Interconnection Security Agreement (ISA)/Memorandum of Understanding (MOU) Privacy Threshold Analysis (PTA)/Privacy Impact Assessment (PIA)

Privacy Threshold Analysis (PTA) Privacy Impact Assessment (PIA)

Risk Assessment Report (RAR) System Security Plan (SSP) Application Threat Modeling

Technical Scans/Testing Requirements Nessus Scan Database Scan Penetration Test/Application Assessment Security Configuration Compliance Data (SCCD) Control Review

Application Hosted in FedRAMP Cloud (-F) and VA-Sponsored FedRAMP (-VAF) Security Documentation

Configuration Management Plan (CMP) Incident Response Plan (IRP) Systems-Based Business Impact Analysis (BIA) Information System Contingency Plan (ISCP) Privacy Threshold Analysis (PTA)/Privacy Impact Assessment (PIA)

Privacy Threshold Analysis (PTA) Privacy Impact Assessment (PIA)

Risk Assessment Report (RAR) System Security Plan (SSP) Annual Cloud Analysis Report (ACAR)

Independent Assessment and Technical Scanning Requirements Vulnerability Scan

Database Scan Penetration Test/Application Assessment/Application Threat Modeling Security Compliance Scanning Control Review

FedRAMP Enterprise or Single Instance Cloud Application (-e and -i Systems) Security Documentation

Configuration Management Plan (CMP) Incident Response Plan (IRP) Systems-Based Business Impact Analysis (BIA) Information System Contingency Plan (ISCP) Interconnection Security Agreement (ISA)/Memorandum of Understanding (MOU) Privacy Threshold Analysis (PTA)/Privacy Impact Assessment (PIA)

Privacy Threshold Analysis (PTA) Privacy Impact Assessment (PIA)

Risk Assessment Report (RAR) System Security Plan (SSP) Control Implementation Summary/Customer Responsibility Matrix (CIS/CRM) Application Threat Modeling

Technical Scans/Testing Requirements Control Review

Facility Security Documentation

Configuration Management Plan (CMP) Disaster Recovery Plan (DRP) Incident Response Plan (IRP) Systems-Based Business Impact Analysis (BIA) Information System Contingency Plan (ISCP) Interconnection Security Agreement (ISA)/Memorandum of Understanding (MOU) Privacy Threshold Analysis (PTA)/Privacy Impact Assessment (PIA)

Privacy Threshold Analysis (PTA) Privacy Impact Assessment (PIA)

Risk Assessment Report (RAR) System Security Plan (SSP)

Technical Scans/Testing Requirements Nessus Scan Enterprise Discovery Scan (EDS) Security Configuration Compliance Data (SCCD) Control Review

Medical Devices Security Documentation

Configuration Management Plan (CMP) Disaster Recovery Plan (DRP) Incident Response Plan (IRP) Systems-Based Business Impact Analysis (BIA)

Information System Contingency Plan (ISCP) Interconnection Security Agreement (ISA)/Memorandum of Understanding (MOU) Privacy Threshold Analysis (PTA)/Privacy Impact Assessment (PIA)

Privacy Threshold Analysis (PTA) Privacy Impact Assessment (PIA)

Risk Assessment Report (RAR) System Security Plan (SSP)

Technical Scans/Testing Requirements Nessus Scan Control Review

Other Federal Agency (Non-eMASS Reciprocity)

Platform Security Documentation

Configuration Management Plan (CMP) Disaster Recovery Plan (DRP) Incident Response Plan (IRP) Systems-Based Business Impact Analysis (BIA) Information System Contingency Plan (ISCP) Interconnection Security Agreement (ISA)/Memorandum of Understanding (MOU)

Privacy Threshold Analysis (PTA)/Privacy Impact Assessment (PIA) Privacy Threshold Analysis (PTA) Privacy Impact Assessment (PIA)

Risk Assessment Report (RAR) System Security Plan (SSP)

Technical Scans/Testing Requirements Control Review

Appendix A – Acronyms/Definitions

Appendix B – Quick Reference Guide – Security Documentation Requirements

Appendix C – Quick Reference Guide – Technical/Testing Requirements

Appendix D – Common Control Providers/System of Record (SOR)

VA T1SOR

VA Enterprise SOR VA Area SOR Cloud Service Provider SaaS and PaaS SOR

Appendix E – New Authorizing Official (AO) Guidelines

Appendix F – Quick Reference Guide – Continuous Monitoring

Appendix G – Type Authorization Process Requirements Responsibilities

Responsibilities of Originating Organization

Responsibilities of Receiving Organization

Change Management

Identical Instance

Validation of Type Authorization

Appendix I – High Priority Control External Connections Controls

Revision Date Summary of Changes Version Author

7/22/2019 Initial Draft 1.0 OIS

8/23/2019 Second Draft 1.1 OIS

9/13/2019 Third Draft 1.3 OIS

10/11/2019 Fourth Draft 1.4 OIS

11/13/2019 Updated Premier/VA Network and Platform sections

1.5 OIS

12/13/2019 Updated Application Registration (section

3.2)

Changed ‘Secure Code Review’ sections to

Application Security Testing’ for all applicable boundaries and updated the steps to complete the requirement

Removed ‘Quality Code Review’ requirement

Changed ‘Secure Design Review’ to

‘Application Threat Modeling’ for all applicable boundaries and updated the steps to complete the requirement

Changed ‘Status of Artifacts’ to ‘Status of

Requirements’ and added link to Status of

Requirements template (Section 4)

Added Security Impact Analysis (SIA) requirement for systems requiring a major change (Section 4)

1.6 OIS

1/13/2020 Added link for SIA Q&A in Section 4

Updated ‘Security Configuration

Compliance Data’ instructions in all SCCD sections

Added Common Control Providers/System of Record (SOR) details (i.e., VA T1SOR, IO

SOR, VA Area SOR) in Appendix D and updated SOR verbiage throughout the SOP

Updated all ‘Application Security Testing’ sections with new details on how results are uploaded to eMASS

1.7 OIS

2/12/2020 Created Appendix E – New Authorizing

Official Guidelines

1.8 OIS

3/13/2020 Changed Major Change Form location to

KS eMASS Job Aids (Section 4) and added link

Updated verbiage in all technical scan sections to indicate that BOD 19-02 remediation timeline requirements are for

Internet accessible systems only

Added the Penetration Test/Application

Assessment (WASA) requirement for

Managed Service (Section 4.2.2.3) and updated the table in Appendix C

Clarified scan requirements for FedRAMP

(Section 4.3.2 and Section 4.4.2)

Revised Step 1 for all Nessus scan sections to include the Hardware/Software SOP

Inserted reference to the eMASS

Implementation Guide throughout the SOP

1.9 OIS

4/13/2020 Added reference and link to the VA Cloud

Security Procedural Guidance in the

FedRAMP cloud Non-VAEC boundary

(Section 4.4)

Created Appendix F – Quick Reference

Guide – Continuous Monitoring

Changed SCA to Control Assessment to capture security and privacy controls

1.10 OIS

5/13/2020 Specified only one POA&M required for each technical scan requirement. Update is within each technical scan section

Added requirement that FedRAMP systems must have registered system in eMASS for the FedRAMP and the enterprise/VA boundary. Entry names in eMASS must be same as names listed on FedRAMP.gov.

Details in section 4.3 and section 4.4

VAEC link updated with new URL

Added a note in section 4.3.2 and section

4.4.2 to ensure Platform-as-a-Service (PaaS) servers/services are not added to the

Hardware and Software system inventory

1.11 OIS

6/12/2020 Updated the SIA paragraph in Section 4

Added CMP template link and template contact information to CMP section for all boundaries except for VAEC and Facility.

VAEC already has a template and the

Facility CMP template is in progress

Replaced CM-2 reference with CM-9 within the CMP sections. When uploading the

CMP to eMASS, CM-9 should be added as the appropriate security control

1.12 OIS

7/13/2020 ISO Responsibilities and Attestation templates have been added to the KS Job

Aids page with link included in Section 3.1

Added a Nessus scan section (Section

4.6.2.1) for the Medical Device boundary

1.13 OIS

8/13/2020 Added note to section 2 that VA ATO information should not leave the VA network

Added SCCD requirement to Premier/VA

Network boundary (section 4.1.2.6)

Clarified one POA&M item required for each technical scan performed (e.g., new

Nessus scan POA&M item required for each monthly scan). Update is within each technical scan section

New section added for Security Boundary

Guidance (section 3.3)

1.14 OIS

9/11/2020 Updated ISA/MOU template link 1.15 OIS

10/13/2020 Incorporated latest eMASS update by changing Risk Review stage to RMF Step 5:

Stage 3 in section 3.1

1.16 OIS

11/13/2020 Updated URL for the VAEC homepage through section 4.3

Updated FedRAMP package request email address for VA OIS ESA CSA

Added Platform as a Service (PaaS) clarification/guidance to FedRAMP Cloud

VAEC section 4.3.2

Updated URLs for Medical Device Nessus scans in section 4.6.2.1

1.17 OIS

12/11/2020 Added ISRM Compliance contact information (email address) in Section 1

Clarified that ‘system-level’ system stewards assist with REEF mitigation in applicable

Nessus scan sections

1.18 OIS

01/13/2021 Clarified in Penetration Test/Application

Assessment sections that VA-CSOC does not perform on-site scans of external systems

Updated requirements for Internet facing applications in Penetration Test/Application

Assessment sections

Added SCCD FAQ link in each SCCD section

1.19 OIS

02/11/2021 Updated section 8.1.1.2 to reference name changed from VA IO SOR to VA Enterprise

SOR (VA ENTSOR). Updated throughout document

Updated Technical Scans section 4.5.2.2 to include new requirement that IA-5.3 will be utilized for POA&M creation where necessary for EDS

Updated URL for Knowledge Service eMASS Job Aids pages in section 4.0 to new SharePoint site

1.20 OIS

3/12/2021 Updated the Note in section 3.1 to add

Control Review timeline details for RMF

Step 4

Added RMF Step 4 Assessment requirement (GRC Bulletin #48) to all

Control Review sections

1.21 OIS

03/24/2021 Added Appendix G Type Authorization 1.22 OIS

04/13/2021 Addition of section 4.5; FedRAMP

Enterprise Cloud Application (-e Systems) procedures

Update of Appendix B and C to include

FedRAMP Enterprise Cloud Application (-e

Systems)

Updated all Penetration Test/Application

Assessment sections to remove redundant language “and/or internet facing” in first bullet

Updated all Nessus scan sections to remove step 5 from completion steps

Updated all Application Threat Modeling sections with clarified procedures

Updated all Application Security Testing sections with clarified procedures

Updated Application Registration section

3.2 with clarified procedures

1.23 OIS

05/13/2021 Update to all System Security Plan (SSP) sections; Step 3: “The system steward should upload the CCI export to the

Artifacts tab within eMASS to be considered an appendix of the SSP. Refer to the eMASS Implementation Guide for additional details”

Update of SOR definition in Appendix D

Updated section 4.3, Application hosted in

FedRAMP cloud (VAEC) with additional VA

ENTSOR language

Updated section 4.3.2, Technical

Scans/Testing Requirements with clarified language and VAEC links

Updated section 4.3.2.6, Security

Configuration Compliance Data (SCCD) with PaaS Note

Added IaaS/PaaS to Appendix A0

Acronyms/Definitions table

Added additional section 8.1.1.4, Cloud

Service Provider SaaS and PaaS SOR to

Appendix D, Common Control

Providers/System of Record (SOR)

Added to section 3.3 Step 10 that devices can only be associated with one FISMA boundary

Added to section 4 that the Status of

Requirements should be uploaded to the

Artifacts tab in eMASS

1.24 OIS

Added note in all SCCD sections to address issues reaching the 90% threshold due to offline devices

Added note on how to request an ISSO in section 3.1

Moved the note in section 3.1 that references the time requirements to be in

RMF Step 4 and RMF Step 5: Stage 3 to

Section 4

Added note to section 4.4 and section 4.5 that the -F/-VAF and -e packages must be completed simultaneously in eMASS

06/11/2021 All ICAMP links have been updated to reflect current Cloud migration

Specified which CCI to use for POA&M creation to all Nessus scan, Penetration

Test/Application Assessment, and Database

Scan sections

Moved Application Threat Modeling requirement from Technical Scans/Testing

Requirements section to Security

Documentation section for each applicable boundary

Updated Appendix B and Appendix C to reflect the Application Threat Modeling change

1.25 OIS

07/13/2021 Updated section 4.3 header from

“Application hosted in FedRAMP cloud

(VAEC)” to “Application Hosted in the VA

Enterprise Cloud (VAEC)”

Updated section 4.3 “VAEC main page” link to “VAEC Cybersecurity page”

Updated section 4.3 to include additional language regarding applications migrating from Traditional/On-Premises/Hybrid applications

1.26 OIS

08/11/2021 Updated sections 11.1.3.1 and 11.1.3.2 in

Appendix G – Type Authorization

Added missing ISCP section to Facility boundary

Updated section 4 to include addition of

“Information System Change Requests” and clarified guidance for SIA and

Significant/Major Changes

Updated Configuration Management guidance to include VA ITSM change control system guidance for sections

4.1.1.1, 4.2.1.1, 4.3.1.1, 4.4.1.1, 4.5.1.1, and

4.6.1.1

Added ‘IT Service Management (ITSM)’ to

Appendix A – Acronyms/Definitions table

Added ‘Software Composition Analysis’ requirement to all applicable Technical

Scans/Testing sections. New scan/analysis will be completed during the Application

Security Testing process

Updated Appendix C – Quick Reference

Guide – Technical/Testing Requirements to include new

‘Software Composition Analysis’ requirement

*Updated all references in section 4.6

Facility from “The ISO or system steward” to

“The ISO, system steward, or designee”

1.27 OIS

09/10/2021 Removed format suggestion in section 4 to eliminate confusion

Added ‘validate’ to all Control Review sections in paragraph 3

Updated step 5 in all SCCD technical scan sections with “SCCD will utilize CCI CM-6.7 for POA&M creation where necessary to keep track of the remediation effort”

Replaced ‘Software Assurance Request’ verbiage with ‘Application Security Support’ in Application Registration section and all

Application Security Testing sections

Added language ‘Kotlin’ to supported programming languages in all Software

Composition Analysis sections

1.28 OIS

10/13/2021 Added ‘Save As’ filename requirement for all monthly Nessus scan/ICAMP reports along with screen capture of how to ‘Save

As’ within ICAMP to all Nessus scan sections (Step 3c)

1.29 OIS

11/12/2021 Added sentence to section 3.3 Step 10 that all lower environments, such as

Development and Test, must be added to the Hardware/Software Inventory for vulnerability scanning purposes

Removed ‘Minor Application Self-

Assessment’ section. Added reference and link to ‘Minor Assessment Requirements for eMASS SOP’ in second paragraph of section 4

1.30 OIS

12/13/2021 Updated all Application Threat Modeling, Application Security Testing, and Software

Composition Analysis sections to eliminate confusion between DevSecOps and Non-

DevSecOps environments

Added verbiage at beginning of section 4.4 to specify the non-VAEC systems covered in the section

Note added in section 4.5 FedRAMP

Enterprise Cloud Application to clarify responsibilities for -F, -VAF, and -e packages

Updated Roles and Responsibilities within

CMP section of the Facility boundary

Updated first paragraph in all SCCD sections to include a BigFix alternative if

BigFix cannot be installed

1.31 OIS

01/13/2022 Added Appendix H – Provisional ATO

Process

Updated verbiage in section 3.3 Step 10 for lower environments

Added link for IRP template in section

4.6.1.3

1.32 OIS

02/11/2022 Updated verbiage in last sentence of the

‘Warning’ box in all Software Composition

Analysis sections

1.33 OIS

03/11/2022 Clarified responsibilities in sections 4.4 and

4.5 for FedRAMP packages and added single instance (-i) verbiage where appropriate

Updated FedRAMP header in section 4.5 to include Single Instance (-i)

Updated broken links for HW/SW Import

SOP throughout document

Changed verbiage in all Control Review sections that states the Control Review team will review a sub-set of the top findings found in OIG audits from the past fiscal year audits

Added note in P-ATO section 12.2 that -F/-

VAF packages must be progressed at the same time as -e/-i packages

1.34 OIS

04/13/2022 Updated ISA/MOU team name in all applicable sections

Added Cybersecurity Support request details to Section 3.1

Provided additional clarification to Section

3.3 Step 10

Added single instance (-i) reference to second paragraph of Section 4.4

Updated the Other Federal Agency boundary in Appendix B and Appendix C

Added sentence to the end of Section 4.8

Other Federal Agency with a link to the

Reciprocity SOP on Knowledge Service

Added Appendix I – Action Item Release

1.35 OIS

05/13/2022 Updated CSOC Database Scan

Questionnaire link in Sections 4.1.2.2, 4.2.2.2, 4.3.2.2, and 4.4.2.2

1.36 OIS

06/10/2022 Removed “Note” for DRP and ISCP due to invalid details in sections 4.1.1.2, 4.1.1.4, 4.2.1.2, 4.2.1.4, 4.3.1.2, 4.3.1.4, 4.4.1.2, 4.4.1.4, 4.5.1.3, 4.6.1.2, 4.6.1.4, 4.9.1.1

Updated ISA/MOU portal links in sections

4.1.1.5, 4.2.1.5, 4.3.1.5, 4.4.1.5, 4.5.1.4, 4.6.1.5, 4.7.1.1, 4.9.1.2

1.37 OIS

07/12/2022 Minor formatting adjustments throughout document

1.38 OIS

08/12/2022 All site and report links updated to reflect new Information Central Analytics Metrics

Platform (ICAMP) migration to SharePoint

Online site

All ICAMP “report export” step and screen captures updated

1.39 OIS

9/13/2022 Updated Appendices B and F to include

Disaster Recovery Plan Test, Incident

Response Plan Test, and Information

System Contingency Plan Test

1.40 OIS

10/13/2022 Added Information System Vulnerability

Management Plan (ISVMP) guidance in section 4.

Clarified Test document requirements for

FedRAMP systems.

1.41 OIS

11/10/2022 Minor formatting adjustments throughout document

1.42 OIS

12/13/2022 Included link to new Templates section of the eMASS Knowledge Service page

Updated each Security Configuration

Compliance Data (SCCD) section to account for the new report requirements

Updated sections 11.1 and 11.2 in

Appendix G – Type Authorization

1.43 OIS

01/13/2023 Added Information System Contingency

Plan and Business Impact Analysis at a requirement for Medical Devices

Added link to connections, ports, and protocols template

1.44 OIS

02/13/2023 Removed Appendix I – Action Item Release

Updated each section to address ISCP and

DRP requirements

Added BIA requirement to each section

Updated Appendices B and F to add the

BIA requirement

Updated links to System Owner Attestation and System Owner Responsibilities

Added link in Section 3.1 to the eMASS

Account Access Request Policy and

Procedure SOP

1.45 OIS

03/13/2023 Fixed broken links; Minor formatting adjustments throughout document

1.46 OIS

04/13/2023 Updated POA&M requirements for sections

4.1.2.1, 4.1.2.2, 4.1.2.3, 4.2.2.1, 4.2.2.2, 4.2.2.3, 4.2.2.6, 4.3.2.2, 4.3.2.3, 4.4.2.1, 4.4.2.2, 4.4.2.3, and 4.6.2.1

Added verbiage to section 4.3 regarding the transition of a traditional system to a cloud system.

Added verbiage to section 4.3.2.2 regarding

Database scan requirements

1.47 OIS

05/12/2023 Updated sections 4.1.2, 4.2.2, 4.3.2, 4.4.2, 4.5.2, 4.6.2, and 4.9.2 to remove single

POA&M requirement.

Updated document requirements for the

Reciprocity, Medical Device, and Platform boundaries

Added Cyber Automated Web Scanner

(CAWS) verbiage to Enterprise Discovery

Scan section

Updated ISA/MOU Sections to address

External Connection Controls

Added Appendix I – High Priority Controls

1.48 OIS

06/02/2023 Removed section 3.2 Application

Registration

Removed Application Security Test and

Software Composition Analysis sections from all boundaries

Updated all Penetration Test/Application

Assessment sections for all boundaries

1.49 OIS

06/15/2023 Removed Appendix H – Provisional ATO;

current process is obsolete

Updated links to System Owner

Responsibilities and System Owner

Attestation

Added requirement to upload the SSP generated in RMF Step 3 Stage 5 to the

Artifacts tab in eMASS

Added language regarding scanning requirements for PaaS systems within the

VAEC boundary that are containerized

1.50 OIS

07/13/2023 Minor formatting adjustments throughout document

1.51 OIS

08/11/2023 Updated step 5 in all technical scan sections with SCCD to utilize CCI CM-6.5 instead of CM-6.7

1.52 OIS

08/30/2023 Updated all DRP sections to reflect the current process.

Fixed duplication in section 4.9

1.53 OIS

09/13/2023 Minor formatting adjustments throughout document

1.54 OIS

10/13/2023 Minor formatting adjustments throughout document

1.55 OIS

11/13/2023 Fixed Information System Vulnerability

Management Plan (ISVMP) template link

1.56 OIS

12/12/2023 Updated each section to address ISCP, BIA, and DRP requirements

1.57 OIS

01/12/2024 Updated section 3 to address changes to the system registration process and update

GRC Committee to Unified System Registry

Workgroup (USR WG)

Added guidance to section 4 regarding

T1SOR inheritance

Updated sections 4.4 and 4.5 to clarify

FedRAMP requirements.

1.58 OIS

02/13/2024 Minor formatting adjustments throughout document

1.59 OIS

03/13/2024 Added guidance to section 4.4 regarding significant changes

Updated the Other Federal Agency (Non-eMASS Reciprocity) boundary in Appendix

C

1.60 OIS

04/12/2024 Updated USR link in section 3.1

Removed link from custom code requirement for Penetration Test/WASA in sections 4.1.2.3, 4.2.2.3, & 4.3.2.3

Added Annual Cloud Analysis Report

(ACAR) requirement to section 4.4

1.61 OIS

05/13/2024 Updated Nessus scan request link in sections 4.1.2.1, 4.2.2.1, 4.3.2.1, & 4.6.2.1

1.62 OIS

05/16/2024 Updated SOP 508 Compliant 1.63 OIS

06/12/2024 Updated the Disaster Recovery (DRP), Information System Contingency Plan

(ISCP), and Systems-Based Business Impact

Analysis (BIA) sections to further clarify requirements.

1.64 OIS

Purpose To obtain and maintain a Department of Veterans Affairs’ (VA) Authorization to Operate

(ATO), the authorization requirements must be completed. Enterprise Mission Assurance

Support Service (eMASS), VA’s Governance, Risk and Compliance (GRC) tool, is the authoritative management tool for VA’s Assessment and Authorization (A&A) process and

Risk Management Framework. All systems will be assessed in eMASS by the Risk Review team for an authorization recommendation to be submitted to the Authorizing Official

(AO) for final ATO consideration. eMASS guidance documentation can be found on the

Help page within eMASS.

This is a living document is based on current federal and VA security policies, standards, and guidance, and is subject to change. For any questions regarding the Authorization

Requirements SOP Guide for eMASS, please contact to ISRM Compliance.

Scope These procedures apply to systems that are required to obtain an ATO. These systems must be entered into eMASS and be evaluated for potential risk to the VA. The ATO packages/artifacts and any other ATO information should not leave the VA network.

Authorization Prerequisites and Registration

Application Prerequisites

Information System Owners (ISO) for a new information system looking for a determination on an ATO requirement or looking to begin the process to obtain an ATO can submit a request to the Unified System Registry Workgroup (USR WG). This form is to request single registration approval for all FISMA systems seeking a full Authority to https://ssologon.sqa.iam.va.gov/centrallogin/Default.aspx?appname=core&URL=https://ssologon.sqa.iam.va.gov/centrallogin/core/redirect.aspx&TYPE=33619969&REALMOID=06-345d7582-c96e-4888-9e5f-6e86468bf060&GUID=&SMAUTHREASON=0&METHOD=GET&SMAGENTNAME=-SM-8cC3rZB2rla99RWuOsX7CwwV0sK9V2UXStKWtHGYij%2bGw74gIreOglndBrPBr09P&TARGET=-SM-HTTPS%3a%2f%2flogon%2esqa%2eiam%2eva%2egov%2faffwebservices%2fredirectjsp%2fredirect%2ejsp%3fSAMLRequest%3dlZExb8IwEIV3JP6D5R07CQESC5CisiDRBVqGbo5rwJLtCzmHVv31dUNRy1Kp69197927m6N0NmtE1YWT3-%2BpzpzGQd2c9imtnQbvWC5BoUHjpNIqgxK563IiMJaJpIYACS38zfyMSUbfBgKdkvVpQ85prnahiekjTbJKX07ycFMlYlsW4lEpl4ykle91iBBY08pFC7PTaY5A-%2BxFKS5aMkH6XFU1qIdCay2QslqxjDeBl66hRCg4JzC0fwDM-%2BSGenYRbIjXLg8HN50HVe6GKWRN11tjeJ9DkSgpLqt-%2BwAeO6fb3XX0ebv5UY5a2sVgIdqyGuBDWqu9Qs8UOP51293NoFJIl8MBIfPeQ-%2FRp2uX-%2Fleb8TmA4-%2BC7c-%2F3L5CQ-%3D-%3D%26RelayState%3dPoJQgARFAcxdHxyCM_PhGqPZ%26SigAlg%3dhttp-%3A-%2F-%2Fwww%2ew3%2eorg-%2F2001-%2F04-%2Fxmldsig--more-%23rsa--sha256%26Signature%3dkZYgC0PL02n7IywzRNOM57peTvjEj4XC1VOwXz2jLZVo34zl9Ss4qfG7larCcLCnGdOb-%2FNzOvw1gWro5w-%2Fd3ppxt07-%2BAD4d5qr3tspPTyUQIpALMk2BF-%2FxTC0YvxghIqP89IkK-%2FsGcpNwZP3UcWUbUsQzAmVxAagrz0Y-%2FeBA2HMo4aaiTq-%2BcO8h4zC8yDmfJhqwct9mFW9SOBOC1xqYoZjqNAUlXcmn-%2FbIG1xCD3-%2BfxDYpYQE5EHLAYuMV4i9JjKmBSSYMJ5q2oFLsJyaaxE4tmZw1GVI9r5ZRNqYgd2uy0ZBG-%2Bgefw0mNXAKpvQhQs-%2FHqjnonfadqf6qjSjY9VcjQ-%3D-%3D%26SMPORTALURL%3dhttps-%3A-%2F-%2Flogon%2esqa%2eiam%2eva%2egov-%2Faffwebservices-%2Fpublic-%2Fsaml2sso%26SAMLTRANSACTIONID%3d15c9933e--7763acb6--1ae63c26--3265aed2--fc1221a2--537

Operate (ATO), Assess Only (Minor Applications), and VASI registration. Follow the steps below to complete the eMASS system pre-registration. For any questions regarding system registration, email the VA OIS USR Taskforce.

1. Fill out a new Unified System Registry request form by going to the Unified System

Registry Portal.

2. Your request will be reviewed by the USR Taskforce team for assignment of a new

ISSO, eMASS Pre-registration approval and VASI ID# assignment through this single request. Once triaged by the Taskforce you may be contacted for further information and then requested to attend the weekly USR WG call for final approval. The USR WG meets weekly on Tuesdays at 10:00am EST. During the meeting, the USR WG will approve or deny the request or may request a follow-on meeting to confirm all details of the new system request.

3. Once the USR WG approves the new information system request you will be assigned a VASI ID number, an ISSO and directed to have the Information System

Owner or System Steward register the new system in eMASS. Once the eMASS administrator approves the system, an email is automatically generated in eMASS to notify the System Owner or delegate of the approval. Access to eMASS is required to register a new system.

4. The System Steward completes the eMASS System Registration. The eMASS

Account Access Request Policy and Procedure SOP can assist with the registration process. You may also reach out to the ISSO or the VA OIS USR Taskforce via email with any questions regarding system registration.

5. Once the eMASS system registration has been completed and approved, the system project team can begin documentation for security and privacy controls and working through the RMF workflow towards an ATO. The ISO must complete the System Owner Responsibilities and the System Owner Attestation documents then upload both to the Artifacts tab within eMASS.

System Boundary Guidance

The System Boundary needs to be properly represented in eMASS to ensure the system description, environment, architecture, assets, devices, and hardware and software baselines are recorded accurately.

Roles and Responsibilities

The ISO and system steward should work to document the boundary. The ISSO should review and validate in RMF Step 1 – Security Categorization.

mailto:vaoisgrcintakereviewers@va.gov https://leaf.va.gov/NATIONAL/103/cybersecurity_request_portal/ https://leaf.va.gov/NATIONAL/103/cybersecurity_request_portal/ ttps://dvagov.sharepoint.com/sites/OITOIS/KnowledgeService/eMassDocumentLibrary/eMASS_Account_Access_Request_Policy_and_Procedure_SOP.pdf?CT=1676303220419&OR=Outlook-Body&CID=7A026EFE-CFE8-4911-8751-A62836BC4ABF ttps://dvagov.sharepoint.com/sites/OITOIS/KnowledgeService/eMassDocumentLibrary/eMASS_Account_Access_Request_Policy_and_Procedure_SOP.pdf?CT=1676303220419&OR=Outlook-Body&CID=7A026EFE-CFE8-4911-8751-A62836BC4ABF

Standards / Guidelines

• NIST SP 800-60

• NIST SP 800-53 (CM-8 Information System Component Inventory, and enhancements)

• FIPS 199, FIPS 200

• VA Handbook 6500

• Hardware and Software System Inventory Import SOP – located eMASS Knowledge

Service page.

Boundary completion steps:

1. On the system information tab, ensure the System Description field is accurate.

Provide a narrative description of the system, function, and purpose.

2. On the system information tab, ensure the System Environment field is accurate.

Provide a general description of the technical system. Include the primary hardware, software, and communications equipment. Include any environmental or technical factors that raise special security concerns. Include hosting location name (i.e., Amazon, AITC, the name of the vendor data center).

3. On the system information tab, ensure the System Authorization Boundary field is accurate and includes a description of everything within the accreditation boundary of the system. Include Pre-Prod* environments if they will handle production data and ensure to include any minor applications, child applications, and VA custom developed applications covered by the same ATO. Do not include connected system information or systems that are not covered by the scans of this boundary, associated artifacts, or control implementation. (*Note: per step 10, all assets for all lower environments, including the Development, Test, and pre-prod environments, must be added to the Hardware/Software Inventory for vulnerability scanning purposes.)

4. On the system information tab, upload a System Authorization Boundary diagram. Select “Choose File” to attach related evidence/diagram. The boundary diagram must include:

a. all components included in the system boundary;

b. an authorization boundary drawn around the components indicating that they are within the system’s boundary;

c. any other systems/devices outside of the system’s boundary to which the system is directly connected; and

d. a legend explaining what each shape/icon/line/etc. represents.

https://dvagov.sharepoint.com/sites/OITOIS/KnowledgeService/eMassDocumentLibrary/eMASS_Hardware_Software_System_Inventory_SOP.pdf https://vaww.vashare.oit.va.gov/sites/ois/KnowledgeService/Pages/eMASS.aspx

5. On the system information tab, ensure the Hardware / Software / Firmware field is accurate. List the Hardware/Software/Firmware used by the system.

6. On the system information tab, ensure the System Enterprise and Information

Security Architecture field is accurate. The security architecture field should accurately and completely describe:

a. the required security functionality;

b. the allocation of security controls among physical and logical components;

and

c. expresses how individual security functions, mechanisms, and services work together to provide required security capabilities and a unified approach to protection.

7. On the system information tab, upload a System Enterprise and Information

Security Architecture diagram. The diagram should include an authorization boundary that:

a. clearly defines services wholly within the boundary;

b. depicts all major components or groups within the boundary;

c. identifies all interconnected systems, including the Agency Access Point

(e.g., VA.gov);

d. depicts all major software/virtual components (or groups of) within the boundary; and

e. is validated against the inventory.

8. On the system information tab, ensure the Information Flows / Paths field is accurate. This field should:

a. identify anywhere Federal data is to be processed, stored, or transmitted;

b. clearly delineate how data comes into and out of the system boundary; and

c. depict how all ports, protocols, and services of all inbound and outbound traffic are represented and managed, including the use of definitive Agency

DNS.

9. On the system information tab, upload an Information Flows / Paths diagram.

The diagram should:

a. identify anywhere Federal data is to be processed, stored, or transmitted;

b. clearly delineate how data comes into and out of the system boundary; and

c. depict how all ports, protocols, and services of all inbound and outbound traffic are represented and managed, including the use of definitive Agency

DNS.

10. All systems should complete the Hardware and Software System Inventory

Import process to ensure all IPs and host names are properly added to eMASS so that scans and integrations with ICAMP, BigFix, and CDM will function. Instructions can be found in the Hardware and Software System Inventory Import SOP. The SOP can also be found by going to the Standard Operating Procedures section of the eMASS Knowledge Service page. The connections, ports, and protocols Template can be found in the Templates section of the eMASS Knowledge Service page. The

ISO or system steward must ensure all hostnames for endpoints that comprise the

FISMA boundary are listed in the eMASS Hardware/Software Inventory. The hostnames in the Hardware/Software Inventory must exactly match the hostnames listed in the BigFix Computer Lookup reporting (e.g., “R03AAASQL99” will be considered a different endpoint than “R03AAASQL99.R03.MED.VA.GOV”).

Please use the Hardware and Software Inventory Import SOP for managing the

Hardware/Software Inventory. Please note, devices can only be associated with one

FISMA boundary. If the device or component is shared, it should only be registered with the owning information system responsible for Enclave/OS/Infrastructure ownership and management. Additionally, development assets that process, store, transmit VA data, have an interconnection to a system that has an ATO, and/or external to VA, must be inventoried for vulnerability scanning. These specific types of lower environment assets should already be part of an ATO boundary due to the inclusion of VA sensitive information and/or connection to a production or external to VA environment. All other lower environment assets must also be inventoried for discovery purposes due to being connected to the VA network.

These inventory assets should not be included within any part of an ATO process outside of CM-8 and CM-8(5). They are included solely for discovery purposes at this time. As a reminder, unaccredited lower environments are never allowed to process, store, and/or transmit VA sensitive information without an ATO. All lower environment assets must adhere to VA standards for naming conventions, patching, vulnerability remediation, configuration management, and IP

Governance for rapid identification within inventory reports.

11. The BigFix agent must be installed to receive Security Configuration Compliance

Data as well as communicate with CDM. Ensure that the BigFix agent is installed/functioning correctly and confirm that your information system/facility endpoints (i.e., servers/workstations) make up the FISMA boundary. A functioning endpoint is one that is actively communicating with the BigFix core servers and has a last-report-time within the last day or two. Please utilize the Computer Lookup reporting to search for endpoints by hostname(s). If an endpoint is found and has a recent last-report-time, then the BigFix agent is functioning as expected. Please see the BigFix FAQ for help on installing the BigFix agent. If you need assistance with BigFix, please contact the Enterprise Service Desk (ESD) to enter a ticket and https://vaww.vashare.oit.va.gov/sites/ois/KnowledgeService/Pages/eMASS.aspx https://vaww.vashare.oit.va.gov/sites/ois/KnowledgeService/Pages/eMASS.aspx https://vaww.vashare.oit.va.gov/sites/ois/KnowledgeService/Pages/eMASS.aspx https://vaww.vashare.oit.va.gov/sites/ois/KnowledgeService/Pages/eMASS.aspx https://dashboard.tic.va.gov/Enterprise-site/Operations-site/Custom-Reports-site/Pages/Computer-Lookup.aspx https://dashboard.tic.va.gov/Docs/Pages/BigFix-FAQ.aspx assign it to the OIS EV Support Group. Contact the ESD by phone at 1-855-673-

4357 or online through Your IT Services portal.

Continuous Monitoring Requirement

The system boundary must be updated and validated on an annual basis (90 days for medical devices per CM-8.1) or when any change to the system boundary, devices, hardware, or software baselines occurs. Ensure devices are only associated with one FISMA boundary.

Assessment and Authorization Requirements The Authorization Requirements SOP details the technical scans/testing and security documentation requirements for each boundary. Within each boundary section, details are provided for the required security artifacts, including security document requirements, technical/testing requirements, and Federal/VA guidelines. Additional information related to the parties/OIS organization(s) that can provide additional guidance or assistance for each artifact may also be provided. A Status of Requirements, which is located in the

Templates section of the eMASS Knowledge Service page, needs to be completed for each ATO package and indicate if a security document and/or technical/testing requirement is applicable or not applicable. The Status of Requirements should provide details on the latest security documentation and technical/testing requirement results or explain why each security document and/or technical/testing requirement is not applicable or not completed. Once the Status of Requirements is completed, it should be uploaded to the Artifacts tab within eMASS. Security artifacts should not be password protected. eMASS limits access to personnel with a need to view the system details and security artifacts.

For items related to Minor Applications in eMASS, please refer to the eMASS Minor

Application Assessment Guide.

Information System Change Requests

According to NIST 800-128; Guide for Security-Focused Configuration Management of

Information Systems, a Security Impact Analysis (SIA) is incorporated into the

Note: Questions about the system boundary guidance or processes should be directed to ISRM.

https://yourit.va.gov/va?id=va_home https://vaww.vashare.oit.va.gov/sites/ois/KnowledgeService/Pages/eMASS.aspx https://dvagov.sharepoint.com/sites/OITOIS/KnowledgeService/Pages/eMASS.aspx https://dvagov.sharepoint.com/sites/OITOIS/KnowledgeService/Pages/eMASS.aspx https://csrc.nist.gov/news/2019/nist-updates-sp-800-128 https://csrc.nist.gov/news/2019/nist-updates-sp-800-128 mailto:vaoisisrmrmf@va.gov configuration management process to ensure the impact of all changes are documented, analyzed, and evaluated for any adverse impacts on the security posture of the system.

To ensure that the changes have been implemented as approved, a SIA is performed as a part of the Configuration Management Plan (CMP) and supports the implementation of

NIST [SP 800-53] control CM-4 and any potential enhancements. If the SIA identifies a significant change(s), the system is required to submit this artifact as part of the CM/CR

Process prior to the change going into operation.

Steps for Security Impact Analysis (SIA)

1. Retrieve Major SIA Template from the Templates section of the eMASS Knowledge

Service page.

2. Fill out all requested tab information regarding systems current security posture and change details.

3. Submit completed SIA form to the VAOISSIATeam@va.gov for ISRM review.

4. Receive competed SIA spreadsheet with completed Summary Memo detailing the extent changes affect the security posture of the system in relation to the functionality of existing security controls and organizational risk tolerance.

Completion Steps for a Significant/Major Change

If the SIA identifies a significant change(s), the system is required to submit this artifact as part of the CM/CR Process prior to the change going into operation. Once the SIA is completed, reviewed, and returned:

1. The completed SIA must be uploaded to the Artifacts tab in eMASS. The

Information System Owner (ISO) is responsible for reviewing this artifact.

2. A completed and signed Significant/Major Change Notification Form should be uploaded to the Artifacts tab in eMASS at least 45 days prior to implementation of the change.

3. According to VA Handbook 6500; Risk Management Framework For VA

Information Systems VA Information Security Program, “formal reauthorization is required whenever a system undergoes a significant change or when there is a major change in the information collected or maintained”.

All RMF steps in eMASS must be completed and all security artifacts need to be updated to reflect the change. To restart the RMF Process in eMASS, please refer to this Authorization Requirements SOP or eMASS Implementation Guide for additional guidance.

https://vaww.vashare.oit.va.gov/sites/ois/KnowledgeService/Pages/eMASS.aspx https://vaww.vashare.oit.va.gov/sites/ois/KnowledgeService/Pages/eMASS.aspx mailto:VAOISSIATeam@va.gov https://gcc02.safelinks.protection.outlook.com/ap/w-59584e83/?url=https%3A%2F%2Fdvagov.sharepoint.com%2Fsites%2FOITOIS%2FKnowledgeService%2FeMassDocumentLibrary%2FMajor_Change_Form-06122020.docx%3FWeb%3D1&data=04%7C01%7C%7C9b0db0a6d18f4c89854f08d9250e45ec%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637581565487592092%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=ok8f0RKomaAuU4ClI3jXNBsBvx6AqxpEl7mT6FT5KAs%3D&reserved=0 https://www.va.gov/vapubs/viewPublication.asp?Pub_ID=1255&FType=2 https://www.va.gov/vapubs/viewPublication.asp?Pub_ID=1255&FType=2

Information System Vulnerability Management Plan (ISVMP)

The Information System Vulnerability Management Plan (ISVMP) establishes a plan for the communication and orchestration of vulnerability management practices at the system-level. It identifies vulnerability management roles and responsibilities, resources, processes, and standards to ensure vulnerabilities are managed throughout the information systems life cycle. ISVMP guidance is provided below.

Roles and Responsibilities

The ISVMP template can be found on the EVMP Knowledge Service (KS) main page.

1. The ISO and system steward should work with the ISSO and applicable service lines, stakeholders, and vendors (if applicable), to complete the ISVMP template.

2. The ISO should validate processes adhere to the ISVMP lifecycles for assessing, prioritizing, remediating, mitigating, and re-assessing vulnerabilities.

Note: For eMASS, the applicable system POCs must request the AODR initiate RMF Step 4 and advance/release controls to the Control Assessor no later than 70 days prior to the Authorization Termination Date (ATD) and/or the scheduled Control Review. The Control Review will be completed within

15 days with the results uploaded to the Artifacts tab in eMASS and the

Control Review Team notifying the system stakeholders to close out RMF

Step 4.

Additionally, the applicable system POCs must have their authorization package completed and progressed to RMF Step 5 Authorize: Stage 3 Risk

Review in the workflow no less than 45 calendar days prior to the ATD or date they want their authorization decision to be made if requesting an out of cycle ATO review due to a major change. Once the package has been progressed, a package snapshot will be taken within eMASS for the Risk

Review team to analyze for an ATO. After progressing the system to RMF

Step 5 Authorize: Stage 3 Risk Review, the system POCs should continue to work on the system requirements within eMASS. Any progress made after the package snapshot will not be able to be viewed by the Risk Review team during their review.

https://dvagov.sharepoint.com/sites/OITOIS/KnowledgeService/Pages/EVMP.aspx https://dvagov.sharepoint.com/sites/OITOIS/KnowledgeService/Pages/EVMP.aspx

3. The ISVMP should include remediation points of contact for those personnel responsible for supporting the remediation activities of the information system and information system components.

• NIST Cyber Security Framework

• Gartner Vulnerability Management Cycle

• VA Handbook 6500

• POAM Management Guide

• Flaw Remediation SOP

• Vulnerability Management Memo

Completion Steps

1. The ISO and system steward works with the ISSO to complete the ISVMP template.

2. Once the ISVMP template is complete, the ISO or system steward uploads the ISVMP to the Artifacts tab in eMASS, and links to the appropriate security control (SI-2.12) for the ISVMP.

The ISVMP must be updated on an annual basis or when a significant/major change to the system occurs.

Application Hosted On-Premises/VA Network

The On-Premises/VA Network includes applications that are VA managed and utilize an

OS platform such as Window, UNIX, or Mainframe. A&A requirements for VAEC and other

FedRAMP Cloud applications are addressed separately. Please refer to System Boundary

Guidance Applications on the On-Premises/VA Network may choose to inherit common control providers from the VA Tier 1 System of Record (T1SOR) and VA Enterprise SOR

(VA ENTSOR). Appendix D – Common Control Providers/System of Record (SOR) for complete details to help determine if the VA T1SOR or VA ENTSOR is applicable.

Security Documentation

The following sections provide details for each of the required security artifacts including the document requirements, references, and the parties that can provide additional guidance for each artifact. If available, templates for the applicable security artifacts/documents are located in the Templates section of the eMASS Knowledge

Service page.

An artifact that is generated through eMASS as part of the authorization package and is reviewed/approved by the ISO and/or Information System Security Officer (ISSO) in the eMASS workflow as part of the authorization package may not require signature(s) and may be valid without signature(s). Contact your ISSO with questions on how to complete the documentation.

Configuration Management Plan (CMP)

The Configuration Management Plan (CMP) identifies configuration management roles and responsibilities, resources, and processes to ensure any changes are evaluated and approved before implementation. CMP guidance is provided below.

As part of the normal configuration/change management of an information system, change requests are entered into the authorized VA IT Service Management (ITSM) change control system, Your IT Services, for review, approval, and implementation by the appropriate VA OIT organizations or service providers.

Roles and Responsibilities

The CMP template should be used to complete the CMP and is available in the VA OIT

Service Management Office’s Process Asset Library (PAL). The ISO or system steward should work with the ISSO to complete the CMP.

Standards / Guidelines

• NIST SP 800-128

• NIST SP 800-53 (CM-9 Configuration Management Plan)

• VA Handbook 6500

• The CMP should include processes for managing configuration and change management.

• The CMP should include infrastructure servers that support the system.

• The CMP should include a current configuration baseline detailing hardware and software associated with the system. Network devices do not apply.

Completion Steps

1. The ISO/system steward works with the ISSO to complete the CMP.

https://vaww.vashare.oit.va.gov/sites/ois/KnowledgeService/Pages/eMASS.aspx https://vaww.vashare.oit.va.gov/sites/ois/KnowledgeService/Pages/eMASS.aspx https://yourit.va.gov/va https://vaww.oed.wss.va.gov/process/Library/configuration_management_plan_template.docx https://vaww.oed.wss.va.gov/process/Library/Forms/Customer.aspx

2. Once the CMP is complete, the ISO or system steward uploads the CMP to the

Artifacts tab in eMASS, and links to the appropriate security control (CM-9) for the Configuration Management Plan.

Continuous Monitoring Requirement

The CMP must be updated on an annual basis or when a significant/major change to the system occurs.

Disaster Recovery Plan (DRP)

Disaster Recovery planning refers to measures to recover information system infrastructure to an alternate location after a disruption. Plans are based upon current boundaries established by the Office of Information Security (OIS). Each year Information

Security Risk Management (ISRM) will monitor systems to make sure they maintain the annual review requirements. DRP guidance is provided below.

Roles and Responsibilities

• ISRM is the Office of Primary Responsibility (OPR) for oversight of planning and testing of system level DRPs.

• The ISO or system steward works with the assigned ISSO and DRP Director to create or revise the DRP. A DRP template can be found on the Knowledge Service page.

• NIST Special Publication 800-34 Rev. 1 – Contingency Planning Guide for Federal

Information Systems

• NIST SP 800-53 (CP-2 Contingency Plan)

• VA Handbook 6500

• VA Handbook 6500.8 Information System Contingency Planning

Note: System Level Configuration Management Plans are under the governance of the VA OIT Service Management Office (SMO), Service

Configuration Management organization, which collaborates with the

Enterprise Program Management Division (EPMD), for continuous maintenance of the template and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .