This is a bidding schedule attachment for an ITS On-Call Repair, Maintenance, Replace, and Install contract opportunity with the State of South Carolina. The contract encompasses 161 line items covering a broad range of services including traffic control operations, fiber optic cable installation and maintenance, conduit installation, electrical services, pole installation and removal, cabinet installation, and equipment rental with operator services. The work includes mobilization, crash truck services, traffic management on interstate and non-interstate highways, installation of HDPE and PVC conduit in various configurations, fiber optic cable installation in new and existing ducts, testing and splicing operations, electrical infrastructure work, pole-related activities for concrete, steel, and wood structures, cabinet and service box installation, and auxiliary services such as helper labor and specialized equipment rental. The contract is structured as a four-year agreement with quantities and pricing specified for each year of performance.
The pricing structure consists of unit prices for the majority of line items, with all items currently showing $0.00 bid prices pending contractor submission, except for a lump sum "Cost plus material 15%" provision that totals $800,000 in Year 1, $825,000 in Year 2, $850,000 in Year 3, and $875,000 in Year 4. Fixed-price line items include mileage reimbursement at the IRS Business Standard Mileage Rate (currently $0.655 per mile for 500,000 miles annually, totaling $327,500 per year) and overnight lodging capped at current GSA rates (250 instances annually at $50,000 total per year). The total annual costs for the bidding schedule are $1,177,500 for Year 1, $1,202,500 for Year 2, $1,227,500 for Year 3, and $1,252,500 for Year 4, with bidders required to complete pricing for all four contract years in the SCEIS system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| Revised Award Date.pdf | ||
| Notice Regarding Award.pdf | ||
| Amendment 1.pdf | ||
| Solicitation.pdf | ||
| Attachment B.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Qty Year 1
| Contract Year 1 | |||||
| Line | Qty | Unit | Bid Price | Description | Annual Total |
| (Yearly Qty *Bid Price) | |||||
| 1 | 75 | EA | Mobilization per work order | $0.00 | |
| 2 | 50 | EA | Crash Truck (per day) | $0.00 | |
| 3 | 50 | EA | Traffic control interstate per day time lane closure | $0.00 | |
| 4 | 120 | EA | Traffic control interstate per night time lane closure | $0.00 | |
| 5 | 75 | EA | Shoulder closure interstate per closure with crash truck | $0.00 | |
| 6 | 150 | EA | Shoulder closure interstate per closure with out crash truck | $0.00 | |
| 7 | 100 | EA | Traffic control per day non interstate | $0.00 | |
| 8 | 50 | EA | Traffic control per night time non interstate | $0.00 | |
| 9 | 100 | EA | Flagging Operation | $0.00 | |
| 10 | 10,000 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe less than 5000' trenched/plowed (includes proofing duct and F/I pull line) | $0.00 | |
| 11 | 200,000 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe greater than 5000' trenched/plowed (includes proofing duct and F/I pull line) | $0.00 | |
| 12 | 2,000 | LF | F/I 2'' HDPE Additional roll pipe SCH 80/SDR11 1-2'' addition for trench/plowed/bore (includes proofing duct and F/I pull line) | $0.00 | |
| 13 | 500 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe Rock Trench | $0.00 | |
| 14 | 200 | LF | F/I 2” HDPE directional rock bore SCH 80/SDR11 to include 1-2” pipes (includes proofing duct and F/I pull line) | $0.00 | |
| 15 | 25,000 | LF | F/I 2” HDPE directional bore SCH 80/SDR11 to include 1-2” pipe greater than 1000’ (includes proofing duct and F/I pull line) | $0.00 | |
| 16 | 5,000 | LF | F/I 2” HDPE directional bore SCH 80/SDR11 to include 1-2” pipe less than 1000’ (includes proofing duct and F/I pull line) | $0.00 | |
| 17 | 50 | LF | F/I 2” Gal Ridged conduit 1-2” pipe trenched/riser | $0.00 | |
| 18 | 3,000 | LF | F/I 2” Gal Ridged conduit to include 1-2” conduit with stainless bridge attachment and hardware | $0.00 | |
| 19 | 2,500 | LF | F/I 2” SCH 80 PVC trenched/ riser (includes proofing duct and F/I pull line) | $0.00 | |
| 20 | 1,500 | LF | F/I 1” SCH 80 PVC trenched/ riser(includes proofing duct and F/I pull line) | $0.00 | |
| 21 | 5,000 | LF | F/I Mule tape in existing conduit | $0.00 | |
| 22 | 10,000 | LF | Install Mule tape in existing conduit | $0.00 | |
| 23 | 5,000 | LF | F/I Detectable mule tape in existing conduit | $0.00 | |
| 24 | 25,000 | LF | F/I Detectable mule tape in new conduit with fiber | $0.00 | |
| 25 | 5,000 | LF | Install Detectable mule tape in existing conduit | $0.00 | |
| 26 | 5 | EA | F/I stainless pull box for bridge with hubs and hardware | $0.00 | |
| 27 | 25 | LF | Saw cut concrete up to 6” depth per ft. | $0.00 | |
| 28 | 25 | LF | Saw cut ASPH up to 6” depth per ft. | $0.00 | |
| 29 | 50 | EA | F/I 100 AMP electrical service on wood or concrete pole overhead | $0.00 | |
| 30 | 25 | EA | F/I 100 AMP electrical service on pedestal underground | $0.00 | |
| 31 | 2 | EA | F/I 200 AMP electrical service on concrete or wood pole overhead | $0.00 | |
| 32 | 2 | EA | F/I 200 AMP electrical service on pedestal underground | $0.00 | |
| 33 | 6,000 | LF | Install #10, 6, 4, or 2 THHN in duct (length of pull not length of cable) | $0.00 | |
| 34 | 2,500 | LF | Install 1/0, 2/0, 3/0, or 4/0 THHN in duct (length of pull not length of cable typical single phase 120/240 three wire plus ground) | $0.00 | |
| 35 | 500 | LF | Install 300 or 350 MCM in duct (length of pull not length of cable typical single phase 120/240 three wire plus ground) | $0.00 | |
| 36 | 100 | EA | F/I additional ground rod 5/8” X 8' | $0.00 | |
| 37 | 200 | LF | Install additional #4 ground wire 7 strand bare | $0.00 | |
| 38 | 100 | EA | F/I additional exothermic weld for 5/8” ground rods and #4 or 6 wire | $0.00 | |
| 39 | 100 | EA | F/I lentil | $0.00 | |
| 40 | 50 | EA | Install lentil | $0.00 | |
| 41 | 10 | EA | F/I 100AMP disconnect | $0.00 | |
| 42 | 5 | EA | F/I 200AMP disconnect | $0.00 | |
| 43 | 6,000 | LF | Install SMF in new duct less than 12,000’ | $0.00 | |
| 44 | 230,000 | LF | Install SMF in new duct greater than 12,000’ | $0.00 | |
| 45 | 10,000 | LF | Install SMF in existing duct less than 12,000’ | $0.00 | |
| 46 | 15,000 | LF | Install SMF in existing duct greater than 12,000’ | $0.00 | |
| 47 | 10,000 | LF | Install SMF lashed to messenger less than 1,000' | $0.00 | |
| 48 | 5,000 | LF | Install SMF lashed to messenger greater than 1,000' | $0.00 | |
| 49 | 5,000 | LF | Install SMF over lashed to messenger with existing cables | $0.00 | |
| 50 | 10,000 | LF | Remove existing fiber from existing duct for reinstallation | $0.00 | |
| 51 | 100,000 | LF | Remove existing fiber from existing duct for disposal | $0.00 | |
| 52 | 2 | EA | Install snow shoes per set | $0.00 | |
| 53 | 144 | EA | LSPM test (any wave) | $0.00 | |
| 54 | 720 | EA | OTDR testing (any wave) up to 72 | $0.00 | |
| 55 | 144 | EA | OTDR testing (any wave) > 144 | $0.00 | |
| 56 | 144 | EA | OTDR reel test (any wave) up to 72 | $0.00 | |
| 57 | 864 | EA | OTDR reel test (any wave) > 144 | $0.00 | |
| 58 | 48 | EA | FO Fusion splicing < 24 | $0.00 | |
| 59 | 96 | EA | FO Fusion splicing < 144 | $0.00 | |
| 60 | 144 | EA | FO Fusion splicing > 144 | $0.00 | |
| 61 | 12 | EA | Install splice trays/coupler panels | $0.00 | |
| 62 | 5 | EA | Install FO splice closure only | $0.00 | |
| 63 | 6 | EA | F/I coupler panel, 6 fiber, SM, ST (CCH-CP06P-19) | $0.00 | |
| 64 | 2 | EA | F/I FO splice tray housing rack max 144 fiber (CSH-03U) | $0.00 | |
| 65 | 6 | EA | F/I FO splice tray, fusion heat shrink 12 fiber (M67-048) | $0.00 | |
| 66 | 6 | EA | F/I FO jumper, SM, ST, LC 6' | $0.00 | |
| 67 | 12 | EA | F/I pigtail, SM, ST, 3’ | $0.00 | |
| 68 | 6 | EA | F/I jumper, SM, ST, 3’ | $0.00 | |
| 69 | 2 | EA | Install term cabinet, wall or rack | $0.00 | |
| 70 | 6 | EA | LT FO cable prep up to 72 | $0.00 | |
| 71 | 12 | EA | LT FO cable prep greater than 96 | $0.00 | |
| 72 | 69 | EA | F/I splice enclosure 48 strand fiber (2178S) | $0.00 | |
| 73 | 4 | EA | F/I splice enclosure 96 strand fiber (2178L w/ Exp) | $0.00 | |
| 74 | 6 | EA | F/I splice enclosure 144 strand fiber (2178LL w/2181 Exp) | $0.00 | |
| 75 | 4 | EA | F/I fiber trays, fusion HS, slant (2523t w/ 2524I) | $0.00 | |
| 76 | 2 | EA | F/I aerial FOSC mounting brackets (2183) | $0.00 | |
| 77 | 15 | EA | F/I 60’ concrete pole | $0.00 | |
| 78 | 12 | EA | Install 60’ concrete pole | $0.00 | |
| 79 | 10 | EA | Remove 60’ concrete pole including fill | $0.00 | |
| 80 | 3 | EA | F/I 80’ concrete pole | $0.00 | |
| 81 | 2 | EA | Install 80’ concrete pole | $0.00 | |
| 82 | 2 | EA | Remove 80’ concrete pole including fill | $0.00 | |
| 83 | 8 | EA | Install 40’ concrete pole | $0.00 | |
| 84 | 10 | EA | Remove 40’ concrete pole including fill | $0.00 | |
| 85 | 10 | EA | F/I 50' Steel Pole including anchor and T-Base | $0.00 | |
| 86 | 10 | EA | Install 50' Steel Pole including anchor and T-Base | $0.00 | |
| 87 | 10 | EA | Remove 50' Steel Pole including fill | $0.00 | |
| 88 | 10 | EA | Remove lowering device on existing erected pole | $0.00 | |
| 89 | 10 | EA | Install CLS lowering device on existing erected pole | $0.00 | |
| 90 | 5 | EA | remove and install lowering device on existing erected pole | $0.00 | |
| 91 | 20 | EA | F/I CLS lowering device on non erected pole | $0.00 | |
| 92 | 15 | EA | Install CLS lowering device non erected pole | $0.00 | |
| 93 | 2 | EA | F/I poured in place cabinet base for 332 cabinet | $0.00 | |
| 94 | 50 | EA | Furnish pre Fab cabinet concrete base for 322 cabinet | $0.00 | |
| 95 | 50 | EA | Install pre Fab cabinet base | $0.00 | |
| 96 | 50 | EA | Install 332 cabinet | $0.00 | |
| 97 | 5 | EA | Install 336 cabinet on pole | $0.00 | |
| 98 | 15 | EA | Remove 332 cabinet | $0.00 | |
| 99 | 15 | EA | Remove 336 Cabinet | $0.00 | |
| 100 | 15 | EA | Remove pre fab concrete cabinet base and fill dirt | $0.00 | |
| 101 | 35 | EA | F/I SCIPCAB1 Cabinet | $0.00 | |
| 102 | 25 | SF | Install SCIPCAB1 Cabinet | $0.00 | |
| 103 | 50 | SF | Furnish SCIPCAB1 Cabinet | $0.00 | |
| 104 | 100 | EA | F/I service box | $0.00 | |
| 105 | 50 | EA | Install service box | $0.00 | |
| 106 | 50 | EA | F/I pull box | $0.00 | |
| 107 | 25 | EA | Install pull box | $0.00 | |
| 108 | 300 | EA | F/I marker post | $0.00 | |
| 109 | 300 | EA | Install maker post | $0.00 | |
| 110 | 10 | EA | F/I concrete footers for DMS structure up to 15 cubic yards include reinforcement steel,sonitube, forms, and misc. material.(One foundation for Butterfly or Cantilever and Two foundations for span structure). | $0.00 | |
| 111 | 10 | EA | Remove DMS structure foundation to 1’ below grade to include removal of anchor bolts and steel reinforcement) | $0.00 | |
| 112 | 25 | EA | F/I 30’ wood pole | $0.00 | |
| 113 | 5 | EA | Install 30’ , 35' or 40' wood pole | $0.00 | |
| 114 | 5 | EA | Remove 30’, 35' or 40' wood pole including fill | $0.00 | |
| 115 | 10 | EA | F/I 35’ wood pole | $0.00 | |
| 116 | 5 | EA | F/I 40’ wood pole | $0.00 | |
| 117 | 15,000 | LF | F/I ¼” Galva steel cable with hardware for messenger | $0.00 | |
| 118 | 5 | EA | F/I back guy for wood pole including cable, anchor, hardware, and ground | $0.00 | |
| 119 | 5 | EA | F/I sidewalk guy for wood pole including cable, anchor, hardware, and ground | $0.00 | |
| 120 | 3 | EA | F/I Aerial guy including all hardware and cable | $0.00 | |
| 121 | 50 | EA | Disposal of concrete and concrete poles per ton (transportation not included) | $0.00 | |
| 122 | 1 | LS | $800,000.00 | Cost plus material 15% | $800,000.00 |
| 123 | 5,000 | HR | Furnish Helper | $0.00 | |
| 124 | 8,000 | HR | Furnish Field Technical Services Level I per hour | $0.00 | |
| 125 | 20,000 | HR | Furnish Field Technical Services Level II per hour | $0.00 | |
| 126 | 8,000 | HR | Furnish Field Technical Services Level III per hour | $0.00 | |
| 127 | 500 | HR | Furnish Field Technical Services Level IV per hour | $0.00 | |
| 128 | 480 | HR | Portable light plant/generator per hour | $0.00 | |
| 129 | 500 | HR | Portable Air Compressor per hour | $0.00 | |
| 130 | 200 | HR | Bucket truck 30’ with operator per hour | $0.00 | |
| 131 | 175 | HR | Bucket truck 55’ with operator per hour | $0.00 | |
| 132 | 50 | HR | Bucket truck 100’ with operator per hour | $0.00 | |
| 133 | 50 | HR | Backhoe with operator per hour | $0.00 | |
| 134 | 800 | HR | Mini excavator with operator per hour | $0.00 | |
| 135 | 400 | HR | Trencher with operator per hour | $0.00 | |
| 136 | 80 | HR | Dump truck 26,000 with operator per hour | $0.00 | |
| 137 | 120 | HR | Dump truck 16,000 with operator per hour | $0.00 | |
| 138 | 30 | HR | 15 ton crane w/ man basket with operator per hour | $0.00 | |
| 139 | 160 | HR | 60 ton crane with operator per hour | $0.00 | |
| 140 | 35 | HR | 100 ton crane with operator per hour | $0.00 | |
| 141 | 480 | HR | Utility trailer up to 24' per hour | $0.00 | |
| 142 | 240 | HR | Reel trailer for use with fiber optic cable, roll duct, electrical cable per hour | $0.00 | |
| 143 | 40 | HR | Pressure Digger 24’’ – 48’’ with operator per hour | $0.00 | |
| 144 | 480 | HR | Tractor and trailer 53 – 80’ per HR unlimited miles with operator/tie down equipment per hour | $0.00 | |
| 145 | 500,000 | MI | $0.655 | Mileage reimbursement for non hourly rated vehicles*as per current IRS Business Standard Mileage Rate | $327,500.00 |
| 146 | 250 | EA | Overnight Lodging *shall not exceed the current GSA Rate for the area of overnight lodging | $50,000.00 | |
| 147 | 600 | LF | F/I Steel Beam Guardrail LF | $0.00 | |
| 148 | 12 | EA | F/I End Anchor - Type B EA | $0.00 | |
| 149 | 12 | EA | F/I End Terminal - Type T EA | $0.00 | |
| 150 | 75 | CY | Unclassified Excavation CY | $0.00 | |
| 151 | 20 | CY | Rock Excavation CY | $0.00 | |
| 152 | 15,000 | LF | Rotary mowing in R/W 30’wide | $0.00 | |
| 153 | 20,000 | LF | Tree trimming 15’ wide, chipped on R/W | $0.00 | |
| 154 | 200 | LF | Clearing and grubbing within R/W 10’ wide | $0.00 | |
| 155 | 150 | EA | Furnish CL-TC1 Cyber Lock ITS Cabinet Lock | $0.00 | |
| 156 | 5 | EA | Furnish CL-M2 Cyber Lock Mortise (for Hub buildings and Ravenel tower-style lock cylinders) | $0.00 | |
| 157 | 10 | EA | Furnish PL-03 Cyber Padlocks (Boron shackled padlocks we use on hub building and Koon St gates) | $0.00 | |
| 158 | 5 | EA | Furnish CK-IR7 Cyber Keys | $0.00 | |
| 159 | 10 | EA | Furnish CK-RXD2 USB Cyber Keys | $0.00 | |
| 160 | 2 | EA | Furnish Cyber Audit Maintenance | $0.00 | |
| 161 | 25 | CY | F/I concrete , minimum 3,000 psi | $0.00 | |
| Total of line items 1 thru 161 | $1,177,500.00 | ||||
| Enter your Total (totaling all 4 years) of line items 1 thru 161 on the Line 1 of the Bidding Schedule and in SCEIS. Make sure to complete all 4 years; see tab for each year on bottom of spreadsheet. |
Qty Year 2
| Contract Year 2 | |||||
| Line | Qty | Unit | Bid Price | Description | Annual Total |
| (Yearly Qty *Bid Price) | |||||
| 1 | 75 | EA | Mobilization per work order | $0.00 | |
| 2 | 50 | EA | Crash Truck (per day) | $0.00 | |
| 3 | 50 | EA | Traffic control interstate per day time lane closure | $0.00 | |
| 4 | 120 | EA | Traffic control interstate per night time lane closure | $0.00 | |
| 5 | 75 | EA | Shoulder closure interstate per closure with crash truck | $0.00 | |
| 6 | 150 | EA | Shoulder closure interstate per closure with out crash truck | $0.00 | |
| 7 | 100 | EA | Traffic control per day non interstate | $0.00 | |
| 8 | 50 | EA | Traffic control per night time non interstate | $0.00 | |
| 9 | 100 | EA | Flagging Operation | $0.00 | |
| 10 | 10,000 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe less than 5000' trenched/plowed (includes proofing duct and F/I pull line) | $0.00 | |
| 11 | 200,000 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe greater than 5000' trenched/plowed (includes proofing duct and F/I pull line) | $0.00 | |
| 12 | 2,000 | LF | F/I 2'' HDPE Additional roll pipe SCH 80/SDR11 1-2'' addition for trench/plowed/bore (includes proofing duct and F/I pull line) | $0.00 | |
| 13 | 500 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe Rock Trench | $0.00 | |
| 14 | 200 | LF | F/I 2” HDPE directional rock bore SCH 80/SDR11 to include 1-2” pipes (includes proofing duct and F/I pull line) | $0.00 | |
| 15 | 25,000 | LF | F/I 2” HDPE directional bore SCH 80/SDR11 to include 1-2” pipe greater than 1000’ (includes proofing duct and F/I pull line) | $0.00 | |
| 16 | 5,000 | LF | F/I 2” HDPE directional bore SCH 80/SDR11 to include 1-2” pipe less than 1000’ (includes proofing duct and F/I pull line) | $0.00 | |
| 17 | 50 | LF | F/I 2” Gal Ridged conduit 1-2” pipe trenched/riser | $0.00 | |
| 18 | 3,000 | LF | F/I 2” Gal Ridged conduit to include 1-2” conduit with stainless bridge attachment and hardware | $0.00 | |
| 19 | 2,500 | LF | F/I 2” SCH 80 PVC trenched/ riser (includes proofing duct and F/I pull line) | $0.00 | |
| 20 | 1,500 | LF | F/I 1” SCH 80 PVC trenched/ riser(includes proofing duct and F/I pull line) | $0.00 | |
| 21 | 5,000 | LF | F/I Mule tape in existing conduit | $0.00 | |
| 22 | 10,000 | LF | Install Mule tape in existing conduit | $0.00 | |
| 23 | 5,000 | LF | F/I Detectable mule tape in existing conduit | $0.00 | |
| 24 | 25,000 | LF | F/I Detectable mule tape in new conduit with fiber | $0.00 | |
| 25 | 5,000 | LF | Install Detectable mule tape in existing conduit | $0.00 | |
| 26 | 5 | EA | F/I stainless pull box for bridge with hubs and hardware | $0.00 | |
| 27 | 25 | LF | Saw cut concrete up to 6” depth per ft. | $0.00 | |
| 28 | 25 | LF | Saw cut ASPH up to 6” depth per ft. | $0.00 | |
| 29 | 50 | EA | F/I 100 AMP electrical service on wood or concrete pole overhead | $0.00 | |
| 30 | 25 | EA | F/I 100 AMP electrical service on pedestal underground | $0.00 | |
| 31 | 2 | EA | F/I 200 AMP electrical service on concrete or wood pole overhead | $0.00 | |
| 32 | 2 | EA | F/I 200 AMP electrical service on pedestal underground | $0.00 | |
| 33 | 6,000 | LF | Install #10, 6, 4, or 2 THHN in duct (length of pull not length of cable) | $0.00 | |
| 34 | 2,500 | LF | Install 1/0, 2/0, 3/0, or 4/0 THHN in duct (length of pull not length of cable typical single phase 120/240 three wire plus ground) | $0.00 | |
| 35 | 500 | LF | Install 300 or 350 MCM in duct (length of pull not length of cable typical single phase 120/240 three wire plus ground) | $0.00 | |
| 36 | 100 | EA | F/I additional ground rod 5/8” X 8' | $0.00 | |
| 37 | 200 | LF | Install additional #4 ground wire 7 strand bare | $0.00 | |
| 38 | 100 | EA | F/I additional exothermic weld for 5/8” ground rods and #4 or 6 wire | $0.00 | |
| 39 | 100 | EA | F/I lentil | $0.00 | |
| 40 | 50 | EA | Install lentil | $0.00 | |
| 41 | 10 | EA | F/I 100AMP disconnect | $0.00 | |
| 42 | 5 | EA | F/I 200AMP disconnect | $0.00 | |
| 43 | 6,000 | LF | Install SMF in new duct less than 12,000’ | $0.00 | |
| 44 | 230,000 | LF | Install SMF in new duct greater than 12,000’ | $0.00 | |
| 45 | 10,000 | LF | Install SMF in existing duct less than 12,000’ | $0.00 | |
| 46 | 15,000 | LF | Install SMF in existing duct greater than 12,000’ | $0.00 | |
| 47 | 10,000 | LF | Install SMF lashed to messenger less than 1,000' | $0.00 | |
| 48 | 5,000 | LF | Install SMF lashed to messenger greater than 1,000' | $0.00 | |
| 49 | 5,000 | LF | Install SMF over lashed to messenger with existing cables | $0.00 | |
| 50 | 10,000 | LF | Remove existing fiber from existing duct for reinstallation | $0.00 | |
| 51 | 100,000 | LF | Remove existing fiber from existing duct for disposal | $0.00 | |
| 52 | 2 | EA | Install snow shoes per set | $0.00 | |
| 53 | 144 | EA | LSPM test (any wave) | $0.00 | |
| 54 | 720 | EA | OTDR testing (any wave) up to 72 | $0.00 | |
| 55 | 144 | EA | OTDR testing (any wave) > 144 | $0.00 | |
| 56 | 144 | EA | OTDR reel test (any wave) up to 72 | $0.00 | |
| 57 | 864 | EA | OTDR reel test (any wave) > 144 | $0.00 | |
| 58 | 48 | EA | FO Fusion splicing < 24 | $0.00 | |
| 59 | 96 | EA | FO Fusion splicing < 144 | $0.00 | |
| 60 | 144 | EA | FO Fusion splicing > 144 | $0.00 | |
| 61 | 12 | EA | Install splice trays/coupler panels | $0.00 | |
| 62 | 5 | EA | Install FO splice closure only | $0.00 | |
| 63 | 6 | EA | F/I coupler panel, 6 fiber, SM, ST (CCH-CP06P-19) | $0.00 | |
| 64 | 2 | EA | F/I FO splice tray housing rack max 144 fiber (CSH-03U) | $0.00 | |
| 65 | 6 | EA | F/I FO splice tray, fusion heat shrink 12 fiber (M67-048) | $0.00 | |
| 66 | 6 | EA | F/I FO jumper, SM, ST, LC 6' | $0.00 | |
| 67 | 12 | EA | F/I pigtail, SM, ST, 3’ | $0.00 | |
| 68 | 6 | EA | F/I jumper, SM, ST, 3’ | $0.00 | |
| 69 | 2 | EA | Install term cabinet, wall or rack | $0.00 | |
| 70 | 6 | EA | LT FO cable prep up to 72 | $0.00 | |
| 71 | 12 | EA | LT FO cable prep greater than 96 | $0.00 | |
| 72 | 69 | EA | F/I splice enclosure 48 strand fiber (2178S) | $0.00 | |
| 73 | 4 | EA | F/I splice enclosure 96 strand fiber (2178L w/ Exp) | $0.00 | |
| 74 | 6 | EA | F/I splice enclosure 144 strand fiber (2178LL w/2181 Exp) | $0.00 | |
| 75 | 4 | EA | F/I fiber trays, fusion HS, slant (2523t w/ 2524I) | $0.00 | |
| 76 | 2 | EA | F/I aerial FOSC mounting brackets (2183) | $0.00 | |
| 77 | 15 | EA | F/I 60’ concrete pole | $0.00 | |
| 78 | 12 | EA | Install 60’ concrete pole | $0.00 | |
| 79 | 10 | EA | Remove 60’ concrete pole including fill | $0.00 | |
| 80 | 3 | EA | F/I 80’ concrete pole | $0.00 | |
| 81 | 2 | EA | Install 80’ concrete pole | $0.00 | |
| 82 | 2 | EA | Remove 80’ concrete pole including fill | $0.00 | |
| 83 | 8 | EA | Install 40’ concrete pole | $0.00 | |
| 84 | 10 | EA | Remove 40’ concrete pole including fill | $0.00 | |
| 85 | 10 | EA | F/I 50' Steel Pole including anchor and T-Base | $0.00 | |
| 86 | 10 | EA | Install 50' Steel Pole including anchor and T-Base | $0.00 | |
| 87 | 10 | EA | Remove 50' Steel Pole including fill | $0.00 | |
| 88 | 10 | EA | Remove lowering device on existing erected pole | $0.00 | |
| 89 | 10 | EA | Install CLS lowering device on existing erected pole | $0.00 | |
| 90 | 5 | EA | remove and install lowering device on existing erected pole | $0.00 | |
| 91 | 20 | EA | F/I CLS lowering device on non erected pole | $0.00 | |
| 92 | 15 | EA | Install CLS lowering device non erected pole | $0.00 | |
| 93 | 2 | EA | F/I poured in place cabinet base for 332 cabinet | $0.00 | |
| 94 | 50 | EA | Furnish pre Fab cabinet concrete base for 322 cabinet | $0.00 | |
| 95 | 50 | EA | Install pre Fab cabinet base | $0.00 | |
| 96 | 50 | EA | Install 332 cabinet | $0.00 | |
| 97 | 5 | EA | Install 336 cabinet on pole | $0.00 | |
| 98 | 15 | EA | Remove 332 cabinet | $0.00 | |
| 99 | 15 | EA | Remove 336 Cabinet | $0.00 | |
| 100 | 15 | EA | Remove pre fab concrete cabinet base and fill dirt | $0.00 | |
| 101 | 35 | EA | F/I SCIPCAB1 Cabinet | $0.00 | |
| 102 | 25 | SF | Install SCIPCAB1 Cabinet | $0.00 | |
| 103 | 50 | SF | Furnish SCIPCAB1 Cabinet | $0.00 | |
| 104 | 100 | EA | F/I service box | $0.00 | |
| 105 | 50 | EA | Install service box | $0.00 | |
| 106 | 50 | EA | F/I pull box | $0.00 | |
| 107 | 25 | EA | Install pull box | $0.00 | |
| 108 | 300 | EA | F/I marker post | $0.00 | |
| 109 | 300 | EA | Install maker post | $0.00 | |
| 110 | 10 | EA | F/I concrete footers for DMS structure up to 15 cubic yards include reinforcement steel,sonitube, forms, and misc. material.(One foundation for Butterfly or Cantilever and Two foundations for span structure). | $0.00 | |
| 111 | 10 | EA | Remove DMS structure foundation to 1’ below grade to include removal of anchor bolts and steel reinforcement) | $0.00 | |
| 112 | 25 | EA | F/I 30’ wood pole | $0.00 | |
| 113 | 5 | EA | Install 30’ , 35' or 40' wood pole | $0.00 | |
| 114 | 5 | EA | Remove 30’, 35' or 40' wood pole including fill | $0.00 | |
| 115 | 10 | EA | F/I 35’ wood pole | $0.00 | |
| 116 | 5 | EA | F/I 40’ wood pole | $0.00 | |
| 117 | 15,000 | LF | F/I ¼” Galva steel cable with hardware for messenger | $0.00 | |
| 118 | 5 | EA | F/I back guy for wood pole including cable, anchor, hardware, and ground | $0.00 | |
| 119 | 5 | EA | F/I sidewalk guy for wood pole including cable, anchor, hardware, and ground | $0.00 | |
| 120 | 3 | EA | F/I Aerial guy including all hardware and cable | $0.00 | |
| 121 | 50 | EA | Disposal of concrete and concrete poles per ton (transportation not included) | $0.00 | |
| 122 | 1 | LS | $825,000.00 | Cost plus material 15% | $825,000.00 |
| 123 | 5,000 | HR | Furnish Helper | $0.00 | |
| 124 | 8,000 | HR | Furnish Field Technical Services Level I per hour | $0.00 | |
| 125 | 20,000 | HR | Furnish Field Technical Services Level II per hour | $0.00 | |
| 126 | 8,000 | HR | Furnish Field Technical Services Level III per hour | $0.00 | |
| 127 | 500 | HR | Furnish Field Technical Services Level IV per hour | $0.00 | |
| 128 | 480 | HR | Portable light plant/generator per hour | $0.00 | |
| 129 | 500 | HR | Portable Air Compressor per hour | $0.00 | |
| 130 | 200 | HR | Bucket truck 30’ with operator per hour | $0.00 | |
| 131 | 175 | HR | Bucket truck 55’ with operator per hour | $0.00 | |
| 132 | 50 | HR | Bucket truck 100’ with operator per hour | $0.00 | |
| 133 | 50 | HR | Backhoe with operator per hour | $0.00 | |
| 134 | 800 | HR | Mini excavator with operator per hour | $0.00 | |
| 135 | 400 | HR | Trencher with operator per hour | $0.00 | |
| 136 | 80 | HR | Dump truck 26,000 with operator per hour | $0.00 | |
| 137 | 120 | HR | Dump truck 16,000 with operator per hour | $0.00 | |
| 138 | 30 | HR | 15 ton crane w/ man basket with operator per hour | $0.00 | |
| 139 | 160 | HR | 60 ton crane with operator per hour | $0.00 | |
| 140 | 35 | HR | 100 ton crane with operator per hour | $0.00 | |
| 141 | 480 | HR | Utility trailer up to 24' per hour | $0.00 | |
| 142 | 240 | HR | Reel trailer for use with fiber optic cable, roll duct, electrical cable per hour | $0.00 | |
| 143 | 40 | HR | Pressure Digger 24’’ – 48’’ with operator per hour | $0.00 | |
| 144 | 480 | HR | Tractor and trailer 53 – 80’ per HR unlimited miles with operator/tie down equipment per hour | $0.00 | |
| 145 | 500,000 | MI | $0.655 | Mileage reimbursement for non hourly rated vehicles*as per current IRS Business Standard Mileage Rate | $327,500.00 |
| 146 | 250 | EA | Overnight Lodging *Shall not excced the current GSA Rate for the area of overnight Lodging | $50,000.00 | |
| 147 | 600 | LF | F/I Steel Beam Guardrail LF | $0.00 | |
| 148 | 12 | EA | F/I End Anchor - Type B EA | $0.00 | |
| 149 | 12 | EA | F/I End Terminal - Type T EA | $0.00 | |
| 150 | 75 | CY | Unclassified Excavation CY | $0.00 | |
| 151 | 20 | CY | Rock Excavation CY | $0.00 | |
| 152 | 15,000 | LF | Rotary mowing in R/W 30’wide | $0.00 | |
| 153 | 20,000 | LF | Tree trimming 15’ wide, chipped on R/W | $0.00 | |
| 154 | 200 | LF | Clearing and grubbing within R/W 10’ wide | $0.00 | |
| 155 | 150 | EA | Furnish CL-TC1 Cyber Lock ITS Cabinet Lock | $0.00 | |
| 156 | 5 | EA | Furnish CL-M2 Cyber Lock Mortise (for Hub buildings and Ravenel tower-style lock cylinders) | $0.00 | |
| 157 | 10 | EA | Furnish PL-03 Cyber Padlocks (Boron shackled padlocks we use on hub building and Koon St gates) | $0.00 | |
| 158 | 5 | EA | Furnish CK-IR7 Cyber Keys | $0.00 | |
| 159 | 10 | EA | Furnish CK-RXD2 USB Cyber Keys | $0.00 | |
| 160 | 2 | EA | Furnish Cyber Audit Maintenance | $0.00 | |
| 161 | 25 | CY | F/I concrete , minimum 3,000 psi | $0.00 |
| Total of line items 1 thru 161 | $1,202,500.00 |
| Enter your Total (totaling all 4 years) of line items 1 thru 161 on the Line 1 of the Bidding Schedule and in SCEIS. Make sure to complete all 4 years; see tab for each year on bottom of spreadsheet. |
Qty Year 3
| Contract Year 3 | |||||
| Line | Qty | Unit | Bid Price | Description | Annual Total |
| (Yearly Qty *Bid Price) | |||||
| 1 | 75 | EA | Mobilization per work order | $0.00 | |
| 2 | 50 | EA | Crash Truck (per day) | $0.00 | |
| 3 | 50 | EA | Traffic control interstate per day time lane closure | $0.00 | |
| 4 | 120 | EA | Traffic control interstate per night time lane closure | $0.00 | |
| 5 | 75 | EA | Shoulder closure interstate per closure with crash truck | $0.00 | |
| 6 | 150 | EA | Shoulder closure interstate per closure with out crash truck | $0.00 | |
| 7 | 100 | EA | Traffic control per day non interstate | $0.00 | |
| 8 | 50 | EA | Traffic control per night time non interstate | $0.00 | |
| 9 | 100 | EA | Flagging Operation | $0.00 | |
| 10 | 10,000 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe less than 5000' trenched/plowed (includes proofing duct and F/I pull line) | $0.00 | |
| 11 | 200,000 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe greater than 5000' trenched/plowed (includes proofing duct and F/I pull line) | $0.00 | |
| 12 | 2,000 | LF | F/I 2'' HDPE Additional roll pipe SCH 80/SDR11 1-2'' addition for trench/plowed/bore (includes proofing duct and F/I pull line) | $0.00 | |
| 13 | 500 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe Rock Trench | $0.00 | |
| 14 | 200 | LF | F/I 2” HDPE directional rock bore SCH 80/SDR11 to include 1-2” pipes (includes proofing duct and F/I pull line) | $0.00 | |
| 15 | 25,000 | LF | F/I 2” HDPE directional bore SCH 80/SDR11 to include 1-2” pipe greater than 1000’ (includes proofing duct and F/I pull line) | $0.00 | |
| 16 | 5,000 | LF | F/I 2” HDPE directional bore SCH 80/SDR11 to include 1-2” pipe less than 1000’ (includes proofing duct and F/I pull line) | $0.00 | |
| 17 | 50 | LF | F/I 2” Gal Ridged conduit 1-2” pipe trenched/riser | $0.00 | |
| 18 | 3,000 | LF | F/I 2” Gal Ridged conduit to include 1-2” conduit with stainless bridge attachment and hardware | $0.00 | |
| 19 | 2,500 | LF | F/I 2” SCH 80 PVC trenched/ riser (includes proofing duct and F/I pull line) | $0.00 | |
| 20 | 1,500 | LF | F/I 1” SCH 80 PVC trenched/ riser(includes proofing duct and F/I pull line) | $0.00 | |
| 21 | 5,000 | LF | F/I Mule tape in existing conduit | $0.00 | |
| 22 | 10,000 | LF | Install Mule tape in existing conduit | $0.00 | |
| 23 | 5,000 | LF | F/I Detectable mule tape in existing conduit | $0.00 | |
| 24 | 25,000 | LF | F/I Detectable mule tape in new conduit with fiber | $0.00 | |
| 25 | 5,000 | LF | Install Detectable mule tape in existing conduit | $0.00 | |
| 26 | 5 | EA | F/I stainless pull box for bridge with hubs and hardware | $0.00 | |
| 27 | 25 | LF | Saw cut concrete up to 6” depth per ft. | $0.00 | |
| 28 | 25 | LF | Saw cut ASPH up to 6” depth per ft. | $0.00 | |
| 29 | 50 | EA | F/I 100 AMP electrical service on wood or concrete pole overhead | $0.00 | |
| 30 | 25 | EA | F/I 100 AMP electrical service on pedestal underground | $0.00 | |
| 31 | 2 | EA | F/I 200 AMP electrical service on concrete or wood pole overhead | $0.00 | |
| 32 | 2 | EA | F/I 200 AMP electrical service on pedestal underground | $0.00 | |
| 33 | 6,000 | LF | Install #10, 6, 4, or 2 THHN in duct (length of pull not length of cable) | $0.00 | |
| 34 | 2,500 | LF | Install 1/0, 2/0, 3/0, or 4/0 THHN in duct (length of pull not length of cable typical single phase 120/240 three wire plus ground) | $0.00 | |
| 35 | 500 | LF | Install 300 or 350 MCM in duct (length of pull not length of cable typical single phase 120/240 three wire plus ground) | $0.00 | |
| 36 | 100 | EA | F/I additional ground rod 5/8” X 8' | $0.00 | |
| 37 | 200 | LF | Install additional #4 ground wire 7 strand bare | $0.00 | |
| 38 | 100 | EA | F/I additional exothermic weld for 5/8” ground rods and #4 or 6 wire | $0.00 | |
| 39 | 100 | EA | F/I lentil | $0.00 | |
| 40 | 50 | EA | Install lentil | $0.00 | |
| 41 | 10 | EA | F/I 100AMP disconnect | $0.00 | |
| 42 | 5 | EA | F/I 200AMP disconnect | $0.00 | |
| 43 | 6,000 | LF | Install SMF in new duct less than 12,000’ | $0.00 | |
| 44 | 230,000 | LF | Install SMF in new duct greater than 12,000’ | $0.00 | |
| 45 | 10,000 | LF | Install SMF in existing duct less than 12,000’ | $0.00 | |
| 46 | 15,000 | LF | Install SMF in existing duct greater than 12,000’ | $0.00 | |
| 47 | 10,000 | LF | Install SMF lashed to messenger less than 1,000' | $0.00 | |
| 48 | 5,000 | LF | Install SMF lashed to messenger greater than 1,000' | $0.00 | |
| 49 | 5,000 | LF | Install SMF over lashed to messenger with existing cables | $0.00 | |
| 50 | 10,000 | LF | Remove existing fiber from existing duct for reinstallation | $0.00 | |
| 51 | 100,000 | LF | Remove existing fiber from existing duct for disposal | $0.00 | |
| 52 | 2 | EA | Install snow shoes per set | $0.00 | |
| 53 | 144 | EA | LSPM test (any wave) | $0.00 | |
| 54 | 720 | EA | OTDR testing (any wave) up to 72 | $0.00 | |
| 55 | 144 | EA | OTDR testing (any wave) > 144 | $0.00 | |
| 56 | 144 | EA | OTDR reel test (any wave) up to 72 | $0.00 | |
| 57 | 864 | EA | OTDR reel test (any wave) > 144 | $0.00 | |
| 58 | 48 | EA | FO Fusion splicing < 24 | $0.00 | |
| 59 | 96 | EA | FO Fusion splicing < 144 | $0.00 | |
| 60 | 144 | EA | FO Fusion splicing > 144 | $0.00 | |
| 61 | 12 | EA | Install splice trays/coupler panels | $0.00 | |
| 62 | 5 | EA | Install FO splice closure only | $0.00 | |
| 63 | 6 | EA | F/I coupler panel, 6 fiber, SM, ST (CCH-CP06P-19) | $0.00 | |
| 64 | 2 | EA | F/I FO splice tray housing rack max 144 fiber (CSH-03U) | $0.00 | |
| 65 | 6 | EA | F/I FO splice tray, fusion heat shrink 12 fiber (M67-048) | $0.00 | |
| 66 | 6 | EA | F/I FO jumper, SM, ST, LC 6' | $0.00 | |
| 67 | 12 | EA | F/I pigtail, SM, ST, 3’ | $0.00 | |
| 68 | 6 | EA | F/I jumper, SM, ST, 3’ | $0.00 | |
| 69 | 2 | EA | Install term cabinet, wall or rack | $0.00 | |
| 70 | 6 | EA | LT FO cable prep up to 72 | $0.00 | |
| 71 | 12 | EA | LT FO cable prep greater than 96 | $0.00 | |
| 72 | 69 | EA | F/I splice enclosure 48 strand fiber (2178S) | $0.00 | |
| 73 | 4 | EA | F/I splice enclosure 96 strand fiber (2178L w/ Exp) | $0.00 | |
| 74 | 6 | EA | F/I splice enclosure 144 strand fiber (2178LL w/2181 Exp) | $0.00 | |
| 75 | 4 | EA | F/I fiber trays, fusion HS, slant (2523t w/ 2524I) | $0.00 | |
| 76 | 2 | EA | F/I aerial FOSC mounting brackets (2183) | $0.00 | |
| 77 | 15 | EA | F/I 60’ concrete pole | $0.00 | |
| 78 | 12 | EA | Install 60’ concrete pole | $0.00 | |
| 79 | 10 | EA | Remove 60’ concrete pole including fill | $0.00 | |
| 80 | 3 | EA | F/I 80’ concrete pole | $0.00 | |
| 81 | 2 | EA | Install 80’ concrete pole | $0.00 | |
| 82 | 2 | EA | Remove 80’ concrete pole including fill | $0.00 | |
| 83 | 8 | EA | Install 40’ concrete pole | $0.00 | |
| 84 | 10 | EA | Remove 40’ concrete pole including fill | $0.00 | |
| 85 | 10 | EA | F/I 50' Steel Pole including anchor and T-Base | $0.00 | |
| 86 | 10 | EA | Install 50' Steel Pole including anchor and T-Base | $0.00 | |
| 87 | 10 | EA | Remove 50' Steel Pole including fill | $0.00 | |
| 88 | 10 | EA | Remove lowering device on existing erected pole | $0.00 | |
| 89 | 10 | EA | Install CLS lowering device on existing erected pole | $0.00 | |
| 90 | 5 | EA | remove and install lowering device on existing erected pole | $0.00 | |
| 91 | 20 | EA | F/I CLS lowering device on non erected pole | $0.00 | |
| 92 | 15 | EA | Install CLS lowering device non erected pole | $0.00 | |
| 93 | 2 | EA | F/I poured in place cabinet base for 332 cabinet | $0.00 | |
| 94 | 50 | EA | Furnish pre Fab cabinet concrete base for 322 cabinet | $0.00 | |
| 95 | 50 | EA | Install pre Fab cabinet base | $0.00 | |
| 96 | 50 | EA | Install 332 cabinet | $0.00 | |
| 97 | 5 | EA | Install 336 cabinet on pole | $0.00 | |
| 98 | 15 | EA | Remove 332 cabinet | $0.00 | |
| 99 | 15 | EA | Remove 336 Cabinet | $0.00 | |
| 100 | 15 | EA | Remove pre fab concrete cabinet base and fill dirt | $0.00 | |
| 101 | 35 | EA | F/I SCIPCAB1 Cabinet | $0.00 | |
| 102 | 25 | SF | Install SCIPCAB1 Cabinet | $0.00 | |
| 103 | 50 | SF | Furnish SCIPCAB1 Cabinet | $0.00 | |
| 104 | 100 | EA | F/I service box | $0.00 | |
| 105 | 50 | EA | Install service box | $0.00 | |
| 106 | 50 | EA | F/I pull box | $0.00 | |
| 107 | 25 | EA | Install pull box | $0.00 | |
| 108 | 300 | EA | F/I marker post | $0.00 | |
| 109 | 300 | EA | Install maker post | $0.00 | |
| 110 | 10 | EA | F/I concrete footers for DMS structure up to 15 cubic yards include reinforcement steel,sonitube, forms, and misc. material.(One foundation for Butterfly or Cantilever and Two foundations for span structure). | $0.00 | |
| 111 | 10 | EA | Remove DMS structure foundation to 1’ below grade to include removal of anchor bolts and steel reinforcement) | $0.00 | |
| 112 | 25 | EA | F/I 30’ wood pole | $0.00 | |
| 113 | 5 | EA | Install 30’ , 35' or 40' wood pole | $0.00 | |
| 114 | 5 | EA | Remove 30’, 35' or 40' wood pole including fill | $0.00 | |
| 115 | 10 | EA | F/I 35’ wood pole | $0.00 | |
| 116 | 5 | EA | F/I 40’ wood pole | $0.00 | |
| 117 | 15,000 | LF | F/I ¼” Galva steel cable with hardware for messenger | $0.00 | |
| 118 | 5 | EA | F/I back guy for wood pole including cable, anchor, hardware, and ground | $0.00 | |
| 119 | 5 | EA | F/I sidewalk guy for wood pole including cable, anchor, hardware, and ground | $0.00 | |
| 120 | 3 | EA | F/I Aerial guy including all hardware and cable | $0.00 | |
| 121 | 50 | EA | Disposal of concrete and concrete poles per ton (transportation not included) | $0.00 | |
| 122 | 1 | LS | $850,000.00 | Cost plus material 15% | $850,000.00 |
| 123 | 5,000 | HR | Furnish Helper | $0.00 | |
| 124 | 8,000 | HR | Furnish Field Technical Services Level I per hour | $0.00 | |
| 125 | 20,000 | HR | Furnish Field Technical Services Level II per hour | $0.00 | |
| 126 | 8,000 | HR | Furnish Field Technical Services Level III per hour | $0.00 | |
| 127 | 500 | HR | Furnish Field Technical Services Level IV per hour | $0.00 | |
| 128 | 480 | HR | Portable light plant/generator per hour | $0.00 | |
| 129 | 500 | HR | Portable Air Compressor per hour | $0.00 | |
| 130 | 200 | HR | Bucket truck 30’ with operator per hour | $0.00 | |
| 131 | 175 | HR | Bucket truck 55’ with operator per hour | $0.00 | |
| 132 | 50 | HR | Bucket truck 100’ with operator per hour | $0.00 | |
| 133 | 50 | HR | Backhoe with operator per hour | $0.00 | |
| 134 | 800 | HR | Mini excavator with operator per hour | $0.00 | |
| 135 | 400 | HR | Trencher with operator per hour | $0.00 | |
| 136 | 80 | HR | Dump truck 26,000 with operator per hour | $0.00 | |
| 137 | 120 | HR | Dump truck 16,000 with operator per hour | $0.00 | |
| 138 | 30 | HR | 15 ton crane w/ man basket with operator per hour | $0.00 | |
| 139 | 160 | HR | 60 ton crane with operator per hour | $0.00 | |
| 140 | 35 | HR | 100 ton crane with operator per hour | $0.00 | |
| 141 | 480 | HR | Utility trailer up to 24' per hour | $0.00 | |
| 142 | 240 | HR | Reel trailer for use with fiber optic cable, roll duct, electrical cable per hour | $0.00 | |
| 143 | 40 | HR | Pressure Digger 24’’ – 48’’ with operator per hour | $0.00 | |
| 144 | 480 | HR | Tractor and trailer 53 – 80’ per HR unlimited miles with operator/tie down equipment per hour | $0.00 | |
| 145 | 500,000 | MI | $0.655 | Mileage reimbursement for non hourly rated vehicles*as per current IRS Business Standard Mileage Rate | $327,500.00 |
| 146 | 250 | EA | Overnight Lodging *shall not exceed the current GSA Rate for the area of overnight lodging | $50,000.00 | |
| 147 | 600 | LF | F/I Steel Beam Guardrail LF | $0.00 | |
| 148 | 12 | EA | F/I End Anchor - Type B EA | $0.00 | |
| 149 | 12 | EA | F/I End Terminal - Type T EA | $0.00 | |
| 150 | 75 | CY | Unclassified Excavation CY | $0.00 | |
| 151 | 20 | CY | Rock Excavation CY | $0.00 | |
| 152 | 15,000 | LF | Rotary mowing in R/W 30’wide | $0.00 | |
| 153 | 20,000 | LF | Tree trimming 15’ wide, chipped on R/W | $0.00 | |
| 154 | 200 | LF | Clearing and grubbing within R/W 10’ wide | $0.00 | |
| 155 | 150 | EA | Furnish CL-TC1 Cyber Lock ITS Cabinet Lock | $0.00 | |
| 156 | 5 | EA | Furnish CL-M2 Cyber Lock Mortise (for Hub buildings and Ravenel tower-style lock cylinders) | $0.00 | |
| 157 | 10 | EA | Furnish PL-03 Cyber Padlocks (Boron shackled padlocks we use on hub building and Koon St gates) | $0.00 | |
| 158 | 5 | EA | Furnish CK-IR7 Cyber Keys | $0.00 | |
| 159 | 10 | EA | Furnish CK-RXD2 USB Cyber Keys | $0.00 | |
| 160 | 2 | EA | Furnish Cyber Audit Maintenance | $0.00 | |
| 161 | 25 | CY | F/I concrete , minimum 3,000 psi | $0.00 | |
| Total of line items 1 thru 161 | $1,227,500.00 | ||||
| Enter your Total (totaling all 4 years) of line items 1 thru 161 on the Line 1 of the Bidding Schedule and in SCEIS. Make sure to complete all 4 years; see tab for each year on bottom of spreadsheet. |
Qty Year 4
| Contract Year 4 | |||||
| Line | Qty | Unit | Bid Price | Description | Annual Total |
| (Yearly Qty *Bid Price) | |||||
| 1 | 75 | EA | Mobilization per work order | $0.00 | |
| 2 | 50 | EA | Crash Truck (per day) | $0.00 | |
| 3 | 50 | EA | Traffic control interstate per day time lane closure | $0.00 | |
| 4 | 120 | EA | Traffic control interstate per night time lane closure | $0.00 | |
| 5 | 75 | EA | Shoulder closure interstate per closure with crash truck | $0.00 | |
| 6 | 150 | EA | Shoulder closure interstate per closure with out crash truck | $0.00 | |
| 7 | 100 | EA | Traffic control per day non interstate | $0.00 | |
| 8 | 50 | EA | Traffic control per night time non interstate | $0.00 | |
| 9 | 100 | EA | Flagging Operation | $0.00 | |
| 10 | 10,000 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe less than 5000' trenched/plowed (includes proofing duct and F/I pull line) | $0.00 | |
| 11 | 200,000 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe greater than 5000' trenched/plowed (includes proofing duct and F/I pull line) | $0.00 | |
| 12 | 2,000 | LF | F/I 2'' HDPE Additional roll pipe SCH 80/SDR11 1-2'' addition for trench/plowed/bore (includes proofing duct and F/I pull line) | $0.00 | |
| 13 | 500 | LF | F/I 2” HDPE roll pipe SCH 80/SDR11 to include 1-2” pipe Rock Trench | $0.00 | |
| 14 | 200 | LF | F/I 2” HDPE directional rock bore SCH 80/SDR11 to include 1-2” pipes (includes proofing duct and F/I pull line) | $0.00 | |
| 15 | 25,000 | LF | F/I 2” HDPE directional bore SCH 80/SDR11 to include 1-2” pipe greater than 1000’ (includes proofing duct and F/I pull line) | $0.00 | |
| 16 | 5,000 | LF | F/I 2” HDPE directional bore SCH 80/SDR11 to include 1-2” pipe less than 1000’ (includes proofing duct and F/I pull line) | $0.00 | |
| 17 | 50 | LF | F/I 2” Gal Ridged conduit 1-2” pipe trenched/riser | $0.00 | |
| 18 | 3,000 | LF | F/I 2” Gal Ridged conduit to include 1-2” conduit with stainless bridge attachment and hardware | $0.00 | |
| 19 | 2,500 | LF | F/I 2” SCH 80 PVC trenched/ riser (includes proofing duct and F/I pull line) | $0.00 | |
| 20 | 1,500 | LF | F/I 1” SCH 80 PVC trenched/ riser(includes proofing duct and F/I pull line) | $0.00 | |
| 21 | 5,000 | LF | F/I Mule tape in existing conduit | $0.00 | |
| 22 | 10,000 | LF | Install Mule tape in existing conduit | $0.00 | |
| 23 | 5,000 | LF | F/I Detectable mule tape in existing conduit | $0.00 | |
| 24 | 25,000 | LF | F/I Detectable mule tape in new conduit with fiber | $0.00 | |
| 25 | 5,000 | LF | Install Detectable mule tape in existing conduit | $0.00 | |
| 26 | 5 | EA | F/I stainless pull box for bridge with hubs and hardware | $0.00 | |
| 27 | 25 | LF | Saw cut concrete up to 6” depth per ft. | $0.00 | |
| 28 | 25 | LF | Saw cut ASPH up to 6” depth per ft. | $0.00 | |
| 29 | 50 | EA | F/I 100 AMP electrical service on wood or concrete pole overhead | $0.00 | |
| 30 | 25 | EA | F/I 100 AMP electrical service on pedestal underground | $0.00 | |
| 31 | 2 | EA | F/I 200 AMP electrical service on concrete or wood pole overhead | $0.00 | |
| 32 | 2 | EA | F/I 200 AMP electrical service on pedestal underground | $0.00 | |
| 33 | 6,000 | LF | Install #10, 6, 4, or 2 THHN in duct (length of pull not length of cable) | $0.00 | |
| 34 | 2,500 | LF | Install 1/0, 2/0, 3/0, or 4/0 THHN in duct (length of pull not length of cable typical single phase 120/240 three wire plus ground) | $0.00 | |
| 35 | 500 | LF | Install 300 or 350 MCM in duct (length of pull not length of cable typical single phase 120/240 three wire plus ground) | $0.00 | |
| 36 | 100 | EA | F/I additional ground rod 5/8” X 8' | $0.00 | |
| 37 | 200 | LF | Install additional #4 ground wire 7 strand bare | $0.00 | |
| 38 | 100 | EA | F/I additional exothermic weld for 5/8” ground rods and #4 or 6 wire | $0.00 | |
| 39 | 100 | EA | F/I lentil | $0.00 | |
| 40 | 50 | EA | Install lentil | $0.00 | |
| 41 | 10 | EA | F/I 100AMP disconnect | $0.00 | |
| 42 | 5 | EA | F/I 200AMP disconnect | $0.00 | |
| 43 | 6,000 | LF | Install SMF in new duct less than 12,000’ | $0.00 | |
| 44 | 230,000 | LF | Install SMF in new duct greater than 12,000’ | $0.00 | |
| 45 | 10,000 | LF | Install SMF in existing duct less than 12,000’ | $0.00 | |
| 46 | 15,000 | LF | Install SMF in existing duct greater than 12,000’ | $0.00 | |
| 47 | 10,000 | LF | Install SMF lashed to messenger less than 1,000' | $0.00 | |
| 48 | 5,000 | LF | Install SMF lashed to messenger greater than 1,000' | $0.00 | |
| 49 | 5,000 | LF | Install SMF over lashed to messenger with existing cables | $0.00 | |
| 50 | 10,000 | LF | Remove existing fiber from existing duct for reinstallation | $0.00 | |
| 51 | 100,000 | LF | Remove existing fiber from existing duct for disposal | $0.00 | |
| 52 | 2 | EA | Install snow shoes per set | $0.00 | |
| 53 | 144 | EA | LSPM test (any wave) | $0.00 | |
| 54 | 720 | EA | OTDR testing (any wave) up to 72 | $0.00 | |
| 55 | 144 | EA | OTDR testing (any wave) > 144 | $0.00 | |
| 56 | 144 | EA | OTDR reel test (any wave) up to 72 | $0.00 | |
| 57 | 864 | EA | OTDR reel test (any wave) > 144 | $0.00 | |
| 58 | 48 | EA | FO Fusion splicing < 24 | $0.00 | |
| 59 | 96 | EA | FO Fusion splicing < 144 | $0.00 | |
| 60 | 144 | EA | FO Fusion splicing > 144 | $0.00 | |
| 61 | 12 | EA | Install splice trays/coupler panels | $0.00 | |
| 62 | 5 | EA | Install FO splice closure only | $0.00 | |
| 63 | 6 | EA | F/I coupler panel, 6 fiber, SM, ST (CCH-CP06P-19) | $0.00 | |
| 64 | 2 | EA | F/I FO splice tray housing rack max 144 fiber (CSH-03U) | $0.00 | |
| 65 | 6 | EA | F/I FO splice tray, fusion heat shrink 12 fiber (M67-048) | $0.00 | |
| 66 | 6 | EA | F/I FO jumper, SM, ST, LC 6' | $0.00 | |
| 67 | 12 | EA | F/I pigtail, SM, ST, 3’ | $0.00 | |
| 68 | 6 | EA | F/I jumper, SM, ST, 3’ | $0.00 | |
| 69 | 2 | EA | Install term cabinet, wall or rack | $0.00 | |
| 70 | 6 | EA | LT FO cable prep up to 72 | $0.00 | |
| 71 | 12 | EA | LT FO cable prep greater than 96 | $0.00 | |
| 72 | 69 | EA | F/I splice enclosure 48 strand fiber (2178S) | $0.00 | |
| 73 | 4 | EA | F/I splice enclosure 96 strand fiber (2178L w/ Exp) | $0.00 | |
| 74 | 6 | EA | F/I splice enclosure 144 strand fiber (2178LL w/2181 Exp) | $0.00 | |
| 75 | 4 | EA | F/I fiber trays, fusion HS, slant (2523t w/ 2524I) | $0.00 | |
| 76 | 2 | EA | F/I aerial FOSC mounting brackets (2183) | $0.00 | |
| 77 | 15 | EA | F/I 60’ concrete pole | $0.00 | |
| 78 | 12 | EA | Install 60’ concrete pole | $0.00 | |
| 79 | 10 | EA | Remove 60’ concrete pole including fill | $0.00 | |
| 80 | 3 | EA | F/I 80’ concrete pole | $0.00 | |
| 81 | 2 | EA | Install 80’ concrete pole | $0.00 | |
| 82 | 2 | EA | Remove 80’ concrete pole including fill | $0.00 | |
| 83 | 8 | EA | Install 40’ concrete pole | $0.00 | |
| 84 | 10 | EA | Remove 40’ concrete pole including fill | $0.00 | |
| 85 | 10 | EA | F/I 50' Steel Pole including anchor and T-Base | $0.00 | |
| 86 | 10 | EA | Install 50' Steel Pole including anchor and T-Base | $0.00 | |
| 87 | 10 | EA | Remove 50' Steel Pole including fill | $0.00 | |
| 88 | 10 | EA | Remove lowering device on existing erected pole | $0.00 | |
| 89 | 10 | EA | Install CLS lowering device on existing erected pole | $0.00 | |
| 90 | 5 | EA | remove and install lowering device on existing erected pole | $0.00 | |
| 91 | 20 | EA | F/I CLS lowering device on non erected pole | $0.00 | |
| 92 | 15 | EA | Install CLS lowering device non erected pole | $0.00 | |
| 93 | 2 | EA | F/I poured in place cabinet base for 332 cabinet | $0.00 | |
| 94 | 50 | EA | Furnish pre Fab cabinet concrete base for 322 cabinet | $0.00 | |
| 95 | 50 | EA | Install pre Fab cabinet base | $0.00 | |
| 96 | 50 | EA | Install 332 cabinet | $0.00 | |
| 97 | 5 | EA | Install 336 cabinet on pole | $0.00 | |
| 98 | 15 | EA | Remove 332 cabinet | $0.00 | |
| 99 | 15 | EA | Remove 336 Cabinet | $0.00 | |
| 100 | 15 | EA | Remove pre fab concrete cabinet base and fill dirt | $0.00 | |
| 101 | 35 | EA | F/I SCIPCAB1 Cabinet | $0.00 | |
| 102 | 25 | SF | Install SCIPCAB1 Cabinet | $0.00 | |
| 103 | 50 | SF | Furnish SCIPCAB1 Cabinet | $0.00 | |
| 104 | 100 | EA | F/I service box | $0.00 | |
| 105 | 50 | EA | Install service box | $0.00 | |
| 106 | 50 | EA | F/I pull box | $0.00 | |
| 107 | 25 | EA | Install pull box | $0.00 | |
| 108 | 300 | EA | F/I marker post | $0.00 | |
| 109 | 300 | EA | Install maker post | $0.00 | |
| 110 | 10 | EA | F/I concrete footers for DMS structure up to 15 cubic yards include reinforcement steel,sonitube, forms, and misc. material.(One foundation for Butterfly or Cantilever and Two foundations for span structure). | $0.00 | |
| 111 | 10 | EA | Remove DMS structure foundation to 1’ below grade to include removal of anchor bolts and steel reinforcement) | $0.00 | |
| 112 | 25 | EA | F/I 30’ wood pole | $0.00 | |
| 113 | 5 | EA | Install 30’ , 35' or 40' wood pole | $0.00 | |
| 114 | 5 | EA | Remove 30’, 35' or 40' wood pole including fill | $0.00 | |
| 115 | 10 | EA | F/I 35’ wood pole | $0.00 | |
| 116 | 5 | EA | F/I 40’ wood pole | $0.00 | |
| 117 | 15,000 | LF | F/I ¼” Galva steel cable with hardware for messenger | $0.00 | |
| 118 | 5 | EA | F/I back guy for wood pole including cable, anchor, hardware, and ground | $0.00 | |
| 119 | 5 | EA | F/I sidewalk guy for wood pole including cable, anchor, hardware, and ground | $0.00 | |
| 120 | 3 | EA | F/I Aerial guy including all hardware and cable | $0.00 | |
| 121 | 50 | EA | Disposal of concrete and concrete poles per ton (transportation not included) | $0.00 | |
| 122 | 1 | LS | $875,000.00 | Cost plus material 15% | $875,000.00 |
| 123 | 5,000 | HR | Furnish Helper | $0.00 | |
| 124 | 8,000 | HR | Furnish Field Technical Services Level I per hour | $0.00 | |
| 125 | 20,000 | HR | Furnish Field Technical Services Level II per hour | $0.00 | |
| 126 | 8,000 | HR | Furnish Field Technical Services Level III per hour | $0.00 | |
| 127 | 500 | HR | Furnish Field Technical Services Level IV per hour | $0.00 | |
| 128 | 480 | HR | Portable light plant/generator per hour | $0.00 | |
| 129 | 500 | HR | Portable Air Compressor per hour | $0.00 | |
| 130 | 200 | HR | Bucket truck 30’ with operator per hour | $0.00 | |
| 131 | 175 | HR | Bucket truck 55’ with operator per hour | $0.00 | |
| 132 | 50 | HR | Bucket truck 100’ with operator per hour | $0.00 | |
| 133 | 50 | HR | Backhoe with operator per hour | $0.00 | |
| 134 | 800 | HR | Mini excavator with operator per hour | $0.00 | |
| 135 | 400 | HR | Trencher with operator per hour | $0.00 | |
| 136 | 80 | HR | Dump truck 26,000 with operator per hour | $0.00 | |
| 137 | 120 | HR | Dump truck 16,000 with operator per hour | $0.00 | |
| 138 | 30 | HR | 15 ton crane w/ man basket with operator per hour | $0.00 | |
| 139 | 160 | HR | 60 ton crane with operator per hour | $0.00 | |
| 140 | 35 | HR | 100 ton crane with operator per hour | $0.00 | |
| 141 | 480 | HR | Utility trailer up to 24' per hour | $0.00 | |
| 142 | 240 | HR | Reel trailer for use with fiber optic cable, roll duct, electrical cable per hour | $0.00 | |
| 143 | 40 | HR | Pressure Digger 24’’ – 48’’ with operator per hour | $0.00 | |
| 144 | 480 | HR | Tractor and trailer 53 – 80’ per HR unlimited miles with operator/tie down equipment per hour | $0.00 | |
| 145 | 500,000 | MI | $0.655 | Mileage reimbursement for non hourly rated vehicles*as per current IRS Business Standard Mileage Rate | $327,500.00 |
| 146 | 250 | EA | Overnight Lodging *shall not exceed the current GSA Rate for the area of overnight lodging | $50,000.00 | |
| 147 | 600 | LF | F/I Steel Beam Guardrail LF | $0.00 | |
| 148 | 12 | EA | F/I End Anchor - Type B EA | $0.00 | |
| 149 | 12 | EA | F/I End Terminal - Type T EA | $0.00 | |
| 150 | 75 | CY | Unclassified Excavation CY | $0.00 | |
| 151 | 20 | CY | Rock Excavation CY | $0.00 | |
| 152 | 15,000 | LF | Rotary mowing in R/W 30’wide | $0.00 | |
| 153 | 20,000 | LF | Tree trimming 15’ wide, chipped on R/W | $0.00 | |
| 154 | 200 | LF | Clearing and grubbing within R/W 10’ wide | $0.00 | |
| 155 | 150 | EA | Furnish CL-TC1 Cyber Lock ITS Cabinet Lock | $0.00 | |
| 156 | 5 | EA | Furnish CL-M2 Cyber Lock Mortise (for Hub buildings and Ravenel tower-style lock cylinders) | $0.00 | |
| 157 | 10 | EA | Furnish PL-03 Cyber Padlocks (Boron shackled padlocks we use on hub building and Koon St gates) | $0.00 | |
| 158 | 5 | EA | Furnish CK-IR7 Cyber Keys | $0.00 | |
| 159 | 10 | EA | Furnish CK-RXD2 USB Cyber Keys | $0.00 | |
| 160 | 2 | EA | Furnish Cyber Audit Maintenance | $0.00 | |
| 161 | 25 | CY | F/I concrete , minimum 3,000 psi | $0.00 | |
| Total of line items 1 thru 161 | $1,252,500.00 | ||||
| Enter your Total (totaling all 4 years) of line items 1 thru 161 on the Line 1 of the Bidding Schedule and in SCEIS. Make sure to complete all 4 years; see tab for each year on bottom of spreadsheet. |