Attachment_A.pdf

PDF 5 MB Posted

Attached to
REQUEST FOR QUALIFICATIONS CITY OF KINGMAN CONSTRUCTION MANAGER AT RISK FOR FIRE STATION 25
Solicitation number
2025-RFQ-039
Issued by
Maricopa County, Arizona

About this file

Fire Station 25 Project Documentation

Attachment A is an architectural site plan and block diagram for the City of Kingman, Arizona's Fire Station 25 project, a comprehensive new public safety facility. The project encompasses approximately 25,000 square feet across multiple buildings, including a primary fire station (15,383 SF), administration building (8,373 SF), community/multi-purpose building (3,038 SF), and a future dispatch center (1,581 SF). The site plan depicts parking facilities with 52 shared spaces tentatively approved by the City as of October 30, 2025, along with dedicated firefighter and dispatch parking areas. The facility includes apparatus bays sized for standard fire department vehicles (pumper engines, aerial platforms, medic units), housing and support areas with multiple bunkrooms, shower facilities, and kitchen/dining spaces, administrative offices with command staff areas, dispatch consoles, and a multi-purpose community room. Infrastructure elements shown include fiber/communications conduits, water service lines with blow-off assemblies, drainage culverts, emergency vehicle parking, and utility connections. The preliminary architectural drawings are prepared by Seabury Fritz Architects of Fort Mohave, Arizona, with a drawing date of December 17, 2025, and are marked as preliminary and not for construction.

The site plan illustrates the facility's layout on property identified as APN 322-15-011, with adjacent land reserved for the future Sunbelt Park development and coordination with an adjacent school for overflow parking via an Intergovernmental Agreement. Building heights are noted as pending finalization, with occupancy classifications ranging from R2/S1 for the fire station to Type B for administrative and dispatch facilities. The construction cost for the project is anticipated at approximately $7.1 million, with the City currently soliciting Construction Manager at Risk (CMAR) services through RFQ 2025-RFQ-039, with responses due by January 27, 2026, and a Notice of Intent to Award scheduled for February 18, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

sshilstone Text Box Fire Station 25

Typewritten Text

Text Box

APN: 322-15-011

sshilstone Text Box Future Site for Sunbelt Park sshilstone Line sshilstone Line sshilstone Line sshilstone Line sshilstone Line sshilstone Line sshilstone Line sshilstone Line

Line

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

AeccDbCogoPoint (AeccLand130)

SE

TB

AC

K

SE

TB

AC

K

9'x20'

9'x20'

9'x20'

9'x20' 4

26'

9'x20'

9'x20'

9'x20'

9'x20'

9'x20'

9'x20'

9'x20'

9'x20'

9'x20'

ADA PARKING

PARK & PUBLIC ASSEMBLY

SHARED PARKING 52 SPACES

TENTITIVELY APPROVED BY CITY 10.30.25

PARK IGA W/ ADJACENT SCHOOL

FOR OVER-FLOW PARKING

EM GEN

9'x20'

FUTURE DISPATCH PARKING90'

FIREFIGHTER

PARKING 10 SPACES

DISPATCH PARKING

10 SPACES

FIBER / COMM (2) 2"

CONDUIT, ROW TO BLDG

DEMARK

.3

3'

SC

RE

EN

ED

G

AT

E

0.

0.

5'

EX

ST

G 8"

W

AT

ER

LI

NE

EXSTG 2" WATERLINE

BLOW-OFF ASSEMBLY

5'SETBACK

40' ENTRANCE

20' 20'

F

V

F

D

A e r i a l

P a t f o r m i e r c

V l o c i t y

C

T a n s o f t

S o l u t i o n s

I n g h s e r v e d

C

I

Y

R

E

S

C

U

A

L

I

F

O

R

N

I

A

F

V r i a t f o e r l o c i t y a n s o l u t i o n g h s e r v e d

C

I

S

C

A

L

I F

O

R

N

I A

40' ENTRANCE

20' 20'

F

V r i a t f o e r l o c i t y a n s o l u t i o n g h s e r v e d

C

I

S

C

A

L

I

F

O

R

N

I

A

F

V r i a t f o e r l o c i t y a n s o l u t i o n g h s e r v e d

C

I

S

C

A

L

I

F

O

R

N

I

A

F

V r i a t f o e r l o c i t y

(C

) 2

T ra n s o ft S o lu tio n s

, In c

. A ll rig h ts re s e rv e d

C

I

S

C

A

L

I

F

O

R

N

I

A

PARK

MONUMENT

SIGN

DISPATCHANTENNA

PARK TRASH

ENCLOSURE

PARK ELEC

SERVICE

.8

7'

30" DIA UG DRAINAGE CULVERT

" D

IA

U

G

DR

AI

NA

GE

C

UL

VE

RT

30" DIA UG DRAINAGE CULVERT

HYD

2-1/2" APPARATUS TANK FILL

PARK

CONCESSION

BLDG

PARK

PLAYGROUND

AREA

PARK

SPLASH PAD

.8

3'

116+00

117+00

.0

8'

SL

OP

E

5%

118+00

119+00

120+00

.6

8'

SL

OP

E

3.

6%

.3

5'

SL

OP

E

3.

2%

3% - 4% APRON SLOPE

RECOMMENDED

FIBER / COMM (2) 2"

CONDUIT, EXTEND FULL ROW

WIDTH

EMERGENCY VEHICLE

PARKING 2 SPACES

22+00 23+0021+00 24+00 24+00 25+00

EX

ST

G 6"

S

EW

ER

L

IN

E

' P

UE

6.

9'x20'10

9'x

9'x20'

9'x

' 2 9' x2 0' 3

10.1'

0.66'

SCREENED GATE

26.17' 0.33'

0.33'

1' 26'

2'

10.37'

5'SETBACK

ADMIN & PUBLIC

ASSEMBLY PARKING

38 SPACES

3499.0'

FIN FLR

ADMINISTRATION8218 SQ. FT..

PUBLIC ASSEMBLY

MULTI PURPOSE &

COMMUNITY AREA3252 SQ. FT..

APPARATUS BAY8109 SQ. FT..

HOUSING UNIT &SUPPORT7117 SQ. FT..

COVEREDPATIO560 SQ. FT..

DISPATCH2242 SQ. FT..

9'x20'

9'x

' 3

FIRE STATION 3SPACES

FIREFIGHTER

PARKING 2 SPACES

DISPATCH PARKING

4 SPACES

FIREFIGHTER

PARKING 3 SPACES

9'x20'

T

Airway & Prospector

Kingman Fire Station 25

928 . 577 . 0078 fax 928 . 577 . 0077

: d a t e : d r a w n

: p r o j e c t

: t i t l e

: r e v i s i o n s

: f i l e

:project

SEABURY

ARCHITECTS

fort mohave

5902 highway 95 arizona 86426 suite 106

FRITZ

PRELIMINARY

NOT FOR

CONSTRUCTION

ARCHITECTURAL

SITE PLAN

1" = 20'

PLAN

TRUE

0 5 25 50

PROPOSED FIRE STATION

BUILDING

15383 S.F.

OCCUPANCY: R2 / S1

TYPE: V-B

BLDG HT: ~PENDING

PROPOSED COMMUNITY /

MULTI PURPOSE BUILDING

3038 S.F.

OCCUPANCY: A3

TYPE: V-B

BLDG HT: ~PENDING

FUTURE DISPATCH

1581 S.F.

OCCUPANCY: B

TYPE: V-B

BLDG HT: ~PENDING

2507 A2 - SITE

12/17/25

GDF

ARCHITECTURAL SITE PLAN

A2.0

PROPOSED ADMIN BUILDING

8373 S.F.

OCCUPANCY: B

TYPE: V-B

BLDG HT: ~PENDING

AutoCAD SHX Text

3498.69 APRX

AutoCAD SHX Text

3499.23 APRX

AutoCAD SHX Text

3498.51 APRX

AutoCAD SHX Text

3499.01 APRX

AutoCAD SHX Text

3497.65 APRX

AutoCAD SHX Text

3496.93 APRX

AutoCAD SHX Text

3495.80 APRX

AutoCAD SHX Text

3498.19 APRX

AutoCAD SHX Text

3500.39 APRX

AutoCAD SHX Text

3495.32 APRX

AutoCAD SHX Text

3495.99 APRX

AutoCAD SHX Text

3496.65 APRX

AutoCAD SHX Text THIS DRAWING IS AN INSTRUMENT OF SERVICE. IT REMAINS THE PROPERTY OF SEABURY FRITZ ARCHITECTS. IT MAY NOT BE REPRODUCED OR COPIED IN WHOLE OR PART WITHOUT THE EXPRESSED WRITTEN PERMISSION OF SEABURY FRITZ ARCHITECTS. IT MAY ONLY BE USED FOR THE ORIGINAL PURPOSE INTENDED. ALL RIGHTS RESERVED.

M

NG

R

OF

F

FL

OO

R

AR

EA

DI

SP

AT

CH

S Q.

F T.

DI

SP

AT

CH

C

ON

SO

LE

3'

3'5'

5'

CONSOLE

3'

3'5'

5'

CONSOLE

3'

3' 5'

5'

CONSOLE

3'

3' 5'

5'

CONSOLE

ST

OR

AD

M

IN

O

FF

EQ

UI

PM

EN

T

PRINTING

DI

SP

AT

CH

C

ON

SO

LE

3'

3'5'

5'

CONSOLE

3'

3'5'

5'

CONSOLE

3'

3' 5'

5'

CONSOLE

3'

3' 5'

5'

CONSOLE

DI

SP

AT

CH

C

ON

SO

LE

3'

3'5'

5'

CONSOLE

3'

3'5'

5'

CONSOLE

3'

3' 5'

5'

CONSOLE

3'

3' 5'

5'

CONSOLE

38'

SH

OW

ER

SH

OW

ER

SH

OW

ER

BU

NK

BU

NK

BU

NK

BU

NK

BU

NK

BU

NK

CL

EA

N

LA

UN

DR

Y

BATH

EMS

COVERED PATIO

DAY RM

KITCHEN

DINING

CAPTAINS OFF

FI

TN

ES

S

DECON UTILITY

DECON HALL

TURNOUT

AIR ROOM

BU

NK

BU

NK

BATH

BATH

BATH

DRY STOR

W

OR

K

BE

NC

H

ICE

REF

PANTRY

RISER

PANTRY

ELECT

IT ROOM UTILITY

PANTRY

EQUIP STOR

SH

OW

ER

SECURE ENTRY

RECHARGE

EM

S

AL

CO

VE

25'

28'

5'

3'

3'

19'

43'

2'

14'

' 6'

STOR

8'

6'

3'-6"

6'

3'-6"

5' 5'

HA

ZM

AT

E

NG

IN

E

10'

8'

6'

3'-6"

6'

3'-6"

5' 5'

M

ED

IC

U

NI

T

8'

' T

O

LA

DD

ER

8'

6'

3'-6"

6'

3'-6"

5' 5'

A

RI

AL

A

PP

AR

AT

US

10'

'-4

" T O

EN

GI

NE

N

OS

E

PL

AT

FO

RM

8'

6'

3'-6"

6'

3'-6"

5' 5'

PU

M

PE

R

EN

GI

NE

10'

FIRE STATION FLOOR AREAS

HOUSING & SUPPORT 7117 SQ. FT.

COVERED PATIO 560 SQ. FT.

APPARATUS 8109 SQ. FT.

FIRE STATION GROUP 3

APPARATUS BAYS93'-8" X 73'-8"

6900 SF

67'-0" 75'-0"

142'-0"

75'-0"

14'-0" 3'-0" 14'-0" 3'-0" 14'-0"3'-0"14'-0" 5'-0"

142'-0"

2'

-0

ADMIN GROUP 3

'-0

MULTI-PURPOSE RM COMMUNITY RM

W

OM

EN

M

EN

FLOOR AREA

MULTI PURPOSE / COMM 3252 SQ. FT.

CRR OFF 4CRR OFF 3CRR OFF 2CRR OFF 1

BREAK RM

PPE STORAGE

ADMIN OFF 2

COPY RM

RR SHOWER

STORAGE

FIRE MARSHAL

ELECT UTILITY

LO

BB

Y

RE

CE

PT

IO

N

CO

NF

R M

OFFICE 4

CO

M

M

AN

D

CO

NF

R

M

CO

M

M

AN

D

ST

OR

ADMIN OFF 1

COMMAND STAFF OFF 1

FP STORAGE

COMMAND STAFF OFF 2COMMAND STAFF OFF 3

RESTROOM

ADMIN STOR

OFFICE 5

COMMNAD

OFFICE 6

FLOOR AREA

ADMIN 8218 SQ. FT.

P

EO

PL

E

24'

15'

MAIL

8'

COMMNAD

8'

COMMNAD

8'

FIRE PREVENT

8'

8'

WOMEN

MEN

RR

S

H

OW

ER

STORAGE

IT RM

ADMIN FLOOR AREAS

ADMIN 8218 SQ. FT.

MULTI PURPOSE / COMM 3252 SQ. FT.

DISPATCH 2242 SQ. FT.

5'-0"

43'-0" 24'-0"

'-0

14'-0" 25'-0" 28'-0"

7'

-0

7' -0

6'

-0

'-0

8'

-0

'-0

17'-01 4" 64'-0"

'-0

'-0

'-0 "33'-0"

'-0

'-0

'-0

8'-0"

102'-0"

BREAK ALCOVE STORAGE

13'-0"

'-0

Airway & Prospector

Kingman Fire Station 25

928 . 577 . 0078 fax 928 . 577 . 0077

: d a t e : d r a w n

: p r o j e c t

: t i t l e

: r e v i s i o n s

: f i l e

:project

SEABURY

ARCHITECTS

fort mohave

5902 highway 95 arizona 86426 suite 106

FRITZ

PRELIMINARY

NOT FOR

CONSTRUCTIONDec 17 2025

X2507 - BLK DGRM

12/17/25

GDF

BLOCK DIAGRAM

B1.0

BLOCK DIAGRAM

3/32" = 1'-0"

PLAN

TRUE

0 20'10'2'

AutoCAD SHX Text THIS DRAWING IS AN INSTRUMENT OF SERVICE. IT REMAINS THE PROPERTY OF SEABURY FRITZ ARCHITECTS. IT MAY NOT BE REPRODUCED OR COPIED IN WHOLE OR PART WITHOUT THE EXPRESSED WRITTEN PERMISSION OF SEABURY FRITZ ARCHITECTS. IT MAY ONLY BE USED FOR THE ORIGINAL PURPOSE INTENDED. ALL RIGHTS RESERVED.

Attachment A Draft 2.pdf
Export.pdf
Attachment A.pdf
Doc1.pdf
x2507 - Site-A2.0 - 2025.12.17.pdf
Sheets and Views
A2.0
x2507 - BLK DGRM-B1.0 - 2025.12.17.pdf
Sheets and Views
B1.0

File details come from the government source that posted it. Updated .