ATTACHMENT 9 - VISN4 DME CONTRACT DEFICIENCY REPORT.docx

DOCX document 28 KB Posted

Attached to
N065: Durable Medical Equipment (DME) services - VISN 4 East Medical Center
Solicitation number
36C24427Q0003
Issued by

About this file

This is a Contract Deficiency Report (CDR) template used by the Department of Veterans Affairs, Veterans Integrated Service Network 4 (VISN 4) for documenting and resolving contract discrepancies related to Durable Medical Equipment (DME) services. The form serves as a standardized tool for identifying, communicating, and tracking quality issues or non-conformances with the DME services contractor supporting VISN 4 East medical centers.

The CDR template establishes a structured communication process between the Contracting Officer and the Contractor's Representative. The form requires documentation of: the specific discrepancy or problem with detailed references to relevant Performance Work Statement (PWS) directives; the contractor's response addressing the root cause and corrective action plan; government evaluation and acceptance determination; and final closeout procedures. The template includes signature blocks for the Contracting Officer's Representative (COR), Contracting Officer, and Contractor Representative, along with specific date fields to track the timeline from CDR preparation through contractor response and final resolution. This appendix is designed to ensure quality control and accountability in the delivery of DME storage, delivery, installation, and repair services across VISN 4 East medical centers.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 9

VISN4 DME CONTRACT DEFICIENCY REPORT (CDR)

CONTRACT DISCREPANCY REPORT

1. CONTRACT NUMBER
2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contracting Officer)
4. FROM: (Name of COR)

5. DATES

a. CDR PREPARED

b. RETURNED BY CONTRACTOR:
c. ACTION COMPLETE

6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF COR
Date:
8. SIGNATURE OF CONTRACTING OFFICER
Date:
9a. TO (Contracting Officer)
9a. FROM (Contractor)

10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)

11. SIGNATURE OF CONTRACTOR REPRESENTATIVE
Date:

12. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)

13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)

14. CLOSE OUT

NAME
TITLE
SIGNATURE
DATE

a. CONTRACTOR NOTIFIED

b. COR

c. CONTRACTING OFFICER

CRG Chapter 7 Appendix F COR Roles and Responsibilities Page 1 of 4 Revision 03 Effective Date: 09/01/2024