Attachment 9 - Spec. 096723 Resinous Flooring.docx

DOCX document 35 KB Posted

Attached to
Building 7 Suite 3 Floor Repair Federal contract opportunity
Solicitation number
1232SA26Q0439
Issued by
Department of Agriculture Agricultural Research Service

About this file

This is a technical specification section (096723) for resinous flooring systems required for the USDA National Center for Agricultural History Building 7 Suite 3 Floor Repair project. The specification calls for a Rock-Tred Polymer Coating Solutions SL System in Dark Grey with the following requirements: 50 mesh quartz traction material, UV-resistant urethane topcoat applied in two coats, a 4-inch integral cove base without traction material using troweled epoxy, and an overall system thickness of 1/8 inch. The flooring must be applied as a troweled screed and sanded finish to create a uniform, monolithic wearing surface.

The specification establishes stringent quality assurance and installation requirements, including engagement of an experienced installer certified by the resinous flooring manufacturer with a minimum of ten completed similar projects, procurement of all primary materials (primers, resins, hardening agents, grouting coats, and topcoats) from a single manufacturer with at least ten years of successful experience, and availability of manufacturer field technical service representatives during installation. Substrate preparation must achieve clean, dry, and neutral pH conditions with moisture-vapor-emission rates not exceeding 3 lb per 1,000 square feet in 24 hours. The contractor must maintain material and substrate temperatures between 65 and 85 degrees Fahrenheit during application and for at least 24 hours after application, close the work area to traffic for a minimum of 24 hours post-application, and provide a three-year warranty covering both materials and workmanship. All materials must be factory pre-weighed and pre-packaged to eliminate on-site mixing errors, and substitution requests must be submitted 10 days prior to bid date for contracting officer approval.

View the file

Other files for this federal contract opportunity

Other files attached to Building 7 Suite 3 Floor Repair, newest first.
File Type Posted
Sol_1232SA26Q0439_Amd_0002.pdf PDF
Attachment 19 - 7-A-201 Floor Plan with Dimensions.pdf PDF
Attachment 20 - 1232SA26Q0439 RFI Questions and Answers.pdf PDF
Sol_1232SA26Q0439_Amd_0001.pdf PDF
Attachment 10 - Photo 01 - Floor mounted post.JPG JPG image
Attachment 13 - Photo 04 - Interior door threshold.JPG JPG image
Attachment 17 - Photo 08 - Ante room floor drain.JPG JPG image
Attachment 2 - Wage Determination IA20260074.pdf PDF
Attachment 3 - Schedule of Pricing (MS Excel Interactive Document).xlsx XLSX spreadsheet
Attachment 5 - 7-A-201 Floor Plan with Dimensions.pdf PDF
Attachment 6 - Building 7 Suite 3 Room Layout.png PNG image
Attachment 8 - Spec. 07920 Sealants.doc DOC document
Attachment 12 - Photo 03 - Corridor door threshold.JPG JPG image
Attachment 15 - Photo 06 - Trench drain expansion joint.JPG JPG image
Attachment 16 - Photo 07 - End of trench drain.JPG JPG image
Attachment 1 - Statement of Work Building 7 Suite 3 Floor Repair.doc DOC document
Attachment 7 - RT00011 Rock-Tred Standard-ColorCard-Rev724.pdf PDF
Attachment 11 - Photo 02 - Interior door threshold.JPG JPG image
Attachment 14 - Photo 05 - Trench drain.JPG JPG image
Attachment 18 - Photo 09 - Expansion joint.JPG JPG image
Solicitation 1232SA26Q0439.pdf PDF
Attachment 4 - G001 Title Page BUILDING 7 SUITE 3 FLOOR REPAIR 01-21-2026.pdf PDF
Attachment 6 - Spec. Rock-Tred epoxy flooring SL.pdf PDF
Site Visit Information.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA, NCAH Building 7 Suite 3 Floor Repair

SECTION 096723 - RESINOUS FLOORING

Copyright 2001, The American Institute of Architects (AIA) This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.

Copyright 2001, The American Institute of Architects (AIA) This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.

Copyright 2001, The American Institute of Architects (AIA) This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.

Copyright 2001, The American Institute of Architects (AIA)

This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.

Copyright 2001, The American Institute of Architects (AIA) Copyright 2001, The American Institute of Architects (AIA) This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.

Copyright 2001, The American Institute of Architects (AIA) This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.

Copyright 2001, The American Institute of Architects (AIA) This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.

GENERAL

RELATED DOCUMENTS

Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

SUMMARY

This Section is for a resinous flooring system with epoxy coating.

Application Method: Troweled screed, and sanded.

If allowance or unit price applies to Work of this Section, insert brief paragraph here to alert Contractor and reference appropriate Division 01 Section for specific details. If concrete substrates exhibit unacceptable moisture-vapor-emission rates, allowance or unit price can be used to plan for or control the costs of remedial procedures. See "Moisture and Flooring Failures" Article in the Evaluations.

SUBMITTALS

Product Data: For each type of product indicated. Include manufacturer's technical data, application instructions, and recommendations for each resinous flooring component required.

Insert requirements for Shop Drawings if special color patterns are required.

Delete paragraph above if colors and other characteristics are preselected and specified or scheduled. Retain paragraph below with or without above.

Samples for Verification: For each resinous flooring system required, 5 inches (150 mm) square, applied to a rigid backing by Installer for this Project.

Delete paragraph below if not required.

Product Schedule: Use resinous flooring designations indicated in Part 2 and room designations indicated on Drawings.

Retain first paragraph below if Installer certification is required in "Quality Assurance" Article.

Installer Certificates: Signed by manufacturer certifying that installers comply with specified requirements.

Maintenance Data: For resinous flooring to include in maintenance manuals.

QUALITY ASSURANCE

No request for substitution shall be considered that would change the generic type of floor system specified (i.e. 100% solids epoxy). Equivalent materials of other manufactures may be substituted only on approval of Contracting Officer. Request for substitution will only be considered only if submitted 10 days prior to bid date. Request will be subject to specification requirements described in this section.

Installer Qualifications: Engage an experienced installer (applicator) who is experienced in applying resinous flooring systems similar in material, design, and extent to those indicated for this Project, whose work has resulted in applications with a record of successful in-service performance, and who is acceptable to resinous flooring manufacturer.

Retain subparagraph above or below if available for products selected; see "Installer Qualifications" Article in the Evaluations. Retain below with requirements for Installer certificates in "Submittals" Article.

Engage an installer who is certified in writing by resinous flooring manufacturer as qualified to apply resinous flooring systems indicated.

Contractor shall have completed at least 10 projects of similar size and complexity.

Source Limitations: Obtain primary resinous flooring materials, including primers, resins, hardening agents, grouting coats, and topcoats, through one source from a single manufacturer, with not less than ten years of successful experience in manufacturing and installing principal materials described in this section. Provide secondary materials, including patching and fill material, joint sealant, and repair materials, of type and from source recommended by manufacturer of primary materials.

Manufacturer Field Technical Service Representatives: Resinous flooring manufacture shall retain the services of Field Technical Service Representatives who are trained specifically on installing the system to be used on the project.

Field Technical Services Representatives shall be employed by the system manufacture to assist in the quality assurance and quality control process of the installation and shall be available to perform field problem solving issues with the installer.

Delete first subparagraph below if no integral cove base.

Revise paragraph below to suit Project or delete if unnecessary.

Delete paragraph and subparagraphs below if not required. If retaining, indicate location, size, and other details of mockups on Drawings or by inserts. Revise wording if only one mockup is required.

If required by authorities having jurisdiction or Owner, insert fire-test-response-characteristic requirements to suit Project. See "Fire-Test-Response Characteristics" Article in the Evaluations.

DELIVERY, STORAGE, AND HANDLING

Deliver materials in original packages and containers, with seals unbroken, bearing manufacturer's labels indicating brand name and directions for storage and mixing with other components.

Store materials to prevent deterioration from moisture, heat, cold, direct sunlight, or other detrimental effects. Store material per Product Data sheet.

All materials used shall be factory pre-weighed and pre-packaged in single, easy to manage batches to eliminate on site mixing errors. No on site weighing or volumetric measurements allowed unless recommended by Field Technical Services Representatives to adjust to field conditions for the application.

PROJECT CONDITIONS

Environmental Limitations: Comply with resinous flooring manufacturer's written instructions for substrate temperature, ambient temperature, moisture, ventilation, and other conditions affecting resinous flooring application.

Retain the Subparagraph below when specifying Stonhard, Inc.’s Stonblend RTZ.

Maintain material and substrate temperature between 65 and 85 deg F (18 and 30 deg C) during resinous flooring application and for not less than 24 hours after application.

Revise first paragraph below if specific foot-candle level is required.

Close spaces to traffic during resinous flooring application and for not less than 24 hours after application, unless manufacturer recommends a longer period.

1.7 WARRANTY

0. Manufacturer shall furnish a single, written warranty covering both material and workmanship for a period of one (3) three full years from date of installation. A sample warranty letter must be included with bid package or bid may be disqualified.

If a special warranty is required, insert "Warranty" Article. Requiring a single-source warranty for application and materials from the manufacturer may ensure quality but will eliminate some manufacturers. Alternatively, a special warranty signed by the Installer and manufacturer can be required.

PRODUCTS

Copy Article below and re-edit it for each resinous flooring system required. Insert number to complete drawing designation for each system required. Use these designations on Drawings to show where each system is required.

RESINOUS FLOORING

See Editing Instruction No. 1 in the Evaluations for cautions about naming manufacturers and products.

Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, the following:

Retain above for nonproprietary or below for semiproprietary specification. Refer to Division 01 Section "Product Requirements."

Products: Provide the following:

Rock-Tred Polymer Coating Solutions – Rock-Tred SL System – Dark Grey 50 Mesh quart traction material Urethane top coat – UV resistant (2 coats) System Characteristics:

Color: As indicated in Statement of Dark Grey.

Traction material: 50 mesh quartz.

Integral Cove Base: 4”, no traction material required on cove base, trowelled epoxy.

Overall System Thickness: 1/8”.

If necessary, insert requirements for metal or plastic cove caps for integral cove base or other materials required for resinous flooring systems selected.

EXECUTION

PREPARATION

Revise paragraph below to suit resinous flooring system selected. Some systems are moisture tolerant; consult manufacturers for guidance.

General: Prepare and clean substrates according to resinous flooring manufacturer's written instructions for substrate indicated. Provide clean, dry, and neutral Ph substrate for resinous flooring application.

Retain first paragraph and subparagraphs below for concrete substrates. Insert requirements for other substrates to suit Project.

Test above provides a more accurate indication as to whether or not a concrete slab has dried sufficiently to allow finish flooring application than the tests below.

For applying impermeable resinous flooring systems, 3 lb of water/1000 sq. ft. (1.36 kg of water/92.9 sq. m) of slab in 24 hours is generally considered a safe moisture-vapor-emission rate. Consult manufacturers for appropriate rates for permeable systems that will allow moisture vapor to continue through them once cured.

Some manufacturers use patching and fill material to fill control joints and other nonmoving cracks. Revise paragraph above or below to suit systems selected.

Treat control joints and other nonmoving substrate cracks to prevent cracks from reflecting through resinous flooring according to manufacturer's written recommendations.

APPLICATION

General: Apply components of resinous flooring system according to manufacturer's written instructions to produce a uniform, monolithic wearing surface of thickness indicated.

Coordinate application of components to provide optimum adhesion of resinous flooring system to substrate, and optimum intercoat adhesion.

Cure resinous flooring components according to manufacturer's written instructions. Prevent contamination during application and curing processes.

Delete subparagraph below if no expansion or isolation joints in floor. Detail joints on Drawings and revise below to suit Project.

At substrate expansion and isolation joints, provide joint in resinous flooring to comply with resinous flooring manufacturer's written recommendations.

Delete subparagraph below if joint sealant is specified in Division 07 Section "Joint Sealants."

Delete paragraph below if only self-priming systems are required.

With Owner's consent, retain paragraph below to ensure compliance with thickness requirements. Core sampling will require repairing damage caused by testing.

Delete paragraph and subparagraphs below if size or nature of Project does not warrant material sampling. If retaining, revise to suit Project.

CLEANING, PROTECTING, AND CURING

Cure resinous flooring materials in compliance with manufacturer's directions, taking care to prevent contamination during stages of application and prior to completion of curing process. Close area of application for a minimum of 24 hours.

Protect resinous flooring materials from damage and wear during construction operation. Where temporary covering is required for this purpose, comply with manufacturer's recommendations for protective materials and method of application. Contractor is responsible for protection and cleaning of surfaces after final coats.

Cleaning: Remove temporary covering and clean resinous flooring just prior to final inspection. Use cleaning materials and procedures recommended by resinous flooring manufacturer. Contractor is responsible for cleaning prior to inspection.

END OF SECTION 096723

SECTION 096723 - 8