Attachment 9 - Mechanical Drawings 626-700.MH.20240308.pdf

PDF 10 MB Posted

Attached to
Y1DZ--626-22-700 EHRM Infrastructure Upgrades Construction Nashville
Solicitation number
36C77624B0029
Issued by

About this file

This document appears to be a set of mechanical drawings related to the EHRM Infrastructure Upgrades Construction project at the Nashville VAMC (Solicitation Number 36C77624B0029). The drawings, numbered 626-700, provide detailed specifications and technical requirements for the mechanical systems to be installed as part of this construction project. Key details include the federal agency involved (Department of Veterans Affairs Technology Acquisition Center Austin), the project name ("Y1DZ--626-22-700 EHRM Infrastructure Upgrades Construction Nashville"), and the opportunity type (Solicitation). While this document does not directly address the required products or services, it provides critical technical information necessary for contractors to submit responsive bids for the construction work.

View the file

Other files

File Type Posted
Redacted Abstract of Bids OF 1419 - Nashville EHRM.pdf PDF
36C77624B0029 0006.docx DOCX document
36C77624B0029 0005.docx DOCX document
Technical Question Tracker - FINAL.pdf PDF
36C77624B0029 0004.docx DOCX document
36C77624B0029 0003.docx DOCX document
S06 - Technical Questions Tracking Spreadsheet.pdf PDF
S06 - Geotech Boring.pdf PDF
36C77624B0029 0002.docx DOCX document
36C77624B0029 0001.docx DOCX document
Site Visit Attachment.pdf PDF
Attachment 2 - Specifications VOL 1 - Revised.pdf PDF
Attachment 3 - Specifications VOL 2 - Revised.pdf PDF
Attachment 13 - Telecommunications Drawings 626-700.TN.20240308.pdf PDF
Attachment 1 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 15 - Site Visit Instructions.pdf PDF
Attachment 11 - Sheet Index Drawings 626-700.SHEET INDEX.20240308.pdf PDF
Attachment 7 - Fire Protection Drawings 626-700.FX.20240308.pdf PDF
Attachment 12 - Structural Drawings 626-700.SF.20240308.pdf PDF
36C77624B0029.docx DOCX document
Attachment 6 - Electrical Drawings 626-700.EP.20240308.pdf PDF
Attachment 10 - Plumbing Drawings 626-700.PL.20240308.pdf PDF
Attachment 8 - General Drawings 626-700.GI.20240308.pdf PDF
Attachment 4 - Architectural Drawings 626-700.AE.20240308.pdf PDF
Attachment 5 - Civil Drawings 626-700.CS.20240308.pdf PDF
Attachment 14 - WDTN20230178 MOD 3 - 7-26-2024.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

C

C

MECHANICAL ABBREVIATION KEY

ABBR: DESCRIPTION:

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FSD FIRE/SMOKE DAMPER

MA MIXED AIR

NOT IN CONTRACTNIC

NORMALLY CLOSEDN.C.

NORMALLY OPENN.O.

MIXING VALVEMV

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TRANSFER DUCTTD

TERMINAL AIR BOXTAB

TYPICALTYP

NOT ALL SYMBOLS MAY APPLY.

1. THE SIZE OF BRANCH PIPING TO TERMINAL HEATING DEVICES AND COILS SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

2. PIPE DRAIN LINES FROM EQUIPMENT TO NEAREST DRAIN INDICATED ON DRAWINGS.

3. INSTALL ALL REFRIGERANT LIQUID AND SUCTION PIPING SIZED PER EQUIPMENT

MANUFACTURER RECOMMENDATIONS.

PIPING GENERAL NOTES:

1. UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO A TERMINAL AIR BOX

(TAB) SHALL MATCH THE INLET SIZE UNLESS THE BRANCH IS GREATER THAN 6 FEET IN

LENGTH, IN WHICH CASE THE BRANCH DUCT SHALL BE SIZED AT A PRESSURE DROP OF

0.07" W.C. PER 100' OF DUCTWORK.

2. UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO AN AIR TERMINAL SHALL

MATCH THE INLET SIZE.

3. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO

EACH OTHER.

4. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.

5. EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING

DRAWINGS, AND ARE FOR REFERENCE ONLY.

6. CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE

CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL

TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED

AS SPECIFIED FOR NEW DUCTWORK.

VENTILATION GENERAL NOTES:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL

EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT

LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,

TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.

16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH

OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE

EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO

THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED

ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC.

17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND

SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.

6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

MECHANICAL PHASING NOTES:

1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO

ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND PHASING SCHEDULES AND FOR

CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT

THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY

DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF

THE PHASING CRITERIA.

2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.

WITH AFFECTED ADJACENT AREAS.

3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE

ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF

PROJECT.

4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP

ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT

5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

1 VIEW NAME

SCALE: 1/8" = 1'-0"A101 0 8' 16'4'

N

SHEET NUMBER

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR

SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL

MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.

FIRE / SMOKE BARRIER DESIGNATIONS

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

SMOKE BARRIER

1 HOUR FIRE/SMOKE BARRIER

2 HOUR FIRE/SMOKE BARRIER

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES: V3.1, JULY 1, 2021

VA FIRE PROTECTION DESIGN MANUAL: 8TH ED., JUNE 1, 2021

VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL: REV. JULY 1, 2022

VA PLUMBING DESIGN MANUAL: REV. JANUARY 1, 2023

VA HVAC DESIGN MANUAL: REV. NOVEMBER 1, 2022

NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS: 2022 EDITION

NFPA 72 FIRE ALARM AND SIGNALING CODE: 2022 EDITION

NFPA 75 FIRE PROTECTION OF IT EQUIPTMENT: 2020 EDITION

NFPA 99 HEALTHCARE FACILITIES CODE: 2021 EDITION

NFPA 101 LIFE SAFETY CODE: 2021 EDITION

NFPA 2001 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS: 2022 EDITION

INTERNATIONAL BUILDING CODE: 2021 EDITION

INTERNATIONAL MECHANICAL CODE: 2021 EDITION

INTERNATIONAL PLUMBING CODE: 2021 EDITION

APPLICABLE CODES AND STANDARDS

CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS

PROJECT ALTITUDE: 554 FT. ABOVE SEA LEVEL

MECHANICAL DESIGN CONDITIONS:

SUMMER:

WINTER:

OUTDOOR CONDITIONS:

INDOOR DESIGN CONDITIONS:

BASED ON WEATHER DATA FOR: NASHVILLE, TENNESSEE

TR IT EQUIPMENT INLET: 41-95°F DRY BULB, 8-80% RELATIVE HUMIDITY

MCR IT EQUIPMENT INLET: 72-81°F DRY BULB, 8-60% RELATIVE HUMIDITY

TR AND MCR SPACES: 64-81°F DRY BULB, 30-60% RELATIVE HUMIDITY

TE ENVIRONMENT: 41-95°F DRY BULB, 8-80% RH, <82.4°F DEW POINT

REFER TO CONTROL DIAGRAMS FOR ROOM SPECIFICS.

94.8°F DRY BULB, 74.9°F WET BULB

14.8°F DRY BULB

MECHANICAL SYMBOL LIST

SYMBOL: DESCRIPTION:

NOT ALL SYMBOLS MAY APPLY.

DIRECTION OF AIR FLOW

FLEXIBLE DUCT

MANUAL VOLUME DAMPER

RISE IN DIRECTION OF AIR FLOWR

DUCT CAP

DROP IN DIRECTION OF AIR FLOWD

DUCT DOWN

DUCT UP

SUPPLY/OUTSIDE AIR DUCT SECTION

RETURN AIR DUCT SECTION

EXHAUST/RELIEF AIR DUCT SECTION

4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION

SD-1

6/115

AIR TERMINAL PROPERTIES SYMBOL

NECK SIZE/CFM

TERMINAL AIR BOX (REFER TO SCHEDULE)###

### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)

HUMIDIFIERH

OPPOSED BLADE DAMPER (REFER TO SCHEDULE)

PARALLEL BLADE DAMPER (REFER TO SCHEDULE)

FAN POWERED TERMINAL AIR BOX w/REHEAT COIL

(REFER TO SCHEDULE)

MECHANICAL SYMBOL LIST

SYMBOL: DESCRIPTION:

NOT ALL SYMBOLS MAY APPLY.

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

CHILLED WATER RETURNCHR

CHILLED WATER SUPPLYCHS

CD CONDENSATE DRAIN

COLD WATER - POTABLECW

HEATING/CHILLED WATER RETURNHCR

HEATING/CHILLED WATER SUPPLYHCS

HEATING WATER RETURNHWR

HEATING WATER SUPPLYHWS

REFRIGERANT LIQUIDLIQ

REFRIGERANTREF

REHEAT WATER RETURNRWR

REHEAT WATER SUPPLYRWS

REFRIGERANT SUCTIONSUC

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

PITCH PIPE IN DIRECTION

DIRECTION OF FLOW IN PIPE

CONTROL VALVE (TWO-WAY)

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

THROTTLING VALVE

AUTOMATIC BALANCING VALVE

MIXING VALVE

CONTROL VALVE (THREE-WAY)

SOLENOID VALVE

CHECK VALVE

BACKFLOW PREVENTER

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE (LIQUID/GAS)

PRESSURE REDUCING VALVE (STEAM)

TRIPLE DUTY VALVE (ANGLE TYPE)

TRIPLE DUTY VALVE (IN-LINE TYPE)

VACUUM BREAKER

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP

PUMP

BASKET STRAINER

FLEXIBLE CONNECTION

PRESSURE/TEMPERATURE TEST PLUG

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

SUCTION DIFFUSER WITH SUPPORT FOOT

AUTOMATIC AIR VENT

MANUAL AIR VENT

DRAIN VALVE WITH HOSE CONNECTION AND CAP

ALIGNMENT GUIDE

PIPE ANCHOR

EXPANSION JOINT

#.#" IS THE EXPANSION TRAVEL INCHES

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

FLOW METER

FM

FLOW SWITCH

F

FS FLOW SENSOR

EJ-#

OCCUPANCY SENSORO

HUMIDISTAT SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

H HUMIDISTAT / SENSOR

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR/MONITORP

PRESSURE SENSOR (DUCT MOUNTED)P

THERMOSTAT/SENSORT

TEMPERATURE SENSORT

THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET

AIRFLOW MEASUREMENT SYMBOL

XX - AHU SYMBOL

Y - SEQUENTIAL NUMBER

XX-Y

MECHANICAL SHEET INDEX

MH000 MECHANICAL COVERSHEET

B01-MH200 BASEMENT LEVEL MECHANICAL PLAN - OVERALL

B01-MH200A BASEMENT LEVEL MECHANICAL PLANS - SECTION A

B01-MH200ACRE BASEMENT LEVEL MECHANICAL PLANS - SECTION ACRE

B01-MH200BE BASEMENT LEVEL MECHANICAL PLANS - SECTION BE

B01-MH200BW BASEMENT LEVEL MECHANICAL PLAN - SECTION BW

B01-MH200CE BASEMENT LEVEL MECHANICAL PLAN - SECTION CE

B01-MH200CW BASEMENT LEVEL MECHANICAL PLAN - SECTION CW

B01-MH200DE BASEMENT LEVEL MECHANICAL PLAN - SECTION DE

B01-MH200DW BASEMENT LEVEL MECHANICAL PLAN - SECTION DW

B01-MH201 FIRST LEVEL MECHANICAL PLAN - OVERALL

B01-MH201A FIRST LEVEL MECHANICAL PLAN - SECTION A

B01-MH201ACRE FIRST LEVEL MECHANICAL PLAN - SECTION ACRE

B01-MH201BE FIRST LEVEL MECHANICAL PLAN - SECTION BE

B01-MH201BW FIRST LEVEL MECHANICAL PLAN - SECTION BW

B01-MH201CE FIRST LEVEL MECHANICAL PLAN - SECTION CE

B01-MH201CW FIRST LEVEL MECHANICAL PLAN - SECTION CW

B01-MH201DE FIRST LEVEL MECHANICAL PLAN - SECTION DE

B01-MH201DW FIRST LEVEL MECHANICAL PLAN - SECTION DW

B01-MH202 SECOND LEVEL MECHANICAL PLAN - OVERALL

B01-MH202A SECOND LEVEL MECHANICAL PLAN - SECTION A

B01-MH202ACRE SECOND LEVEL MECHANICAL PLAN - SECTION ACRE

B01-MH202B SECOND LEVEL MECHANICAL PLAN - SECTION B

B01-MH202C SECOND LEVEL MECHANICAL PLAN - SECTION C

B01-MH202D SECOND LEVEL MECHANICAL PLAN - SECTION D

B01-MH203 THIRD LEVEL MECHANICAL PLAN - OVERALL

B01-MH203A THIRD LEVEL MECHANICAL PLAN - SECTION A

B01-MH203ACRE THIRD LEVEL MECHANICAL PLAN - SECTION ACRE

B01-MH203B THIRD LEVEL MECHANICAL PLAN - SECTION B

B01-MH203C THIRD LEVEL MECHANICAL PLAN - SECTION C

B01-MH203D THIRD LEVEL MECHANICAL PLAN - SECTION D

B01-MH204 FOURTH LEVEL MECHANICAL PLAN - OVERALL

B01-MH204A FOURTH LEVEL MECHANICAL PLAN - SECTION A

B01-MH204ACRE FOURTH LEVEL MECHANICAL PLAN - SECTION ACRE

B01-MH204B FOURTH LEVEL MECHANICAL PLAN - SECTION B

B01-MH204C FOURTH LEVEL MECHANICAL PLAN - SECTION C

B01-MH204D FOURTH LEVEL MECHANICAL PLAN - SECTION D

B01-MH205 FIFTH LEVEL MECHANICAL PLAN - OVERALL

B01-MH205ACRE FIFTH LEVEL MECHANICAL PLAN - SECTION ACRE

B01-MH206 SIXTH LEVEL MECHANICAL PLAN - OVERALL

B01-MH206ACRE SIXTH LEVEL MECHANICAL PLAN - SECTION ACRE

B01-MH207ACRE ROOF LEVEL MECHANICAL PLAN - SECTION ACRE

B01-MH300 SECOND LEVEL ENLARGED MCR MECHANICAL DEMOLITION

B01-MH301 SECOND LEVEL ENLARGED MCR VENTILATION PLAN

B01-MH302 SECOND LEVEL ENLARGED MCR MECHANICAL PIPING PLAN

B01A-MH201 FIRST LEVEL MECHANICAL PLANS

B09-MH200 PARKING GARAGE BASEMENT LEVEL MECHANICAL PLANS

MH400 MECHANICAL DETAILS

MH600 MECHANICAL SCHEDULES

MH700 TEMPERATURE CONTROLS DIAGRAMS AND SEQUENCES

GRAND TOTAL: 50

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:2

A

M

MH000

MECHANICAL COVERSHEET EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

N/A

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

Revisions: Date:

o.: 223

SECTION BE

SECTION BW

SECTION BW

SECTION DE

SECTION DE

SECTION DW

SECTION DWSECTION CW

SECTION CE

SECTION CW

SECTION A

SECTION CE

SECTION ACRE

SECTION A

SECTION ACRE SECTION BE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN N

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

ACRE

A BW

CE DE

1A

BE

CW DW

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:1

A

M

B01-MH200

BASEMENT LEVEL MECHANICAL PLAN -

OVERALL

EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

SCALE: 1" = 20'-0"B01-MH200

1 BASEMENT LEVEL PLAN - OVERALL

SHEET NOTES:

1. THIS SHEET IS FOR REFERENCE ONLY. REFER

TO ENLARGED VIEWS ON SUBSEQUENT

DRAWINGS FOR ADDITIONAL INFORMATION.

2. HATCHED AREAS INDICATE LOCATIONS OF

NEW OR RENOVATED TELECOMMUNICATION

SPACES.

N

0 20' 40'10'

T

TT H

TT H

2 3

4 5 6 7 8 9 10 11 12 13

B

C

D

E

F

G

H

J

TR

D-57A

STORAGE

F-9B

STORGAE

D-13

STORAGE

D-14

BIOMED SHOP

D-15

TOILET

D-16

STORAGE

F-9C

PEN

D-19A

EQUIPMENT

F-7A

CATH LAB # 2

D-19CONTROL ROOM

D-18

CATH LAB # 1

D-17

TC LAB

D-12E

MICRO LAB

D-12

OFFICE

D-12A

GEN WASH

D-09

ANTE RM

D-12B

WORK RM

D-12C

BSLE LAB

D-12D

BD2

D-11

BD1

D-10

CT-1

D-27K

CONTROL

D-27J

CT-2

D-27H

MECH

D-28-B CLEAN LINEN

D-28

TOSHIBA

D-28A

MICRO OFFICE

D-05E

MALE TOILET

D-08MULTIPURPOSE

D-05C FEMALE TOILET

D-07

OFFICE

D-06A

SCREENING

D-06 ELECTRICAL

CLOSET

D-29

BD ELECTRICAL

CLOSET

D-30

HOT LAB

D-40D

TREAT

D-40E

TREAT

D-40F

CHANGING/TOILET

D-27E

STORAGE

D-27F

OFFICE

D-27G

MULTI VIEWING

D-41

MULTI VIEWING

CB-12D D-42

OFFICE

CB-12C D-43

MULTI VIEWING

D-44

MULTI VIEWING

D-45

OFFICE

D-46 Room

D-47

ADP COORD

OFFICE

D-02D

OFFICE

D-02E

ELEC

CLOSET

D-02F

MALE TOILET

D-49

FEMALE TOILET

D-48

BREAK

D-27B

SUPPLY

MAMMOGRAPHY

D-22

DARK RM

D-22A

READING RM

D-21

VESTIBULE

D-20

HC TOILET

D-20A

HC TOILET

D-20B

LOUNGE/LOCKERS

D-58

COMPUTER RM

D-57

CHIEF TECH

D-50

SEC

D-651

SVC CHIEF

D-65

SIG

D-02G

OFFICE

D-02C

OFFICE

D-02B

OFFICE

D-02A

Room

D-01

ADP

TOILET

D-63

STORAGE

D-56

HAC

D-55

RADIOGRAPHIC

FLUOROSCOPIC

D-54

RADIOGRAPHIC

FLUOROSCOPIC

D-53B

CONTROL

D-53C

CONTROL

D-54C Room

A-585

TOILET

TOILET

D-54B

Room

A-588

DRESS

D-53A

DRESS

D-54A

Room

CB-12

CORRIDOR

DRESS

D-52A

DRESS

D-51A

RADIOGRAPHIC

FLUOROSCOPIC

ROOM

A-594

RADIOGRAPHIC

FLUOROSCOPIC

D-52

CONTROL

D-52C

CONTROL

D-51C

HOLDING

D-27D

PASSAGE

D-27

WHL CHR.

STRG

SCRUB/ WORK AREA

D-24B

I.R.

D-24

WAITING

D-27A

CONTROL

D-24A

TOILET

A-606

TOILET

D-51B

TOILET

D-52B

GANTRY

D-40A

TOILET

D-40C

CORRIDOR

Room

A-612

CNTRL RM

D-40B

PET SCAN

D-40

CYTO LAB

D-05

BLK STORAGE

D-05D

CORRIDOR

CB-24

CORRIDOR

CB-11SAW RM

CUTTING RM

D-05A

READING ROOM

D-04

TECH

D-03A

ADP COMPUTER RM

D-03

WAITING

D-02

WAITING SPACE

CB-14A

CORRIDOR

CB-13

CORRIDOR

CB-14

CORRIDOR

CB-10

CORRIDOR

CB-20

CORRIDOR

D-26

OTHER

F-7C

LINEN

D-23

STAIR

NO.4

ELEVATOR

ELEVATOR

S-2

CORRIDOR

CB-19

B01-MH200A

B01-MH200A

B01-MH200A

/4

"C D

REF

COMPUTER RM

D-57

14ø SA x1

R

A

10x14 SA

RG-E

SG-E

TR

D-57A

COMPUTER RM

D-57 x1

R

A

14ø SA

10x14 SA

SS-D57A

SG-E

10x14/150

RG-E

12x12/100

TR

D-57A

COMPUTER RM

D-57

SS-D57A3

3/4"CD

REF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN N

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

ACRE

A BW

CE DE

1A

BE

CW DW

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:2

A

M

B01-MH200A

BASEMENT LEVEL MECHANICAL PLANS -

SECTION A

EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

SCALE: 1/16" = 1'-0"B01-MH200A

1 BASEMENT LEVEL MECHANICAL PLAN - SECTION A

SCALE: 1/4" = 1'-0"B01-MH200A

2 BASEMENT LEVEL MECHANICAL DEMOLITION PLAN - TR D-57A

SCALE: 1/4" = 1'-0"B01-MH200A

3 BASEMENT LEVEL VENTILATION PLAN - TR D-57A

SCALE: 1/4" = 1'-0"B01-MH200A

4 BASEMENT LEVEL PIPING PLAN - TR D-57A

SHEET NOTES:

1. DRIP PANS TO BE PROVIDED UNDER ALL

EXISTING HYDRONIC, PLUMBING, AND FIRE

PROTECTION PIPING OVERHEAD IN TR

SPACES. FOR CLARITY, DRIP PANS ARE ONLY

SHOWN ON PLUMBING DRAWINGS.

MECHANICAL CONTRACTOR SHALL

COORDINATE WITH PLUMBING CONTRACTOR

TO VERIFY ALL EXISTING AND NEW PIPING

OVERHEAD ARE PROVIDED WITH DRIP PAN

COVERAGE.

2. DO NOT SPILL CONDENSATE PIPING INTO DRIP

PANS OVER TR SPACES. COORDINATE

INSTALLATION OF REFRIGERANT AND

CONDENSATE PIPING WITH DRIP PAN

LOCATIONS. AVOID PENETRATIONS OF NEW

DRIP PANS. SEAL ANY NECESSARY

PENETRATIONS WATER TIGHT.

3. TEMPERATURE CONTROLS CONTRACTOR

SHALL COORDINATE LOCATION OF ALL DRIP

PANS FOR LEAK DETECTION MONITORING.

4. TEMPERATURE CONTROLS CONTRACTOR

SHALL BE RESPONSIBLE FOR INTEGRATION OF

MONITORING OF ALL TEMPERATURE AND

HUMIDITY SENSORS INTO EXISTING FACILITY

CONTROLS SYSTEM.

5. ELECTRICAL AND TELECOMMUNICATIONS

EQUIPMENT SHOWN FOR REFERENCE ONLY.

KEYNOTES:

1. EXISTING BOTTOM TAPPED RETURN GRILLE TO

REMAIN.

2. EXISTING THERMOSTAT SERVING DEDICATED

VAV BOX TO REMAIN. DISABLE HEATING.

3. INSTALL WALL MOUNTED SPLIT SYSTEM PER

MANUFACTURER'S INSTRUCTIONS.

COORDINATE EXACT LOCATION WITH

ELECTRICAL AND TELECOMMUNICATIONS

CONTRACTORS.

4. REBALANCE EXISTING AIR DEVICE TO CFM

INDICATED.

5. INSTALL NEW COMBINATION

TEMPERATURE/HUMIDITY SENSOR ON WALL

ADJACENT TO LIGHT SWITCH. TCC TO

INTEGRATE SENSOR INTO EXISTING FMCS.

REFER TO SHEET MH700 FOR ADDITIONAL

INFORMATION.

6. ROUTE CONDENSATE DRAIN PIPING ABOVE

CEILING TO HAC. ROUTE PIPING DOWN WALL

AND SPILL INTO MOP BASIN.

7. ROUTE REFRIGERANT LINESET, SIZED PER

MANUFACTURER'S RECOMMENDATIONS, AS

INDICATED. REFER TO SHEET B01-MH201A FOR

CONTINUATION.

8. EXISTING VAV TO BE REBALANCED PER

AIRFLOWS INDICATED. DISABLE HEATING TO

VAV. CONTRACTOR TO VERIFY EXACT

LOCATION OF EXISTING EQUIPMENT.

N

0 16' 32'8'

N

0 4' 8'2'

A.1 A.2 A.3 A.4 A.5 A.6 A.7 A.8 A.9 A.10 A.11

A.A

A.B

A.C

A.D

A.E

CRAWL

MECH EQUIP

F-10

COMPRESSOR RM

F-12

TRANSFORMER

ROOM

F-14

F-11

SHOP

F-9

CB-F4

STORAGE

F-9B

Room

F-13

ELECTRICAL

CLOSET

F-12A

OFFICE

F-11A

FILTER STORAGE

F-6A

OFFICE

F-4

OFFICE

F-3

DUCT SHAFT

ELECTICAL CLOSET

F-2

JANITOR CLST

F-1ELEVATOR LOBBY

CB-F1IRM

OFFICE

F-6B

HOUSEKEEPING

F-6

STORAGE

F-9C

ELEVATOR

FS-2

VACANT

Room

A-400

PEN

D-19A

MAGNETIC RM

Room

FS-1

ELEVATOR

EQUIPMENT

F-7A

MECH EQUIP

CRAWL SPACE

F-8

CONTROL RM

F-11B

HOUSE KEEPING

STORAGE

Room

F-5

STORAGE

TELEPHONE

CLOSET

F-2A

OFFICE

F-9A

OTHER

F-7C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN N

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

ACRE

A BW

CE DE

1A

BE

CW DW

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:2

A

M

B01-MH200ACRE

BASEMENT LEVEL MECHANICAL PLANS -

SECTION ACRE

EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

SCALE: 1/16" = 1'-0"B01-MH200ACRE

1 BASEMENT LEVEL MECHANICAL PLAN - SECTION ACRE

N

0 16' 32'8'

SHEET NOTES:

1. THIS DRAWING SHOWN FOR REFERENCE

ONLY. NO SCOPE IN THIS AREA.

T H

T H

B

14 15 16

17 18 19 20 21 21.5 22 23

TR

E-15

CORRIDOR

CB-18

STORAGE

D-68C

E-10

OFFICE

E-09D

OFFICE

E-09C

OFFICE

E-09B

STORAGE

E-09A

STAFF TOILET

E-08

ELEVATOR

P-9

TOILET

E-12

OFFICE

E-09J

OFFICE

E-09H

OFFICE

E-09G

OFFICE

E-09F

RECIEVING & ISSUE

AREA EQUIPMENT

STORAGE

E-22

ELEVATOR EQUIP

E-13

ELECTRICAL

E-17

PEST CONTROL

OFFICE

E-18

OFFICE

E-22A

MED GAS

E-21

MED GAS

E-20

RECIEVING AND

SHIPPING DOCK

OFFICE

E-11A

E-10A

SWITCH GEAR

E-11

STORAGE

E-23A

STORAGE

E-23

MAIL RM

E-14

EQUP RM

E-19

BUSINESS RM

E-09I

VESTIBULE

E-09

MULTI PURPOSE

E-09E

CORRIDOR

CB-17

CORRIDOR

CB-18

TOILET

E-18B

PEST CONTROL

WORK ROOM

E-18A

B01-MH200BE

B01-MH200BE

B01-MH200BE

REF

ELECTRICAL

E-17

SIGNAL

E-15

OFFICE

E-14A

SIGNAL

E-16 x2

S

A

10x6 SA

22x22 SA

1 1/2"CHR

1 1/2"CHS

3/4"CD1 1/2"CHR

1 1/2"CHS

10x6 RA x6

R A10x6 RA

TR

E-15 x2

S

A

10x6 SA

22x22 SA

SS-E15

SG-1

8x6/50

10x6 RA x6

R A

10x6 RA

TR

E-15

SS-E15

R E

F

3/4"CD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN N

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

ACRE

A BW

CE DE

1A

BE

CW DW

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:2

A

M

B01-MH200BE

BASEMENT LEVEL MECHANICAL PLANS -

SECTION BE

EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

SCALE: 1/16" = 1'-0"B01-MH200BE

1 BASEMENT LEVEL MECHANICAL PLAN - SECTION BE

SCALE: 1/4" = 1'-0"B01-MH200BE

2 BASEMENT LEVEL MECHANICAL DEMOLITION PLAN - TR E-15

SCALE: 1/4" = 1'-0"B01-MH200BE

3 BASEMENT LEVEL VENTILATION PLAN - TR E-15

SCALE: 1/4" = 1'-0"B01-MH200BE

4 BASEMENT LEVEL PIPING PLAN - TR E-15

SHEET NOTES:

1. DRIP PANS TO BE PROVIDED UNDER ALL

EXISTING HYDRONIC, PLUMBING, AND FIRE

PROTECTION PIPING OVERHEAD IN TR

SPACES. FOR CLARITY, DRIP PANS ARE ONLY

SHOWN ON PLUMBING DRAWINGS.

MECHANICAL CONTRACTOR SHALL

COORDINATE WITH PLUMBING CONTRACTOR

TO VERIFY ALL EXISTING AND NEW PIPING

OVERHEAD ARE PROVIDED WITH DRIP PAN

COVERAGE.

2. DO NOT SPILL CONDENSATE PIPING INTO DRIP

PANS OVER TR SPACES. COORDINATE

INSTALLATION OF REFRIGERANT AND

CONDENSATE PIPING WITH DRIP PAN

LOCATIONS. AVOID PENETRATIONS OF NEW

DRIP PANS. SEAL ANY NECESSARY

PENETRATIONS WATER TIGHT.

3. TEMPERATURE CONTROLS CONTRACTOR

SHALL COORDINATE LOCATION OF ALL DRIP

PANS FOR LEAK DETECTION MONITORING.

4. TEMPERATURE CONTROLS CONTRACTOR

SHALL BE RESPONSIBLE FOR INTEGRATION OF

MONITORING OF ALL TEMPERATURE AND

HUMIDITY SENSORS INTO EXISTING FACILITY

CONTROLS SYSTEM.

5. ELECTRICAL AND TELECOMMUNICATIONS

EQUIPMENT SHOWN FOR REFERENCE ONLY.

N

0 16' 32'8'

N

0 4' 8'2'

KEYNOTES:

1. REMOVE EXISTING CEILING DEVICE. DEMOLISH

DUCT TO POINT INDICATED AND CAP. SEAL

DUCT AND REPAIR INSULATION AS REQUIRED.

PATCH AND REPAIR OPENING IN WALL TO

MATCH ADJACENT SURFACES AND RATINGS.

2. DEMOLISH EXISTING PIPING BACK TO MAIN

AND CAP.

3. DEMOLISH EXISTING PRECISION COOLING UNIT

AND ASSOCIATED DUCTWORK, PIPING,

SUPPORTS, HANGERS, CONTROLS, WIRING,

ETC. COMPLETE. TURN UNIT AND WALL

MOUNTED SENSOR OVER TO FACILITY.

4. DEMOLISH EXISTING CONDENSATE DRAIN

PIPING AND ALL HANGERS, SUPPORTS, ETC.

DOWN TO DRAIN. EXISTING DRAIN TO REMAIN.

5. INSTALL WALL MOUNTED SPLIT SYSTEM PER

MANUFACTURER'S INSTRUCTIONS.

COORDINATE EXACT LOCATION WITH

ELECTRICAL AND TELECOMMUNICATIONS

CONTRACTORS.

6. CONNECT TO EXISTING DUCT AND PROVIDE

NEW SIDEWALL GRILLE MOUNTED TO END OF

DUCT. REBALANCE EXISTING DEVICES ON

SYSTEM TO ACCOMMODATE CFM IN NEW TR.

REBALANCING SHALL MAINTAIN REQUIRED

SPACE PRESSURIZATIONS.

7. INSTALL NEW COMBINATION

TEMPERATURE/HUMIDITY SENSOR ON WALL

ADJACENT TO LIGHT SWITCH. TCC TO

INTEGRATE SENSOR INTO EXISTING FMCS.

REFER TO SHEET MH700 FOR ADDITIONAL

INFORMATION.

8. ROUTE 3/4" CONDENSATE DRAIN PIPING AS

INDICATED. HOLD TIGHT TO WALL. ROUTE

PIPING DOWN WALL AND SPILL INTO EXISTING

DRAIN. TERMINATE PIPING WITHIN DRAIN.

9. ROUTE REFRIGERANT LINESET, SIZED PER

MANUFACTURER'S RECOMMENDATIONS, AS

INDICATED. REFER TO SHEET B01-MH201BW

FOR CONTINUATION.

B

C

D

E

F

G

H

J

14 15 16 17 18 19 20 21 21.5 22 23

CORRIDOR

CB-18

PROCEDURE RM

D-59

SWITCHBOARD

ROOM

D-67 ELECTRICAL SHOP

STORAGE

D-68A

ELECTRIC SHOP

D-68

ELECTRONICS

D-68B

STAFF

D-65A

STAFF

D-65B

STAFF

D-65C

STAFF

D-65D

STAFF

D-65E

RESIDENT/INTERN

D-65F

CONFERENCE/CLASS

RM

D-65G

RECEPTION & SEC

D-65H

OFFICE

D-71

MULTIPURPOSE

D-73A

ELECTRICAL

ENGINEERING

D-70

CLERICAL OFFICE

D-73B

OFFICE

D-73C

OFFICE

D-73D

STORAGE

D-74A

MAINTAINENCE

FOREMAN

E-07 OFFICE

A/C FOREMAN

E-06

PAINT SHOP

E-05

A/C SHOP

E-27

CARPENTER SHOP

E-04

MACHINE SHOP

E-03

ELEC CLOSET

E-26A

PLUMBING SHOP

E-02

BIOMEDICAL ENGG

STORGAE

E-01B

OFFICE

E-01C

BLDG MGT

LOCKERS

B-03

ENGG LOCKERS

B-04

Room

A-542 Room

A-543

HAC

B-05

RECIEVING AND

CLEANING

E-01A

BIOMED ENG

REPAIRING AND

DEVELOPMENT

E-01

BOILER ROOM

E-25F

BOILER OPERATOR

E-25E

FLAME STORAGE

E-24

OFFICE

E-25C

GROUND & TRANS

E-25D GROUND EQUIP

E-25

CLOSET

E-25A

A/C OPERATIONS

E-25B

SVC RM

E-26

KEY SHOP

D-69

CORRIDOR

CB-17

CORRIDOR

CB-18

OFFICE

D-73Room

A-573

AUTOATED

RADIOGRAPHIC

D-60

CONTROL RM

D-61

CHEST ROOM

D-62

TOILET

D-63

TOILET

D-64

D-66

CORRIDOR

CB-16

CORRIDOR

CB-16B

EMERGENCY

GENERATOR RM

E-25G

EMERGENCY

GENERATOR

E-25H

STAIR

NO.8

ELEVATOR LOBBY

CB-10A

ELEVATOR LOBBY

CB-16D

VESTIBULE

OFFICE

D-74

ELEVATOR

ELEVATOR

S-2

ELEVATOR

P-3

ELEVATOR

P-4

ELEVATOR

P-5

TOILET

MECH

E-5

OFFICE

CORRIDOR

CB-16C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN N

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

ACRE

A BW

CE DE

1A

BE

CW DW

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:3

A

M

B01-MH200BW

BASEMENT LEVEL MECHANICAL PLAN -

SECTION BW

EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

SCALE: 1/16" = 1'-0"B01-MH200BW

1 BASEMENT LEVEL MECHANICAL PLAN - SECTION BW

N

0 16' 32'8'

SHEET NOTES:

1. THIS DRAWING SHOWN FOR REFERENCE

ONLY. NO SCOPE IN THIS AREA.

1 2 3

4 5 6 7 8 9 10 11 12 13 14

K

L

M

N C.I

C.G1 P

TR

A-11

EMBALMING

A-03

REFRIGERATOR

AUTOPSY

A-02

MENS RESTROOM

WOMENS

RESTROOM

CORRIDOR

CB-6

EQUIPMENT

ELEVATOR

A-05

ELEVATOR

S-1

FEMALE TOILET

A-06

CENTRAL STORAGE

A-17G

CHEM SUPER LEAD

TECH

A-17F

OFFICE

A-07

HAC

A-08

PATH CHIEF

A-09

HEMA SUPER

A-17C

LEAD TECH

A-17D

LEAD TECH

A-17E

MULTIPURPOSE

A-17B

MALE TOILET

A-12 MALE TOILET

A-13

BLOOD BANK

A-14

OFFICE

A-14A

ELECTRICAL

CLOSET

A-15BA2

HEMATOLOGY

CHEMISTRY

A-17

SPECIMEN

RECEIVING

URINANALYSIS

COMM CLOSET

A-17A

SEC

A-25H

CHIEF

A-25I

VIEWING/CONFERENCE

A-25J

LABORATORY LOW

LEVEL INVITRO

COUNTING

A-25K

EXAM

A-25L

LAB HIGH LEVEL IN

VITRO COUNTING

A-25M

BIOCHEMISTRY LAB

A-25N

HOT LAB

A-25O

RADIATION SAFETY

& EQUIP RM

A-25P

NUCLEAR

CARDIOLOGY

A-25Q

ELECTRICAL

CLOSET

A-25R

EQUIP STORAGE

A-25S

NUCLEAR IMAGING

A-25T

TELE EQUIP EXPANS

A-22

EXIST TELEPHONE

EQUIP RM

580 ELECTRICAL

CLOSET

A-22A

ANCILLARY LISTING

A-21

FLOW CYTO

A-20A

TISSUE TYP

A-20

OFFICE

A-04B

OFFICE

A-04A

FLOW CYTOMETRY

A-04

ELECTRICAL

CLOSET

A-16

MULTIPURPOSE

A-19A

LAB SEC

A-19

OFFICE

A-19F

OFFICE

A-19E

OFFICE

A-19D

OFFICE

A-19C

EXAM RM

A-OV

HAC

A-25W

FEMALE TOILET

A-25A

MALE TOILET

A-25B

OFFICE HOUSE

STAFF

A-25C

Room

A-18

OFFICE

OFFICE

A-19B

ELECTRICAL

CLOSET

A-27

COMPUTER RM

A-25U

ELECTRICAL

CLOSET

A-26

RCPT & FILES

A-25

Room

A-663

CORRIDOR

CORRIDOR

A-673

CORRIDOR

CB-9D

Room

A-679

CORRIDOR

CB-8

CORRIDOR

CB-9A

CORRIDOR

CB-9

WAITING RM

A-25X

CORRIDOR

CB-10

CORRIDOR

B01-MH200CE

B01-MH200CE

B01-MH200CE

3/4"CD

REF

FEMALE TOILET

A-11

CORRIDOR

FEMALE TOILET

A-10

10x10 EA

10x10 SA

2 1

TR

A-11

CORRIDOR

10x10 SA

10x10 EA

SG-1

8x6/50

SS-A11.1 SS-A11.2

TR

A-11

CORRIDOR

SS-A11.1 SS-A11.2

/4

"C D

3/4"CD

3/4"CD

R

EF

REF

REF

REF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN N

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

ACRE

A BW

CE DE

1A

BE

CW DW

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:3

A

M

B01-MH200CE

BASEMENT LEVEL MECHANICAL PLAN -

SECTION CE

EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

SCALE: 1/16" = 1'-0"B01-MH200CE

1 BASEMENT LEVEL MECHANICAL PLAN - SECTION CE

SCALE: 1/4" = 1'-0"B01-MH200CE

2 BASEMENT LEVEL MECHANICAL DEMOLITION PLAN - TR A-11

SCALE: 1/4" = 1'-0"B01-MH200CE

3 BASEMENT LEVEL VENTILATION PLAN - TR A-11

SCALE: 1/4" = 1'-0"B01-MH200CE

4 BASEMENT LEVEL PIPING PLAN - TR A-11

SHEET NOTES:

1. DRIP PANS TO BE PROVIDED UNDER ALL

EXISTING HYDRONIC, PLUMBING, AND FIRE

PROTECTION PIPING OVERHEAD IN TR

SPACES. FOR CLARITY, DRIP PANS ARE ONLY

SHOWN ON PLUMBING DRAWINGS.

MECHANICAL CONTRACTOR SHALL

COORDINATE WITH PLUMBING CONTRACTOR

TO VERIFY ALL EXISTING AND NEW PIPING

OVERHEAD ARE PROVIDED WITH DRIP PAN

COVERAGE.

2. DO NOT SPILL CONDENSATE PIPING INTO DRIP

PANS OVER TR SPACES. COORDINATE

INSTALLATION OF REFRIGERANT AND

CONDENSATE PIPING WITH DRIP PAN

LOCATIONS. AVOID PENETRATIONS OF NEW

DRIP PANS. SEAL ANY NECESSARY

PENETRATIONS WATER TIGHT.

3. TEMPERATURE CONTROLS CONTRACTOR

SHALL COORDINATE LOCATION OF ALL DRIP

PANS FOR LEAK DETECTION MONITORING.

4. TEMPERATURE CONTROLS CONTRACTOR

SHALL BE RESPONSIBLE FOR INTEGRATION OF

MONITORING OF ALL TEMPERATURE AND

HUMIDITY SENSORS INTO EXISTING FACILITY

CONTROLS SYSTEM.

5. ELECTRICAL AND TELECOMMUNICATIONS

EQUIPMENT SHOWN FOR REFERENCE ONLY.

KEYNOTES:

1. REMOVE EXISTING CEILING DEVICE. DEMOLISH

DUCT TO POINT INDICATED AND CAP. SEAL

DUCT AND REPAIR INSULATION AS REQUIRED.

2. REMOVE EXISTING CEILING DEVICE. DEMOLISH

DUCT TO POINT INDICATED AND PREPARE FOR

RECONNECTION.

3. INSTALL WALL MOUNTED SPLIT SYSTEM PER

MANUFACTURER'S INSTRUCTIONS.

COORDINATE EXACT LOCATION WITH

ELECTRICAL AND TELECOMMUNICATIONS

CONTRACTORS.

4. CONNECT TO EXISTING DUCT AND PROVIDE

NEW SIDEWALL GRILLE MOUNTED TO END OF

DUCT. REBALANCE EXISTING DEVICES ON

SYSTEM TO ACCOMMODATE CFM IN NEW TR.

REBALANCING SHALL MAINTAIN REQUIRED

SPACE PRESSURIZATIONS.

5. INSTALL NEW COMBINATION

TEMPERATURE/HUMIDITY SENSOR ON WALL

ADJACENT TO LIGHT SWITCH. TCC TO

INTEGRATE SENSOR INTO EXISTING FMCS.

REFER TO SHEET MH700 FOR ADDITIONAL

INFORMATION.

6. ROUTE CONDENSATE DRAIN PIPING ABOVE

CEILING TO HAC. ROUTE PIPING DOWN WALL

AND SPILL INTO MOP BASIN.

7. ROUTE REFRIGERANT LINESET, SIZED PER

MANUFACTURER'S RECOMMENDATIONS, AS

INDICATED. TURN PIPING UP IN EXISTING

CHASE. REFER TO SHEET B01-MH201CE FOR

CONTINUATION.

N

0 16' 32'8'

N

0 4' 8'2'

6 7 8 9 10 11 12 13 14

C.G1 P

R C.G

C.F

C.E

C.D

C.C

C.1 C.2 C.3 C.4 C.4.1C.4.2C.5 C.5.1 C.6 C.7 C.8 C.9 C.10

FAN RM -4

B-B105

PV CV LAB #1

B-B101I

CONTROL #1

B-B101J

EPS CV LAB #2

B-G127J

CV EQUIP #2

B-B101N

VIEW

B-G127O

CV EQUIP #3

B-B101P

CV LAB #3

B-B101O

SOILED UTIL

B-B101E

MULTIPURPOSE

B-G127S

CLEAN SUPPLY

B-G127R

Room

B-G127Y

CHANGE

COR

B-G127Z

TLT

B-B101G

CLEAN LINEN

B-G127AA

PREP/HOLDING

B-G127T

G-09H

CONTROL #2

B-B101Q

G-09G

OFFICE

G-04

ELEVATOR

P-8

TLT

1-G127W

OFFICE

ON CALL

G-16

DRESSING &

HOLDING

A-161

TOILET

G-15A

TOILET

G-15B

OFFICE

G-07

CONFERENCE RM

G-14

SEC

G-13

CHIEF

G-08

OFFICE

G-11

HAC

G-12

STORAGE

CB-5

WC ALCOVE

SUB STERILE

G-19A

OPERATING RM

GENERAL

G-19 OPERATING RM

GENERAL

G-21

EQUIPMENT

G-20

HOLDING

G-17

CONTROL

G-03

OFFICE

G-02B

OFFICE

G-02A

CLERICAL

G-02

OFFICE

G-02C

G-20A

G-20B

G-20C

HAC

B-B101H

STAIR

NO. 2

FLOW CYTOMETRY

A-04

CORRIDOR

CORRIDOR

CB-4

STRETCHER

ALCOVE

CORRIDOR

Room

A-756

CORRIDOR

CB-2

CORRIDOR

CB-6A

FROZEN SECTION

G-18

ALCOVE

B-G127VALCOVE

B-G127BB

Room

A-766

ALCOVE

B-G127W

ALCOVE

B-G127X

CORRIDOR

B-G127F

CORRIDOR

CB-7

AREAWAY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN N

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

ACRE

A BW

CE DE

1A

BE

CW DW

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:4

A

M

B01-MH200CW

BASEMENT LEVEL MECHANICAL PLAN -

SECTION CW

EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

SCALE: 1/16" = 1'-0"B01-MH200CW

1 BASEMENT LEVEL MECHANICAL PLAN - SECTION CW

SHEET NOTES:

1. THIS DRAWING SHOWN FOR REFERENCE

ONLY. NO SCOPE IN THIS AREA.

N

0 16' 32'8'

14 15 16 17 18 19 20 21 21.5 22 23

24 25 26 27 28

K

L

M

N C.I

C.G1 P

CLEAN CORE

SUPPORT

G-34

STAIR

NO. 1

VEST

B-01R

ANEST WORK RM

B-07

WORK ROOM

G-35

ANTE ROOM 3

B-02A

VESTIBULE

B-01E

STORAGE

B-01F

HAC

B-01H

TOILET

B-01G

STUDY CUBICLES

A-25G

STAFF PHYSICIAN

OFFICE

A-25F

STAFF

NON-PHYSICIAN

OFFICE

A-25E

ELECTRICAL

CLOSET

A-22A

FEMALE TOILET

A-25A

MALE TOILET

A-25B

OFFICE HOUSE

STAFF

A-25C

STAFF LOUNGE

A-25D

EXIST FIRE ALARM

PANELS

A-23

DECONTAMINATION

ROOM

B-02

PREPARATION,

ASSEMBLY &

STERILIZATION

B-02C

CART WASH

MEDICATOR ROOM

STERILE STORAGE

B-02F

ANTE ROOM 2

B-2Ec

ANTE ROOM 1

B-02Ea

SCOPE STAGING

ANTE ROOM

EQUIP-1

B-02G

EQUIP 2

B-02E

CORRIDOR

B-02Eb

STAIR

NO.10

HAC

G-43

OFFICE

C-09

GAS STORAGE

G-44

FEMALE TOILET

C-08B

FEMALE LOCKER

C-08A MECH RM AHU-26

MALE TOILET

C-08D

MALE LOCKER

C-08C

STAFF

MULTIPURPOSE

C-08

OFFICE

C-07W

BARIATRIC POS RM

C-07V

POS RM

C-07U

ELECTRICAL

CLOSET

C-07D

ELECTRICAL

CLOSET

C-07C

CLOSET

C-07B

HAC

C-06

OFFICE

B-01Q

MALE LOCKERS

B-01O

MALE TOILET

B-01P

CLEAN

EQUIP/SUPPLY

C-05

HEART POS RM

C-07F

ELECTRICAL

CLOSET

C-04

CHASE

C-04A

FEMALE TOILET

B-01N

FEMALE LOCKERS

B-01M

HAC

B-01L

SPD CHIEF & ASSIST

C-01K

MED PREP

C-07A

POS RM

C-07T

POS RM

C-07S

NEG RM

C-07R

SHOWER/TOILET

C-07Q

BARIATRIC NEG RM

C-07P

NED RM

C-07O

SPD

C-07N

NEG RM

C-07L

POS RM

C-07K

POS RM

C-07J

POS RM

C-07I

HEART POS RM

C-07H

Room

A-542 Room

A-543

CONSULT/MEDITATION

C-03A

SOILED

C-07G

WAITING

C-03

Room

A-554

Room

A-555

Room

A-556

LOGISTICS ITEM

MGRS

BREAKOUT AREA

LOGISTICS ITEM

MGRS

B-06

ELECTRICAL RM

RCPT & FILES

A-25

CORRIDOR

CB-9A

CORRIDOR

CB-9

CORRIDOR

CB-16E

OFFICE

C-07M

SPD ADMIN

B-011

LOGISTICS SUPV

B-01J

CORRIDOR

CB-21

RECESS

CORRIDOR

CB-1

STAIR

NO. 9

ELEVATOR LOBBY

CB-16D

SPD VESTIBULE

B-01A Room

B-01B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN N

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

ACRE

A BW

CE DE

1A

BE

CW DW

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:4

A

M

B01-MH200DE

BASEMENT LEVEL MECHANICAL PLAN -

SECTION DE

EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

SCALE: 1/16" = 1'-0"B01-MH200DE

1 BASEMENT LEVEL MECHANICAL PLAN - SECTION DE

N

0 16' 32'8'

SHEET NOTES:

1. THIS DRAWING SHOWN FOR REFERENCE

ONLY. NO SCOPE IN THIS AREA.

T H T H

C.G1 P

R C.G

C.F

C.E

C.D

C.C

C.10 C.11 C.12 C.13C.13.1C.14C.15C.15.1 C.16 C.16.2 C.16.3C.17C.17.1C.18 C.19 C.20 C.20.1

TR

D-001

VESTIBULE

CB-22A

OPERATING RM

GENERAL

G-21 SUB STERILE

G-21A

GENERAL

OPERATING RM

G-25

OFFICE

G-02D

OFFICE

G-02E

G-20A

G-20B

G-20C

REC & OR HEAD

NURSES

G-01

ELECTRICAL

CLOSET

G-22

ELECTRICAL

CLOSET

PHONE/ SGNL RM

PHYSICIAN LOUNGE

G-24

STAFF LOUNGE

G-23

ELEVATOR

P-6

ELEVATOR

P-7

MALE TOILET &

SHOWER

G-24A MALE LOCKERS

G-24B

FEMALE TOILET

G-23C

DICTATING

G-23A

FEMALE LOCKERS

G-23D

FEMALE SHOWER

G-23B

NEUROSURGERY OR

G-36

SUB STERILE

G-37

PUMP TECHS PREP

RM

G-36A

EXT RAD CONTROL

G-32

CARDIAC OR 8

G-38

OFFICE

G-31

ORTHOPEDIC OR 7

G-39

CLEAN CORE

CB-3

OPERATING RM

GENERAL

G-26

SUB STERILE

G-26A

SCRUB

CB-3B

OPERATING RM

GENERAL

G-27

EQUIP STORAGE

G-40

PLASTER & SPLINTS

G-41

SUB STERILE

G-42

OFFICE

G-28

EQUIP

G-28A

SCRUB UP ALCOVE

G-30

SCRUB UP ALCOVE

G-29

CLEAN CORE

SCRUB-UP ALCOVE

G-33

SCRUB UP ALCOVE

CB-3C

EMERGENCY

GENERATOR

B-G124B

ELECTRICAL

B-G124A

FAN RM 5

B-G124

RECOVERY

STORAGE

G-56B

SOILED UTILITY

G-56A

RECOVERY

ISOLATION

BEDROOM

G-54

ANTE RM

G-56C

RECOVERY

ISOLATION

BEDROOM

G-52

FEMALE STAFF

TOILET

G-51

PACU

G-50

SICU

G-56

FEMALE STAFF

TOILET

G-55

RECOVERY CLEAN

UTILITY

G-56E

CLEAN LINEN

G-56D

ELECTRICAL

CLOSET

G-49BTELE

G-49C

ALCOVE

G-49

SIGNAL

G-49A

OFFLINE

MONITORING

G-47

ON CALL

G-48

BATH

G-48A

CLOSET

G-46

STAIR

NO.10

HAC

G-43

CORRIDOR

CB-22

CORRIDOR

CB-4

STRETCHER

ALCOVE

WC ALCOVE

CORRIDOR

STRETCH ALCOVE

CB-24A

Room

A-757

CORRIDOR

CB-1

CORRIDOR

CB-2C

CORRIDOR

CB-2B

B01-MH200DW

B01-MH200DW

B01-MH200DW

OFFLINE MONITORING

G-47

CORRIDOR

CB-22

x1

R

A

12x6 RA

12x6 RA x8

R A

FSD

212x6 SA

SD-E

8/180

RG-E

RG-E

SD-E

8/190

VAV-E

24x12 OA

TR

D-001

VESTIBULE

CB-22A

OFFLINE MONITORING

G-47

CORRIDOR

CB-22

x S

A x1

R

A

12x6 SA

12x6 SA

SG-1

8x6/50

SD-1

8/130

SS-D001

x8

R A

VAV-E

SD-E

8/190

RG-E

RG-E

24x12 OA

8x6 SA

TR

D-001

VESTIBULE

CB-22A

OFFLINE MONITORING

G-47

CORRIDOR

CB-22

SS-D001

REF

3/4"CD

3/4"CD

/4

"C D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN N

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

ACRE

A BW

CE DE

1A

BE

CW DW

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:5

A

M

B01-MH200DW

BASEMENT LEVEL MECHANICAL PLAN -

SECTION DW

EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

SCALE: 1/16" = 1'-0"B01-MH200DW

1 BASEMENT LEVEL MECHANICAL PLAN - SECTION DW

SCALE: 1/4" = 1'-0"B01-MH200DW

2 BASEMENT LEVEL MECHANICAL DEMOLITION PLAN - TR D-001

SCALE: 1/4" = 1'-0"B01-MH200DW

3 BASEMENT LEVEL VENTILATION PLAN - TR D-001

SCALE: 1/4" = 1'-0"B01-MH200DW

4 BASEMENT LEVEL PIPING PLAN - TR D-001

SHEET NOTES:

1. DRIP PANS TO BE PROVIDED UNDER ALL

EXISTING HYDRONIC, PLUMBING, AND FIRE

PROTECTION PIPING OVERHEAD IN TR

SPACES. FOR CLARITY, DRIP PANS ARE ONLY

SHOWN ON PLUMBING DRAWINGS.

MECHANICAL CONTRACTOR SHALL

COORDINATE WITH PLUMBING CONTRACTOR

TO VERIFY ALL EXISTING AND NEW PIPING

OVERHEAD ARE PROVIDED WITH DRIP PAN

COVERAGE.

2. DO NOT SPILL CONDENSATE PIPING INTO DRIP

PANS OVER TR SPACES. COORDINATE

INSTALLATION OF REFRIGERANT AND

CONDENSATE PIPING WITH DRIP PAN

LOCATIONS. AVOID PENETRATIONS OF NEW

DRIP PANS. SEAL ANY NECESSARY

PENETRATIONS WATER TIGHT.

3. TEMPERATURE CONTROLS CONTRACTOR

SHALL COORDINATE LOCATION OF ALL DRIP

PANS FOR LEAK DETECTION MONITORING.

4. TEMPERATURE CONTROLS CONTRACTOR

SHALL BE RESPONSIBLE FOR INTEGRATION OF

MONITORING OF ALL TEMPERATURE AND

HUMIDITY SENSORS INTO EXISTING FACILITY

CONTROLS SYSTEM.

5. ELECTRICAL AND TELECOMMUNICATIONS

EQUIPMENT SHOWN FOR REFERENCE ONLY.

KEYNOTES:

1. DEMOLISH EXISTING LOUVER. COORDINATE

WALL PATCH AND REPAIR WITH

ARCHITECT/GENERAL TRADES CONTRACTOR.

2. REMOVE EXISTING CEILING DEVICE. DEMOLISH

DUCT TO POINT INDICATED AND PREPARE FOR

RECONNECTION.

3. INSTALL WALL MOUNTED SPLIT SYSTEM PER

MANUFACTURER'S INSTRUCTIONS.

COORDINATE EXACT LOCATION WITH

ELECTRICAL AND TELECOMMUNICATIONS

CONTRACTORS.

4. INSTALL NEW SIDEWALL SUPPLY GRILLE

ABOVE DOOR. ROUTE SA DUCT TO EXISTING

LOW PRESSURE DUCTWORK ABOVE CEILING

AND CONNECT.

5. INSTALL NEW COMBINATION

TEMPERATURE/HUMIDITY SENSOR ON WALL

ADJACENT TO LIGHT SWITCH. TCC TO

INTEGRATE SENSOR INTO EXISTING FMCS.

REFER TO SHEET MH700 FOR ADDITIONAL

INFORMATION.

6. 3/4" CONDENSATE DRAIN PIPING FROM ABOVE.

CONNECT 3/4" CD AT THIS LEVEL TO VERTICAL.

7. ROUTE 3/4" CD AS INDICATED ABOVE CEILING

OF VESTIBULE. ROUTE PIPING DOWN WALL OF

MECHANICAL ROOM AND SPILL TO NEAREST

FLOOR DRAIN. TERMINATE PIPING WITHIN

DRAIN BODY.

8. ROUTE REFRIGERANT LINESET, SIZED PER

MANUFACTURER'S RECOMMENDATIONS, UP

THROUGH FLOOR ABOVE. REFER TO SHEET

B01-MH201DW FOR CONTINUATION.

9. DISCONNECT DUCTWORK IN MECHANICAL

ROOM FROM EXISTING LOUVER. REMOVE

LOUVER AND TURN OVER TO STATION.

PREPARE DUCT FOR RECONNECTION.

10. ROUTE NEW DUCT, FULL SIZE OF EXISTING

DUCTWORK, UP THROUGH NEW ROOF AND

TERMINATE WITH GOOSENECK. BOTTOM OF

OA INLET TO BE MINIMUM 3'-0" ABOVE NEW

ROOF. CONTRACTOR TO FIELD VERIFY

EXISTING DUCT SIZE. COORDINATE ROOF

FLASHING WITH ROOFING CONTRACTOR.

N

0 16' 32'8'

N

0 4' 8'2'

SECTION BE

SECTION BW

SECTION BW

SECTION DE

SECTION DE

SECTION DW

SECTION DWSECTION CW

SECTION CE

SECTION CW

SECTION A

SECTION CE

SECTION ACRE

SECTION A

SECTION ACRE SECTION BE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN N

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

ACRE

A BW

CE DE

1A

BE

CW DW

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:0

A

M

B01-MH201

FIRST LEVEL MECHANICAL PLAN - OVERALL EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

SCALE: 1" = 20'-0"B01-MH201

1 FIRST LEVEL PLAN - OVERALL

SHEET NOTES:

1. THIS SHEET IS FOR REFERENCE ONLY. REFER

TO ENLARGED VIEWS ON SUBSEQUENT

DRAWINGS FOR ADDITIONAL INFORMATION.

2. HATCHED AREAS INDICATE LOCATIONS OF

NEW OR RENOVATED TELECOMMUNICATION

SPACES.

N

0 20' 40'10'

H T

T H

T

2 3

4 5 6 7 8 9 10 11 12 13

B

C

D

E

F

G

H

J

TR

D-114S

CORRIDOR

C1-24

EXAM

D-120I

EXAM

D-120E

EXAM

D-120F

EXAM

D-120J

EXAM

D-120K D-120L

MECH RM

D-119

MECH RM

D-119A

MALE TOILET

F-107

FEMALE TOILET

F-106

TOILET

D-114K

TOILET

D-114I

CORRIDOR

A-40

EXAM RM

D-114H

EXAM RM

D-114G

EXAM RM

D-113F

EXAM RM

D-114L

TOILET

D-114R

PHARMACY

D-117C

D-117B

EXAM RM

D-114T

EXAM RM

D-114U

SPD

D-114Q

EXAM RM

D-114P

EXAM RM

D-114M

TOILET

D-117A

TREATMENT

D-117

1D1

D-114V

EXAM RM

D-114W

EXAM RM

D-114O

EXAM RM

D-114N

EXAM RM

D-114X

EXAM RM

D-113

CHASE

D-115A

WAITING

D-114

MALE TOILET

D-115

CHECK-IN

D-114AEXAM RM

D-114B

EXAM RM

D-114C

EXAM RM

D-114D

EXAM RM

D-114E

TRIAGE VESTIBULE

D-114F

ENTRY CORRIDOR

C1-12A

CHECK-ING

A-41

SCREENING

D-113A

EXAM RM

D-113B

EXAM RM

D-113C

EXAM RM

D-113D

TOILET

D-113E

EXAM RM

D-113G

EXAM

D-113H

SCREENING

D-113I

PHONE CARE

D-110

ER EMERGENCY

STORAGE

D-112

TELE CLOSET

D-111

TRAVEL OFFICE

D-106PFT

D-107

HAC

D-108

FEMALE PATIENT

TOILET

D-109

STAIR

NO. 4

GROUP ROOM

D-136BB

EXAM 1

D-136AA

ELEVATOR

A-55

ELEVATOR

A-56

ELECTRICAL

CLOSET

C-101A

DIETICIAN

D-101B

SECY

D-102

CHIEF

D-102D

CLERK

D-102B

SUPERINTEND

D-102C

STORAGE

D-102A

TELE CLOSET

D-103

EXAM 13

D-105R

X-RAY

D-105Q

EXAM 14

D-105S

EXAM 15

D-105T

CORRIDOR

D-137

TLT

D-105PDR GROUP

D-137B

CNTRL/SCHEDULING

D-137E

TLT

D-105V

NURSE WRKRM

D-137A

D-104

EXAM 16

D-105U

EXAM

D-105B

EXAM

D-105C EXAM

D-105E

EXAM 5

D-105F

CHECK-IN

D-105HH

NURSE WORK

D-105GG

EXAM 7

D-136F

SPD

D-136G

SUB-STATION

KITCHEN EQUIP 1D

D-101D

SOIL UTIL

D-105H

EXAM 8

D-105I

EXAM

D-105K

EXAM 10

D-105L

EXAM 11

D-105M

TOILET

D-136T

SCULLERY AND

CARTS

D-101C

CENTRAL TRAY

AREA

D-101

REFR

D-101L

MALE TOILET

D-101J

FEMALE TOILET

A-57

FEMALE LOCKER

D-101K

MALE LOCKER

D-101I

FOOD STORAGE

D-101F

SALAD

PREPARATION

D-101H

REFR

D-101G

TELE CLOSET

D-101E

EXAM 3

A-58

CHASE

A-59

EXAM 2

D-136CC

DOCTOR'S GROUP

D-136D

CORRIDOR

C1-9

CORRIDOR

C1-24

Room

C1-25

PHARMACY WAITING

D-116

CORRIDOR

CD1-4

CORRIDOR

CD1-3

CORRIDOR

CD1-2

CORRIDOR

CD1-1

CORRIDOR

A-74

CORRIDOR

C1-23A

CORRIDOR

C1-7

B01-MH201A

B01-MH201A

B01-MH201A

R E

F

3/4"CD

D-117B

EXAM RM

D-114S ø

S A

12x12 RA x1

R

A

"H

W R

"H

W S

1"HWS

1"HWR

1 1/2"HWS

1 1/2"HWR

ø

S A

TR

D-114S

D-117B ø

S A

12x12 RA

SG-1

8x6/50

SS-D114S.1

SS-D114S.2

TR

D-114S

D-117B

SS-D114S.1

7 3/4"CD

3/4"CD

R E

F

1 1/2"HWS

1 1/2"HWR

R E

F

SS-D114S.2

/4

"C D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEYPLAN N

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

A/E:

ACRE

A BW

CE DE

1A

BE

CW DW

A u to d e s k D o c s /2

N a s h v ill e E

H R

M /6

-7

.B

.M

P F

P R

.r v t

/1

/2

:3

:0

A

M

B01-MH201A

FIRST LEVEL MECHANICAL PLAN - SECTION A EHRM INFRASTRUCTURE

UPGRADES DESIGN

1310 24th Avenue South Nashville, TN 37212

626-22-700

02/16/2024 MatKah CasHos

100% FINAL BID

DOCUMENTS

FULLY SPRINKLERED

IMEG

101 N SEVENTH STREET

LOUISVILLE, KY 40202

502.415.7814

SCALE: 1/16" = 1'-0"B01-MH201A

1 FIRST LEVEL MECHANICAL PLAN - SECTION A

SCALE: 1/4" = 1'-0"B01-MH201A

2 FIRST LEVEL MECHANICAL DEMOLITION PLAN - TR D-114S

SCALE: 1/4" = 1'-0"B01-MH201A

3 FIRST LEVEL VENTILATION PLAN - TR D-114S

SCALE: 1/4" = 1'-0"B01-MH201A

4 FIRST LEVEL PIPING PLAN - TR D-114S

N

0 16' 32'8'

N

0 4' 8'2'

SHEET NOTES:

1. DRIP PANS TO BE PROVIDED UNDER ALL

EXISTING HYDRONIC, PLUMBING, AND FIRE

PROTECTION PIPING OVERHEAD IN TR

SPACES. FOR CLARITY, DRIP PANS ARE ONLY

SHOWN ON PLUMBING DRAWINGS.

MECHANICAL CONTRACTOR SHALL

COORDINATE WITH PLUMBING CONTRACTOR

TO VERIFY ALL EXISTING AND NEW PIPING

OVERHEAD ARE PROVIDED WITH DRIP PAN

COVERAGE.

2. DO NOT SPILL CONDENSATE PIPING INTO DRIP

PANS OVER TR SPACES. COORDINATE

INSTALLATION OF REFRIGERANT AND

CONDENSATE PIPING WITH DRIP PAN

LOCATIONS. AVOID PENETRATIONS OF NEW

DRIP PANS. SEAL ANY NECESSARY

PENETRATIONS WATER TIGHT.

3. TEMPERATURE CONTROLS CONTRACTOR

SHALL COORDINATE LOCATION OF ALL DRIP

PANS FOR LEAK DETECTION MONITORING.

4. TEMPERATURE CONTROLS CONTRACTOR

SHALL BE RESPONSIBLE FOR INTEGRATION OF

MONITORING OF ALL TEMPERATURE AND

HUMIDITY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .