Attachment 9 - Contractors Daily Log of Construction.pdf
PDF 165 KB Posted
- Solicitation number
- 36C78626B0015
About this file
This is a template for Attachment 9: Contractor's Daily Log of Construction/Inspector Quality Assurance Report (Q.A.R.), used to document daily construction activities on federal projects.
The form captures essential project information including contract number, project title, location, contractor details, and contracting officer identification. It requires daily documentation of weather conditions (temperature, precipitation, visibility, wind speed) and assessment of weather-related delays affecting 50% or more of the critical path. The form tracks workforce composition across multiple trades for contractors and subcontractors, including project managers, site managers, QC managers, field engineers, and miscellaneous laborers. Additional sections document equipment on site, materials delivered, project comments, deficiencies, potential causes for delay, and tests/observations conducted. The form is organized by construction divisions using standard CSI specifications: Division 1 (General Conditions) covering shop drawings and testing laboratory services; Division 2 (Existing Conditions) addressing site surveying; Division 31 (Earthwork); and Division 32 (Exterior Improvements) including flat marker support systems, headstone setting, and turf renovation. The form includes space for visitor information, weekly progress meeting notes, site manager signature, supervisor initials, and project photographs. Project completion percentage is tracked on each report, beginning at 00% for the initial submission.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 9
CONTRACTOR’S DAILY LOG OF CONSTRUCTION
INSPECTOR QUALITY
ASSURANCE REPORT (Q.A.R.)
DAILY LOG OF CONSTRUCTION
REPORT NUMBER: 01
Project Completion at 00 %
DATE:
CONTRACT NUMBER:
Project Title:
Location:
Contractor:
Name:
Address:
Phone:
Contractor’s Site Manager:
Name:
Address:
Phone:
Contracting Officer:
COR:
Midwest District Project Managers:
WEATHER CONDITIONS:
Temperature:
Max: ° Min: °
Precipitation:
(24hour total)
Visibility:
Miles:
Wind Speed:
mph
WEATHER RELATED DELAYS:
(Affected 50% or more of critical path?)
YES OR NO
OFFICIAL WEATHER DELAY DATES:
WORK FORCE-CONTRACTORS & SUB-CONTRACTORS:
TRADE: # TRADE: # TRADE: #
Project Manager Site Manager QC manager PM assistant Field Admin- Misc. Laborers Field Engineer Construction Mgr.
VISITORS: COMPANY:
EQUIPMENT ON SITE:
1.
2.
3.
4.
5.
6.
MATERIALS DELIVERED TO JOB SITE:
PROJECT COMMENTS:
DEFICIENCIES:
POTENTIAL CAUSES FOR DELAY:
TESTS AND OBSERVATION:
WORK ACCOMPLISHED / PREP. MEETINGS CONDUCTED TODAY:
DIVISION 1: GENERAL CONDITIONS
01 33 23 - Shop Drawings, Product Data, and Samples
01 45 29 - Testing Laboratory Services
DIVISION 2: EXISTING CONDITIONS
02 21 00 – Site Surveying
DIVISION 31: EARTHWORK
31 00 00 - Earthwork
DIVISION 32: EXTERIOR
IMPROVEMENTS
32 39 20 - Flat Marker Support System, Headstone Setting, Alignment, Backfilling, and Headstone Cleaning
32 92 24 – Turf Renovation
WEEKLY PROGRESS MEETINGS:
Site Manager’s Signature: Date Supervisors Initials: Date
PHOTOS: