Attachment 8_SF1413-23a.pdf
PDF 701 KB Posted
- Attached to
- Fermilab- CUB Boiler 1 PC Replacement-382968-DG
- Solicitation number
- 382968-DG
About this file
This is a Standard Form 1413 (Rev. 10/2023), a federal contracting document used to document and acknowledge labor standards clauses in subcontracts. The form documents a subcontract awarded under prime contract number 89243024CSC000002 by the prime contractor Fermi Forward Discovery Group LLC, located at Kirk Road and Pine Street, Batavia, IL 60510. The subcontract involves the rebuild of Tower Water Pumps #6 and #10 at CUB (Fermi National Accelerator Laboratory). The form was signed on 9/10/2026 by Dasia Guthrie, Subcontract Administrator.
The form confirms that the prime contract contains the Contract Work Hours and Safety Standards Act – Overtime Compensation clause. Part II of the form documents the subcontractor's acknowledgment that specific labor standards clauses from the prime contract are incorporated into the subcontract, including provisions relating to payrolls and basic records, withholding of funds, disputes concerning labor standards, construction wage rate requirements, apprentices and trainees, compliance with the Copeland Act, subcontracts (labor standards), contract termination–debarment, and certification of eligibility. The document includes space to identify any intermediate subcontractors and requires signature and acknowledgment from the subcontractor's representative.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement And Acknowledgment OMB Control Number: 9000-0066 Expiration Date: 5/31/2027
Part I - Statement Of Prime Contractor
1. Prime Contract Number 2. Date Subcontract
Awarded
3. Subcontract Number
Authorized For Local Reproduction Previous Edition Is Not Usable
STANDARD FORM 1413 (REV. 10/2023)
Prescribed by GSA/FAR (48 CFR) 53.222(e)
4. Prime Contractor 5. Subcontractor
a. Name a. Name
b. Street Address b. Street Address
c. City d. State e. ZIP Code c. City d. State e. ZIP Code
6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."
7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in Item 5 by the following firm:
a. Name Of Awarding Firm
b. Description Of Work By Subcontractor
8. Project 9. Location
10a. Name Of Person Signing 11. By (Signature) 12. Date Signed
10b. Title Of Person Signing
Part II - Acknowledgment Of Subcontractor
13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:
Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations
Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. §
3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.
The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800
F Street, NW, Washington, DC 20405.
15b. Title Of Person Signing
15a. Name Of Person Signing 16. By (Signature) 17. Date Signed
14. Name(s) Of Any Intermediate Subcontractors, If Any
A C
DB
STANDARD FORM 1413 (REV. 10/2023) BACK
1.6 Presentation Agent PDFlib 3.02 (C++/Win32) D:20050617125503-04'00' D:20080212101247-05'00' Presentation Agent Standard Form 1413 - Statement and Acknowledgment Statement And Acknowledgment OMB Control Number: 9000-0066 Expiration Date: 5/31/2027 Part I - Statement Of Prime Contractor
1. Prime Contract Number
2. Date Subcontract Awarded
3. Subcontract Number Authorized For Local Reproduction Previous Edition Is Not Usable
STANDARD FORM 1413 (REV. 10/2023)
Prescribed by GSA/FAR (48 CFR) 53.222(e)
4. Prime Contractor
5. Subcontractor
a. Name
a. Name
b. Street Address
b. Street Address
c. City
d. State
e. ZIP Code
c. City
d. State
e. ZIP Code
6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."
7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in Item 5 by the following firm:
a. Name Of Awarding Firm
b. Description Of Work By Subcontractor
8. Project
9. Location 10a. Name Of Person Signing
11. By (Signature)
12. Date Signed 10b. Title Of Person Signing Part II - Acknowledgment Of Subcontractor
13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:
Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.
15b. Title Of Person Signing 15a. Name Of Person Signing
16. By (Signature)
17. Date Signed
14. Name(s) Of Any Intermediate Subcontractors, If Any A C D B
STANDARD FORM 1413 (REV. 10/2023) BACK
| 1. Enter the Prime Contract Number. : 89243024CSC000002 |
| 4a. Enter the Prime Contractor's Name. : Fermi Forward Discovery Group LLC |
| 4b. Enter the Prime Contractor's Street Address. : Kirk Road and Pine Street |
| 4c. Enter the Prime Contractor's City.: Batavia |
| 7a. Enter the Name of the Awarding Firm.: |
| 10a. Enter the Name of the Person signing this form as the Prime Contractor. : Dasia Guthrie |
| 10b. Enter the Title of the Person signing this form as the Prime Contractor. : Subcontract Administrator |
| 8. Enter the Project name.: Rebuild Tower Water Pumps #6 and #10 at CUB |
| 9. Enter the Location. : |
| 7b. Enter a Description of Work completed by the Subcontractor. : Rebuild Tower Water Pumps #6 and #10 at CUB |
| 5c. Enter the Subcontractor's City.: |
| 4e. Enter the Prime Contractor's Zone Improvement Plan (ZIP) Code. : 60510 |
| 5e. Enter the Subcontractor's Zone Improvement Plan (ZIP) Code. : |
| 4d. Enter the Prime Contractor's State.: IL |
| 5d. Enter the Subcontractor's State.: |
| 3. Enter the Subcontract Number. : |
| 5a. Enter the Subcontractor's Name.: |
| 5b. Enter the Subcontractor's Street Address.: |
| 2. Enter the Date the Subcontract was Awarded (enter 2 digit month, 2 digit day and 4 digit year).: |
| 12. If you are the Prime Contractor, enter the Date you signed this form (enter 2 digit month, 2 digit day and 4 digit year).: 2026-09-10 |
| 6. Click here to select, "the prime contract does contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 1 |
| 6. Click here to select, "the prime contract does NOT contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 0 |
| 16. Sign here if you are the Subcontractor.: |
| 15b. Enter the Title of the Person Signing this form as the Subcontractor. : |
| 15a. Enter the Name of the Person Signing this form as the Subcontractor. : |
| 17. If you are the Subcontractor, enter the Date you signed this form (enter 2 digit month, 2 digit day and 4 digit year).: |
| 14a. Enter the First Name of an Intermediate Subcontractor, If Any. : |
| 14c. Enter the Third Name of an Intermediate Subcontractor, If Any.: |
| 14d. Enter the Fourth Name of an Intermediate Subcontractor, If Any.: |
| 14b. Enter the Second Name of an Intermediate Subcontractor, If Any.: |
File details come from the government source that posted it. Updated .