Attachment 8 - M-2505 Asbestos Report.pdf

PDF 2 MB Posted

Attached to
Fort Bragg DPW Vertical Construction Federal contract opportunity
Solicitation number
W91247-20-R-0009
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command

About this file

This document contains an asbestos survey report for Building M-2505 at Fort Bragg, North Carolina, and details for a related federal contract opportunity. The asbestos survey report documents an inspection of the building conducted in June 2016, and identifies transite pipe insulation elbows located behind a wall in the building's foyer area as the only asbestos containing material found. The report provides background on the building, inspection methodology, laboratory analysis results, and certifications of the inspector.

The related federal contract opportunity is solicitation number W91247-20-R-0009 from the Department of the Army Materiel Command Mission and Installation Contracting Command for vertical construction services at Fort Bragg. The indefinite-delivery/indefinite-quantity contract will be for maintenance, repair, and minor construction projects across various trades such as carpentry, roofing, electrical work, and plumbing. The scope includes new construction, maintenance and repair work, energy conservation, and general construction tasks to support Fort Bragg facilities.

View the file

Other files for this federal contract opportunity

Other files attached to Fort Bragg DPW Vertical Construction, newest first.
File Type Posted
W91247-20-R-0009-P0008-ConformCopy.pdf PDF
W91247-20-R-0009 Amendment P0002.pdf PDF
Final Amendment 1 Posting Solicitation W91247-20-R-0009.pdf PDF
Attachment 15 - M-6205 fiber tie points.pdf PDF
W91247-20-R-0009 Amendment P0008.pdf PDF
Attachment 14 - MICC_MATOC_Vertical_W9124720R0043_KeyPersonnel_20210913aa.docx DOCX document
W91247-20-R-0009-P0007-ConformCopy.pdf PDF
Attachment 4 - MA IDIQ CAP Rates.xlsx XLSX spreadsheet
W91247-20-R-0009 Amendment P0007.pdf PDF
W91247-20-R-0009-P0006-ConformCopy.pdf PDF
W91247-20-R-0009 Amendment P0006.pdf PDF
Attachment 11 - M2505 - M6205 Asbuilt.pdf PDF
Attachment 7 - Government Answers VERTICAL MA IDIQ RFI Excel Spreadsheet.xlsx XLSX spreadsheet
Attachment 12 - M2505 - M6205 Communications.pdf PDF
Attachment 4 - MA IDIQ CAP Rates.xlsx XLSX spreadsheet
Attachment 13 - M2505 - M6205 Pictures.pdf PDF
Attachment 2 - Pricing Schedule.docx DOCX document
Attachment 1B - Notional Seed Project Wage Determinations.pdf PDF
Attachment 10 - 7859 FB-00007-21 and FB-00009-21 Revitalize M-6205 M 2505 IDGSpecs.pdf PDF
W91247-20-R-0009-P0005-ConformCopy.pdf PDF
W91247-20-R-0009 Amendment P0005.pdf PDF
W91247-20-R-0009-P0004-ConformCopy.pdf PDF
W91247-20-R-0009 Amendment P0004.pdf PDF
W91247-20-R-0009-P0003-ConformCopy.pdf PDF
W91247-20-R-0009 Amendment P0003.pdf PDF
W91247-20-R-0009-P0002-ConformCopy.pdf PDF
W91247-20-R-0009 Amendment P0002.pdf PDF
July 1 Site Visit Sign in Sheet 4.jpg JPG image
Final Amendment 1 Posting Solicitation W91247-20-R-0009.pdf PDF
July 1 Site Visit Sign in Sheet 5.jpg JPG image
July 1 Site Visit Sign in Sheet 3.jpg JPG image
July 1 Site Visit Sign in Sheet 2.jpg JPG image
July 1 Site Visit Sign in Sheet 1.jpg JPG image
July 1 Site Visit Sign in Sheets.jpg JPG image
Conformed Copy Solicitation W91247-20-R-0009.pdf PDF
Site Visit Sign in Sheet Picture 1.jpg JPG image
Site Visit Sign in Sheet Picture 2.jpg JPG image
Attachment 5 - M2505__Utility Plan.pdf PDF
Attachment 9 - M-6205 Asbestos Report.pdf PDF
Attachment 1A - Notional Seed Project SOW.docx DOCX document
Attachment 2 - Pricing Schedule.docx DOCX document
W91247-20-R-0009 Solicitation FINAL.pdf PDF
Attachment 7 - VERTICAL MA IDIQ RFI Excel Spreadsheet.xlsx XLSX spreadsheet
Attachment 1B - Notional Seed Project Wage Determinations.pdf PDF
Attachment 6 - M6205__Utility Plan.pdf PDF
Attachment 1C - Notional Project DWGs - FB-00007-21-FB-00009-21.pdf PDF
Attachment 4 - MA IDIQ CAP Rates 17Jun2021.xlsx XLSX spreadsheet
Attachment 3 - Notional Seed Project Site Visit Location.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building M-2505 Fort Bragg, NC

Asbestos Survey for Demolition of

Fort Bragg, North Carolina

Prepared by Solomon Locklear of Carolina Environmental Design, LLC, Inspector

License Number 12601 for

The Directorate of Public Works, Ft. Bragg, North Carolina

Asbestos Survey Report Introduction

Scope of the Investigation

This report documents the asbestos inspection and survey of Building M-2505, located at Fort Bragg, North Carolina conducted on June 7th, 2016, by Solomon Locklear, NC asbestos inspector license number: NC12601.

Background

Building M-2505 is a single story structure that was used on Ft. Bragg as a chapel. The chapel has an estimated construction date of 1941 with a square footage of 3,710 square feet. The exterior of the building is constructed out of wood siding with the roof system of the building constructed in an “A” roof shape that is covered with a layer of asphalt roof shingles and roof felt. The interior of the building is constructed out of wood, drywall and an acoustical fiberboard material. The flooring system of the building is constructed out of wood joist that also has a layer of plywood and hardwood throughout the chapel. The HVAC system is located in the exterior of the mechanical room. The mechanical room has drywall/joint compound and concrete present throughout. The original HVAC system has been replaced with a newer system, but some of the original piping is still present in the chapel.

Conclusions

Asbestos was not detected in the following materials:

Asphalt Roof Shingle Roof Felt Wall/Ceiling Texture Material Drywall Concrete Panel Material

Asbestos detected in the following materials:

TSI Pipe Insulation Elbow

Limitations

As is the case with any asbestos inspection, materials that were not readily apparent or were located in concealed locations may not have been identified. If any material that is suspected to contain asbestos, and was not included in this report as a material identified and tested, is discovered, it should be evaluated for asbestos content before it is disturbed.

This report is not intended for use as an asbestos removal specification. It is not within the scope of this work to describe all appropriate precautions, safeguards and regulations relating to asbestos.

Sole Use Statement

This report is provided for the sole use of the Directorate of Public Works at Ft. Bragg. Reliance on this report by any third parties will be at such party’s sole risk, and Carolina Environmental Designs the survey disclaims liability for any use of or reliance on this report by third parties. All portions of this report, including attachments and figures, are interrelated and integral to this report and should not be transmitted independent of each other.

Photo of Asbestos Containing Material

TSI Pipe Insulation Elbows TSI Pipe Insulation Elbow Material Has Fallen From Original Position

Asbestos Containing Materials

MATERIAL CHARACTERISTICS ASSESSMENT

Sample Type Homogenous Area Description/Location

% Asbestos Yes/No/Presumed

Quantity/Type (If ACM)

Friable / Non-Friable Condition Disturbance

Potential

TSI

TSI Pipe Insulation Elbow

Located Behind Wall in Foyer Area of Chapel

Asbestos Detected 35% Asbestos

Chrysotile Undetermined

Amount Friable Poor

Laboratory Reports and Chain of Custody Forms

Sample Locations

Certifications and Accreditations

Asbestos Survey for Demolition of
Building M-2505
Fort Bragg, North Carolina
Introduction
Scope of the Investigation
Background
Conclusions
Limitations
Sole Use Statement
Asbestos Containing Materials
Laboratory Reports and Chain of Custody Forms
Sample Locations
Certifications and Accreditations

File details come from the government source that posted it. Updated .