Attachment_8_-_Limitation_on_Subcontracting_Worksheet.docx

DOCX document 19 KB Posted

Attached to
DINO QUARRY AREA FUELS SYSTEM UPGRADE Federal contract opportunity
Solicitation number
140P1423R0016
Issued by
Department of the Interior National Park Service Intermountain Region

About this file

This document is a worksheet for calculating the subcontracting percentage under a federal contract. The prime contractor and subcontractor would list direct labor costs, fringe benefits, and general and administrative (G&A) overhead rates to calculate total labor costs for each entity. The subcontracting labor cost percentage would then be derived using a formula that divides the subcontractor's total labor costs by the combined total labor costs of the prime and subcontractor.

The related federal contract opportunity is solicitation number 140P1423R0016 for upgrades to the Dino Quarry Area Fuels System issued by the National Park Service Intermountain Region of the Department of the Interior.

View the file

Other files for this federal contract opportunity

Other files attached to DINO QUARRY AREA FUELS SYSTEM UPGRADE, newest first.
File Type Posted
Amendment_1_Q_As_0001.docx DOCX document
Sol_140P1423R0016_Amd_0001.pdf PDF
Attachment_2_-_Bollard_Detail.pdf PDF
Attachment_7_-_Past_Performance_Questionnaire.doc DOC document
Attachment_4_-_SECTION_033000_CAST_IN_PLACE_CONCRETE.DOC DOC document
Attachment_1_-_Scope_of_Work.docx DOCX document
Attachment_6_-_SECTION_321600_PAVEMENT_AND_WALKS.doc DOC document
Attachment_3_-__Wage_Determination.pdf PDF
Attachment_5_-_SECTION_312317_TRENCHING_UTILITIES.docx DOCX document
Sol_140P1423R0016.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 7

U. S. DEPARTMENT OF THE INTERIOR

FAR CLAUSE 52.219-14—LIMITATIONS OF SUBCONTRACTING

SUBCONTRACTING PERCENTAGE WORKSHEET

PRIME CONTRACTOR:

SOURCE:

SUBCONTRACTOR:

SOURCE:

PRIME CONTRACTOR

SUBCONTRACTOR

DIRECT LABOR

FRINGE BENEFITS*

SUBTOTAL
(A)
$
(B)
$

LABOR G&A** @_____%

TOTAL LABOR COSTS
(C)
$
(D)
$

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B). Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A). Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B). Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D), respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D) ÷ [(C) + (D)]

SUBCONTRACTING LABOR COST PERCENTAGE =
%

*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.2056(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

**G&A denotes General and Administrative Costs

*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.

File details come from the government source that posted it. Updated .