Attachment 8 - Drawings_619A4-23-111 Replace Sewer Lift Pump B12.pdf
PDF 6 MB Posted
- Solicitation number
- 36C24725R0023
About this file
This is a set of construction drawings for replacing a sewer lift pump in Building 12 at the CAVHCS East VA Medical Center in Tuskegee, Alabama (Project #619A4.23.111). The drawings detail the removal of an existing sewage lift pump installed around 1923 and installation of new duplex sewer pumps with basin on the first floor of Building 12.
The drawings include plumbing and electrical specifications for installing two new 7.5 HP sewage pumps (SP-1 and SP-2) rated at 207 GPM at 31 ft head, operating at 460V/3-phase power. The pump system will include a 6'-0" diameter by 8'-0" deep fiberglass basin, automatic controls, level alarms, and connection to the building automation system. The pumps will serve buildings 12, 13, 14, 15, and 65, connecting to the existing 6" force main and gravity drain lines. The electrical scope includes new 20A/3P circuit breaker connections from panel PP12-1 for the pumps and a 20A/1P connection from panel LP12-1 for the control panel. The drawings specify that the new pump system must be fully operational for 2 weeks before the existing pump can be removed.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I 85
I 85
I 85
TUSKEGEE
VA MEDICAL
CENTER
N MAIN ST
M
IDW
AY RD
MIDW
AY RD
TAYLOR ST
W MONTGOMERY RD
W GATE RD
HOSPITAL RD
RO
BE
RT
C
IR
ROBERT CIR.
H O
SP
IT
A L
R D
HOSPITAL RD.
Department of
VETERANS AFFAIRS
CAVHCS EAST VA MEDICAL CENTER
TUSKEGEE, ALABAMA
REPLACE SEWER LIFT PUMP IN BUILDING 12
PROJECT # 619A4.23.111
FINAL SUBMISSION CONSTRUCTION DOCUMENTS
2/12/2024
S E A L 024911
HAROLD J . MARV
I N
PR
OFESSIONAL
ENGINEER
NO
RTH CAROL I NA
COVER SHEET
VICINITY / CAMPUS MAPS
DRAWINGS INDEX
G-001 1 11plbHJM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text ATRIAX, PLLC 703 MAIN AVENUE SW HICKORY, NC 28602 PHONE: 828.315.9962 FAX: 828.315.9964 NC ENGINEERING LICENSE NO: P-0214 NC ARCHITECTURE LICENSE NO: 51254
AutoCAD SHX Text 02/12/2024
AutoCAD SHX Text
IN BUILDING 12
AutoCAD SHX Text
REPLACE SEWER LIFT PUMP
AutoCAD SHX Text
AL
AutoCAD SHX Text
TUSKEGEE
AutoCAD SHX Text
CAVHCS EAST VAMC
AutoCAD SHX Text
AutoCAD SHX Text 619A4.23.111
AutoCAD SHX Text Approved:
AutoCAD SHX Text Date:
AutoCAD SHX Text Approved:
AutoCAD SHX Text Date:
AutoCAD SHX Text Approved:
AutoCAD SHX Text Date:
AutoCAD SHX Text Approved:
AutoCAD SHX Text Date:
AutoCAD SHX Text Approved:
AutoCAD SHX Text Date:
AutoCAD SHX Text Approved:
AutoCAD SHX Text Date:
AutoCAD SHX Text Approved:
AutoCAD SHX Text Date:
AutoCAD SHX Text Approved:
AutoCAD SHX Text Date:
AutoCAD SHX Text Approved:
AutoCAD SHX Text Date:
AutoCAD SHX Text Reviewed:
AutoCAD SHX Text Date:
AutoCAD SHX Text Requesting Service
AutoCAD SHX Text Chief, FMS
AutoCAD SHX Text Infection Control
AutoCAD SHX Text Associate Director for Patient Care Services
AutoCAD SHX Text M & R Supervisor
AutoCAD SHX Text Chief of Staff
AutoCAD SHX Text Safety Manager
AutoCAD SHX Text Associate Director
AutoCAD SHX Text
AFGE
AutoCAD SHX Text Medical Center Director
AutoCAD SHX Text DRAWING INDEX GENERAL G-001 1 OF 11 COVER SHEET - VICINITY/CAMPUS MAPS - DRAWING INDEX 1 OF 11 COVER SHEET - VICINITY/CAMPUS MAPS - DRAWING INDEX COVER SHEET - VICINITY/CAMPUS MAPS - DRAWING INDEX CIVIL C-501 2 OF 11 SITE DETAILS 2 OF 11 SITE DETAILS SITE DETAILS PLUMBING P000 3 OF 11 PLUMBING SYMBOLS AND ABBREVIATIONS 3 OF 11 PLUMBING SYMBOLS AND ABBREVIATIONS PLUMBING SYMBOLS AND ABBREVIATIONS P100 4 OF 11 PLUMBING DEMOLITION 4 OF 11 PLUMBING DEMOLITION PLUMBING DEMOLITION PP200 5 OF 11 FLOOR PLAN - PLUMBING 5 OF 11 FLOOR PLAN - PLUMBING FLOOR PLAN - PLUMBING P600 6 OF 11 PLUMBING SCHEDULES AND DETAILS 6 OF 11 PLUMBING SCHEDULES AND DETAILS PLUMBING SCHEDULES AND DETAILS ELECTRICAL E000 7 OF 11 ELECTRICAL SYMBOLS AND ABBREVIATIONS 7 OF 11 ELECTRICAL SYMBOLS AND ABBREVIATIONS ELECTRICAL SYMBOLS AND ABBREVIATIONS EP200 8 OF 11 FIRST FLOOR PLAN - POWER 8 OF 11 FIRST FLOOR PLAN - POWER FIRST FLOOR PLAN - POWER EP201 9 OF 11 SECOND FLOOR PLAN - POWER 9 OF 11 SECOND FLOOR PLAN - POWER SECOND FLOOR PLAN - POWER E500 10 OF 11 ONE LINE DIAGRAM 10 OF 11 ONE LINE DIAGRAM ONE LINE DIAGRAM E600 11 OF 11 ELECTRICAL DETAILS11 OF 11 ELECTRICAL DETAILSELECTRICAL DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VICINITY MAP NTS
AutoCAD SHX Text
CAMPUS MAP NTS
CONTRACT LIMIT LINE
DEMOLITION LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
EXISTING / EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
NEW LINE
BREAK, STRAIGHT (SEE SECTION INDICATORS,
BUILDING, WITH BREAK STANDARDS)
DETAIL INDICATOR
DETAIL INDICATOR
DETAIL INDICATOR FOR SMALL CONDITIONS
DIMENSION LINE
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
ARCHITECTURAL SYMBOLS (NOT ALL SYMBOLS ARE USED ON THIS PROJECT)
CENTER LINE
GRAPHIC SCALE, 18"=1'-0"
KEYNOTE
NORTH ARROW
V V ITEM - VA SUPPLIED & INSTALLED
VC ITEM - VA SUPPLIED & CONTRACTOR
INSTALLED
CC ITEM - CONTRACTOR SUPPLIED & INSTALLED
SECTION INDICATOR
DETAIL INDICATOR
PARTITION TYPE DESIGNATION
1-HR RATED WALL
2-HR RATED WALL
DOOR / OPENING IDENTIFIER
ROOM NAME AND NUMBER
COLUMN GRID
FIRE EXTINGUISHER CABINET
CONCRETE
EARTH
BASE COURSE
RIGID INSULATION
BATT INSULATION
ACOUSTICAL CEILING TILE
GYPSUM BOARD
CEILING HEIGHT ABOVE FLOOR
RECESSED DOWN LIGHT (NEW) Ref. Electrical Drawings
EXIT LIGHT
MECHANICAL SUPPLY DIFFUSER Ref. Mechanical Drawings
LIGHT FIXTURES (NEW) Ref. Electrical Drawings
CAMERA
ACCESS PANEL
MECHANICAL RETURN GRILLE Ref. Mechanical Drawings
MECHANICAL EXHAUST GRILLE Ref. Mechanical Drawings
1. UNLESS OTHERWISE NOTED, DIMENSIONS ARE TO COLUMN CENTERLINE,
CENTER OF INTERIOR GYPSUM BOARD PARTITION, INSIDE FACE OF EXTERIOR
WALLS, FACE OF MASONRY WALLS AND FACE OF EXISTING WALLS.
2. DUE TO MANUFACTURER'S VARIATION WITH SIZE OF EQUIPMENT, CASEWORK,
PLUMBING FIXTURES, ETC., ALL DIMENSIONS REFERRING TO THE SPACE
WHERE SUCH ITEMS ARE BUILT-IN SHALL BE VERIFIED WITH THE ITEM
SUPPLIED.
3. MAJOR MECHANICAL AND ELECTRICAL ITEMS ARE SHOWN ON THIS DRAWING
FOR GENERAL LOCATION WITHIN THE CEILING SYSTEM. SEE MECHANICAL AND
ELECTRICAL DRAWING FOR INFORMATION DESCRIBING THE SYSTEMS TO
WHICH THEY BELONG AND FOR ADDITIONAL SECONDARY CEILING MOUNTED
DEVICES.
4. CENTER ACOUSTICAL CEILING TILE IN ROOM UNLESS NOTED OTHERWISE.
ARCHITECTURAL NOTES
5"
9" M
AX
1' -0
" M
AX
2"
5" 5" 2"
4' -0
" M
IN
3'
-0 " A
VE
R
AG
E
6"
6' -0
8'-0"
ALL LETTERING TO BE
PAINTED BLACK WITH
EXCEPTION OF PROJECT
TITLE WHICH IS TO BE
BLUE
PAINT BORDER
MEMBER
BLACK ENAMEL
2"x4" [51x102mm]
FRAME AND BRACES
IN SAME PLANE
METAL FACE
WHITE ENAMEL
2"x4" [51x102mm] FRAME
AND BRACE IN BACK
BORDER MEMBER
PAINTED BLACK
BACKGROUND TO
BE PAINTED WHITE
METAL FACE
STRETCH METAL FACE
TIGHT, TURN OVER
FRAME AND SECURE
WITH FLAT HEAD
DEFORMED NAILS.
LETTERING TO BE
HELVETICA STYLE 1 1/2"
[38mm] HIGH TO BE
CENTERED HORIZONTAL
ANY SEAM IN METAL TO
BE FLAT SEAM - SEAMS
TO BE HORIZONTAL AND
OCCUR BETWEEN LINES
OF LETTERING.
NOTE:
4"x4" [102x102mm] POSTS
PAINTED WHITE
SECTION ON CENTERLINEELEVATION
THIS SPACE FOR CONTRACTOR'S NAME
ONE OR TWO LINES AS REQUIRED
THIS SPACE FOR PROJECT TITLE LETTERING
TO BE HELVETICA STYPE 5" HIGH CENTERED
BETWEEN LETTERING ABOVE AND BELOW
ONE OR TWO LINES AS REQUIRED
DESIGNED AND SUPERVISED BY: DEPARTMENT
OF VETERANS AFFAIRS WASHINGTON D.C.
GENERAL CONTRACTOR
CENTER TO BE WHITE
SURROUNDING
BORDER TO BLUE
[152mm]
[2438mm]
[5 1m m
[1
9m m
[2 m m
VA
R
IE
S [3 m m
[9 m m
VA
R
IE
S [1
9m m
[3 m m
VA
R
IE
S [1 m m
[5 1m m
[1 m m
[1 m m
[1 m m
[1 m m
[1 m m
[5 1m m
NOT TO SCALE1 CONSTRUCTION SIGN
FINAL SUBMISSION CONSTRUCTION DOCUMENTS
2/12/2024
S E A L 024911
HAROLD J . MARV
I N
PR
OFESSIONAL
ENGINEER
NO
RTH CAROL I NA
SITE DETAILS
C-501 2 11plbHJM
AutoCAD SHX Text
DRAWING BLOCK TITLE
AutoCAD SHX Text 1 1/2" = 1'-0"
AutoCAD SHX Text C4
AutoCAD SHX Text 1 1/2'
AutoCAD SHX Text 1/2'
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text A-201
AutoCAD SHX Text A4
AutoCAD SHX Text
AutoCAD SHX Text 16'
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
AutoCAD SHX Text A-201
AutoCAD SHX Text A4
AutoCAD SHX Text A-512
AutoCAD SHX Text D2
AutoCAD SHX Text A-512
AutoCAD SHX Text D2
AutoCAD SHX Text A-512
AutoCAD SHX Text D2
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
MATERIALS LEGEND
AutoCAD SHX Text A4
AutoCAD SHX Text A-201
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
AutoCAD SHX Text A4.3
AutoCAD SHX Text
SHEET WHERE REFERENCED OR DRAWN
AutoCAD SHX Text
RM NO.
AutoCAD SHX Text
RM NAME
AutoCAD SHX Text
FEC
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AA
AutoCAD SHX Text
AP
AutoCAD SHX Text 9'-0"
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text Department of
AutoCAD SHX Text L
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text ATRIAX, PLLC 703 MAIN AVENUE SW HICKORY, NC 28602 PHONE: 828.315.9962 FAX: 828.315.9964 NC ENGINEERING LICENSE NO: P-0214 NC ARCHITECTURE LICENSE NO: 51254
AutoCAD SHX Text 02/12/2024
AutoCAD SHX Text
IN BUILDING 12
AutoCAD SHX Text
REPLACE SEWER LIFT PUMP
AutoCAD SHX Text
AL
AutoCAD SHX Text
TUSKEGEE
AutoCAD SHX Text
CAVHCS EAST VAMC
AutoCAD SHX Text
AutoCAD SHX Text 619A4.23.111
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ABBREVIATION
GENERAL ABBREVIATIONS
DESCRIPTION ABBREVIATION DESCRIPTION
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
AD ACCESS DOOR/PANEL
AFF ABOVE FINISHED FLOOR
AMB AMBIENT
DIA DIAMETER
DN DOWN
E EXISTING
EC ELECTRICAL CONTRACTOR
EFF EFFICIENCY
GC GENERAL CONTRACTOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
L LENGTH
LF LINEAR FEET
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MFR MANUFACTURER
MIN MINIMUM
NIC NOT IN CONTRACT
NTS NOT TO SCALE
PC PLUMBING CONTRACTOR
PSIG POUNDS PER SQUARE INCH GAUGE
RPM REVOLUTIONS PER MINUTE
SHT SHEET
TOB TOP OF BEAM
GPM GALLONS PER MINUTE
TOS TOP OF STEEL
BOB BOTTOM OF BEAM
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
UNION
STRAINER WITH BLOW-OFF VALVE
ELBOW UP
ELBOW DOWN
TEE UP
PIPING
- SOLID LINE INDICATES SYSTEM SUPPLY
-- DASHED LINE INDICATES SYSTEM RETURN
NUMBER INDICATES NOMINAL DIAMETER IN INCHES,
LETTER(S) INDICATES SYSTEM.
REFER TO ABBREVIATIONS FOR SYSTEM TYPE.
GENERAL PLUMBING SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
# SHEET NOTE
DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS
AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.
DIAMETER
DENOTES CONNECTION OF NEW
WORK TO EXISTING SYSTEM
PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.
#/# ARROW INDICATES DOWNWARD PIPE SLOPE
#/# INDICATES SLOPE IN INCHES PER FOOT
WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR
REQUIREMENTS
ARROW INDICATES DIRECTION OF FLOW IN
PIPING
ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
CHECK VALVE
ARROW INDICATES DIRECTION OF NORMAL FLOW
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
BALANCING DEVICE
# INDICATES FLOW TO BE BALANCED IN GPM
CIRCUIT SETTER, AUTOFLOW, ETC.
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM#
PRESSURE GAUGE
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER
TEE DOWN
TEE HORIZONTAL
PIPE REDUCER
INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER.
SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.
REQUIRED SERVICE CLEARANCE FOR EQUIPMENT
CONTINUATION SYMBOLS
FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING.
SECOND SYMBOL APPLIES TO RECTANGULAR AND OVAL DUCT.
ABBREVIATION
PLUMBING ABBREVIATIONS
DESCRIPTION
CHEMICAL VENTCV
BOTTLE/GLASS FILLERBF
ABBREVIATION DESCRIPTION
DOMESTIC HOT WATERHW
DOMESTIC HOT WATER CIRCULATIONHWC
LAVATORYL
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
BACK FLOW PREVENTERBFP
BATH TUBBT
COMPRESSED AIR (NON-MEDICAL)CA
PROPANELPG
LEAVING WATER TEMPERATURELWT
BTU (1000'S)MBH
CONDENSATE DRAINCD
CLEANOUTCO
CONDENSATE PUMPCP
MOP SINKMS
NORMALLY CLOSEDNC
NORMALLY OPENNO
CLINICAL SINKCS
DOMESTIC COLD WATERCW
DRINKING FOUNTAINDF NON-POTABLE WATERNPW
POST INDICATOR VALVEPIV
PRESSURE REDUCING VALVEPRV
DOUBLE GRADE CLEANOUTDGCO
DEIONIZED WATERDI
DEIONIZED WATER CIRCULATINGDIC
ROOF DRAINRD
REVERSE OSMOSIS WATERRO
DEIONIZED HOT WATERDIH
RPZ
S
REDUCED PRESSURE ZONE (BACK FLOW PREVENTER)
SINK
DEIONIZED HOT WATER CIRCULATINGDIHC
DISTILLED WATERDIS
DISTILLED WATER CIRCULATINGDISC
SANITARY SEWERSAN
SUMP PUMP DRAINSPD
DIALYSIS WATER RETURNDR
DIALYSIS WATER SUPPLYDS
DRAIN TILEDT
SEWAGE EJECTORSE
SHOWERSH
EMERGENCY EYE WASHEEW
EMERGENCY SHOWERES
EMERGENCY SHOWER AND EYE WASH COMBOESEW
STORM OVERFLOWSO
SUMP PUMPSP
SERVICE SINKSS
EXPANSION TANKET
ELECTRIC WATER COOLEREWC
ENTERING WATER TEMPERATUREEWT
STORM SEWERST
TEMPERATURETEMP
URINALUR
FILTERF
FLOOR CLEANOUTFCO
FLOOR DRAINFD
VENTV
VENT THROUGH ROOFVTR
FLOOR SINKFS
WB
WC
WALL BOX
WATER CLOSET
NATURAL GASG
WALL CLEANOUTWCO
GRADE CLEANOUTGCO
HUB DRAINHD
WATER HEATERWH
WATER SOFTENERWS
HORSEPOWERHP
WPD
YCO
WATER PRESSURE DROP
YARD CLEANOUT
GREASE VENTGV
HOSE BIBHB
GREASE WASTEGW
DOWN SPOUT NOZZLEDSN
C.O.
C.O.
PLUMBING SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
PIPING
- SINGLE DASH INDICATES DOMESTIC COLD WATER
- DOUBLE DASH INDICATES DOMESTIC HOT WATER
- TRIPLE DASH INDICATES HOT WATER CIRCULATING
- SOLID INDICATES SANITARY ABOVE FLOOR
- CONTINUOUS DASHED INDICATES VENT
- LONG DASHED LINES INDICATE SANITARY BELOW
FLOOR
NUMBER INDICATES NOMINAL DIAMETER IN INCHES,
LETTER(S) INDICATES SYSTEM.
REFER TO ABBREVIATIONS FOR SYSTEM TYPE.
ROOF DRAIN
TAG INDICATES DRAIN SIZE IN INCHES AND AREA OF
ROOF DRAINED IN SQUARE FEET
REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.
#"RD
# SF
WALL DISCHARGE (DOWNSPOUT NOZZLE)
TAG INDICATES DRAIN SIZE IN INCHES AND AREA OF
ROOF DRAINED IN SQUARE FEET
REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.
#"DSN
# SF
FD-# FLOOR DRAIN REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.
CLEANOUT CIRCLE INDICATES UP TO FLOOR OR WALL CLEANOUT.
LINE INDICATES END OF PIPE CLEANOUT LOCATED ABOVE A CEILING.
DOUBLE GRADE CLEANOUT REFER TO DETAILS FOR ADDITIONAL REQUIREMENTS.
1. PLUMBING DRAWINGS ARE DIAGRAMMATIC AND INDICATIVE OF WORK TO BE FURNISHED
AND INSTALLED UNDER THIS CONTRACT. REFER TO ARCHITECTURAL AND STRUCTURALLY
DRAWINGS FOR ALL DIMENSIONS.
2. INSTALL ALL WORK IN ACCORDANCE WITH ALL STATE AND LOCAL PLUMBING CODES.
WHERE CONFLICTS OCCUR BETWEEN CODES AND BETWEEN THE CONSTRUCTION
DOCUMENTS AND CODES, THE MOST RESTRICTIVE REQUIREMENTS SHALL GOVERN.
3. PLUMBING CONTRACTOR SHALL PAY FOR ALL INSPECTION PERMITS, CERTIFICATES,
CONNECTION FEES, SYSTEMS DEMAND CHARGES AND LICENSE FEES IN CONNECTION
WITH THE SCOPE OF PLUMBING WORK TO BE PERFORMED.
4. PLUMBING CONTRACTOR SHALL MAINTAIN A CLEAN WORK AREA AT ALL TIMES AND SHALL
CLEAN CONSTRUCTION SITE OF ALL PLUMBING DEBRIS AT THE END OF THE DAY AND BEFORE
FINAL PAYMENT IS MADE.
5. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE UNLESS NOTED OTHERWISE.
6. BEFORE SUBMITTING PROPOSAL FOR THE WORK TO BE PERFORMED, PLUMBING CONTRACTOR
SHALL VISIT AND EXAMINE THE PREMISES AND SATISFIED HIMSELF AS TO THE EXISTING
CONDITIONS UNDER WHICH THEY WILL BE OBLIGATED TO OPERATE THE WORK UNDER THIS
CONTRACT. NO ALLOWANCE WILL BE MADE SUBSEQUENTLY IN THIS CONNECTION ON BEHALF
OF THE CONTRACTOR FOR ANY ERROR OF NEGLIGENCE ON THEIR PART.
7. ALL MISCELLANEOUS EQUIPMENT TO BE FURNISHED UNDER OTHER SECTIONS OF THE
SPECIFICATIONS THAT REQUIRE PIPING CONNECTIONS SHALL BE RECEIVED AND SET WITH
ROUGH - IN AND FINAL CONNECTIONS MADE UNDER THESE SECTIONS.
8. GRAVITY FLOW SYSTEMS HAVE SPACE PRIORITY FOR SLOPING PIPES, HOWEVER SLOPE MUST
BE STARTED AT HIGHEST POINT POSSIBLE. PLUMBING CONTRACTOR SHALL COORDINATE
ROUTING WITH OTHER TRADES PRIOR TO INSTALLATION.
9. FLOOR PENETRATIONS SHALL BE APPROVED BY THE STRUCUTRAL ENGINEER.
10. FLOOR/WALL PENETRATIONS THROUGH RATED SEPARATIONS SHALL BE SEALED WITH AN
APPROVED FIRE RATED MATERIAL.
11. WALL PENETRATIONS THROUGH NON-RATED PARTITIONS SHALL BE SEALED WITH A NON-
SHRINKING GROUT OR CAULKING MATERIAL.
12. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING
CONDITIONS PRIOR TO STARTING WORK.
13. THE PLUMBING CONTRACTOR SHALL VERIFY PIPING INVERTS AND LOCATIONS PRIOR TO
INSTALLATION.
14. OFFSET NEW PIPING BELOW FLOOR AS REQUIRED TO AVOID CONFLICTS WITH EXISTING
CONDITIONS.
15. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE DISRUPTION OF EXISTING UTILITIES WITH THE OWNER. THE TIME AND DURATION OF THE DISRUPTION SHALL BE
APPROVED BY THE OWNER PRIOR TO THE START OF WORK.
16. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING OF
EXISTING FLOORS, WALLS AND CEILINGS AS REQUIRED FOR THE DEMOLITION AND
INSTALLATION OF THE PLUMBING SYSTEMS.
PLUMBING GENERAL NOTES:
1300 Baxter Street, Suite 230 Charlotte, NC 28204
Phone: 704.348.3097 www.specializedeng.com o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Project Title
FINAL SUBMISSION CONSTRUCTION DOCUMENTS
Drawing No:
Revision
Drawing Title Project No.
ARCHITECT/ENGINEERS:
Date
Date
BUILDING NUMBER
Location
DrawnChecked
Approved:
DO NOT SCALE DRAWING. ALL DIMENSIONS
AND CLEARANCES SHALL BE VERIFIED
FROM APPROPRIATE SOURCES. ALL WORK
SHALL BE COORDINATED PRIOR TO
INSTALLATION. SEE SPECIFICATIONS.
PERMISSION TO REPRODUCE ANY PART OF
THIS DOCUMENT IS HEREBY GRANTED
SOLELY FOR THE PURPOSE OF THE
CONSTRUCTION OF THE PROJECT OR THE
ARCHIVING OF THIS PROJECT.
UNAUTHORIZED USE OF THIS DOCUMENT
WITHOUT THE WRITTEN PERMISSION OF
SPECIALIZED ENGINEERING SOLUTIONS IS
PROHIBITED BY COPYRIGHT LAW.
2023 © COPYRIGHT
619A4.23.111
ATRIAX, PLLC
703 MAIN AVENUE SW HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9964
02/12/2024 23080
/5
/2
:4
:4
A
M B
IM
://2
- V
A T u s k e g e e A
L L ift S ta tio n /2
V
A T u s k e g e e A
L L ift S ta tio n S
E S
.rv t
P000
PLUMBING SYMBOLS AND
ABBREVIATIONS
REPLACE SEWER LIFT
PUMP IN BUILDING 12
SLCCGH
CAVHCS EAST VAMC TUSKEGEE AL
02/12/2024
Office of Construction and Facilities Management
SHEET INDEX - PLUMBING
Sheet Number Sheet Name
P000 PLUMBING SYMBOLS AND ABBREVIATIONS
P100 FIRST FLOOR PLAN - PLUMBING DEMOLITION
PP200 FIRST FLOOR PLAN - PLUMBING DRAINAGE
P600 PLUMBING SCHEDULES, DETAILS, WASTE AND VENT RISER
Grand total: 4
1 2 3 4 5 6
A
C
D
E
B
B1
(E) LIFT STATION
PUMP
(E) 6" FORCE MAIN
TO EXTERIOR
FROM PUMP
(E) 6" GRAVITY DRAIN
FROM BUILDINGS
13, 14, AND 15.
(E) 4" GRAVITY DRAIN
FROM BUILDING 12.
(ABOVE FLOOR)
(E)4" SAN
(E) PUMP CONTROL
PANEL
(E) AIR PIPING
SERVING PUMP
(E) VENT TO
EXTERIOR
DEMO EX 90
ELBOW.
(E) 4" GRAVITY DRAIN
FROM BUILDING 65.
(ABOVE FLOOR)
(E) 4" GRAVITY DRAIN
FROM BUILDING 12.
(ABOVE FLOOR)
CAP
DEMO EX 90
ELBOW.
DEMO 4" PIPING
1300 Baxter Street, Suite 230 Charlotte, NC 28204
Phone: 704.348.3097 www.specializedeng.com o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Project Title
FINAL SUBMISSION CONSTRUCTION DOCUMENTS
Drawing No:
Revision
Drawing Title Project No.
ARCHITECT/ENGINEERS:
Date
Date
BUILDING NUMBER
Location
DrawnChecked
Approved:
DO NOT SCALE DRAWING. ALL DIMENSIONS
AND CLEARANCES SHALL BE VERIFIED
FROM APPROPRIATE SOURCES. ALL WORK
SHALL BE COORDINATED PRIOR TO
INSTALLATION. SEE SPECIFICATIONS.
PERMISSION TO REPRODUCE ANY PART OF
THIS DOCUMENT IS HEREBY GRANTED
SOLELY FOR THE PURPOSE OF THE
CONSTRUCTION OF THE PROJECT OR THE
ARCHIVING OF THIS PROJECT.
UNAUTHORIZED USE OF THIS DOCUMENT
WITHOUT THE WRITTEN PERMISSION OF
SPECIALIZED ENGINEERING SOLUTIONS IS
PROHIBITED BY COPYRIGHT LAW.
2023 © COPYRIGHT
619A4.23.111
ATRIAX, PLLC
703 MAIN AVENUE SW HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9964
02/12/2024 23080
/5
/2
:4
:4
A
M B
IM
://2
- V
A T u s k e g e e A
L L ift S ta tio n /2
V
A T u s k e g e e A
L L ift S ta tio n S
E S
.rv t
P100
FIRST FLOOR PLAN - PLUMBING
DEMOLITION
REPLACE SEWER LIFT
PUMP IN BUILDING 12
SLCCGH
CAVHCS EAST VAMC TUSKEGEE AL
02/12/2024
Office of Construction and Facilities Management
1. PLUMBING SYMBOLS AND ABBREVIATIONS GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING PLUMBING SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW PLUMBING SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND PIPING INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
5. THE PLUMBING CONTRACTOR SHALL VERIFY EXISTING LOCATIONS OF PLUMBING SYSTEMS PRIOR TO THE
START OF WORK.
6. THE PLUMBING CONTRACTOR SHALL CUT, REMOVE AND PATCH BACK ALL FLOORS, WALLS AND CEILINGS
FOR THE DEMOLITION AND INSTALLATION OF THE PLUMBING SYSTEMS.
7. THE PLUMBING CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO THE COR 14 DAYS PRIOR TO ANY
SHUTDOWNS FOR APPROVAL.
8. THE NEW PUMPS, BASIN AND PUMP CONTROLS SHALL BE INSTALLED AND OPERATIONAL PRIOR TO THE
REMOVAL OF THE EXISTING PUMP AND PIPING.
SHEET NOTES:
1. REMOVE EXISTING PUMP AND ALL ASSOCIATED PIPING AND CONNECTIONS AFTER COMPLETE INSTALLATION
OF NEW PUMP AND PUMP IS OPERATIONAL.
2. CAP AND REMOVE EXISTING AIR PIPING SERVING PUMP.
3. REMOVE EXISTING PUMP VENT PIPING TO EXTERIOR. PATCH ALL EXISTING HOLES.
4. REMOVE EXISTING PUMP CONTROL PANEL AND WIRING.
GENERAL NOTES:
N 1/4" = 1'-0"
FIRST FLOOR PLAN - PLUMBING -DEMOLITION
EXISTING PUMP EXISTING PIPING CONNECTIONS TO PUMP
NOTES:
1. DEMOLITION PLAN INDICATES PIPING TO BE DEMOED TO PROVIDE CONNECTIONS FOR THE
EXISTING PUMP TO REMAIN OPERATIONAL DURING THE NEW PUMP INSTALLATION.
AFTER THE NEW PUMP IS OPERATIONAL FOR 2 WEEKS DEMO THE EXISTING PIPING NOT
REQUIRED FOR THE NEW PUMP INSTALL. PROVIDE BLIND FLANGES AND/OR CAPS AS REQUIRED.
2. THE GENERAL CONTRACTOR SHALL PROVIDE A PRESSURE TEST ON THE EXISTING FORCE MAIN PRIOR TO NEW PUMP INSTALLATION. THIS TEST WILL PROVIDE THE LIMITS OF THE PIPELINE, RELIABILITY, MAXIMUM CAPACITY, LEAKS ON JOINTS AND FITTINGS AND PRESSURE. THE TEST
SHALL BE IN ACCORDANCE WITH AWWA AND ASTM STANDARDS.
3. THE GENERAL CONTRACTOR SHALL HAVE EXISTING FLOOR SLAB X-RAYED IN THE AREA OF
WORK PRIOR TO THE CUTTING AND REMOVING OF THE EXISTING FLOOR SLAB.
4. REFER TO ARCHITECTS PLANS FOR PHASING.
UP
GENERATOR
Room
BOILER ROOM
SECONDARY HOT WATER
PUMP
002B
EMERGENCY ELECTRIC
ROOM
003A
ELECTRIC ROOM
003B
AIR COMPRESSOR
002A
FUEL OIL PUMP
002C
STAIR
S1
1 2 3 4 5 6
A
C
D
E
B
B1
PB-1
SP-1 SP-2
(E) 6" FORCE MAIN
TO EXTERIOR
FROM PUMP
(E) 6" GRAVITY DRAIN
FROM BUILDINGS
13, 14, AND 15.
(E) 4" GRAVITY DRAIN
FROM BUILDING 65.
(ABOVE FLOOR)
(E) 4" GRAVITY DRAIN
FROM BUILDING 12.
(ABOVE FLOOR)
(E)4" SAN
(E)4" SAN
6" SAN BELOW GRADE
(E)6" SAN
6" SAN DN
4" SAN UP
4" SAN DN
6" SAN
4" SAN
4" VTR
(E) PUMP
WALLS TO BE CONSTRUCTED DURING
BOILER HOUSE RENOVATION.
1300 Baxter Street, Suite 230 Charlotte, NC 28204
Phone: 704.348.3097 www.specializedeng.com o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Project Title
FINAL SUBMISSION CONSTRUCTION DOCUMENTS
Drawing No:
Revision
Drawing Title Project No.
ARCHITECT/ENGINEERS:
Date
Date
BUILDING NUMBER
Location
DrawnChecked
Approved:
DO NOT SCALE DRAWING. ALL DIMENSIONS
AND CLEARANCES SHALL BE VERIFIED
FROM APPROPRIATE SOURCES. ALL WORK
SHALL BE COORDINATED PRIOR TO
INSTALLATION. SEE SPECIFICATIONS.
PERMISSION TO REPRODUCE ANY PART OF
THIS DOCUMENT IS HEREBY GRANTED
SOLELY FOR THE PURPOSE OF THE
CONSTRUCTION OF THE PROJECT OR THE
ARCHIVING OF THIS PROJECT.
UNAUTHORIZED USE OF THIS DOCUMENT
WITHOUT THE WRITTEN PERMISSION OF
SPECIALIZED ENGINEERING SOLUTIONS IS
PROHIBITED BY COPYRIGHT LAW.
2023 © COPYRIGHT
619A4.23.111
ATRIAX, PLLC
703 MAIN AVENUE SW HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9964
02/12/2024 23080
/5
/2
:4
:5
A
M B
IM
://2
- V
A T u s k e g e e A
L L ift S ta tio n /2
V
A T u s k e g e e A
L L ift S ta tio n S
E S
.rv t
PP200
FIRST FLOOR PLAN - PLUMBING
DRAINAGE
REPLACE SEWER LIFT
PUMP IN BUILDING 12
SLCCGH
CAVHCS EAST VAMC TUSKEGEE AL
02/12/2024
Office of Construction and Facilities Management
1. PLUMBING SYMBOLS AND ABBREVIATIONS GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING PLUMBING SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING PLUMBING SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW PLUMBING SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND PIPING INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
5. THE PLUMBING CONTRACTOR SHALL VERIFY SANITARY PIPING INVERTS PRIOR TO THE START OF WORK.
6. PLUMBING CONTRACTOR SHALL ROUGH-IN AND MAKE FINAL CONNECTIONS TO EQUIPMENT AS REQUIRED.
7. THE PLUMBING CONTRACTOR SHALL CUT, REMOVE AND PATCH BACK ALL FLOORS, WALLS AND CEILINGS
FOR THE DEMOLITION AND INSTALLATION OF THE PLUMBING SYSTEMS.
8. THE PLUMBING CONTRACTOR SHALL VERIFY AND COORDINATE NEW SANITARY PIPING INSTALLATION WITH
EXISTING CONDITIONS.
9. THE NEW PUMPS, BASIN AND PUMP CONTROLS SHALL BE INSTALLED AND OPERATIONAL PRIOR TO THE
REMOVAL OF THE EXISTING PUMP AND PIPING.
10. THE NEW PUMPS AND PIPING SHALL BE CONTINUOUS AND TROUBLE FREE OPERATIONAL FOR THE
MINIMUM OF 2 WEEKS BEFORE THE REMOVAL OF THE EXISTING PUMP AND PIPING. PROVIDE REQUIRED
VALVES AND PIPING TO SEPARATE EXISTING PUMP FROM NEW PUMP PACKAGE.
11. THE PLUMBING CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO THE COR 14 DAYS PRIOR TO ANY
SHUTDOWNS FOR APPROVAL.
SHEET NOTES:
1. INSTALL NEW DUPLEX PUMP PACKAGE AND BASIN. PROVIDE ALL NECESSARY PIPING AND MATERIALS FOR A FULLY
OPERATIONAL SYSTEM.
2. INSTALL VALVES ON SANITARY PIPING TO PROVIDE SEPARATION BETWEEN EXISTING PUMP AND NEW PUMP
PACKAGE.
3. ROUTE NEW BASIN VENT UP THROUGH EXISTING ROOF. PATCH EXISTING ROOF TO MATCH. MAINTAIN 25'-0"
REQUIRED CLEARANCES FROM ANY FRESH AIR INTAKE.
4. NEW PUMP CONTROL PANEL. VERIFY FINAL LOCATION WITH OWNER. COORDINATE WITH ELECTRICAL CONTRACTOR.
INSTALL 5'-0" ABOVE FINISHED FLOOR.
5. PROVIDE UNISTRUT WALL TO SUPPORT PIPING AND CONTROL PANEL UNTIL NEW WALL IS CONSTRUCTED. SUPPORT UNISTRUT WALL FROM FLOOR AND EXISTING STRUCTURE. UNISTRUT CHANNEL SHALL BE 12 GAUGE AND A
MINIMUM OF 1-5/8".
GENERAL NOTES:
N 1/4" = 1'-0"
FIRST FLOOR PLAN - PLUMBING DRAINAGE
POINT OF CONNECTION TO EXISTING PIPING POINT OF CONNECTION TO EXISTING FORCE MAIN
NOTES:
1. THE GENERAL CONTRACTOR SHALL PROVIDE A PRESSURE TEST ON THE EXISTING FORCE MAIN PRIOR TO NEW PUMP INSTALLATION. THIS TEST WILL PROVIDE THE LIMITS OF THE PIPELINE, RELIABILITY, MAXIMUM CAPACITY, LEAKS ON JOINTS AND FITTINGS AND PRESSURE. THE TEST SHALL BE IN ACCORDANCE WITH AWWA AND ASTM
STANDARDS.
2. THE GENERAL CONTRACTOR SHALL HAVE EXISTING FLOOR SLAB X-RAYED IN THE AREA OF WORK PRIOR TO THE
CUTTING AND REMOVING OF THE EXISTING FLOOR SLAB.
3. REFER TO ARCHITECTS PLANS FOR PHASING.
PUMP POWER SUPPLY
ELECTRICAL ALTERNATOR
CONTROL PANEL
INDICATOR LAMPS (INSIDE ENCLOSURE)
TOGGLE SWITCHES (INSIDE ENCLOSURE)
DISCONNECT
ALARM LIGHT
CHECK VALVE (TYPICAL)
SHUTOFF VALVE (TYPICAL)
DISHCARGE PIPING (TYPICAL)
FLOAT ASSEMBLY
DUPLEX PUMP PACKAGE
4" BASIN VENT THRU ROOF
NOTES:
1. INSTALL CONTROL PANEL PER MANUFACTURER INSTRUCTIONS. COMPONENTS
AND WIRING ARRANGEMENT MAY DIFFER FROM THAT SHOWN.
2. CONTRACTOR TO VERIFY LOCATION OF SANITARY PIPING PENETRATION INTO
MANUFACTURED BASIN.
3. BASIN SIZE AND DEPTH NOT TO SCALE.
BACKFILL AROUND BASIN
WITH 6" OF SAND
BASIN WITH GASKETED
COVER PLATE
12" DEEP CONCRETE
ANCHOR FLANGE
FINISHED FLOOR
6" SANITARY SEWER
TO BASIN
5'-0" AFF
CONCRETE
SAND
SOIL BACKFILL
REMARKS:
1. PERFORMANCE BASED ON FLUID AND CONDITIONS INDICATED IN THIS SCHEDULE.
2. PROVIDE WITH THE FOLLOWING ACCESSORIES: DISCONNECT, VALVES, CHECK VALVES, UNIONS, ON EACH CONNECTION.
3. ALL WETTED COMPONENTS SHALL BE NSF 61 AND NSF 372 COMPLIANT.
4. PROVIDE BACNET INTERFACE.
5. PROVIDE 6'-0" DIAMETER BY 8'-0" DEEP FIBERGLASS SUMP BASIN. BASIS OF DESIGN: PUMP BASIN (PB-1) ZOELLER.
STARDARD ALUMINUM HATCH, 6" INLET HUB, 4" DISCHARGE PIPING. INLET DEPTH 18", STAINLESS STEEL HARDWARE AND
RAIL STUDS.
6. PROVIDE DUPLEX SUBMERSIBLE SEWER PUMP PACKAGE. PROVIDE AUTOMATIC CONTROL AND LEVEL ALARM. PROVIDE
PUMP REMOVAL AND DISCONNECT SYSTEM.
7. PROVIDE PUMP ALARM CONNECTIONS TO BUILDING AUTOMATION SYSTEM THROUGH DRY CONTACTS.
8. PROVIDE PUMP CONTROL PANEL. BASIS OF DESIGN: ZOELLER PIVOT PRO CONTROL PANEL. ELECTRICAL: 1Ph, 120 VAC.
9. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON
PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC.
RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT.
PB-1
(E) 6" FORCE MAIN
TO EXTERIOR
FROM PUMP
(E) 6" GRAVITY DRAIN
FROM BUILDINGS
13, 14, AND 15.
(E) 4" GRAVITY DRAIN
FROM BUILDING 12.
(ABOVE FLOOR)
(E) 4" GRAVITY DRAIN
FROM BUILDING 65.
(ABOVE FLOOR)
PUMP CONTROL PANEL
6" SAN
4" SAN
(E)PUMP
(E)VALVE
NEW VALVE
4" SAN (E)VALVE
4" V
NEW VALVE
6" SAN
1300 Baxter Street, Suite 230 Charlotte, NC 28204
Phone: 704.348.3097 www.specializedeng.com o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Project Title
FINAL SUBMISSION CONSTRUCTION DOCUMENTS
Drawing No:
Revision
Drawing Title Project No.
ARCHITECT/ENGINEERS:
Date
Date
BUILDING NUMBER
Location
DrawnChecked
Approved:
DO NOT SCALE DRAWING. ALL DIMENSIONS
AND CLEARANCES SHALL BE VERIFIED
FROM APPROPRIATE SOURCES. ALL WORK
SHALL BE COORDINATED PRIOR TO
INSTALLATION. SEE SPECIFICATIONS.
PERMISSION TO REPRODUCE ANY PART OF
THIS DOCUMENT IS HEREBY GRANTED
SOLELY FOR THE PURPOSE OF THE
CONSTRUCTION OF THE PROJECT OR THE
ARCHIVING OF THIS PROJECT.
UNAUTHORIZED USE OF THIS DOCUMENT
WITHOUT THE WRITTEN PERMISSION OF
SPECIALIZED ENGINEERING SOLUTIONS IS
PROHIBITED BY COPYRIGHT LAW.
2023 © COPYRIGHT
619A4.23.111
ATRIAX, PLLC
703 MAIN AVENUE SW HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9964
02/12/2024 23080
/5
/2
:4
:4
A
M B
IM
://2
- V
A T u s k e g e e A
L L ift S ta tio n /2
V
A T u s k e g e e A
L L ift S ta tio n S
E S
.rv t
P600
PLUMBING SCHEDULES, DETAILS,
WASTE AND VENT RISER
REPLACE SEWER LIFT
PUMP IN BUILDING 12
SLCCGH
CAVHCS EAST VAMC TUSKEGEE AL
02/12/2024
Office of Construction and Facilities Management
PUMP SCHEDULE
MARK
FLOW
[GPM]
TOTAL
HEAD
[FT]
TYPE OF
FLUID RPM
DISCHARGE
SIZE
[IN]
MAX IMPELLER
DIAMETER
[IN]
ELECTRICAL DATA
BASIS OF DESIGN MODEL REMARKSHP KW FLA VOLTAGE PHASE DISCONNECT BY SCCR
SP-1 207 31 SANITARY 1750 4" 7-3/8" 7.5 7.8 11 460 V 3 ELECTRICAL CONT 22 ZOELLER, 62 HD SERIES 6221 ALL
SP-2 207 31 SANITARY 1750 4" 7-3/8" 7.5 7.8 11 460 V 3 ELECTRICAL CONT 22 ZOELLER, 62 HD SERIES 6221 ALL
NO SCALEP600
PACKAGE SEWER PUMP SYSTEM2
A. NEW VALVE SHALL REMAIN CLOSED.
B. NEW VALVE SHALL REMAIN OPEN.
C. EXISTING VALVES SHALL BE CLOSED.
NEW PUMP OPERATION
1. NEW VALVE SHALL BE OPENED.
2. NEW VALVE SHALL BE CLOSED.
3. EXISTING VALVES SHALL BE OPENED.
EXISTING PUMP OPERATION
WASTE AND VENT RISER DIAGRAM
A
B
B
C C
B
ELECTRICAL ABBREVIATIONS
ABBREVIATION DESCRIPTION
REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.
MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)
AMPERE
AMPERE FRAME
ABOVE FINISHED FLOOR
ALUMINUM
AMPERE TRIP
CEILING
CIRCUIT BREAKER
CORRELATED COLOR TEMPERATURE
COPPER
DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)
DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)
EXISTING
ELECTRICALLY OPERATED
ENERGY REDUCING MAINTENANCE SWITCH
FUSE
FULL LOAD AMPS
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT ALARM
GROUND FAULT PROTECTION
HORSEPOWER
KILOAMPERE INTERRUPTING CAPACITY
KILOVOLT AMPERE
KILOWATT
MAXIMUM
MINIMUM CIRCUIT AMPS
MAIN CIRCUIT BREAKER
MINIMUM
MAIN LUGS ONLY
MANUALLY OPERATED
NORMALLY CLOSED
NON-FUSED
NOT IN CONTRACT
NORMALLY OPEN
POLES
PARTIAL
RELOCATE
SHORT CIRCUIT CURRENT RATING
SURGE PROTECTIVE DEVICE
SHUNT TRIP
TYPICAL
UNLESS NOTED OTHERWISE
VOICE
WALL PHONE
WIRE
WEATHER RESISTANT
TRANSFORMER
ZONE SELECTIVE INTERLOCKING
A
AF
AFF
AL
AT
C
CB
CCT
CU
D
D
E
EO
ERMS
F
FLA
G, GFCI
GFA
GFP
HP
KAIC
KVA
KW
MAX
MCA
MCB
MIN
MLO
MO
NC
NF
NIC
NO
P
PART
R
SCCR
SPD
ST
TYP
UNO
V
W
W
WR
XFMR
ZSI
A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.
RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG
CONDUCTORS.
B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE
SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.
C. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL
COST TO THE OWNER.
D. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR
INSTALLED DEVICES.
E. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS
ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND
PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.
F. PROVIDE AN INSULATED CONTINUOUS COPPER CONDUCTOR, NOT SMALLER THAN #10, TO BOND ALL
NORMAL AND ESSENTIAL ELECTRICAL SYSTEM PANELBOARDS TOGETHER THAT SERVE THE SAME
INDIVIDUAL PATIENT VICINITY AS DEFINED IN NEC 517.14.
G. ALL CRITICAL AND LIFE SAFETY BRANCH CIRCUITS, INCLUDING LIGHTING AND WALL RECEPTACLES, SHALL BE MECHANICALLY PROTECTED PER NEC 517.31(C)(3). NON-FLEXIBLE RACEWAY SHALL BE USED FOR CRITICAL AND LIFE SAFETY BRANCH CIRCUITS, EXCEPT THAT THE FINAL CONNECTION TO VIBRATING EQUIPMENT OR LIGHT FIXTURES IF THE TOTAL LENGTH OF FLEXIBLE RACEWAY IS 6' OR LESS ACROSS THE
ENTIRE CIRCUIT LENGTH.
H. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN
CABLING.
(GENERAL NOTES SHALL APPLY TO ALL SHEETS)
ELECTRICAL GENERAL NOTES:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1300 Baxter Street, Suite 230 Charlotte, NC 28204
Phone: 704.348.3097 www.specializedeng.com
FINAL SUBMISSION CONSTRUCTION DOCUMENTS
ARCHITECT/ENGINEERS:
DO NOT SCALE DRAWING. ALL DIMENSIONS
AND CLEARANCES SHALL BE VERIFIED
FROM APPROPRIATE SOURCES. ALL WORK
SHALL BE COORDINATED PRIOR TO
INSTALLATION. SEE SPECIFICATIONS.
PERMISSION TO REPRODUCE ANY PART OF
THIS DOCUMENT IS HEREBY GRANTED
SOLELY FOR THE PURPOSE OF THE
CONSTRUCTION OF THE PROJECT OR THE
ARCHIVING OF THIS PROJECT.
UNAUTHORIZED USE OF THIS DOCUMENT
WITHOUT THE WRITTEN PERMISSION OF
SPECIALIZED ENGINEERING SOLUTIONS IS
PROHIBITED BY COPYRIGHT LAW.
2023 © COPYRIGHT
619A4.23.111
ATRIAX, PLLC
703 MAIN AVENUE SW HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9964
02/12/2024 23080
/5
/2
:2 :3
P
M B
IM
://2
- V
A T u s k e g e e A
L L ift S ta tio n /2
V
A T u s k e g e e A
L L ift S ta tio n S
E S
.rv t
E000
ELECTRICAL SYMBOLS AND
ABBREVIATIONS
REPLACE SEWER LIFT
PUMP IN BUILDING 12
MJJCGH
CAVHCS EAST VAMC TUSKEGEE AL
02/12/2024
ELECTRICAL FIXTURE
SYMBOLS
PLAN SYMBOL NAME
RECEPTACLE - DUPLEX - CONV -
GFCI
ELECTRICAL FIXTURE SYMBOL LEGEND
PLAN SYMBOL NAME DESCRIPTION
JUNCTION BOX - WALL GENERAL:
PROVIDE JUNCTION BOX AS DESCRIBED IN THESE GENERAL NOTES AND NOTES BELOW FOR EACH JUNCTION BOX TYPE. REFER TO PLANS FOR JUNCTION BOX DESIGNATION. PROVIDE ONE (1) 4" SQUARE, 2-1/8" DEEP JUNCTION BOX WITH SINGLE GANG TRIM RING AND BLANK WALL PLATE WITH ONE (1) 1” CONDUIT TO ABOVE FINISHED CEILING WHERE NOT INDICATED OTHERWISE. WHERE SHOWN ADJACENT TO RECEPTACLES ON FLOOR PLANS, PROVIDE MAXIMUM 12” BETWEEN BACK BOXES. WHERE SHOWN AS PART OF BRANCH CIRCUIT, PROVIDE CONDUCTORS
WITHIN CONDUIT TO SOURCE INDICATED ON FLOOR PLANS.
TYPE 'EWC-1', ELECTRIC WATER COOLER:
PROVIDE [DUPLEX RECEPTACLE] [JUNCTION BOX] AT APPROXIMATE LOCATION INDICATED. MOUNT AT [CONFIRM HEIGHT]" AFF. COORDINATE EXACT MOUNTING LOCATION WITH ADA REQUIREMENTS, FINAL PLUMBING FIXTURE SELECTION, AND PLUMBING CONTRACTOR INSTALLATION LOCATION TO CONCEAL BEHIND EQUIPMENT PANEL.
TYPE ‘FF’, MODULAR FURNITURE FEED POWER CONNECTION:
PROVIDE JUNCTION BOX WITH WALL PLATE AND FLEXIBLE CONDUIT CONNECTION FOR POWER TO MODULAR FURNITURE AT APPROXIMATE LOCATION INDICATED. CIRCUIT MODULAR FURNITURE TO 20A 120V BRANCH CIRCUITS IN ASSOCIATED BRANCH PANEL. REFER TO FLOOR PLANS FOR BRANCH CIRCUIT DESIGNATIONS. COORDINATE CONDUIT SIZE REQUIRED WITH QUANTITY OF BRANCH CIRCUIT. ISOLATE BRANCH CIRCUIT CONDUCTORS FROM OTHER BRANCHES. POWER CONNECTION SHALL BE TERMINATED TO MODULAR FURNITURE PER MANUFACTURER REQUIREMENTS. PROVIDE ALL NECESSARY ACCESSORIES FOR CONNECTION TO MODULAR FURNITURE FEED WHIP.
COORDINATE REQUIREMENTS WITH MODULAR FURNITURE MANUFACTURER. PROVIDE VOICE/DATA FURNITURE FEED ADJACENT TO POWER FURNITURE FEED PER PLANS. PROVIDE MAXIMUM 12” BETWEEN BACK BOXES.
COORDINATE EXACT MOUNTING LOCATION WITH ARCHITECT AND MODULAR FURNITURE FINAL LOCATION.
TYPE ‘H’, HORIZONTAL:
PROVIDE JUNCTION BOX DESCRIBED ABOVE, MOUNTED HORIZONTALLY TO ACCOMMODATE BUILDING
CONSTRAINTS.
TYPE 'LIGHT', CEILING PROCEDURE LIGHT WALL-MOUNTED CONTROLLER:
PROVIDE ROUGH-IN FOR CEILING PROCEDURE LIGHT WALL-MOUNTED CONTROLLER, FURNISHED BY PROCEDURE LIGHT MANUFACTURER. MOUNT BACK BOX AT 48" AFF. COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL
EQUIPMENT SELECTION.
TYPE 'SHADE', MOTORIZED SHADE WALL-MOUNTED CONTROLLER:
PROVIDE ROUGH-IN FOR WALL-MOUNTED SHADE CONTROLLER, FURNISHED BY CONTROLLER MANUFACTURER.
MOUNT BACK BOX AT 48" AFF. COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL EQUIPMENT SELECTION.
TYPE 'TUBE', PNEUMATIC TUBE STATION:
PROVIDE DUPLEX RECEPTACLE AT APPROXIMATE LOCATION INDICATED, CIRCUITED TO CRITICAL BRANCH CIRCUIT INDICATED ON FLOOR PLANS. COORDINATE MOUNTING HEIGHT AND FINAL CONNECTION REQUIREMENTS WITH FINAL EQUIPMENT SELECTION. PROVIDE NETWORK DATA CONNECTION, MOUNTED ADJACENT TO DUPLEX RECEPTACLE. [PNEUMATIC TUBE SYSTEM INFORMATION IS PRELIMINARY AT THIS TIME. PROVIDE ADDITIONAL 20A 120V HARD-WIRED CRITICAL BRANCH CIRCUIT FOR PNEUMATIC TUBE SYSTEM TRANSFER STATION FOR EACH TUBE STATION LOCATION. PROVIDE 20A, 120V TOGGLE SWITCH DISCONNECT SWITCH AT EACH TRANSFER STATION LOCATION. PROVIDE ONE (1) XXA, XXXV BRANCH CIRCUIT TO SERVE PNEUMATIC TUBE BLOWER FOR ENTIRE SYSTEM. PROVIDE XXA, XXXV NON-FUSED DISCONNECT SWITCH AT BLOWER LOCATION. PROVIDE 3-#XX, #XX GND IN X/X"C. EXACT BRANCH CIRCUITS, SOURCE, AND LOCATIONS ARE TO BE DETERMINED WITH FINAL EQUIPMENT
SELECTION.]
TYPE ‘USB’, POWER USB ONLY DEVICE:
PROVIDE [PASS & SEYMOUR CATALOG # TM8USB4**CC6] [HUBBELL CATALOG # USB4**] FOUR (4) PORT USB TYPE A CHARGING DEVICE OR PRIOR APPROVED EQUIVALENT AT THIS LOCATION. DEVICE SHALL MATCH COLOR OF OTHER WIRING DEVICES PER SPECIFICATION. PROVIDE 4" SQUARE BACK BOX WITH SINGLE GANG TRIM RING AND 3/4" CONDUIT TO SOURCE. COORDINATE BACK BOX DEPTH WITH FINAL DEVICE SELECTION. SUBMIT SHOP DRAWINGS FOR APPROVAL. REFER TO MANUFACTURER INSTALLATION INSTRUCTIONS FOR ADDITIONAL DETAILS.
TYPE 'DISH', DISHWASHER:
PROVIDE 20A 120V ELECTRICAL CONNECTION FOR DISHWASHER AT APPROXIMATE LOCATION INDICATED, MOUNTED WITHIN ADJACENT CABINET. ELECTRICAL CONNECTION SHALL NOT BE ROUGHED-IN BEHIND DISHWASER LOCATION.
PROVIDE 20A, 1 POLE GFCI PROTECTED CIRCUIT BREAKER. COORDINATE MOUNTING LOCATION AND FINAL
CONNECTION REQUIREMENTS WITH MANUFACTURER AND FINAL EQUIPMENT SELECTION.
ELECTRICAL MISC SYMBOLS
PLAN SYMBOL NAME
BRANCH CIRCUIT CONCEALED IN
CEILING OR WALL
BRANCH CIRCUIT CONCEALED IN
FLOOR OR BELOW GRADE
CLEARANCE SPACE
CONDUIT BREAK
CONDUIT DOWN
CONDUIT STUB-OUT
CONDUIT UP
HOMERUN TO PANEL
G = GFCI CIRCUIT
(PART) = PARTIAL CIRCUIT
SWITCHED RECEPTACLE
ELECTRICAL MISC SYMBOL LEGEND
PLAN SYMBOL NAME DESCRIPTION
CABLE TRAY PROVIDE CABLE TRAY AT LOCATIONS INDICATED ON PLANS. REFER TO FLOOR PLANS FOR TYPE DESIGNATION.
COORDINATE MOUNTING WITH OTHER TRADES AND REQUIREMENTS IN SPECIFICATION.
TYPE 'WIDTH x DEPTH", WIRE BASKET CABLE TRAY:
PROVIDE CABLE TRAY IN DIMENSION INDICATED ON FLOOR PLANS.
TYPE 'WIDTH LADDER', LADDER CABLE TRAY:
PROVIDE CABLE TRAY IN DIMENSION INDICATED ON FLOOR PLANS.
LIGHTING CONTROL TAG REFER TO LIGHTING CONTROL SCHEDULE FOR ADDITIONAL INFORMATION.
ONE LINE SYMBOL
PLAN SYMBOL NAME
AUTOMATIC TRANSFER SWITCH
CONTINUATION
GROUND BAR
GROUNDING ELECTRODE
MOTOR STARTER
PANEL BOARD
SWITCHBOARD/SWITCHGEAR
TRANSFORMER
ELECTRICAL EQUIPMENT
SYMBOLS
PLAN SYMBOL NAME
DISTRIBUTION PANEL
ENCLOSED DISCONNECT
SWITCH - FUSED
LOAD CENTER - SURFACE
PANELBOARD - SURFACE
SWITCHBOARD
TRANSFORMER - DRY TYPE
ELECTRICAL EQUIPMENT
SYMBOLS
PLAN SYMBOL NAME
DISTRIBUTION PANEL
ENCLOSED DISCONNECT
SWITCH - FUSED
LOAD CENTER - SURFACE
PANELBOARD - SURFACE
SWITCHBOARD
TRANSFORMER - DRY TYPE
SHEET INDEX - ELECTRICAL
Sheet Number Sheet Name
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
EP200 FIRST FLOOR PLAN - POWER
EP201 SECOND FLOOR POWER PLAN
E500 ONE-LINE DIAGRAM
E600 ELECTRICAL DETAILS
Grand total: 5
GENERATOR
Room
BOILER ROOM
SECONDARY HOT WATER
PUMP
002B
EMERGENCY ELECTRIC
ROOM
003A
ELECTRIC ROOM
003B
AIR COMPRESSOR
002A
FUEL OIL PUMP
002C
STAIR
S1
1 2 3 4 5 6
A
C
D
E
B
B1
J
A. ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS.
CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH
ARCHITECTURAL INTERIOR ELEVATIONS. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER ARCHITECT, MOUNT DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.
B. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEVICE ROUGH-IN LOCATIONS AND ELEVATIONS WITH
ARCHITECTURAL DRAWINGS TO ASSURE COMPATIBILITY WITH FINISHES SPECIFIED ON THE
ARCHITECTURAL DRAWINGS. ROUTE ALL ELECTRICAL BRANCH CIRCUITS AND CONDUITS SPECIFIED, TO COORDINATE WITH OTHER TRADES AND TO ALLOW FOR SERVICE AND MAINTENANCE AND TO MINIMIZE THE USE OF ACCESS PANELS. WHERE ACCESS PANELS CANNOT BE AVOIDED, ARRANGE WORK TO INSTALL
PANELS IN LOCATIONS ACCEPTABLE TO ARCHITECT.
C. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.
D. REDUNDANT GROUNDING METHODS REQUIRED FOR PATIENT CARE AREAS. REFER TO NEC FOR
REQUIREMENTS AND TO PROJECT SPECIFICATIONS FOR ACCEPTABLE METHODS/APPLICATIONS.
E. GFCI TYPE RECEPTACLES ARE NOTED AS SUCH ON THE PLANS FOR PRICING PURPOSES. HOWEVER, CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE ALL RECEPTACLES INSTALLED WHERE A 6' CORD
LENGTH COULD REACH THE EDGE OF A SINK HAVE GFCI PROTECTION.
F. ELECTRICAL DISTRIBUTION EQUIPMENT SHOWN ON FLOOR PLAN ARE SHOWN FOR FOR REFERENCE ONLY.
REFERENCE RMF ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION.
(POWER GENERAL NOTES SHALL APPLY TO ALL SHEETS)
POWER GENERAL NOTES:
PROVIDE NEW 20A/1P CONNECTION TO
EXISTING 208V PANEL (LP12-1) FOR PUMP
CONTROL PANEL. COORDINATE LOCATION
WITH PLUMBING DRAWINGS.
PROVIDE NEW 20A/3P CONNECTION TO
EXISTING PANEL (PP12-1) FOR SEWAGE
PUMP, SP-1. COORDINATE LOCATION WITH
PLUMBING DRAWINGS.
PROVIDE NEW 20A/3P CONNECTION TO
EXISTING PANEL (PP12-1) FOR SEWAGE
PUMP, SP-2. COORDINATE LOCATION WITH
PLUMBING DRAWINGS.
PP12-1: 13,15,17
PP12-1: 4,6,8
LP12-1: 9
LP12-1: 8
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1300 Baxter Street, Suite 230 Charlotte, NC 28204
Phone: 704.348.3097 www.specializedeng.com
FINAL SUBMISSION CONSTRUCTION DOCUMENTS
ARCHITECT/ENGINEERS:
DO NOT SCALE DRAWING. ALL DIMENSIONS
AND CLEARANCES SHALL BE VERIFIED
FROM APPROPRIATE SOURCES. ALL WORK
SHALL BE COORDINATED PRIOR TO
INSTALLATION. SEE SPECIFICATIONS.
PERMISSION TO REPRODUCE ANY PART OF
THIS DOCUMENT IS HEREBY GRANTED
SOLELY FOR THE PURPOSE OF THE
CONSTRUCTION OF THE PROJECT OR THE
ARCHIVING OF THIS PROJECT.
UNAUTHORIZED USE OF THIS DOCUMENT
WITHOUT THE WRITTEN PERMISSION OF
SPECIALIZED ENGINEERING SOLUTIONS IS
PROHIBITED BY COPYRIGHT LAW.
2023 © COPYRIGHT
619A4.23.111
ATRIAX, PLLC
703 MAIN AVENUE SW HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9964
02/12/2024 23080
/5
/2
:2 :3
P
M B
IM
://2
- V
A T u s k e g e e A
L L ift S ta tio n /2
V
A T u s k e g e e A
L L ift S ta tio n S
E S
.rv t
EP200
FIRST FLOOR PLAN - POWER REPLACE SEWER LIFT
PUMP IN BUILDING 12
MJJCGH
CAVHCS EAST VAMC TUSKEGEE AL
02/12/2024
SHEET NOTES:
1. PROVIDE NEW 20A, 1-POLE, 120V CIRCUIT TO PANEL LP12-1.
N 1/4" = 1'-0"
FIRST FLOOR PLAN - POWER
1 2 3 4 5 6
A
C
D
E
B
B1
1 2 3 4 5 6
A
C
D
E
B
B1
LP12-1
PP12-1
TR
LOCATION OF EXISTING
PANELS
1/4" = 1'-0"
SECOND FLOOR - FLOOR PLAN - POWER
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
1300 Baxter Street, Suite 230 Charlotte, NC 28204
Phone: 704.348.3097 www.specializedeng.com
FINAL SUBMISSION CONSTRUCTION DOCUMENTS
ARCHITECT/ENGINEERS:
DO NOT SCALE DRAWING. ALL DIMENSIONS
AND CLEARANCES SHALL BE VERIFIED
FROM APPROPRIATE SOURCES. ALL WORK
SHALL BE COORDINATED PRIOR TO
INSTALLATION. SEE SPECIFICATIONS.
PERMISSION TO REPRODUCE ANY PART OF
THIS DOCUMENT IS HEREBY GRANTED
SOLELY FOR THE PURPOSE OF THE
CONSTRUCTION OF THE PROJECT OR THE
ARCHIVING OF THIS PROJECT.
UNAUTHORIZED USE OF THIS DOCUMENT
WITHOUT THE WRITTEN PERMISSION OF
SPECIALIZED ENGINEERING SOLUTIONS IS
PROHIBITED BY COPYRIGHT LAW.
2023 © COPYRIGHT
619A4.23.111
ATRIAX, PLLC
703 MAIN AVENUE SW HICKORY, NC 28602
PHONE: 828.315.9962
FAX: 828.315.9964
02/12/2024 23080
/5
/2
:2 :3
P
M B
IM
://2
- V
A T u s k e g e e A
L L ift S ta tio n /2
V
A T u s k e g e e A
L L ift S ta tio n S
E S
.rv t
EP201
SECOND FLOOR POWER PLAN REPLACE SEWER LIFT
PUMP IN BUILDING 12
MJJCGH
CAVHCS EAST VAMC TUSKEGEE AL
02/12/2024
(E)
PP12-1
(E)
LP12-1
(E) T12-1
30KVA
480V-208Y/120V
A. REFERENCE FLOOR PLANS FOR ADDITIONAL CIRCUIT AND ELECTRICAL INFORMATION.
(GENERAL NOTES SHALL APPLY TO ALL ONE-LINE SHEETS)
ONE-LINE GENERAL NOTES:
REMARKS: (EQUIPMENT CONNECTION SCHEDULE)
1. CONTROLS BETWEEN INDOOR AND OUTDOOR UNITS - INCLUDE CONTROL WIRING IN CONDUIT BETWEEN INDOOR AND OUTDOOR UNIT PER MANUFACTURER'S REQUIREMENTS.
2.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .