This document outlines COVID-19 safety protocols for contractors working in or traveling to Department of Veterans Affairs facilities. It requires contractors to provide proof of full vaccination or a negative COVID-19 test within three days of entry. Contractors must adhere to daily screening protocols which may include answering screening questions. They must also notify the contracting officer representative if contract performance is impacted due to denied entry. For indefinite delivery contracts, contractors must comply with these supplemental requirements for any existing task or delivery orders.

The related federal contract opportunity is a solicitation to replace mechanical systems in Building 1 of the Fresno VA Medical Center. The contractor will provide all labor, materials, equipment, supervision and other resources necessary to complete the construction project according to the attached specifications and drawings. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files

File Type Posted
Pipe PDF Drawings Bldg 1.zip ZIP file
100 Percent PDF Drawings Bldg 1.zip ZIP file
Technical Question Tracking Sheet - Fresno Mech Syst - 5-2-22.pdf PDF
VA Fresno ACM Survey - Asbestos Study Report Only.pdf PDF
Bldg 1 - Asbestos Bulk - Pt 1.pdf PDF
Bldg 1 - Asbestos Bulk - Pt 2.pdf PDF
Supporting Asbestos Bulk - Bldg 1 - Pt 2..zip ZIP file
HA PDF Drawings Bldg 1.zip ZIP file
36C77622B0022 0002.pdf PDF
Survey Documents.zip ZIP file
Asbestos Table - Final.xlsx XLSX spreadsheet
Supporting Asbestos Bulk - Bldg 1 - Pt 1..zip ZIP file
36C77622B0022 Amendment 0001.pdf PDF
Site Visit Attendance Sheet - IFB - Fresno.pdf PDF
Attachment 11 - DBA Rates - Fresno County - 4-1-22.pdf PDF
Attachment 5 - Plumbing Drawings.pdf PDF
Campus Map (Highlighted Parking).pdf PDF
Attachment 4 - Mechanical Drawings (Part II).zip ZIP file
Attachment 6 - Structural Drawings.pdf PDF
Attachment 10 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 3 - Architectural Drawings.pdf PDF
Attachment 4 - Mechanical Drawings (Part I).zip ZIP file
IFB Solicitation 36C77622B0022.pdf PDF
Attachment 2 - Cover Sheet.pdf PDF
Attachment 1 - 570-19-307 Issued for Construction - Specifications.pdf PDF
Attachment 9 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 7 - Electrical Plans.pdf PDF
Attachment 11 - DBA Rates - Fresno County - 3-25-22.pdf PDF
Site Visit Instructions - Fresno.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Last Updated on Tuesday December 14, 2021

VHA Supplemental Contract Requirements for Combatting COVID-19

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements:

1) If fully vaccinated, contractors shall show proof of vaccination.

i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

2) If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.

3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.

a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.

https://www.va.gov/covid19screen/ https://www.va.gov/covid19screen/

Last Updated on Wednesday, December 15, 2021

4. For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.

File details come from the government source that posted it. Updated .