Attachment 6 - Structural Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- 36C77622B0022
About this file
This document package includes construction drawings and specifications for the Replace Mechanical Systems project at the Veterans Affairs Medical Center in Fresno, California. The project scope involves demolishing existing ductwork and supports in phases, installing new mechanical equipment and related structural supports, and performing other construction work. The solicitation is for a firm fixed-price construction contract to complete the work in accordance with the specifications, drawings, and phasing plans provided. The contractor must furnish all labor, materials, equipment and supervision to perform demolition, new construction, and related tasks over multiple phases. The Department of Veterans Affairs is the contracting agency.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODES
2019 CALIFORNIA BUILDING CODE
VA SEISMIC DESIGN REQUIREMENTS H-18-8
RISK CATEGORY TYPE IV
ROOF LOAD
DEAD LOADS X PSF
LIVE LOAD X PSF
THIRD AND SIXTH FLOOR LOADS
DEAD LOADS 64 PSF
LIVE LOADS 60 PSF
WALL LOADS
9" CONCRETE WALL DEAD LOADS 112.5 PSF
8" CONCRETE WALL DEAD LOADS 100 PSF
SEISMIC LOADING CRITERIA
SEISMIC IMPORTANCE FACTOR, Ie 1.5
MAPPED SPECTRAL ACCELERATION, MCE:
a. Ss 0.584
b. S1 0.227
SPECTRAL RESPONSE COEFFICIENT:
a. Fa 1.333
b. Fv 2.146
MAXIMUM CONSIDERED EARTHQUAKE RESPONSE ACCELERATIONS:
a. Sms 0.778
b. Sm1 0.487
DESIGN SPECTRAL RESPONSE ACCELERATIONS:
a. Sds 0.519
b. Sd1 0.325
SEISMIC DESIGN CATEGORY D
WIND LOADING CRITERIA:
BASIC WIND SPEED 105 MPH
WIND DIRECTIONALITY FACE, Kd 0.85
EXPOSURE CATEGORY C
TOPOGRAPHIC FACTOR, Kzt 1.00 GROUND ELEVATION FACTOR, Ke 1.00 VELOCITY PRESSURE EXPOSURE COEFFICENT, Kz 1.24
C&C DESIGN WALL WIND LOADS, Pnet 38 PSF
A.B. ANCHOR BOLT
ABV. ABOVE
A.C.I. AMERICAN CONCRETE INSTITUTE
ADDL. ADDITIONAL
A.E.S.A. ARCHITECTURAL EXPOSED STEEL
A.F.P.A. AMERICAN FOREST AND PAPER
ASSOCIATION
A.I.S.C. AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
A.I.T.C. AMERICAN INSTITUTE OF TIMBER
CONSTRUCTION
ALT. ALTERNATE
A.P.A. AMERICAN PLYWOOD
ASSOCIATION
ARCH. ARCHITECT(URAL)
A.E.S.S. ARCHITECTURAL EXPOSED
STRUCTURAL STEEL
A.S.C.E. AMERICAN SOCIETY OF CIVIL
ENGINEERS
A.S.T.M. AMERICAN SOCIETY FOR TESTING
& MATERIALS
A.W.S. AMERICAN WELDING SOCIETY
BLDG. BUILDING
BLK., BLKG., BLOCK, BLOCKING
BM. BEAM
B.O. BOTTOM OF
BOT. BOTTOM
C CHANNEL
C.B.C. CALIFORNIA BUILDING CODE
CDX C-D EXPOSURE 1
C.J. CONSTRUCTION JOINT
CL CENTERLINE
CLG. CEILING
CLR. CLEAR
C.M.U. CONCRETE MASONRY UNIT
COL. COLUMN
CONC. CONCRETE
CONN. CONNECTION
CONT. CONTINUOUS
CTSK. COUNTERSINK
d PENNY NAILS
DBL. DOUBLE
DEMO. DEMOLISH
DET., DTL. DETAIL
DF DOUGLAS FIR
DIA., Ø DIAMETER
DIAG. DIAGONAL
DIM. DIMENSION
DL DEAD LOAD
DO DITTO / DO OVER
DP DEEP
D.S.A. DEPARTMENT OF STATE
ARCHITECT
DWG DRAWING
(E) EXISTING
EA. EACH
ELEV. ELEVATION
E.N. EDGE NAILING
ENGR. ENGINEER
EQ. EQUAL
EQUIP. EQUIPMENT
EXP. EXPANSION
E.W. EACH WAY
FDN. FOUNDATION
F.E.M.A. FEDERAL EMERGENCY
MANAGEMENT AGENCY
F.F. FINISH FLOOR
FIN. FINISH
FLR. FLOOR
F.N. FIELD NAILING
FRMG. FRAMING
FT., FTG. FOOT, FOOTING
F.V. FIELD VERIFY
GA. GAUGE
GALV. GALVANIZED
GLB GLUE LAMINATED BEAM
H.D. HOLDOWN
HDR. HEADER
HGR. HANGER
HORIZ. HORIZONTAL
HSS HOLLOW STRUCTURAL SECTION
HT. HEIGHT
I.B.C. INTERNATIONAL BUILDING CODE
I.C.C. INTERNATIONAL CODE COUNCIL
IN INCH
I.D. INSIDE DIAMETER
INT. INTERIOR
I.R. INTERPRETATION OF
REGULATIONS
JST. JOIST
K KIPS
KSI KIPS PER SQUARE INCH
L ANGLE
LBS, # POUNDS (XXX LBS, XXX#)
LL LIVE LOAD
LLV(LLH) LONG LEG VERTICAL (HORIZ.)
LOC. LOCATION
LSL LAMINATED STRAND LUMBER
LT. WT. LIGHT WEIGHT
LVL LAMINATED VENEER LUMBER
MAS. MASONRY
MAX. MAXIMUM
M.B. MACHINE BOLT
MFR MANUFACTURER
MIN. MINIMUM
M.S.R. MACHINE STRESS RATED
MTL. METAL
(N) NEW
NO., # NUMBER, (NO. XX, #XX)
N.T.S. NOT TO SCALE
O/, o/ OVER
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.H. OPPOSITE HAND
OPNG. OPENING
OP. OPPOSITE
OSB ORIENTED STRAND BOARD
O.S.H.P.D. OFFICE OF STATEWIDE HEALTH
PLANNING AND DEVELOPMENT
PL. PLATE
P.T. PRESSURE TREATED
PLYWD. PLYWOOD
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
REINF. REINFORCING
REQD. REQUIRED
RM. ROOM
SCHED. SCHEDULE
SHTG. SHEATHING
SHT. SHEET
SIM. SIMILAR
SMS SHEET METAL SCREWS
SPEC. SPECIFICATION
SQ. SQUARE
STGR. STAGGER
STD. STANDARD
STIFF. STIFFENER
STL. STEEL
STRUCT. STRUCTURAL
SYM. SYMMETRICAL
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
THK. THICK
TL TOTAL LOAD
T.O. TOP OF
TYP. TYPICAL
U.N.O., U.O.N. UNLESS NOTED OTHERWISE
VERT. VERTICAL
W/, W/O WITH, WITH OUT
WD WOOD
W.F. WIDE FLANGE
W.C.L.I.B. WEST COAST LUMBER
INSPECTION BUREAU
WT. WEIGHT
W.W.F. WELDED WIRE FABRIC
W.W.A. WELDED WIRE MESH
W.W.P.A. WESTERN WOOD PRODUCTS
ASSOCIATION
-STEEL
-MASONRY
-AGGREGATE
-WOOD BLOCK
-NATIVE SOIL
-ENGINEERED FILL
-GROUT
-CONCRETE
-CONTINUOUS WOOD MEMBER
-DETAIL
-SECTION
X
XX
X
XX
DETAIL NUMBER
SHEET NUMBER
-ELEVATION
X
XX
SECTION NUMBER
SHEET NUMBER
ELEVATION NUMBER
SHEET NUMBER
1. ANY SUBSTITUTIONS FOR STRUCTURAL ITEMS ON APPROVED PLANS SHALL BE REVIEWED
BY THE ARCHITECT AND STRUCTURAL ENGINEER PRIOR TO USE. REVIEW WILL BE BILLED ON
A TIME AND MATERIALS BASIS TO CONTRACTOR WITH NO GUARANTEE THE SUBSTITUTION
WILL BE ALLOWED.
2. DETAILS AND NOTES ON TYPICAL SHEETS SHALL APPLY U.N.O. DETAILS OF CONSTRUCTION
NOT FULLY SHOWN SHALL BE OF THE SAME NATURE AS SHOWN FOR SIMILAR CONDITIONS.
U.N.O.
3. DO NOT SCALE STRUCTURAL DRAWINGS. IF DIMENSIONS IN DRAWINGS ARE NOT CLEAR, OR
DISCREPANCIES EXIST ON THE DRAWINGS OR SPECIFICATIONS, CONTACT THE ENGINEER.
4. SEE MECHANICAL, ELECTRICAL, AND/OR ARCHITECTURAL DRAWINGS FOR LOCATION AND
SIZE OF PIPES, CONDUITS, FLOOR DRAINS, VENTS, DUCTS, DRAIN LEADERS AND OTHER
SIMILAR OPENINGS NOT INDICATED ON THE STRUCTURAL DRAWINGS.
5. SEE MECHANICAL, ELECTRICAL AND/OR ARCHITECTURAL DRAWINGS FOR EMBEDMENT OF
BOLTS, ANCHORS AND OTHER MISCELLANEOUS EMBEDDED ITEMS NOT SHOWN ON
STRUCTURAL DRAWINGS.
6. THE DESIGN, FABRICATION AND CONSTRUCTION SHALL COMPLY WITH ACCEPTED LOCAL
GOVERNING CODES OF THE PARTICULAR AREA.
7. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE.
UNLESS OTHERWISE SHOWN, THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE
CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT AND SHALL BE SOLELY
RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND
PROCEDURES. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES,
THE CONTRACTOR WILL SOLELY AND COMPLETELY BE RESPONSIBLE FOR CONDITIONS
OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING
PERFORMANCE OF THE WORK REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE
LIMITED TO NORMAL WORKING HOURS.
8. THE DUTY OF THE ENGINEER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S
PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE
CONTRACTOR'S SAFETY MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE.
9. CONSTRUCTION SHALL BE DISTINGUISHED FROM CONTINUOUS AND DETAILED INSPECTION
SERVICES WHICH ARE FURNISHED BY OTHERS. THESE SUPPORT SERVICES PERFORMED BY
THE ENGINEER WHETHER PERFORMED PRIOR TO, DURING, OR AFTER COMPLETION OF
CONSTRUCTION ARE PERFORMED SOLELY FOR THE PURPOSE OF ASSISTING IN QUALITY
CONTROL AND IN ACHIEVING CONFORMANCE WITH CONTRACT DRAWINGS AND
SPECIFICATIONS, BUT THEY DO NOT GUARANTEE CONTRACTOR'S PERFORMANCE AND SHALL
NOT BE CONSTRUED AS SUPERVISION OF CONSTRUCTION.
10. ALL WORK SHALL CONFORM TO THE LATEST APPLICABLE CONSTRUCTION SAFETY
REQUIREMENTS OF O.S.H.A. AND ANY OTHER GOVERNMENTAL ENTITY HAVING JURISDICTION.
11. SHOP DRAWINGS:
· SHOP DRAWINGS SHALL BE SUBMITTED PER PROJECT SPECIFICATIONS.
· PRIOR TO SUBMISSION, THE CONTRACTOR SHALL REVIEW ALL SUBMITTALS FOR
CONFORMANCE WITH THE APPROVED DOCUMENTS AND SHALL STAMP SUBMITTALS AS
BEING "REVIEWED FOR CONFORMANCE" TO APPROVED CONTRACT DOCUMENTS.
· THE PURPOSE OF SHOP DRAWING SUBMITTALS BY THE CONTRACTOR IS TO
DEMONSTRATE TO THE DESIGN TEAM THAT HE AND THE SUBCONTRACTOR UNDERSTAND
THE DESIGN CONCEPT BY INDICATING WHICH MATERIAL HE INTENDS TO FURNISH AND
INSTALL, AND BY DETAILING THE FABRICATION AND INSTALLATION METHODS HE INTENDS
TO USE.
· DESIGN DOCUMENTS ARE NOT SHOP DRAWINGS AND SHALL NOT BE SUBMITTED AS SUCH.
12. ALL NOTES SPECIFIED ON PLANS AND IN DETAILS WITH THE WORD "TYPICAL" FOLLOWED
BY BOLD AND UNDERLINED TEXT REFER TO THE TYPICAL PROJECT DETAILS ON S1 SERIES
SHEETS. TYPICAL DETAILS ARE NOT SPECIFICALLY REFERENCED ON PLANS AND
SPECIFIC DETAIL U.N.O.
1. THESE NOTES GOVERN ALL CONDITIONS CALLED OUT ON THE PLANS AS "SHOT PINS" UNLESS
SPECIFICALLY NOTED OTHERWISE.
2. ALL SHOT PINS SHALL BE AS MANUFACTURED BY HILTI, INCORP. REFERENCE SHALL BE MADE TO THE LATEST EDITION OF THE HILTI 'PRODUCT TECHNICAL GUIDE' AND THE ICC-ES ESR-2269
REPORT FOR ADDITIONAL INFORMATION.
3. SHOT PINS DRIVEN INTO STEEL BASE MATERIAL SHALL BE X-U TYPE WITH P8 WASHERS.
LENGTH OF PIN SHALL BE AS REQUIRED TO PENETRATE THROUGH THE STEEL BASE
MATERIAL. MINIMUM EDGE DISTANCE TO ANY CONNECTED PART SHALL BE 1/2" AND MINIMUM
FASTENER SPACING SHALL BE 2". ENTIRE POINTED END OF PIN MUST PENETRATE THROUGH
STEEL LESS THAN 1/2" THICK OR PENETRATE A MINIMUM OF 1/2" INTO STEEL 1/2" THICK OR
GREATER. PINS IN STEEL SUBJECT TO WITHDRAW LOADS ARE REQUIRED TO HAVE KNURLED
SHANK.
4. SHOT PINS DRIVEN INTO CONCRETE BASE MATERIAL SHALL BE X-U TYPE WITH P8 WASHERS.
LENGTH OF PIN SHALL BE AS REQUIRED TO PENETRATE 1 1/2" INTO THE CONCRETE BASE
MATERIAL. MINIMUM EDGE DISTANCE TO ANY CONCRETE MATERIAL SHALL BE 3" AND MINIMUM
FASTENER SPACING SHALL BE 4".
5. SHOT PINS DRIVEN INTO CONCRETE BASE MATERIAL THROUGH METAL DECK SHALL BE X-U
TYPE WITH P8 WASHERS. LENGTH OF PIN SHALL BE AS REQUIRED TO PENETRATE 1" INTO THE
CONCRETE THROUGH THE LOW FLUTE. PIN SHALL BE CENTERED IN THE LOW FLUTE AND
MINIMUM FASTENER SPACING SHALL BE 4".
6. WHERE STEEL WASHERS ARE INDICATED ON THE DRAWINGS, PINS SHALL BE X-U WITH
PREMOUNTED STEEL WASHERS WITH A MINIMUM DIAMETER OF 36mm (1 7/16").
VERIFICATION AND INSPECTION
DESCRIPTION
FREQUENCY
OF
INSPECTION
REFERENCED
STANDARD
REQ.
FOR
PROJ.
MATERIAL VERIFICATION OF HIGH STRENGTH
BOLTS, NUTS AND WASHERS.
a.
2.
b.
a.
b.
b.
a.
1.
3.
4.
5.
6.
a.
a.
a.
b.
b.
b.
c.
1)
2)
3)
4)
5)
3)
4)
1)
2)
IDENTIFICATION MARKINGS TO CONFORM
TO A.S.T.M. STANDARDS SPECIFIED IN THE
APPROVED CONSTRUCTION DOCUMENTS.
MANUFACTURERS CERTIFICATE OF
COMPLIANCE REQUIRED.
INSPECTION OF HIGH-STRENGTH BOLTING:
BEARING TYPE CONNECTIONS.
SLIP-CRITICAL CONNECTIONS.
MATERIAL VERIFICATION OF STRUCTURAL
STEEL:
IDENTIFICATION MARKINGS TO
CONFORM TO A.S.T.M. STANDARDS
SPECIFIED IN THE APPROVED
CONSTRUCTION DOCUMENTS.
MANUFACTURERS CERTIFIED MILL
TEST REPORTS:
MATERIAL VERIFICATION OF WELD
FILLER MATERIALS:
IDENTIFICATION MARKINGS TO
CONFORM TO A.W.S. SPECIFICATION IN
THE APPROVED CONSTRUCTION
DOCUMENTS.
MANUFACTURERS CERTIFICATE OF
COMPLIANCE REQUIRED.
INSPECTION OF WELDING:
STRUCTURAL STEEL:
COMPLETE AND PARTIAL PENETRATION
OF GROOVE WELDS.
MULTIPASS FILLET WELDS.
SINGLE-PASS FILLET WELDS > 5/16"
SINGLE PASS FILLET WELDS < 5/16"
FLOOR AND ROOF DECK WELDS.
REINFORCING STEEL:
VERIFICATION OF WELDABILITY OF
REINFORCING STEEL OTHER THAN
A.S.T.M. A706.
REINFORCING STEEL-RESISTING
FLEXURAL AND AXIAL FORCES IN
INTERMEDIATE AND SPECIAL MOMENT
FRAMES, AND BOUNDARY ELEMENTS
OF SPECIAL REINFORCED CONCRETE
SHEAR WALLS AND SHEAR
REINFORCEMENT.
SHEAR REINFORCEMENT.
OTHER REINFORCING STEEL.
INSPECTION OF STEEL FRAME JOINT DETAILS
FOR COMPLIANCE WITH APPROVED
CONSTRUCTION DOCUMENTS:
DETAILS SUCH AS BRACING AND
STIFFENING.
MEMBER LOCATIONS.
APPLICATION OF JOINT DETAILS AT EACH
CONNECTION
PERIODIC
CONTINUOUS
PERIODIC
PERIODIC
PERIODIC
PERIODIC
VERIFICATION
VERIFICATION
VERIFICATION
VERIFICATION
CONTINUOUS
CONTINUOUS
CONTINUOUS
CONTINUOUS
CONTINUOUS
PERIODIC
PERIODIC
PERIODIC
PERIODIC
PERIODIC
APPLICABLE
A.S.T.M. MATERIAL
SPECIFICATIONS;
A.I.S.C. 360, SECTION A3.3
A.I.S.C. 360, SECTION M2.5
A.S.T.M. A6 OR
A.S.T.M. A568
A.S.T.M. A 6 OR
A.S.T.M. A 568
A.I.S.C. 360, SECTION A3.5
A.W.S. D1.1 1,2
A.W.S. D1.3
A.W.S. D1.4 A.C.I. 318: 3.5.2
1. FOR SEISMIC-FORCE-RESISTING SYSTEMS IN SEISMIC DESIGN CATEGORY D, E, OR
F A.I.S.C. 341 ALSO APPLIES.
2. APPLIES TO SHOP AND FIELD WELDING.
VERIFICATION AND INSPECTION
DESCRIPTION
FREQUENCY
OF
INSPECTION
REFERENCED
STANDARD
REQ.
FOR
PROJ.
1.
a.
b.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
INSPECTION OF REINFORCING STEEL,
INCLUDING PRESTRESSING TENDONS, AND
PLACEMENT.
APPLICATION OF PRESTRESSING
FORCES
PERIODIC
SEE SPECIAL
INSPECTION
FOR STEEL
DETAIL
CONTINUOUS
PERIODIC
CONTINUOUS
CONTINUOUS
PERIODIC
CONTINUOUS
PERIODIC
PERIODIC
PERIODIC
CONTINUOUS
INSPECTION OF REINFORCING STEEL
WELDING IN ACCORDANCE TO TABLE 1704.3
& 1704A.3, ITEM 5b.
INSPECT BOLTS TO BE INSTALLED IN
CONCRETE PRIOR TO AND DURING
PLACEMENT OF CONCRETE WHERE
ALLOWABLE LOADS HAVE BEEN INCREASED
OR DESIGN IS BASED ON SECTION 1912A.
VERIFYING USE OF REQUIRED DESIGN MIX.
AT THE TIME FRESH CONCRETE IS SAMPLED
TO FABRICATE SPECIMENS FOR STRENGTH
TESTS, PERFORM SLUMP AND AIR CONTENT
TESTS, AND DETERMINE THE TEMPERATURE
OF THE CONCRETE.
INSPECTION OF CONCRETE AND SHOTCRETE
PLACEMENT FOR PROPER APPLICATION
TECHNIQUES.
INSPECTION FOR MAINTENANCE OF
SPECIFIED CURING TEMPERATURE AND
TECHNIQUES.
INSPECTION OF PRESTRESSED CONCRETE:
GROUTING OF BONDED PRESTRESSING
TENDONS IN SEISMIC-FORCE-RESISTING
SYSTEM.
ERECTION OF PRECAST CONCRETE
MEMBERS.
VERIFICATION OF IN-SITU CONCRETE
STRENGTH, PRIOR TO STRESSING OF
TENDONS IN POSTTENSIONED CONCRETE
AND PRIOR TO REMOVAL OF SHORES AND
FORMS FROM BEAMS AND STRUCTURAL
SLABS.
INSPECT FORMWORK FOR SHAPE,
LOCATION AND DIMENSIONS OF THE
CONCRETE MEMBER BEING FORMED.
POST-INSTALLED ANCHORS.
A.C.I. 318:
3.5, 7.1-7.7
A.W.S. D1.4 A.C.I. 318: 3.5.2
A.C.I. 318:
APPENDIX D
A.C.I. 318:
CH. 4, 5.2-5.4
A.S.T.M. C172 A.S.T.M. C31
A.C.I. 318: 5.6, 5.8
A.C.I. 318:
5.9, 5.10
A.C.I. 318:
5.11, 5.13
A.C.I. 318: 18.20 A.C.I. 318: 18.18.4
A.C.I. 318: CH. 16
A.C.I. 318: 6.2
A.C.I. 318: 6.1.1
1. SCREW ANCHORS INTO CONCRETE SHALL BE TITEN HD AS MANUFACTURED BY SIMPSON
STRONG-TIE COMPANY, INC. 5956 WEST LAS POSITAS BOULEVARD PLEASANTON, CALIFORNIA
94588. INSTALLATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS AND I.C.C. REPORT NO. ESR 2713.
2. TEST VALUES AND INSTALLATION REQUIREMENTS SHALL BE AS FOLLOWS:
3. PLACEMENT GUIDELINES FOR ABOVE VALUES IN ITEM 2 REQUIRE THE FOLLOWING
CONDITIONS:
· TABLE VALUES ARE BASED ON f'c = 2500 PSI
· HOLES DRILLED WITH A HAND-HELD ELECTRO-PNEUMATIC ROTARY HAMMER DRILL WITH A
CARBIDE-TIPPED DRILL BIT CONFORMING TO ANSI B212.15-1994.
· PILOT HOLE MUST BE THE SAME DIAMETER AS THE SPECIFIED ANCHOR
· HOLE IS TO BE DRILLED TO THE SPECIFIED EMBEDMENT DEPTH PLUS 1/2" (ONLY 1/4"
REQUIRED FOR 3/8" SCREW)
· ANY SEISMIC DESIGN CATEGORY PER 2019 C.B.C.
· TENSION LOAD VALUES SHALL BE MULTIPLIED BY 0.6 FOR LIGHTWEIGHT CONCRETE
· A.C.I. "CRACKED" CONCRETE CONDITION IS ASSUMED.
· HOLES SHALL BE CLEANED IN ACCORDANCE WITH ICC REPORT NO. ESR-2713
4. WHEN INSTALLING SCREW ANCHORS IN EXISTING CONCRETE, USE CARE AND CAUTION TO
AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS. MAINTAIN A MINIMUM
CLEARANCE OF ONE-INCH BETWEEN THE EXISTING REINFORCEMENT AND THE SCREW
ANCHOR.
5. ANY BOLTS SHOWN ON THE APPROVED PLANS AS SCREW ANCHORS, REQUIRES PERIODIC
SPECIAL INSPECTION IN ACCORDANCE WITH SECTION 4.4 IN THE I.C.C. REPORT. SPECIAL
INSPECTION SHALL BE BY AN APPROVED TESTING AND INSPECTION AGENCY. ANY ITEMS THAT
REQUIRE SCREW ANCHORS BUT ARE NOT SPECIFICALLY SHOWN ON THE APPROVED PLANS
MUST BE APPROVED BY THE STRUCTURAL ENGINEER AND BUILDING DEPARTMENT PRIOR TO
INSTALLATION.
BOLT SIZE MIN. EMBED. CONC. THKS. TORQUE TEST
3 1/4" 4" 10 FT LBS
1/2" 4" 6 1/4"
3/4" 6 1/4" 10"
3/8"
10 FT LBS
20 FT LBS
5/8" 5 1/2" 8 1/2" 10 FT LBS
3. PLACEMENT GUIDELINES FOR ABOVE VALUES IN ITEM 2 REQUIRE THE FOLLOWING
CONDITIONS:
• TABLE VALUES ARE BASED ON f'c = 3000 PSI
• HOLES DRILLED WITH A HAMMER DRILL AND CARBIDE BIT COMPLYING W/ ANSI B212.15-1994
• BIT DIAMETER EQUALS THE SIZE OF THE ANCHOR BEING INSTALLED
• HOLE DEPTH MUST EXCEED MIN. EMBED. BY ONE BOLT DIAMETER
• ANY SEISMIC DESIGN CATEGORY PER 2019 C.B.C.
• TENSION LOAD VALUES SHALL BE MULTIPLIED BY 0.6 FOR LIGHTWEIGHT CONCRETE
• A.C.I. "CRACKED" CONCRETE CONDITION IS SUFFICIENT
• FOR CARBON OR STAINLESS STEEL BOLTS
4. WHEN INSTALLING EXPANSION ANCHORS IN EXISTING CONCRETE, USE CARE AND CAUTION TO
AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS. MAINTAIN A MINIMUM
CLEARANCE OF ONE-INCH BETWEEN THE EXISTING REINFORCEMENT AND THE EXPANSION
ANCHOR.
5. ANY BOLTS SHOWN ON THE APPROVED PLANS AS EXPANSION ANCHORS, REQUIRES SPECIAL
INSPECTION IN ACCORDANCE WITH SECTION 4.4 IN THE I.C.C. REPORT. SPECIAL INSPECTION
SHALL BE BY AN APPROVED TESTING AND INSPECTION AGENCY. ANY ITEMS THAT REQUIRE
EXPANSION ANCHORS BUT ARE NOT SPECIFICALLY SHOWN ON THE APPROVED PLANS MUST
BE APPROVED BY THE STRUCTURAL ENGINEER AND BUILDING DEPARTMENT PRIOR TO
INSTALLATION.
1. EXPANSION ANCHORS SHALL BE HILTI KWIK BOLT TZ AS MANUFACTURED BY HILTI, INC., 7250
DALLAS PARKWAY, SUITE 1000, PLANO, TEXAS 75024. INSTALLATION SHALL BE IN
ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND I.C.C. REPORT NO.
ESR-1917.
2. TEST VALUES AND INSTALLATION REQUIREMENTS SHALL BE AS FOLLOWS:
BOLT SIZE MIN. EMBED CONT. THKS. TENSION TEST TORQUE TEST
3/8"
1/2"
5/8"
3/4"
2"
3 1/2"
4"
4 3/4"
4"
6"
6"
8"
1100#
2000#
2300#
3700#
25 #-FT
40 #-FT
60 #-FT
110 #-FT
1. EPOXY INTO CONCRETE SHALL BE SIMPSON SET-XP ADHESIVE AS MANUFACTURED BY
SIMPSON STRONG-TIE CO.,INC. 5956 W. LAS POSITAS BLVD., PLEASANTON, CA. 94588.
INSTALLATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS
AND I.C.C. REPORT NO. ESR-2508.
2. TEST VALUES AND INSTALLATION REQUIREMENTS SHALL BE AS FOLLOWS:
3. PLACEMENT GUIDELINES FOR ABOVE VALUES REQUIRE THE FOLLOWING CONDITIONS:
· TABLE VALUES ARE BASED ON f'c = 3000 psi
· 6" MIN. EDGE DISTANCE ON ONE SIDE AND SPACING = 3x EMBED. DEPTH
· HOLES DRILLED WITH A HAMMER DRILL AND CARBIDE BIT
· BIT DIAMETER EQUALS (BAR DIAMETER) + 1/8"
· HOLES SHALL BE DRY
· MAX. LONG TERM TEMPS OF 110° F OR LESS & MAX. SHORT TERM OF 150° F OR LESS
· TEMP. OF CONCRETE SHALL BE KEPT ABOVE 50° F DURING ENTIRE CURE TIME
· ANY SEISMIC DESIGN CATEGORY PER 2019 C.B.C., CONDITION B IS ASSUMED
· A.S.T.M. A615 GRADE 60 REBAR OR A.S.T.M. A193 GRADE B7 THREADED RODS
· A.C.I. "CRACKED" CONCRETE CONDITION IS SUFFICIENT
· DEPTH/THICKNESS OF CONCRETE BEING ATTACHED TO MUST BE AT LEAST EQUAL TO THE
EMBEDMENT DEPTH + (5)BAR DIAMETERS.
· HOLES SHALL BE CLEANED ACCORDING TO THE ICC REPORT NO. ESR-2508
4. WHEN INSTALLING EPOXIED REBAR/BOLTS IN (E) CONCRETE, USE CARE AND CAUTION TO
AVOID CUTTING OR DAMAGING THE (E) REINFORCING BARS. MAINTAIN A MINIMUM CLEARANCE
OF (1) INCH BETWEEN THE (E) REINFORCEMENT AND THE EPOXIED REBAR/BOLT.
5. ANY REBAR/BOLTS SHOWN ON THE APPROVED PLANS AS BEING EPOXIED, REQUIRES
CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH SECTION 4.4 IN THE I.C.C. REPORT.
SPECIAL INSPECTION SHALL BE BY AN APPROVED TESTING AND INSPECTION AGENCY. ANY
ITEMS THAT REQUIRE EPOXY BUT ARE NOT SPECIFICALLY SHOWN AS BEING EPOXIED ON THE
APPROVED PLANS MUST BE APPROVED BY THE STRUCTURAL ENGINEER AND D.S.A./O.S.H.P.D.
PRIOR TO INSTALLATION.
6. PULL TESTING SHALL BE DONE IN ACCORDANCE WITH D.S.A./O.S.H.P.D. GUIDELINES WHEN
REQUIRED.
BAR
SIZE
BOLT
SIZE
MIN.
EMBEDMENT
#4 1/2" 4"
#5 5/8" 5"
#6 3/4" 7"
TENSION
TEST(POUNDS)
1. ALL CONSTRUCTION INDICATED IS NEW UNLESS SPECIFICALLY DENOTED AS EXISTING.
2. CAREFULLY EXAMINE THE CONSTRUCTION DOCUMENTS AND NOTIFY THE STRUCTURAL
ENGINEER OF ANY CONFLICTS OR DISCREPANCIES WITHIN THE STRUCTURAL
CONSTRUCTION DOCUMENTS AND BETWEEN ALL OTHER CONSTRUCTION DOCUMENTS AND
THE EXISTING CONDITION.
3. EXISTING CONSTRUCTION INDICATED IN THE CONSTRUCTION DOCUMENTS IS BASED UPON
INFORMATION SHOWN ON AVAILABLE RECORD PLANS AND/OR LIMITED VISUAL
OBSERVATIONS. THE EXISTING CONSTRUCTION MAY VARY FROM THAT INDICATED ON THE
CONSTRUCTION DOCUMENTS. PROVIDE ALL WORK AND MATERIALS NECESSARY TO
COMPLETE THE PROJECT AS REPRESENTED IN THE CONSTRUCTION DOCUMENTS.
4. VERIFY CONSTRUCTION DOCUMENTS WITH THE EXISTING CONSTRUCTION PRIOR TO
STARTING CONSTRUCTION OR FABRICATION. DO NOT SCALE THE EXISTING RECORD
PLANS.
5. PROVIDE AND MAINTAIN A COMPLETE SET OF EXISTING RECORD PLANS AND MAKE THEM
AVAILABLE FOR USE ON JOB SITE.
6. EXISTING STRUCTURAL ELEMENTS SHALL NOT BE REMOVED OR MODIFIED UNLESS
INDICATED IN THE STRUCTURAL CONSTRUCTION DOCUMENTS. IF EXISTING STRUCTURAL
ELEMENTS INTERFERE WITH THE WORK INDICATED ON PLANS, OR IF UNCERTAIN THAT AN
ELEMENT IS STRUCTURAL, NOTIFY STRUCTURAL ENGINEER IMMEDIATELY.
7. PROVIDE ALL MEASURES NECESSARY FOR PROTECTION OF THE EXISTING STRUCTURE
AND SITE DURING DEMOLITION AND CONSTRUCTION. MEASURES SHALL INCLUDE, BUT NOT BE
LIMITED TO, PROVIDING ADEQUATE SHORING, BRACING, WEATHER PROTECTION AND
DUST PROTECTION. THE REMOVAL OR ALTERATION OF EXISTING STRUCTURAL ELEMENTS
SHALL BE PERFORMED IN A MANNER TO PREVENT DAMAGE TO THOSE ELEMENTS THAT
REMAIN. SHOULD DAMAGE OCCUR TO ANY EXISTING ELEMENTS, THOSE ELEMENTS SHALL BE
RESTORED TO THEIR ORIGINAL CONDITION AT NO ADDITIONAL COST TO OWNER.
8. IF EXISTING STRUCTURAL ELEMENTS NOT INDICATED FOR REPLACEMENT OR REPAIR ARE
DISCOVERED TO BE DAMAGED OR DIFFERENT THAN INDICATED ON THE PLANS, NOTIFY
THE STRUCTURAL ENGINEER. SUCH DAMAGE OR DIFFERENCE SHALL INCLUDE, BUT NOT
LIMITED TO, DRY ROT, WATER DAMAGE, INSECT DAMAGE, POOR WORKMANSHIP OR FIT-
UP, BUCKLING OR EXCESSIVE DEFLECTION, SAGGING, TWISTING AND DIFFERENT SIZE,
ORIENTATION, SPACING, GRADE QUALITY OR MATERIAL.
9. DO NOT CUT ANY EXISTING RE-BAR OR FRAMING MEMBERS NOT DETAILED ON
STRUCTURAL CONSTRUCTION DOCUMENTS.
CUTTING BLADE
I"
LIMIT OF SAW CUT,
OVERCUTTING
NOT PERMITTED
LIMIT OF OPENINGSECTION TO BE
HAND-CHIPPED TO
FORM NEAT CORNER
(E) CONCRETE
WALL OR SLAB
I"
I" LIMIT OF SAW CUT,
OVERCUTTING NOT
PERMITTED
SECTION TO BE
HAND-CHIPPED TO
FORM NEAT CORNER
3" MIN. CORE @ CORNERS
OF OPENINGS, TYP.
VERT. REINF. TO MATCH ORIGINAL
REINF. SIZE AND MATERIAL. USE
TYPICAL LAP SPLICED DETAIL AND
PLACE NEXT TO (E) DAMAGED REINF.
NOTE:
IF WALL IS RETAINING SOIL, CARE
MUST BE TAKEN NOT TO DAMAGE
WATER PROOFING BARRIER.
CONCRETE BEING PLACED
AT REPAIRED LOCATION
(E) REINF. TO REMAIN
(E) CONCRETE WALL. PRIOR TO PLACING
CONCRETE CLEAR ALL LOOSE MATERIAL.
IF LESS THAN 3"
REMAIN, THEN CONT.
CUT THROUGH ENTIRE
WALL/SLAB.
REINF. TO MATCH ORIGINAL
REINF. SIZE AND MATERIAL
PLACE NEXT TO (E) DAMAGED
REINF.
PER LAP
SPLICE DETAIL
PER LAP
SPLICE DETAIL_ _
M
IN
T Y P
1/
C L R
(E) FLOOR/WALL
(E) REINF. CONCRETE SLAB
CONC. BEING PLACED AT
REPAIRED LOCATION.
ROUGHEN ALL (E) EDGES
TO AN AMPLITUDE OF 1/4".
REINF. TO MATCH
ORIGINAL
REINF. SIZE AND MATERIAL.
PLACE NEXT TO (E)
DAMAGED REINF. & USE
TYP. LAP SPLICE.
LOCATION OF
REMOVED
(E) DAMAGED REINF.
(E) CONC. SLAB
REINFORCEMENT
AA
PLAN VIEW
SECTION A-A
CONC. BEING PLACED AT
REPAIRED LOCATION.
ROUGHEN ALL (E) EDGES TO
AN AMPLITUDE OF 1/4".
REINF. TO MATCH ORIGINAL REINF. SIZE
AND MATERIAL. PLACE NEXT TO (E)
DAMAGED REINF. & USE TYP. LAP SPLICE.
SPLICE DETAIL
PER TYP. LAP
SPLICE DETAIL
PER TYP. LAP
CLR., TYP.
1 1/2" MIN.
7415 N. PALM AVE. STE 100 | FRESNO, CA 93711
(559) 449-8444 OFFICE | (559) 449-8404 FAX
3-31-22
EXPIRES
No.S2386
L A
RUTC
U
R
T S
NOISSEFORP
AI
NROFILACFO
ET
AT
S
R E
E
NI
G
NE
LA
DE
R E T
SI
G
E R M
O S
NA
R.RDR
OL
Y
A G
VA FORM 08-6231
1, 32
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER. CONSULTANT ENGINEER OF RECORD
MILLER-REMICK LLC
PROFESSIONAL ENGINEER Office of
Management and Facilities Construction
Drawing Title
Approved: Project Director
Phase Project Title
Location
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
20529
NO. DESCRIPTION DATE
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
U.S. Department of Veterans Affairs
100% CONSTRUCTION DOCUMENTS
ISSUED FOR CONSTRUCTION
BROOKS RANSOM ASSOCIATES
PROFESSIONAL ENGINEER CONSULTANT
THE VERNAL GROUP
LICENSED ARCHITECT
The Vernal Group 554 E. Sussex Way Fresno, CA 93704
/2 /2
:4
:1
A M
00-SS101
TYPICAL STRUCTURAL ABBREVIATIONS, NOTES
AND SYMBOLS
AL BWY
REPLACE MECHANICAL SYSTEMS,
FRESNO, CALIFORNIA
570-19-307
BUILDING 1
12" = 1'-0"B9
DESIGN CRITERIA
12" = 1'-0"D7
ABBREVIATIONS
12" = 1'-0"D9
LEGENDS AND SYMBOLS
12" = 1'-0"F7
GENERAL PROJECT NOTES
12" = 1'-0"F4
"SHOT PIN" NOTES FOR HILTI X-U
12" = 1'-0"F2
SPECIAL INSPECTION FOR STEEL
12" = 1'-0"C2
SPECIAL INSPECTION FOR CONC.
12" = 1'-0"E4
SIMPSON TITEN HD IN CONC.
12" = 1'-0"E6
HILTI KWIK BOLT TZ IN CONC.
12" = 1'-0"D6
SIMPSON SET-XP EPOXY NOTES
1" = 1'-0"B6
EXISTING CONDITIONS NOTES
12" = 1'-0"F9
SAW CUTTING IN CONCRETE
12" = 1'-0"B4
(E) CONC. WALL/COLUMN REPAIR
12" = 1'-0"C4
(E) REINF. CONC. SLAB REPAIR
UP
DN
12 13 14
D1 D1
11.5 12.5 13.7
X.7
Z.3
A.5
B.5
C.3
Z.7
Y.7
A
B
C
10.A
X
Y
Z
(E) 20 I 65.4 (E) 20 I 65.4 (E) 20 I 65.4 (E) 20 I 65.4
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
T A
P E
R E
D G
IR
D
E R
(E
T A
P E
R E
D G
IR
D
E R
(E) W10X12 RIDGE BEAM
(E
W X
(E
W X
(E
W X
(E
W X
20'-8" 24'-0"
(E) W12X16
(E) W10X12 (E) W12X16 (E) W12X16
(E) W12X16(E) W10X12
(E) W10X12 (E) W12X16 (E) W12X16
(E) W12X16(E) W12X16(E) W10X12
(E) W10X12 (E) W12X16 (E) W12X16
(E) W12X16(E) W12X16(E) W10X12
(E) W10X12
(E) W10X12
(E) W10X12 (E) W12X16 (E) W12X16
(E) W12X16(E) W12X16(E) W10X12
(E) W10X12 (E) W12X16 (E) W12X16
(E
W
F
(E
W
F
(E) 21WF62
(E
W
F
(E
W
F
(E) 4" CONC. SLAB FLOOR W/ 1/2"
DIA. @ 10" O.C. TRANSVERSE
DIRECTION & 1/2" DIA. @ 12" O.C.
LONGITUDINAL DIRECTION
(E) 12WF120
(E) 12WF120 (E) 12WF92
(E) 12WF92
(E) 12WF99
(E) TS6x6x3/8 (E) TS6x6x3/8
(E) TS6x6x3/8
(E) TS6x6x3/8
(E) 1 1/2" X 18 GA. METAL DECK
LEDGER AT PERIMETER, TYP.
(E) 8 I 18.4
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF82(E) 21WF62
(E
W
F
(E
W
F
(E
W
F
(E) 8 I 18.4 (E) 8 I 18.4
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF62(E) 21WF73(E) 21WF62(E) 21WF62
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF68(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF73(E) 21WF62
(E
W
F
(E
W
F
(E) W12X16
(E) W12X16 (E) W12X16
(E) W12X16
(E) W12X16 RIDGE BEAM(E) W12X16 RIDGE BEAM
(E) 20 I 65.4(E) 20 I 65.4(E) 20 I 65.4(E) 20 I 65.4
(E) 12WF161(E) 12WF161
(E) 12WF161 (E) 12WF161 (E) 12WF161
(E) 12WF120
(E) 12WF161
(E) 12WF161(E) 12WF133(E) 12WF161
(E) 12WF120 (E) 12WF106
(E) 12WF120
(E) 12WF99
(E
R O
O F
B E
L O
W
D6F5
F5
AT THIRD
FLOOR
AT SIXTH
FLOOR
1/
(E) W8X10
(E
W X
0 TYPICAL
T Y
P
IC
A L
F1______
TEMPORARY DUCT. COORDINATE WITH
MECHANICAL FOR SIZE AND PHASE SEQUENCING
(E
R O
O F
B E
L O
W
C1
(E) L4X3X1/4
32-S-301.1
01-S-301.3
01-S-302.3
01-S-601.3
32-S-301.1
1. SEE TYPICAL SHEETS FOR ALL GENERAL AND MATERIAL NOTES, AND ALL TYPICAL SCHEDULES
AND DETAILS. THE INFORMATION ON THE TYPICAL SHEETS APPLY TO THE PROJECT AND ARE
NOT SPECIFICALLY REFERENCED ON PLAN WORK, UNLESS NOTED OTHERWISE. IF TYPICAL
DETAILS ARE SPECIFIED ON PLANS OR NOTES, THEY WILL BE REFERENCED WITH THE WORD
"TYPICAL" FOLLOWED BY BOLD AND UNDERLINED TEXT STATING THE TITLE OF THE TYPICAL
DETAIL OR NOTE.
2. ALL UNCLEAR AND/OR MISSING DETAILS SHALL BE BROUGHT TO THE STRUCTURAL ENGINEER'S
ATTENTION BEFORE PROCEEDING WITH CONSTRUCTION.
3. ALL TOP OF FRAMING ABOVE FINISH SLAB VARIES, SEE PLAN FOR INFORMATION.
4. BEAMS ARE EQUALLY SPACED BETWEEN MAIN BEAMS OR COLUMNS, U.N.O.
5. ALL ITEMS ARE NEW UNLESS NOTED OTHERWISE.
6. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING ANY PLANS AND CALCULATIONS FOR ANY
SHORING/TEMPORARY SCAFFOLDING. THESE PLANS AND CALCULATIONS WILL BE REVIEWED
BY THE VA.
STEEL STUDS. AT EXTERIOR WALL LOCATIONS, PROVIDE 600S162-54 @ 16"
O.C., U.N.O. SEE TYPICAL BEARING AND EXTERIOR WALL FRAMING AT
OPENINGS FOR LIGHT GAUGE STEEL DETAIL. AT INTERIOR WALL
LOCATIONS, SEE ARCHITECTURAL AND TYPICAL INTERIOR NON-BEARING
WALL FRAMING AT OPENINGS FOR LIGHT GAUGE STEEL DETAIL.
WALL BELOW. SEE FRAMING PLAN AT LEVEL BELOW.
"XX" COLUMN AS INDICATED ON PLAN.
TOP OF STEEL (T.O.S.) OR BOTTOM OF STEEL (B.O.S.). +X'-X" IS THE
DISTANCE FROM FINISHED FIRST FLOOR, UNLESS NOTED OTHERWISE.
STEEL BEAM.
(E) 2-MC13x50 STEEL BRACE FRAME.
BEAM BOTTOM FLANGE BRACING. ARROW POINTS TOWARDS BOTTOM
FLANGE OF BEAM BEING BRACED.
COLUMN DOES NOT EXTEND BEYOND FRAMING LEVEL BEING DEPICTED.
CONCRETE SLAB OPENING
CONCRETE SLAB. SEE PLAN
T.O.S.
+X'-X"
SIZE (STUDS)
CAMBER
1. ALL DUCTWORK DRAWINGS ARE SHOWN IN PHASES. SEQUENCE OF WORK IS SHOWN BELOW
AND SHOULD BE COORDINATED WITH MECHANICAL PLANS:
A. 32-S-301.1 B. 32-S-301.6 C. 1-S-301.3 D. 1-S-301.4 E. 1-S-301.6 F. 1-S-302.3 G. 1-S-302.4 H. 1-S-302.6 I. 1-S-601.3 J. 1-S-601.4 K. 1-S-601.6
11.5
C.3
5'-0" 5'-10"
4'-0"
1" 10"
1"
A A
(E) 12" CMU WALL PER PLAN
TEMPORARY DUCT PER PLAN. COORDINATE WITH
MECHANICAL FOR SIZE AND PHASE SEQUENCING.
W6x15 AT 5'-0" O.C. MAX VERTICAL. SEE VIEW A-A
FOR CMU WALL CONNECTION INFORMATION
NOTE:
1) ALL NEW EXPOSED STEEL TO BE HOT DIPPED GALVANIZED
SADDLE SUPPORT BRACKET PER DETAIL
/F1 01-S-601.3
W6x15 AT 5'-0" O.C. VERT. MAX
3/8" THICK STIFF. PLATE
1'-0"x1'-0" x 3/8" THICK STEEL PLATE
(E) CMU WALL PER PLAN
/2
/2
3/16
3 SIDES
TYP
1/4
1/4
VIEW A-A
(4) SIMPSON TITEN THD50400H
PROVIDE 1/2" MAX THICKNESS
COMPRESSIBLE NEOPRENE PLATE
WASHERS AS REQUIRED FOR LEVEL
FIT UP AGAINST TEXTURED CMU
T.O. WAREHOUSE PARAPET
26'-0"
11.5
18'-5 7/8"
/4
BUILT UP W BEAM WITH (4) A307 BOLTS THRU
W6x15 AND (4) SIMPSON TITEN THD50400H
ANCORED TO CMU WALL. SEE VIEW A-A
/2
/2
A A
(E) FLUTED CMU BLOCK AT TOP PORTION OF WALL.
ANCHOR TEMPORARY DUCT BELOW FLUTES
TEMPORARY DUCT. COORDINATE WITH
MECHANICAL FOR SIZE AND PHASE SEQUENCING
W6x15 AT 5'-0" O.C. MAX
NOTE:
1) ALL NEW EXPOSED STEEL TO BE HOT DIPPED GALVANIZED
/2
+/- 1'-6"
34'-8"
SADDLE SUPPORT BRACKET PER DETAIL
/F1 01-S-601.3
1'-0"
1 1/2"
1"
W6x15 PER PLAN
BUILT UP 'W' WITH 3/8" THICK STEEL
PLATES
1/4
1/4
(4) SIMPSON TITEN THD50400H
(4) 1/2" Φ A307 BOLTS
VIEW A-A
6"
PROVIDE 1/2" MAX THICKNESS
COMPRESSIBLE NEOPRENE PLATE
WASHERS AS REQUIRED FOR LEVEL
FIT UP AGAINST TEXTURED CMU
7415 N. PALM AVE. STE 100 | FRESNO, CA 93711
(559) 449-8444 OFFICE | (559) 449-8404 FAX
3-31-22
EXPIRES
No.S2386
L A
RUTC
U
R
T S
NOISSEFORP
AI
NROFILACFO
ET
AT
S
R E
E
NI
G
NE
LA
DE
R E T
SI
G
E R M
O S
NA
R.RDR
OL
Y
A G
VA FORM 08-6231
1, 32
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER. CONSULTANT ENGINEER OF RECORD
MILLER-REMICK LLC
PROFESSIONAL ENGINEER Office of
Management and Facilities Construction
Drawing Title
Approved: Project Director
Phase Project Title
Location
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
20529
NO. DESCRIPTION DATE
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
U.S. Department of Veterans Affairs
100% CONSTRUCTION DOCUMENTS
ISSUED FOR CONSTRUCTION
BROOKS RANSOM ASSOCIATES
PROFESSIONAL ENGINEER CONSULTANT
THE VERNAL GROUP
LICENSED ARCHITECT
The Vernal Group 554 E. Sussex Way Fresno, CA 93704
/2 /2
:4
:3
A M
32-S-301.1
PHASE 1 PARTIAL 3RD FLOOR AND WAREHOUSE
ROOF FRAMING PLANS
AL BWY
REPLACE MECHANICAL SYSTEMS,
FRESNO, CALIFORNIA
570-19-307
BUILDING 1
KEY PLAN
NORTH
1/8" = 1'-0"F3
PHASE 1 PARTIAL 3RD FLOOR & WAREHOUSE ROOF FRAMING PLANS
AREA OF WORK
12" = 1'-0"A9
STEEL FRAMING NOTES
1/4" = 1'-0"C9
STEEL LEGEND
12" = 1'-0"E9
SHEET PHASING NOTES
3/4" = 1'-0"C1
DETAIL
1" = 1'-0"F1
DETAIL
W6x15
BUILT UP W BEAM WITH
SIMPSON TITEN THD50400H
ANCORED TO CMU WALL. SEE
SIMILAR VIEW A-A
1/4
1/4
3 SIDES
(E) METAL DECK PER PLAN
(E) #7 CHORD BARS
12 13 14
D1 D1
11.5 12.5 13.7
X.7
Z.3
A.5
B.5
C.3
Z.7
Y.7
A
B
C
10.A
X
Y
Z
D6
(E) 20 I 65.4 (E) 20 I 65.4 (E) 20 I 65.4 (E) 20 I 65.4
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
T A
P E
R E
D G
IR
D
E R
(E
T A
P E
R E
D G
IR
D
E R
(E) W10X12 RIDGE BEAM
(E
W X
(E
W X
(E
W X
(E
W X
20'-8" 24'-0"
(E) W12X16
(E) W10X12 (E) W12X16 (E) W12X16
(E) W12X16(E) W10X12
(E) W10X12 (E) W12X16 (E) W12X16
(E) W12X16(E) W12X16(E) W10X12
(E) W10X12 (E) W12X16 (E) W12X16
(E) W12X16(E) W12X16(E) W10X12
(E) W10X12
(E) W10X12
(E) W10X12 (E) W12X16 (E) W12X16
(E) W12X16(E) W12X16(E) W10X12
(E) W10X12 (E) W12X16 (E) W12X16
(E
W
F
(E
W
F
(E) 21WF62
(E
W
F
(E
W
F
(E) 4" CONC. SLAB FLOOR W/ 1/2"
DIA. @ 10" O.C. TRANSVERSE
DIRECTION & 1/2" DIA. @ 12" O.C.
LONGITUDINAL DIRECTION
(E) 12WF120
(E) 12WF120 (E) 12WF92
(E) 12WF92
(E) 12WF99
(E) TS6x6x3/8 (E) TS6x6x3/8
(E) TS6x6x3/8
(E) TS6x6x3/8
(E) 1 1/2" X 18 GA. METAL DECK
LEDGER AT PERIMETER, TYP.
(E) 8 I 18.4
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF82(E) 21WF62
(E
W
F
(E
W
F
(E
W
F
(E) 8 I 18.4 (E) 8 I 18.4
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF62(E) 21WF73(E) 21WF62(E) 21WF62
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF68(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF73(E) 21WF62
(E
W
F
(E
W
F
(E) W12X16
(E) W12X16 (E) W12X16
(E) W12X16
(E) W12X16 RIDGE BEAM(E) W12X16 RIDGE BEAM
(E) 20 I 65.4(E) 20 I 65.4(E) 20 I 65.4(E) 20 I 65.4
(E) 12WF161(E) 12WF161
(E) 12WF161 (E) 12WF161 (E) 12WF161
(E) 12WF120
(E) 12WF161
(E) 12WF161(E) 12WF133(E) 12WF161
(E) 12WF120 (E) 12WF106
(E) 12WF120
(E) 12WF99
(E
R O
O F
B E
L O
W
F3
F3
AT THIRD
FLOOR
AT SIXTH
FLOOR
1/
(E) W8X10
(E
W X
0 TYPICAL
T Y
P
IC
A L
REMOVE TEMPORARY DUCT AND ITS SUPPORTS.
COORDINATE WITH MECHANICAL FOR SIZE AND
PHASE SEQUENCING
(E
R O
O F
B E
L O
W
(E) L4X3X1/4
F1______
32-S-301.6
C1
32-S-301.6
01-S-601.6
01-S-302.6
01-S-301.6
T.O. WAREHOUSE PARAPET
26'-0"
11.5
UPON REMOVAL OF TEMPORARY DUCT, CAREFULLY
UNSCREW SIMPSON TITENS AND FILL IN HOLES WITH NON-
SHRINK GROUT. MATCH COLOR OF CMU WALL
(E) METAL DECK PER PLAN
(E) FLUTED CMU BLOCK AT TOP PORTION OF WALL.
REMOVE TEMPORARY DUCT AND ITS
SUPPORTS. COORDINATE WITH MECHANICAL
FOR SIZE AND PHASE SEQUENCING
(E) #7 CHORD BARS
11.5
C.3
(E) 12" CMU WALL PER PLAN
REMOVE TEMPORARY DUCT AND ITS SUPPORTS.
COORDINATE WITH MECHANICAL FOR SIZE AND PHASE
SEQUENCING.
UPON REMOVAL OF TEMPORARY DUCT,
CAREFULLY UNSCREW SIMPSON TITENS AND
FILL IN HOLES WITH NON-SHRINK GROUT.
MATCH COLOR OF CMU WALL
STEEL STUDS. AT EXTERIOR WALL LOCATIONS, PROVIDE 600S162-54 @ 16"
O.C., U.N.O. SEE TYPICAL BEARING AND EXTERIOR WALL FRAMING AT
OPENINGS FOR LIGHT GAUGE STEEL DETAIL. AT INTERIOR WALL
LOCATIONS, SEE ARCHITECTURAL AND TYPICAL INTERIOR NON-BEARING
WALL FRAMING AT OPENINGS FOR LIGHT GAUGE STEEL DETAIL.
WALL BELOW. SEE FRAMING PLAN AT LEVEL BELOW.
"XX" COLUMN AS INDICATED ON PLAN.
TOP OF STEEL (T.O.S.) OR BOTTOM OF STEEL (B.O.S.). +X'-X" IS THE
DISTANCE FROM FINISHED FIRST FLOOR, UNLESS NOTED OTHERWISE.
STEEL BEAM.
(E) 2-MC13x50 STEEL BRACE FRAME.
BEAM BOTTOM FLANGE BRACING. ARROW POINTS TOWARDS BOTTOM
FLANGE OF BEAM BEING BRACED.
COLUMN DOES NOT EXTEND BEYOND FRAMING LEVEL BEING DEPICTED.
CONCRETE SLAB OPENING
CONCRETE SLAB. SEE PLAN
T.O.S.
+X'-X"
SIZE (STUDS)
CAMBER
1. SEE TYPICAL SHEETS FOR ALL GENERAL AND MATERIAL NOTES, AND ALL TYPICAL SCHEDULES
AND DETAILS. THE INFORMATION ON THE TYPICAL SHEETS APPLY TO THE PROJECT AND ARE
NOT SPECIFICALLY REFERENCED ON PLAN WORK, UNLESS NOTED OTHERWISE. IF TYPICAL
DETAILS ARE SPECIFIED ON PLANS OR NOTES, THEY WILL BE REFERENCED WITH THE WORD
"TYPICAL" FOLLOWED BY BOLD AND UNDERLINED TEXT STATING THE TITLE OF THE TYPICAL
DETAIL OR NOTE.
2. ALL UNCLEAR AND/OR MISSING DETAILS SHALL BE BROUGHT TO THE STRUCTURAL ENGINEER'S
ATTENTION BEFORE PROCEEDING WITH CONSTRUCTION.
3. ALL TOP OF FRAMING ABOVE FINISH SLAB VARIES, SEE PLAN FOR INFORMATION.
4. BEAMS ARE EQUALLY SPACED BETWEEN MAIN BEAMS OR COLUMNS, U.N.O.
5. ALL ITEMS ARE NEW UNLESS NOTED OTHERWISE.
6. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING ANY PLANS AND CALCULATIONS FOR ANY
SHORING/TEMPORARY SCAFFOLDING. THESE PLANS AND CALCULATIONS WILL BE REVIEWED
BY THE VA.
1. ALL DUCTWORK DRAWINGS ARE SHOWN IN PHASES. SEQUENCE OF WORK IS SHOWN BELOW
AND SHOULD BE COORDINATED WITH MECHANICAL PLANS:
A. 32-S-301.1 B. 32-S-301.6 C. 1-S-301.3 D. 1-S-301.4 E. 1-S-301.6 F. 1-S-302.3 G. 1-S-302.4 H. 1-S-302.6 I. 1-S-601.3 J. 1-S-601.4 K. 1-S-601.6
7415 N. PALM AVE. STE 100 | FRESNO, CA 93711
(559) 449-8444 OFFICE | (559) 449-8404 FAX
3-31-22
EXPIRES
No.S2386
L A
RUTC
U
R
T S
NOISSEFORP
AI
NROFILACFO
ET
AT
S
R E
E
NI
G
NE
LA
DE
R E T
SI
G
E R M
O S
NA
R.RDR
OL
Y
A G
VA FORM 08-6231
1, 32
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER. CONSULTANT ENGINEER OF RECORD
MILLER-REMICK LLC
PROFESSIONAL ENGINEER Office of
Management and Facilities Construction
Drawing Title
Approved: Project Director
Phase Project Title
Location
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
20529
NO. DESCRIPTION DATE
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
U.S. Department of Veterans Affairs
100% CONSTRUCTION DOCUMENTS
ISSUED FOR CONSTRUCTION
BROOKS RANSOM ASSOCIATES
PROFESSIONAL ENGINEER CONSULTANT
THE VERNAL GROUP
LICENSED ARCHITECT
The Vernal Group 554 E. Sussex Way Fresno, CA 93704
/2 /2
:4
:3
A M
32-S-301.6
PHASE 6 PARTIAL 3RD FLOOR AND WAREHOUSE
ROOF DEMOLITION PLANS
AL BWY
REPLACE MECHANICAL SYSTEMS,
FRESNO, CALIFORNIA
570-19-307
BUILDING 1
KEY PLAN
NORTH
AREA OF WORK
1/8" = 1'-0"F3
PHASE 6 PARTIAL 3RD FLOOR & WAREHOUSE ROOF DEMOLITION PLANS
1" = 1'-0"F1
DETAIL
3/4" = 1'-0"C1
DETAIL
1/4" = 1'-0"C9
STEEL LEGEND
12" = 1'-0"A9
STEEL FRAMING NOTES
12" = 1'-0"E9
SHEET PHASING NOTES
UP
DN
A
B
C
10.A
D6
(E) 4" CONC. SLAB FLOOR W/ 1/2"
DIA. @ 10" O.C. TRANSVERSE
DIRECTION & 1/2" DIA. @ 12" O.C.
LONGITUDINAL DIRECTION
(E) 21WF62(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF68(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 20 I 65.4(E) 20 I 65.4
(E) 12WF161 (E) 12WF161
(E) 12WF120
(E) 12WF161
(E) 12WF161(E) 12WF133
(E) 12WF106
(E) 12WF120 (E) 12WF99
(N) TEMPORARY DUCT COORDINATE WITH
MECHANICAL FOR SIZE AND PHASE SEQUENCING
(E) 18WF64
1'-5" 2'-1" 5'-0" 5'-0" 4'-0" 4'-11"
D3______
W6x15 AT 5'-0" O.C. MAX
F7
D1______
01-S-601.3 01-S-601.3 01-S-601.3
01-S-601.3
7'-5"
A8
L6x4x3/8
01-S-301.3
A7______
01-S-301.3
C.3
A
B
C
10.A
(E) 4" CONC. SLAB FLOOR W/ 1/2"
DIA. @ 10" O.C. TRANSVERSE
DIRECTION & 1/2" DIA. @ 12" O.C.
LONGITUDINAL DIRECTION
(E) 21WF62(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF68(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 20 I 65.4(E) 20 I 65.4
(E) 12WF161 (E) 12WF161
(E) 12WF120
(E) 12WF161
(E) 12WF161(E) 12WF133
(E) 12WF106
(E) 12WF120
(E) 12WF99
(N) TEMPORARY DUCT COORDINATE WITH
MECHANICAL FOR SIZE AND PHASE SEQUENCING.
REMOVE (2) WINDOWS
COORDINATE WITH MECHANICAL
STEEL STUDS. AT EXTERIOR WALL LOCATIONS, PROVIDE 600S162-54 @ 16"
O.C., U.N.O. SEE TYPICAL BEARING AND EXTERIOR WALL FRAMING AT
OPENINGS FOR LIGHT GAUGE STEEL DETAIL. AT INTERIOR WALL
LOCATIONS, SEE ARCHITECTURAL AND TYPICAL INTERIOR NON-BEARING
WALL FRAMING AT OPENINGS FOR LIGHT GAUGE STEEL DETAIL.
WALL BELOW. SEE FRAMING PLAN AT LEVEL BELOW.
"XX" COLUMN AS INDICATED ON PLAN.
TOP OF STEEL (T.O.S.) OR BOTTOM OF STEEL (B.O.S.). +X'-X" IS THE
DISTANCE FROM FINISHED FIRST FLOOR, UNLESS NOTED OTHERWISE.
STEEL BEAM.
(E) 2-MC13x50 STEEL BRACE FRAME.
BEAM BOTTOM FLANGE BRACING. ARROW POINTS TOWARDS BOTTOM
FLANGE OF BEAM BEING BRACED.
COLUMN DOES NOT EXTEND BEYOND FRAMING LEVEL BEING DEPICTED.
CONCRETE SLAB OPENING
CONCRETE SLAB. SEE PLAN
T.O.S.
+X'-X"
SIZE (STUDS)
CAMBER
1. SEE TYPICAL SHEETS FOR ALL GENERAL AND MATERIAL NOTES, AND ALL TYPICAL SCHEDULES
AND DETAILS. THE INFORMATION ON THE TYPICAL SHEETS APPLY TO THE PROJECT AND ARE
NOT SPECIFICALLY REFERENCED ON PLAN WORK, UNLESS NOTED OTHERWISE. IF TYPICAL
DETAILS ARE SPECIFIED ON PLANS OR NOTES, THEY WILL BE REFERENCED WITH THE WORD
"TYPICAL" FOLLOWED BY BOLD AND UNDERLINED TEXT STATING THE TITLE OF THE TYPICAL
DETAIL OR NOTE.
2. ALL UNCLEAR AND/OR MISSING DETAILS SHALL BE BROUGHT TO THE STRUCTURAL ENGINEER'S
ATTENTION BEFORE PROCEEDING WITH CONSTRUCTION.
3. ALL TOP OF FRAMING ABOVE FINISH SLAB VARIES, SEE PLAN FOR INFORMATION.
4. BEAMS ARE EQUALLY SPACED BETWEEN MAIN BEAMS OR COLUMNS, U.N.O.
5. ALL ITEMS ARE NEW UNLESS NOTED OTHERWISE.
6. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING ANY PLANS AND CALCULATIONS FOR ANY
SHORING/TEMPORARY SCAFFOLDING. THESE PLANS AND CALCULATIONS WILL BE REVIEWED
BY THE VA.
1. ALL DUCTWORK DRAWINGS ARE SHOWN IN PHASES. SEQUENCE OF WORK IS SHOWN BELOW
AND SHOULD BE COORDINATED WITH MECHANICAL PLANS:
A. 32-S-301.1 B. 32-S-301.6 C. 1-S-301.3 D. 1-S-301.4 E. 1-S-301.6 F. 1-S-302.3 G. 1-S-302.4 H. 1-S-302.6 I. 1-S-601.3 J. 1-S-601.4 K. 1-S-601.6
1 3/16" 1 3/16"
GAP
1/2"
W6x15 PER PLAN
L6x4x3/8 PER PLAN WITH
(2) 1/2"Φ BOLTS AT EA. END
1 3/8" 1 3/8"
1/2"
ANGLE PER PLAN
L3x3x1/4 PER PLAN WITH
1/2"Φ BOLT EA. END
3/8" THK. SKEWED TAB PLATE
1/4
7415 N. PALM AVE. STE 100 | FRESNO, CA 93711
(559) 449-8444 OFFICE | (559) 449-8404 FAX
3-31-22
EXPIRES
No.S2386
L A
RUTC
U
R
T S
NOISSEFORP
AI
NROFILACFO
ET
AT
S
R E
E
NI
G
NE
LA
DE
R E T
SI
G
E R M
O S
NA
R.RDR
OL
Y
A G
VA FORM 08-6231
1, 32
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER. CONSULTANT ENGINEER OF RECORD
MILLER-REMICK LLC
PROFESSIONAL ENGINEER Office of
Management and Facilities Construction
Drawing Title
Approved: Project Director
Phase Project Title
Location
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
20529
NO. DESCRIPTION DATE
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
U.S. Department of Veterans Affairs
100% CONSTRUCTION DOCUMENTS
ISSUED FOR CONSTRUCTION
BROOKS RANSOM ASSOCIATES
PROFESSIONAL ENGINEER CONSULTANT
THE VERNAL GROUP
LICENSED ARCHITECT
The Vernal Group 554 E. Sussex Way Fresno, CA 93704
/2 /2
:4
:1
A M
01-S-301.3
PHASE 3 PARTIAL 3RD FLOOR FRAMING
DEMOLITION AND NEW WORK
AL BWY
REPLACE MECHANICAL SYSTEMS,
FRESNO, CALIFORNIA
570-19-307
BUILDING 1
3/16" = 1'-0"F5
PHASE 3 PARTIAL 3RD FLOOR FRAMING PLAN
KEY PLAN
NORTH
AREA OF WORK
3/16" = 1'-0"F1
PHASE 3 PARTIAL 3RD FLOOR FRAMING PLAN DEMOLITION
1/4" = 1'-0"C9
STEEL LEGEND
12" = 1'-0"A9
STEEL FRAMING NOTES
12" = 1'-0"E9
SHEET PHASING NOTES
1" = 1'-0"A8
DETAIL
1" = 1'-0"A7
DETAIL
UP
DN
A
B
C
10.A
(E) 4" CONC. SLAB FLOOR W/ 1/2"
DIA. @ 10" O.C. TRANSVERSE
DIRECTION & 1/2" DIA. @ 12" O.C.
LONGITUDINAL DIRECTION
(E) 21WF62(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF68(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 20 I 65.4(E) 20 I 65.4
(E) 12WF161 (E) 12WF161
(E) 12WF120
(E) 12WF161
(E) 12WF161(E) 12WF133
(E) 12WF106
(E) 12WF120
(E) 12WF99
TEMPORARY DUCT INSTALLED IN PREVIOUS
PHASE
(E
W
F
(N) 4" CONCRETE CURB PER
MECHANICAL
4"AHU-9 INLET
(8,400#)
A H
U -9
D
IS
C H
(2 ,0
E9______
F9______
B7______
21'-0" 21'-0"
(E
S T
E E
L T
R U
S S
9"x12" x 1" THICK BASE PLATES. SEE
DETAIL ./F9 01-S-601.4
01-S-601.4
01-S-601.4
01-S-601.4
E7______ 01-S-601.4
A
B
C
10.A
(E) 4" CONC. SLAB FLOOR W/ 1/2"
DIA. @ 10" O.C. TRANSVERSE
DIRECTION & 1/2" DIA. @ 12" O.C.
LONGITUDINAL DIRECTION
(E) 21WF62(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF68(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 20 I 65.4(E) 20 I 65.4
(E) 12WF161 (E) 12WF161
(E) 12WF120
(E) 12WF161
(E) 12WF161(E) 12WF133
(E) 12WF106 (E) 12WF120
(E) 12WF99
(E) T6
(E) T6
TEMPORARY DUCT INSTALLED IN PREVIOUS
PHASE
REMOVE (E) CONCRETE CURBS FLUSH
WITH CONCRETE SLAB
6" 1'-4" 3'-0"
21'-0" 21'-0"
1. ALL DUCTWORK DRAWINGS ARE SHOWN IN PHASES. SEQUENCE OF WORK IS SHOWN BELOW
AND SHOULD BE COORDINATED WITH MECHANICAL PLANS:
A. 32-S-301.1 B. 32-S-301.6 C. 1-S-301.3 D. 1-S-301.4 E. 1-S-301.6 F. 1-S-302.3 G. 1-S-302.4 H. 1-S-302.6 I. 1-S-601.3 J. 1-S-601.4 K. 1-S-601.6
1. SEE TYPICAL SHEETS FOR ALL GENERAL AND MATERIAL NOTES, AND ALL TYPICAL SCHEDULES
AND DETAILS. THE INFORMATION ON THE TYPICAL SHEETS APPLY TO THE PROJECT AND ARE
NOT SPECIFICALLY REFERENCED ON PLAN WORK, UNLESS NOTED OTHERWISE. IF TYPICAL
DETAILS ARE SPECIFIED ON PLANS OR NOTES, THEY WILL BE REFERENCED WITH THE WORD
"TYPICAL" FOLLOWED BY BOLD AND UNDERLINED TEXT STATING THE TITLE OF THE TYPICAL
DETAIL OR NOTE.
2. ALL UNCLEAR AND/OR MISSING DETAILS SHALL BE BROUGHT TO THE STRUCTURAL ENGINEER'S
ATTENTION BEFORE PROCEEDING WITH CONSTRUCTION.
3. ALL TOP OF FRAMING ABOVE FINISH SLAB VARIES, SEE PLAN FOR INFORMATION.
4. BEAMS ARE EQUALLY SPACED BETWEEN MAIN BEAMS OR COLUMNS, U.N.O.
5. ALL ITEMS ARE NEW UNLESS NOTED OTHERWISE.
6. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING ANY PLANS AND CALCULATIONS FOR ANY
SHORING/TEMPORARY SCAFFOLDING. THESE PLANS AND CALCULATIONS WILL BE REVIEWED
BY THE VA.
STEEL STUDS. AT EXTERIOR WALL LOCATIONS, PROVIDE 600S162-54 @ 16"
O.C., U.N.O. SEE TYPICAL BEARING AND EXTERIOR WALL FRAMING AT
OPENINGS FOR LIGHT GAUGE STEEL DETAIL. AT INTERIOR WALL
LOCATIONS, SEE ARCHITECTURAL AND TYPICAL INTERIOR NON-BEARING
WALL FRAMING AT OPENINGS FOR LIGHT GAUGE STEEL DETAIL.
WALL BELOW. SEE FRAMING PLAN AT LEVEL BELOW.
"XX" COLUMN AS INDICATED ON PLAN.
TOP OF STEEL (T.O.S.) OR BOTTOM OF STEEL (B.O.S.). +X'-X" IS THE
DISTANCE FROM FINISHED FIRST FLOOR, UNLESS NOTED OTHERWISE.
STEEL BEAM.
(E) 2-MC13x50 STEEL BRACE FRAME.
BEAM BOTTOM FLANGE BRACING. ARROW POINTS TOWARDS BOTTOM
FLANGE OF BEAM BEING BRACED.
COLUMN DOES NOT EXTEND BEYOND FRAMING LEVEL BEING DEPICTED.
CONCRETE SLAB OPENING
CONCRETE SLAB. SEE PLAN
T.O.S.
+X'-X"
SIZE (STUDS)
CAMBER
7415 N. PALM AVE. STE 100 | FRESNO, CA 93711
(559) 449-8444 OFFICE | (559) 449-8404 FAX
3-31-22
EXPIRES
No.S2386
L A
RUTC
U
R
T S
NOISSEFORP
AI
NROFILACFO
ET
AT
S
R E
E
NI
G
NE
LA
DE
R E T
SI
G
E R M
O S
NA
R.RDR
OL
Y
A G
VA FORM 08-6231
1, 32
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER. CONSULTANT ENGINEER OF RECORD
MILLER-REMICK LLC
PROFESSIONAL ENGINEER Office of
Management and Facilities Construction
Drawing Title
Approved: Project Director
Phase Project Title
Location
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
20529
NO. DESCRIPTION DATE
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
U.S. Department of Veterans Affairs
100% CONSTRUCTION DOCUMENTS
ISSUED FOR CONSTRUCTION
BROOKS RANSOM ASSOCIATES
PROFESSIONAL ENGINEER CONSULTANT
THE VERNAL GROUP
LICENSED ARCHITECT
The Vernal Group 554 E. Sussex Way Fresno, CA 93704
/2 /2
:4
:2
A M
01-S-301.4
PHASE 4 PARTIAL 3RD FLOOR FRAMING
DEMOLITION AND NEW WORK
AL BWY
REPLACE MECHANICAL SYSTEMS,
FRESNO, CALIFORNIA
570-19-307
BUILDING 1
3/16" = 1'-0"F5
PHASE 4 PARTIAL 3RD FLOOR FRAMING PLAN
3/16" = 1'-0"F1
PHASE 4 PARTIAL 3RD FLOOR FRAMING PLAN DEMOLITION
KEY PLAN
NORTH
AREA OF WORK
12" = 1'-0"E9
SHEET PHASING NOTES
12" = 1'-0"A9
STEEL FRAMING NOTES
1/4" = 1'-0"C9
STEEL LEGEND
A
B
C
10.A
(E) 4" CONC. SLAB FLOOR W/ 1/2"
DIA. @ 10" O.C. TRANSVERSE
DIRECTION & 1/2" DIA. @ 12" O.C.
LONGITUDINAL DIRECTION
(E) 21WF62(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF68(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 20 I 65.4(E) 20 I 65.4
(E) 12WF161 (E) 12WF161
(E) 12WF120
(E) 12WF161
(E) 12WF161(E) 12WF133
(E) 12WF106
(E) 12WF120
(E) 12WF99
REMOVE TEMPORARY DUCT AND IT'S SUPPORTS
(E
W
F
(E) 18WF64
D6
D3______
AHU-9 INLET
(8,400#)
A H
U -9
D
IS
C H
(2 ,0
01-S-601.6 01-S-601.6
STEEL STUDS. AT EXTERIOR WALL LOCATIONS, PROVIDE 600S162-54 @ 16"
O.C., U.N.O. SEE TYPICAL BEARING AND EXTERIOR WALL FRAMING AT
OPENINGS FOR LIGHT GAUGE STEEL DETAIL. AT INTERIOR WALL
LOCATIONS, SEE ARCHITECTURAL AND TYPICAL INTERIOR NON-BEARING
WALL FRAMING AT OPENINGS FOR LIGHT GAUGE STEEL DETAIL.
WALL BELOW. SEE FRAMING PLAN AT LEVEL BELOW.
"XX" COLUMN AS INDICATED ON PLAN.
TOP OF STEEL (T.O.S.) OR BOTTOM OF STEEL (B.O.S.). +X'-X" IS THE
DISTANCE FROM FINISHED FIRST FLOOR, UNLESS NOTED OTHERWISE.
STEEL BEAM.
(E) 2-MC13x50 STEEL BRACE FRAME.
BEAM BOTTOM FLANGE BRACING. ARROW POINTS TOWARDS BOTTOM
FLANGE OF BEAM BEING BRACED.
COLUMN DOES NOT EXTEND BEYOND FRAMING LEVEL BEING DEPICTED.
CONCRETE SLAB OPENING
CONCRETE SLAB. SEE PLAN
T.O.S.
+X'-X"
SIZE (STUDS)
CAMBER
1. ALL DUCTWORK DRAWINGS ARE SHOWN IN PHASES. SEQUENCE OF WORK IS SHOWN BELOW
AND SHOULD BE COORDINATED WITH MECHANICAL PLANS:
A. 32-S-301.1 B. 32-S-301.6 C. 1-S-301.3 D. 1-S-301.4 E. 1-S-301.6 F. 1-S-302.3 G. 1-S-302.4 H. 1-S-302.6 I. 1-S-601.3 J. 1-S-601.4 K. 1-S-601.6
1. SEE TYPICAL SHEETS FOR ALL GENERAL AND MATERIAL NOTES, AND ALL TYPICAL SCHEDULES
AND DETAILS. THE INFORMATION ON THE TYPICAL SHEETS APPLY TO THE PROJECT AND ARE
NOT SPECIFICALLY REFERENCED ON PLAN WORK, UNLESS NOTED OTHERWISE. IF TYPICAL
DETAILS ARE SPECIFIED ON PLANS OR NOTES, THEY WILL BE REFERENCED WITH THE WORD
"TYPICAL" FOLLOWED BY BOLD AND UNDERLINED TEXT STATING THE TITLE OF THE TYPICAL
DETAIL OR NOTE.
2. ALL UNCLEAR AND/OR MISSING DETAILS SHALL BE BROUGHT TO THE STRUCTURAL ENGINEER'S
ATTENTION BEFORE PROCEEDING WITH CONSTRUCTION.
3. ALL TOP OF FRAMING ABOVE FINISH SLAB VARIES, SEE PLAN FOR INFORMATION.
4. BEAMS ARE EQUALLY SPACED BETWEEN MAIN BEAMS OR COLUMNS, U.N.O.
5. ALL ITEMS ARE NEW UNLESS NOTED OTHERWISE.
6. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING ANY PLANS AND CALCULATIONS FOR ANY
SHORING/TEMPORARY SCAFFOLDING. THESE PLANS AND CALCULATIONS WILL BE REVIEWED
BY THE VA.
7415 N. PALM AVE. STE 100 | FRESNO, CA 93711
(559) 449-8444 OFFICE | (559) 449-8404 FAX
3-31-22
EXPIRES
No.S2386
L A
RUTC
U
R
T S
NOISSEFORP
AI
NROFILACFO
ET
AT
S
R E
E
NI
G
NE
LA
DE
R E T
SI
G
E R M
O S
NA
R.RDR
OL
Y
A G
VA FORM 08-6231
1, 32
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER. CONSULTANT ENGINEER OF RECORD
MILLER-REMICK LLC
PROFESSIONAL ENGINEER Office of
Management and Facilities Construction
Drawing Title
Approved: Project Director
Phase Project Title
Location
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
20529
NO. DESCRIPTION DATE
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h ts i n c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
U.S. Department of Veterans Affairs
100% CONSTRUCTION DOCUMENTS
ISSUED FOR CONSTRUCTION
BROOKS RANSOM ASSOCIATES
PROFESSIONAL ENGINEER CONSULTANT
THE VERNAL GROUP
LICENSED ARCHITECT
The Vernal Group 554 E. Sussex Way Fresno, CA 93704
/2 /2
:4
:2
A M
01-S-301.6
PHASE 6 PARTIAL 3RD FLOOR FRAMING
DEMOLITION PLAN
AL BWY
REPLACE MECHANICAL SYSTEMS,
FRESNO, CALIFORNIA
570-19-307
BUILDING 1
KEY PLAN
NORTH
3/16" = 1'-0"F3
PHASE 6 PARTIAL 3RD FLOOR FRAMING PLAN DEMOLITION
1/4" = 1'-0"C9
STEEL LEGEND
12" = 1'-0"E9
SHEET PHASING NOTES
12" = 1'-0"A9
STEEL FRAMING NOTES
DN.
UP
DN.
10 119
A
B
C
10.A
D6
(E) 12WF50
(E) 12WF50 (E) 12WF53 (E) 12WF53
(E) 12WF53
(E) 12WF58
(E) 12WF72
(E) 12WF58
(E) 12WF58
(E
W
F
(E
W
F
(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E) 20 I 65.4 (E) 20 I 75 (E) 20 I 75
(E
W
F
(E) 12WF27
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF68
(E) 18WF64
(E
W
F
(E
W
F
(E
I
.9
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF73(E) 21WF62 (E) 21WF62
(E
W
F
(E
W
F
(E
W
F
(E
W
F 6(E) 8 I 18.4(E) 8 I 18.4
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(N) TEMPORARY DUCT COORDINATE WITH
MECHANICAL FOR SIZE AND PHASE SEQUENCING.
(E) 4" CONC. SLAB FLOOR W/ 1/2"
DIA. @ 10" O.C. TRANSVERSE
DIRECTION & 1/2" DIA. @ 12" O.C.
LONGITUDINAL DIRECTION
F3______
1'-11" 3'-1" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 4'-0"
1'-4" 2'-1"
W6x15 AT 5'-0" O.C. MAX
STACKED W8x28. SEE SIM
DETAIL .. ./F3 01-S-601.3
F7
01-S-601.3
01-S-601.3
01-S-601.3
10 119
A
B
C
10.A
(E) 12WF50
(E) 12WF50
(E) 12WF53
(E) 12WF53
(E) 12WF53
(E) 12WF58
(E) 12WF72
(E) 12WF58
(E) 12WF58
(E
W
F
(E
W
F
(E) 21WF73
(E
W
F
(E
W
F
(E
W
F
(E) 20 I 65.4 (E) 20 I 75 (E) 20 I 75
(E
W
F
(E) 12WF27
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF68
(E) 18WF64
(E
W
F
(E
W
F
(E
I
.9
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(E) 21WF73(E) 21WF62 (E) 21WF62
(E
W
F
(E
W
F
(E
W
F
(E
W
F 6(E) 8 I 18.4(E) 8 I 18.4
(E
W
F
(E
W
F
(E
W
F
(E
W
F
(N) TEMPORARY DUCT COORDINATE WITH
MECHANICAL FOR SIZE AND PHASE SEQUENCING.
REMOVE (E) INTAKE LOUVER.
COORDINATE WITH MECHANICAL
(E) 4" CONC. SLAB FLOOR W/ 1/2"
DIA. @ 10" O.C. TRANSVERSE
DIRECTION &…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .